A2500, Lower Road, Minster Improvement Scheme Copyright: © 2019 Kent County Council All rights reserved E-mail: [email protected] Website: www.kent.gov.uk/lowerroad Telephone: 03000 418181 Phase 2 Construction works for Phase 2 is planned to be split into two phases. Initially Phase 2a will include the widening of the road at Cowstead Corner Roundabout, the construction of the new footway/cycleway between Cowstead Corner and Barton Hill Drive and installation of associated surface water drainage. Should further funding become available the intention is to construct Phase 2b which will widen the existing Lower Road up to the new roundabout at Barton Hill Drive and to also provide a right turn lane into Wall End Farm. Newsletter 4 March 2019 Phase 2 Construction Advanced vegetation clearance early April 2019. Phase 2a works planned start 7th May 2019. Phase 2a planned to be completed December 2019 Upcoming Works Advanced vegetation clearance at Cowstead Corner Roundabout. Topsoil strip and associated archaeology works. We apologise in advance for any inconvenience these works may cause and our aim is to keep any disruption to the absolute minimum. Planned Temporary Traffic Signals The early works on Phase 2a will require the use of two way temporary traffic signals on Lower Road where restricted road widths dictate. The signals will be in place weekdays and will be manually controlled. Where temporary traffic control is not necessary works will be undertaken within coned verges. It will be necessary for works access points to be located along the road in order for the contractor to gain access to works areas. Latest Progress Phase 1 construction of the new roundabout is now complete with traffic now having full use of the new roundabout at Barton Hill Drive. The new roundabout looking southwest from Barton Hill Drive along Lower Road

Improvement Scheme · A2500, Lower Road, Minster Improvement Scheme Copyright: © 2019 Kent County Council All rights reserved E-mail: [email protected] Website:

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Improvement Scheme · A2500, Lower Road, Minster Improvement Scheme Copyright: © 2019 Kent County Council All rights reserved E-mail: Lowerroad@breheny.co.uk Website:

A2500, Lower Road, Minster Improvement Scheme

Copyright: © 2019 Kent County Council All rights reserved

E-mail: [email protected] Website: www.kent.gov.uk/lowerroad Telephone: 03000 418181

Phase 2

Construction works for Phase 2 is

planned to be split into two phases.

Initially Phase 2a will include the

widening of the road at Cowstead

Corner Roundabout, the construction

of the new footway/cycleway between

Cowstead Corner and Barton Hill Drive

and installation of associated surface

water drainage.

Should further funding become

available the intention is to construct

Phase 2b which will widen the existing

Lower Road up to the new roundabout

at Barton Hill Drive and to also provide

a right turn lane into Wall End Farm.

Newsletter 4

March 2019

Phase 2

Construction

• Advanced

vegetation

clearance early

April 2019.

• Phase 2a works

planned start 7th

May 2019.

• Phase 2a planned

to be completed

December 2019

Upcoming Works

• Advanced

vegetation

clearance at

Cowstead Corner

Roundabout.

• Topsoil strip and

associated

archaeology

works.

• We apologise in

advance for any

inconvenience

these works may

cause and our aim

is to keep any

disruption to the

absolute

minimum.

Planned Temporary Traffic

Signals

The early works on Phase 2a will

require the use of two way temporary

traffic signals on Lower Road where

restricted road widths dictate. The

signals will be in place weekdays and

will be manually controlled. Where

temporary traffic control is not

necessary works will be undertaken

within coned verges. It will be

necessary for works access points to

be located along the road in order for

the contractor to gain access to

works areas.

Latest Progress

Phase 1 construction of the new roundabout is now complete with traffic now

having full use of the new roundabout at Barton Hill Drive.

The new roundabout looking southwest from Barton Hill Drive along Lower Road