McConnell Park Community Meeting #2 Improvements to January 25, 2018 Boston Parks and Recreation

Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

McConnell Park Community Meeting #2

Improvements to

January 25, 2018Boston Parks and Recreation

Page 2: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

PROJECT TEAMCathy Baker-EclipseProject [email protected] or 617-961-3058

Marchelle Jacques-YardeOutreach Coordinator, External [email protected] or 617-961-3006

Cheri Ruane, RLAPractice Leader, Weston & Sampson Design Studio

Jeanne Lukenda, RLASenior Project Manager, Weston & Sampson Design Studio

Elise BluellLandscape Designer, Weston & Sampson Design Studio

Dave CotterOffice of Neighborhood Services for McConnell [email protected] or 617-635-4819

Page 3: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

1

AGENDA

WELCOMING REMARKS

PROJECT OVERVIEW & SCHEDULE2

COMMUNITY MEETING #1 REVIEW – WHAT WE HEARD3

EXISTING CONDITIONS4

PROPOSED CONCEPT PLANS5

PRECEDENT IMAGERY 6

LISTENING & DISCUSSION7

Page 4: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

BUILDING A NEW PARK TOGETHER

Page 5: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

PROJECT SCHEDULE & FUNDING

MAY 2017Community Meeting 1

JANUARY 2018Community Meeting 2

SPRING 2018Community Meeting 3 (and possibly 4)

WINTER 2018-19Final Construction Documents

SPRING 2019Construction Begins

SPRING 2020Anticipated Park

Opening**Dependent on

construction conditions

Page 6: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

Community Meeting #1 – What we heard from you• The park is loved by the neighborhood and is a premier waterfront destination

for the residents• Parking is an ongoing issue – unorganized, unenforced, and lacks emergency

access• Consider field layout for multiple sport uses, but Baseball/Little League/Softball

should remain the primary use • Improve field drainage and/or Synthetic Turf surfacing• Interested in the addition of a Challenger League ball field• Modernize sports lighting • Sport equipment storage should remain• Imaginative and interactive playground with increased accessibility

• Ongoing Coordination:Department of Conservation and Recreation (DCR) Boston Police Department (BPD)Boston Transportation Department (BTD)MassDOTOffice of Neighborhood Services (ONS)Public Works Department (PWD)Boston Water and Sewer Commission (BWSC)Climate Ready BostonConservation Commission

Page 7: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

SITE ANALYSIS

NORTH

Page 8: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

EXISTING PERMITTED USE ACTIVITIES

BOS: 311

Savin Hill Little League• Baseball (ages 4-15)• Challenger (ages 6-14)

• Youth Softball• Adult Softball• Soccer (ages 4-13)• Kickball

Page 9: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

NON-PERMIT SITE AREAS

Walking, jogging, reading, social interaction, sun bathing, frisbee, yoga, picnicking, and others…

Page 10: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

RECENT STORM EVENTS

1/4/2018 Photo via Brian Taylor 1/4/2018 Photo via Twitter

High Tide 11/6/2017 +/- 12ft.Photo via W&S

High Tide 11/6/2017 +/- 12ft.Photo via W&S

Page 11: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

BOS: 311

CONCEPT PLAN 1

Page 12: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

CONCEPT PLAN 2

BOS: 311

Page 13: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

PRECEDENT IMAGES - FIELDS

BOS: 311

Page 14: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

PRECEDENT IMAGES - PLAYGROUND

BOS: 311

Page 15: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

PRECEDENT IMAGES – PASSIVE / PLAZA

Page 16: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

PRECEDENT IMAGES – PEDESTRIAN SAFETY

Page 17: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

LISTENING & DISCUSSIONField Alternatives:• Combined Little League / Baseball vs separate

90’ / 60’ base paths• Natural vs. Synthetic Turf

Playground Locations: • Next to fields vs. existing location

Entry Plaza:• Vehicular separation vs. integrated with traffic

calming devices

Other thoughts or concerns?

Page 18: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

BOS: 311

CONCEPT PLAN 1

Page 19: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

CONCEPT PLAN 2

BOS: 311

Page 20: Improvements to McConnell Park Community Meeting #2 · Community Meeting #1 – What we heard from you • The park is loved by the neighborh ood and is a premier waterfront destination

January 25, 2018Boston Parks and Recreation

THANK YOU!

For questions, maintenance requests or concerns regarding any of our

parks contact 311

Next Meeting Date TBD