19
“PMI” is a registered trade and service mark of the Project Management Institute, Inc. ©2012 Permission is granted to PMI for PMI® Marketplace use only. Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

  • Upload
    others

  • View
    8

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

“PMI” is a registered trade and service mark of the Project Management Institute, Inc.

©2012 Permission is granted to PMI for PMI® Marketplace use only.

Improving Outcomes Through

Change Management: Integrating

Tools to the PM Lifecycle

Jeralyn Rittenhouse, PMP

Page 2: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

2

Change Managers vs. Program

Managers

• Organization specific

• Often interact/ have a reporting interrelationship

• HR vs. PM

• Most commonly CMs are the PgM equivalent

Page 3: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

3

Antibiotics will eventually not work

http://www.ted.com/talks/ramanan_laxminarayan_the_coming_crisis_in_antibiotics

Page 4: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

4

Antibiotics will eventually not work

http://www.ted.com/talks/ramanan_laxminarayan_the_coming_crisis_in_antibiotics

Page 5: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

5

Change resistance and antibiotics

Reactions?

http://www.ted.com/talks/ramanan_laxminarayan_the_coming_crisis_in_antibiotics

Page 6: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

6

Reasons to resist

• Dislike

• Uncertainty/ lack of clarity

• Negative effects on

interests

• Attachments

• Breach of psychological

contract

• Timing/excessive change

• Believes change is

inappropriate

• Experience of previous

change/ how was

managed

Page 7: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

7

Change Management as a practice

• Key assumptions:

– People generally don’t like change

– A lot of work is involved

– The more you can organize the work the more results

you’ll see

– Because people are also generally predictable, you

can create “template” approaches to managing

change

Change management and project / program management interact and can

mutually benefit one another

Page 8: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

8

Change Management tools

• “Ten Commandments”

– Kanter, Stein and Jick (1992)

• “Ten Keys”

– Pendlebury, Grouard, and Meston

(1998)

• “12 Action Steps”

– Nadler (1998)

• “Transformation Trajectory”

– Taffinder (1998)

• “Nine-Phase Change Process

Model”

– Anderson and Anderson (2001)

• “Step-by-Step Change Model”

– Kirkpatrick (2001)

• 12-Step Framework

– Mento, Jones and Dimdorfer (2002)

• “RAND’s Six Steps”

– Light (2005)

• “Integrated Model”

– Lepplit (2006)

• ….

Page 9: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

9

Integrating tools to the PM lifecycle

• Readiness assessments

– Ideally at the portfolio level

• If this doesn’t exist, the program and project level

• Mapping Stakeholder perspectives

• “Restraining” and “driving” forces

Focusing Change Management Where it Counts, PMI 2014

Page 10: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

10

The Four Frame Model

“Organizations are filled with people who have their own

interpretations of what is and what should be happening.

Each version contains a glimmer of truth, but each is a

product of the prejudices and blind spots of its maker”

– Lee Bolman and Terry Deal (2003)

Page 11: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

11

The Four Frame Model

• Stakeholder perspectives or “frames” assessment

• Ask the stakeholders to describe their organization as a

simile

• Map their interpretation to a frame

• Impacts: resistance planning, expectation

management, and resourcing

Page 12: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

12

The Four Frame Model

Page 13: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

1313

The Force Field Analysis

Page 14: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

14

The Force Field Analysis

Page 15: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

15

Six Methods to Manage Resistance

(Kotter and Schlesinger)• Education and Communication – investing heavily in informing people on

the rationale for change (when resistance appears as a result of lack of or

misinformation)

• Participation and Involvement – bringing stakeholders into the change

process more as active participants (when resistance appears to be a

result of being excluded from the process)

• Facilitation and Support – staffing up on emotional and physical/technical

support to aid in the execution of the change (when anxiety or uncertainty

surfaces as reaction to the change)

Page 16: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

16

Six Methods to Manage Resistance

(Kotter and Schlesinger)• Negotiation and Agreement – Incentivising adoption of the change

– particularly helpful when resistant stakeholders are well positioned to

undermine and cause serious issues if their needs are not met

• Manipulation – intentionally limiting information to some stakeholders,

helping with stakeholder buy-in by giving them key roles in the change

process

– often used when the other methods are deemed too time or resourcing

consumptive for the change team

• Explicit and Implicit Coercion – threats of undesirable consequences to

the resistors

– high stakes situations, such as the survival of the organization is in

question if a particular change is not adopted

Page 17: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

1717

The Force Field Analysis

Page 18: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

18

Closing

• Change is a function of a project / program

• Proactive planning will reduce risk

• Integrate to anticipate

Page 19: Improving Outcomes Through Change Management: Integrating ...€¦ · Improving Outcomes Through Change Management: Integrating Tools to the PM Lifecycle Jeralyn Rittenhouse, PMP

19

Contact Information

Jeralyn Rittenhouse

[email protected]

+1 808 777 8071

Linkedin.com/jeralynrittenhouse