20
Implementing the Remote Control Water Meters at, Water Utility of Istria, for the purpose of leakage reduction Melita Čohilj , Marija Brajković, Alen Sprčić, Vanja Totman, Kristjan Gašperin Water utility of Istria INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT 29 th January 2016, Rijeka, Croatia

Implementing the Remote Control Water Meters at, Water Utility of

Embed Size (px)

Citation preview

Page 1: Implementing the Remote Control Water Meters at, Water Utility of

Implementing the Remote Control Water Meters at, Water Utility of Istria, for the purpose of leakage reduction

Melita Čohilj, Marija Brajković, Alen Sprčić, Vanja Totman, Kristjan Gašperin

Water utility of Istria

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 2: Implementing the Remote Control Water Meters at, Water Utility of

CONTENT

1. Introduction2. Supervisory Control and Data Aquisition (SCADA)3. Parametars for the Reduction of Water Losses4. New Procedures 5. Implemented Equipment6. Benefits7. Difficulties8. Reached Goals9. Conclusion

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 3: Implementing the Remote Control Water Meters at, Water Utility of

1. INTRODUCTION

• Water Utility of Istria, Buzet (WUI) provides drinking water supply service inmore then 60% of the area within the County of Istria

• Thanks to the DRINKADRIA Project, the WUI has implemented the Pilot Project -"Control Water Meters for More Water”

• The aim of the project "Control Water Meters for More Water”, is to identifyleakage and pipe breaks within the WUI water supply system, which willultimately result in decrease of the water losses.

• The activities which have been identified in this project include the analysis ofthe present WSS on the consumption control locations placed in DistrictMetered Areas (DMA) - the control water meters, the activities connected tothe tendering procedures, equipment commissioning, operation of the AMRcontrol 2.0., employees’ training and finally, all the activities connected to theproject results

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 4: Implementing the Remote Control Water Meters at, Water Utility of

Table 1. District Metered Areas (DMA)

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Operational units DMA

Buje 20

Buzet 38

Pazin 23

Poreč 23

Rovinj 25

Overall: 129

Page 5: Implementing the Remote Control Water Meters at, Water Utility of

2. SUPERVISORY CONTROL AND DATA AQUISITION (SCADA)

• We have been implementing and using the SCADA for many years• The SCADA consists of the Dispatching Centre placed in the Buzet and three

sub-centres: Sveti Ivan, Gradole and Butoniga• SCADA main tasks:

- Efficient monitoring and management of the processes of water treatmentproduction and distribution, from its source to the final consumer;

- Secure availability of water - prevention of large disturbances and breaks inwater supply;

- Secure effectiveness of the supply system – coordination between the plantand production process;

- Savings’ plan – minimising of the cost while keeping a high level of watersupply.

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 6: Implementing the Remote Control Water Meters at, Water Utility of

Figure 1. Scada

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 7: Implementing the Remote Control Water Meters at, Water Utility of

3. PARAMETARS FOR THE REDUCTION OF WATER LOSSES

• Monitored parametres:

- Daily consumption (24 hours);- Consumption the day before (48 hours);- Comparison (over, under - realized in %) for the last two days;- Minimal night consumption;- Consumption within the DMA (without the consumers);

• The data gathered via this system will be utilized for the hydraulic (numericalmodelling) as well as for the improvements and the construction of the watersupply network in the future (e.g. reconstruction works and building of newbranches)

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 8: Implementing the Remote Control Water Meters at, Water Utility of

4. NEW PROCEDURES

We have applied an operational instruction:

• Operational Instruction for Early Breakages/Leakages Detection within the Water Supply System by following the AMR control 2.0 application

- available to the Management, the Managers, distribution officials, system analysts in the Technical Department, foremen, dispatchers and the officials in charge of losses detection in the Operational Units

• Procedure for Breakage/Leakage Repairs list evidence assistance- The Application is reviewed daily by the officials assigned the task and, if

necessary, the system analyst and the production and distribution official from the Technical Department

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 9: Implementing the Remote Control Water Meters at, Water Utility of

5. IMPLEMENTED EQUIPMENT

• The new equipment enables:

- Accurate water distribution measurements, which present the primary module of a supply network management and thus create a basis for a safe water supply system, water balance and efficient picture of losses

- Reliable data acquisition from each of the control locations for the possibility of remote diagnostics and further data analysis in the control center

- Reliable, simple and up-to-date data analysis from the control locations for an efficient comparison of controlled measurements within water distribution, efficient management of losses and efficient adjustments of production and distribution of water to the real water consumption

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 10: Implementing the Remote Control Water Meters at, Water Utility of

5. IMPLEMENTED EQUIPMENT

• Arad Octave Ultrasonic Water Meters with DRINKADRIA labels

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 11: Implementing the Remote Control Water Meters at, Water Utility of

5. IMPLEMENTED EQUIPMENT

• Aplisens - pressure meter PCE – 28

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 12: Implementing the Remote Control Water Meters at, Water Utility of

5. IMPLEMENTED EQUIPMENT

• Inventia MT – 713 HC – logger

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 13: Implementing the Remote Control Water Meters at, Water Utility of

5. IMPLEMENTED EQUIPMENT

• Software AMR control 2.0.

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 14: Implementing the Remote Control Water Meters at, Water Utility of

5. IMPLEMENTED EQUIPMENT

• Software AMR control 2.0.

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 15: Implementing the Remote Control Water Meters at, Water Utility of

6. BENIFITS

• Improved water distribution surveillance within zones

• Following possible losses in the network according to the quantity of lost water

• Following possible losses according to night consumption

• Improved measurement accuracy

• Documenting

• Data comparison

• Graphic layout of all data

• Water supply system pressure monitoring

• Displayed battery status and signal strength

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 16: Implementing the Remote Control Water Meters at, Water Utility of

7. DIFFILCUTIES

• Document preparation

• Calls for tendering

• Appeal to the Decision and Documentation

• Water meter delivery

• Short deadline (105 days) of System of Remote Reading implementation

• Continuous problems with the mobile connection and the signal for water meter readings being sent to AMR CONTROL 2.0

• Scale

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 17: Implementing the Remote Control Water Meters at, Water Utility of

8. REACHED GOALS

• Monitoring the daily and night flow (consumption) of water in the distributionsystem

• Faster responses to failures

• 129 DMA on AMR CONTROL 2.0. application

• Modernization of the existing water supply system

• Key parameters for future surveillance were defined

• The process of system surveillance and leakage repairs was redefined

• Application for informing and evidence of leakage repairs agreed and launched

• Three-month report period on activities of noted and repairedbreakages/leakages was defined.

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 18: Implementing the Remote Control Water Meters at, Water Utility of

9. CONCLUSION

• Work on the Drinkadria project still is a great challenge. Nevertheless, thehardest part of work has been completed.

• Future steps:- Updating of the existing GIS base (pipes position, types of pipes and the

diameters)- Zoning: (129 zones) division to smaller zones according to implemented

water meters- Introducing the management of losses according to IWA methodology

or the ILI indicator- Analysis of leakage- Pressure adjustments in the critical zones (according to ILI indicators)

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 19: Implementing the Remote Control Water Meters at, Water Utility of

For any question you can send us e-mail

[email protected]

[email protected]

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Page 20: Implementing the Remote Control Water Meters at, Water Utility of

INTERNATIONAL SYMPOSIUM: CROSS-BORDER DRINKING WATER MANAGEMENT29th January 2016, Rijeka, Croatia

Thank you for your attention!