Implementing Pollution Prevention “P2 Dee-fusion” Clearwater, FL June 7, 2000. Cam Metcalf Executive Director [email protected] 502-852-0965. Driving Forces on Legislation. Property Owners: NIMBY, “Universal Backyard” Taxpayers: Pressured by rising disposal fees - PowerPoint PPT Presentation
Citation preview
Implementing Pollution Prevention P2 Dee-fusionClearwater, FLJune 7, 2000Cam MetcalfExecutive [email protected]
Driving Forces on LegislationProperty Owners: NIMBY, Universal BackyardTaxpayers: Pressured by rising disposal feesEnvironmentalists: Concerns of ecological effectsIndustries: Fear punitive regulations & legislation
Driving Forces on LegislationProperty Owners: NIMBY, Universal BackyardTaxpayers/Agency: Pressured by rising treatment feesEnvironmentalists: Concerns of ecological effectsIndustries: Fear punitive regulations & legislation
Our Universal Backyard NIMBY NOTE BANANA CAVE NOPE
90 Pollution Prevention Act Defines Source Reduction as:Any practice which reduces the amount of any hazardous substance, pollutant, or contaminant entering any waste stream or otherwise released into the environment (including fugitive emissions) prior to recycling, treatment, or disposal;and reduces the hazards to public health and the environment associated with the release of such substances, pollutants, or contaminants.
Hierarchy for Pollution Prevention (P2)Source ReductionReuse/RecyclingEnergy RecoveryTreatmentDisposal
P2 Programs are Selling Multi-Media ApproachesW aterA irS olidsT imeE nergy
Cross-Media TransferWasteGaseous/ParticlesWasteProcessingWasteProcessingWasteProcessingSolidResidualsWastewaterGaseous/ParticlesLandWatercourse orImpoundment or Deep WellAir
Cross-Media Transfer (cont.)An example of cross-media transfer:Facility installs a wet scrubber: VOCs transferred from air to water, which is discharged into a nearby stream.Discharge to stream requires water permit modification: air stripper is installed to meet permit requirements--VOCs transferred back to the air.New air stripper requires another air permit.After 3 permits, 3 years, & $3,000,000 the same amount of contaminants are reaching the air!Pollution Prevention Review, Steven Anderson & Jeanne Herb
Process Flow DiagramProcess Flow Diagram
P2 MeansProcess modifications;Feedstock substitutions;Product reformulation;Management practices or housekeeping alterations;Recycling within industrial processes; orEquipment replacement or modifications.
Good HousekeepingLeads to Pride & CommitmentKeep It Clean In the First PlaceWaste, Leaks & Spills Easier to SpotDry Cleanup
Inventory ManagementProcurement ControlMaterial Types & QuantitiesContainer Sizes & Packaging RequirementsRaw Material QualityMSDSs Material ControlUnloading & StorageHandling & Use
Source Reduction Optionsfor PackagingLight weightingSelecting another materialBulk packagingSwitching from single-use to reusable containers
Preferred Packaging GuidelinesNO PackagingMinimal PackagingConsumableReturnable/ReusableRecyclable Packaging, Recycled Material
Returnable for Reuse
Packaging Designed forEase of Breakdown & ReuseLOreal USA Florence, KY
Plastic Container, Strap & Sheet RecyclingLOreal USA Florence, KY
Redesign Packaging for Reuse to Avoid Recycling
ParallelParadigms
TQM
P2
Customer Satisfaction
Stakeholder Satisfaction
Continuous Improvement
Continuous Reduction
Mgmt. By Measurement
Monitor Waste
Maximize Productivity
Minimize Waste
Zero Defects
Zero Emissions
The Future of Pollution Prevention (P2)...Environmental Management Systems(EMSs)EnvironmentalManagementSystem
Prevent Waste:Involvement orCommitmentAdd Value: Fullfillment Expectations Exceed ExpectationsSupplierProcessCustomer DelightOwnerEmployeesCan / should P2 become a strategic thrust for the Company?P2 &EMSsSystems Approach
P2 Sustainable PhasesOPERATIONSPRODUCTION PROCESSEQUIPMENT/ SYSTEMS
Payoff
What
When
Big ROI Today
Now
Smaller ROI Today (Future??)
Near-term
Smallest ROI Today (Future??)
Long-term
Waste Reduction Operation Phase0-6 months, Big Return on InvestmentPHASE ONEStartSimple RecyclingWaste SeparationGood HousekeepingAssessment & Trng.Recognized Need
Agency & Industry Management StrategiesObjectivesTo meet regulatory requirementsTo be cost-effectiveTo improve environmental qualityTo produce a quality product
Implementing Pollution Prevention (P2)Corporate CommitmentTeam selectionMunicipality Agrees to & SUPPORTS P2 Activities of its Staff.IPP Staff, Industry & Business PersonnelIn GeneralIn an IPP
Implementing P2Background InformationFlow Diagram & Plant SurveyMaterials BalanceHeadworks AnalysisSewer Line BlueprintsSIU Process Flow DiagramsPermit ApplicationsIndirect Discharge Monitoring ReportsSelf-monitoring ReportsIn GeneralIn an IPP
Implementing P2Alternatives AnalysisBest Available Control Technology (BACT Treatment)Source Reduction OpportunitiesReuse PotentialRecycle PotentialEnergy RecoveryTreatment (BACT)DisposalIn The PastPresent & Future
Evaluate Why P2 is Important to CommunitiesWater is a limited resourceStatewide Water Quality - Once quantity is restricted, the quality must be monitoredTMDLs - Limits to what a watershed can receiveP2 may be the first step to encourage nonpretreatment cities to reduce pollutant contributions
Incorporate P2 LanguageRestate the Citys environmental policy statements in City Ordinances, wastewater permits & permit applicationsRequire P2 plans & best management practices (EMS) as part of all departments goals
Source Reduction TrainingManager TrainingEmployee TrainingProcess / Job / ShiftEMS/Systems ApproachInternal AssessmentShow Corporate & Agency Commitment
42 Cubic Yard Compactor Boxes15 - 22 Loads per Day
Closer View of Compactor Loads
ID Solid Waste MaterialsCardboardWoodPlasticsPolystyreneOffice Paper
Compactor Box LoadTotal = 10,560 lbs.
Cardboard SeparationTotal = 2,940 lbs. (27.8%)Conveyor of Mixed Solid WastesCardboard Sorting by HandUncontaminated Cardboard is Baled
Solid Waste w/ Cardboard Removed = 7,620 lbs. (71.2%)
Wood Separation
Wood = 2,400 lbs. (22.7%)
Trash = 5,220 lbs. (49.4%)
Plastic in the Solid Waste StreamWhat types?$0.03/lb. Or $60/Ton
Reclaim,Recover & ReuseOn-site
Off-siteMaterials Exchange
Challenges to RecyclingCheaper to use virgin materialsRecycled materials often fail to meet Buyer SpecsConsumer mistrust of recycled materialsInadequate supply of Post-consumer materials
Kentucky Industrial Materials ExchangeWhat is KIME?A databaseA matching serviceA way to reduce landfill volumeA way for organizations to reduce waste disposal costs & raw material costs
Kentucky Industrial Materials Exchange48%HazardousAcidSolventEtc.43%Non-HazardousGlassWoodPaperEtc.9%Miscellaneous
Types of CompaniesUsing KIME
Waste ReductionEquipment Phase6 months - 2 yearsSome Return on InvestmentPHASE TWOSource TreatmentEquipment ModificationsProcess Controls
General P2 ConsiderationsManagementProcess & equipment selectionVehicle MaintenanceSludge managementConstruction methods & materialsLaboratoriesOperational Control & Maintenance
Equipment Maintenance &Preventive MaintenanceRoutine InspectionsProper setup & adjustmentRepairing Leaks ImmediatelyReplace Parts Before Expected FailureReduce Unexpected DowntimeTracking MaintenanceOperator training
P2 Process & Equipment Selection ConsiderationsSolid Waste (Reduce/Reuse/Recycle)Energy demand (efficiency)Chemical use (disinfect, odors, aids)Air emissions (VOCs, aerosols)Water use & conservationSludge generated (heavy metals, etc.)
Waste Reduction Process Phase2 years - 5 years Little Return on InvestmentPHASE THREE Process Changes Complex Recycling, Refining, ReuseRaw Material and Catalyst ChangesProduct Reformulations
Material SubstitutionLess-toxic, lower-emitting substitutesMay effect process elsewhereMay require equipment modifications
Reduce Materials Usage & LossesReduce Toxics Use with Alternative MaterialsReduce Water UsageReduce Energy UsageP2 Perspective: Minimization
Increase Market ShareImprove Cash FlowReduce Cycle TimeReduce Set-up TimeReduce Work In-ProgressReduce Defect & Reject rateImprove Flexibility of ManufacturingReduce Production BottlenecksBusiness Perspective: Optimization
Productivity EnhancementQuality Management SystemsPreventive MaintenanceOperation AutomationInventory Control (JIT)Product DevelopmentComputer Integrated Mfg.Employee Health & SafetyEnvironmental ManagementIntegrating P2 into Existing Programs
Old Paradigm: DoersInvestigation & ImplementationCreates pollution prevention programsCreates new channels of communication Implements existing opportunitiesFocuses on information transferModifies existing activitiesSeeks to create awarenessBuilds upon trustNew Paradigm: FinishersLong-term Organizational ChangeIntegrates P2 w/ existing programsCo-opts existing channels of communicationPrepares for new opportunities
Focuses on information analysisModifies existing contextsSeeks to move to actionBuilds on credibility P2 Program Paradigm Shift
An expanded assessmentEMS Gap AuditExamining:Business SystemsBusiness PracticesOverall Manufacturing ContextSo that:P2 strategies are tailored to the organizations objectives & targetsP2 is implemented with EMPsIntegrated P2 AssessmentEMS Audit
Investigate:Business goals & policiesManagement perspectives on current operationsDecision-making methodsAmounts & types of planningOrganizational structureTo Determine:Expressions & amount of management commitmentManagement triggers & prioritiesSacred Cows--What P2 must be respectful of!Who holds key power & influences positionsSenior Management Track
Investigate:Purchasing & procurement methodsProduction scheduling methodsInventory control systemsRelationships with suppliers/quality assuranceTo Determine:Opportunities for P2 through production control improvementsOpportunities to link P2 to existing production management changesPossible coordination with buyers/suppliersProduction/Activities Management Track
Investigate:Cost accounting/overhead allocation systemsCapital budgeting processTraining ProgramsCompensation & incentive programsEnvironmental data gathering & managementQuality improvement programs, methods & toolsTo Determine:Total environmental management costsAmount & quality of resources available for P2 planningWays to integrate P2 into quality improvement efforts
Support Functions/Services Track
Emphasis on ProcessInadequate TrainingLack of PlanningPoor CommunicationsLack of PatienceAssign to Person, Not a TeamTreating as a Special Program
Impediments to Success
Supply PracticesMaterials Usage PatternsMaterials Management PracticesWaste Disposal PracticesResource Consumption PatternsPreferential Use of Equipment or Techniques
Institutional Barriers
www.kppc.org
The Next Steps: P2 & EMSs
Clearwater, FLJune 7, 2000Cam MetcalfExecutive [email protected]