5
EFFICIENT CONSTRUCTION

IMPRESION - en › wp-content › uploads › 2020 › 03 › DS-Vibert-En… · 3D Bim Design Quick execution ViBert’s construction speed allows you to save up costs during the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IMPRESION - en › wp-content › uploads › 2020 › 03 › DS-Vibert-En… · 3D Bim Design Quick execution ViBert’s construction speed allows you to save up costs during the

EFFICIENT CONSTRUCTION

Page 2: IMPRESION - en › wp-content › uploads › 2020 › 03 › DS-Vibert-En… · 3D Bim Design Quick execution ViBert’s construction speed allows you to save up costs during the

2

2 Vibert | Efficient construction

3

3 Efficient construction | Vibert

PS 120Potential

1. Three times faster than traditional construction

2. By reducing construction times, building costs decreases

3. No waste of materials or dirt

4. Thermal and acoustic insulation. Certificate of technical competence (CAT)

5. Reinforced concrete is highly resistant to structural movement, humidity and fire

6. Sustainable construction

7. Anti-seismic panel

8. Structure without thermal bridge. Provides complete interior-exterior insulation

Sustainable

Speed

No waste Insulating

Save up

$

Resistant

Adn 150

Quickness Reducescosts

$

No waste Insulating

Strength Sustainabilitiy Anti-seismicstructure

ThermaltransmittanceEn

closure

Pane

ls

Page 3: IMPRESION - en › wp-content › uploads › 2020 › 03 › DS-Vibert-En… · 3D Bim Design Quick execution ViBert’s construction speed allows you to save up costs during the

4

4 Vibert | Efficient construction

5

5 Efficient construction | Vibert

1° capaHormigón EstructuralAislantePolietileno Expandido2°capa deHormigón Estructural

Energy efficiencyAll our houses are twice as energy efficient as a traditional building.

Our thermal insulation system keeps indoor temperatures stable.

ViBert 120 and 150 panel’s technology generate real savings by significantly reducing utilities expenses.

Architecture

1. Minimalism

2. Pure lines and volumes

3. Exposed concrete

4. Low maintenance

5. 3D Bim Design

Quick execution

ViBert’s construction speed allows you to save up costs during the building stage and avoid economic detours.

Page 4: IMPRESION - en › wp-content › uploads › 2020 › 03 › DS-Vibert-En… · 3D Bim Design Quick execution ViBert’s construction speed allows you to save up costs during the

6

6 Vibert | Efficient construction

7

7 Efficient construction | Vibert

Quick execution

Short deadlines, much faster than traditional construction. An architect assigned to your project will look after your best interest and comfort, and will help you fulfill the dream of having your house. He will also guide you in the selection of typology, distribution, materials and finishings.

Save up

By building faster, your production costs decrease. It guarantees that there are no wasted materials or dirt. It also requires low maintenance. The reinforced concrete is highly resistant to structural movements, humidity or fire.

Assistance

We provide technical support during the entire process and guarantee the fulfillment of the agreement. We work in a neat and clean construction site, optimizing resources and avoiding risks of rupture or theft of materials and expenses such as containers, dump trucks, chemical bathrooms, etc.

$

The ViBert differenceHeritage value1. We have over 60 years of experience

2. Longer durability than a conventional house

3. Low maintenance

4. Highly resistant

5. Stable, safe investment that will last you a lifetime

6. We respect your budget, without deviations

7. Higly qualified technical team

8. Human quality, personalized attention

Single interlocutor

Energetic efficiency

Low maintenance

Over 60 years of experience

Durability of over 100 years

Fire resistant

Clean construction site, with no waste or dirt

3 times faster than traditional construction

Certificate of technical competence given by Sec. for Housing

Anti-seismic structure

Thermal transmittance, structure without termal bridge

VIBERTHOUSE

STEEl fRAmIng HOUSE

WOOdEnHOUSE

TRAdITIOnAllyBUIlT HOUSE

Page 5: IMPRESION - en › wp-content › uploads › 2020 › 03 › DS-Vibert-En… · 3D Bim Design Quick execution ViBert’s construction speed allows you to save up costs during the

OFFICES AND R19National Route 19, km 4,Santo Tomé, Santa Fe

[email protected]

+ 342 412 808054PLANT