IMPLEMENTATION OF THE WFDIMPLEMENTATION OF THE WFDAND THE RIVER BASINAND THE RIVER BASIN
MANAGEMENT PLAN OFMANAGEMENT PLAN OFCATALONIACATALONIA
Brussels, 5th of November 20106th EWA Annual Conference
Catalan Water AgencyLorenzo Paolo Galbiati – [email protected]
2
EBRO BASINSSHARED RESPONSIBILITIESwith Spain (Ebro BasinAuthority)•Surface: 15,330 km2 (48%)•Municipalities: 312•Inhabitants: 0,7 M (8%)
INTERNAL BASINSACA has full RESPONSABILITIES•Surface: 16,600 Km2 (52%)•Municipalities: 634•Inhabitants: 6,7 M (92%)
3
69 29
1726
3
Urban UsesIndustrial UsesAgricultureRecreational Uses
1.138 hm3/year1.138 hm3/year
Urban UsesIndustrial UsesAgricultureRecreational Uses
1.827 hm3/year1.827 hm3/year
Description of the main consumptive uses
4
Available resources Environmental Flow Average waterdemand
Description of the main consumptive uses
5
Identification of the main problemsGW contamination - nitrates comingfrom agricultureL’Empordà.Osona.El Maresme. Camp deTarragona.Pla de Lleida
Invasive speciesCuenca del Muga y río Fluvià. Lagunas delos Aiguamolls de l’Empordà. Tramomedio del Ter y afluentes. Lago y acequiade Sils. Afluentes del Llobregat. Embalsesde Boadella, Sau, Susqueda, La Baells,Riba-roja y Flix. Lagos de Bañolas y Clotd’Espolla. Lagunas del Delta del Ebro. RíoEbro y afluentes del tramo bajo.
Limitation of the ecological flow dueto urban, industrial and irrigationusesRío Muga des de la presa deBoadella hasta el mar. Río Ter desdel Pasteral hasta el mar. Río Gaiàdes de la presa del Catllar hasta elmar.
Limitation of the ecological flow dueto hydropower plantsRío Fluvià. Alto Ter. Alto Llobregat yCardener. Alto Segre. Ríos NogueraPallaresa y Noguera Ribagorzana. RíoGarona. Baix Ter
Over-exploitations of GWAcuíferos desde tramos bajos del Muga, elFluvià y el Ter. Acuíferos del bajoLlobregat
Hydromorfological modification ofriverbeds, riparian areas and wetlansTramo bajo del Muga. Bajo Ter y Daró.Desembocadura del Tordera. RegiónMetropolitana de Barcelona. Tramo bajodel Francolí
Hydromorfological modificationof the costlineEl Port de la Selva. La Escala.Maresme y Barcelonés. Puertos deBarcelona y Tarragona. Costas delGarraf y Vilanova y la Geltrú. CostaDorada de Cubellas hasta Altafulla.
Accumulation of saline residuesExplotaciones salinas del Bages
Description of the WBs Status
6
Actual Status
58
20
1111
2025
151
10
44
4
3
15822
25
1328
0%
20%
40%
60%
80%
100%
Ríos Embalses Lagos Transición Costeras SubterráneasCumple Datos parciales No cumple
Description of the WBs StatusCategories Internal
BasinsEbro
Watershed Catalonia
Rivers 248 119(1) 367Reservoirs/Ponds 41 66 107
Transitional waters 25 15 40
Coastal waters 33 3 36
Groundwater 39 14 53Total 386 217 603
7
http://acamap.gencat.cat/impress/Description of the WBs Status
8
TOOLSRiver Basin Management Plan of
Catalonia� Programme of Measures� Monitoring Programme� Specific Plans
Proposals of theACA the Ebro
RBMP
River BasinManagement Plan of theInternal basins of CAT
Programme ofMeasures
- Measures to beimplemented in the internal
basins- Measures to be
implemented in the Catalanpart of the Ebro watershed
9
� Achieve the GES in 67% (402 WBs) of the Water Bodies in theentire Catalonia and 55% (214 WBs) in the internal basins.
� Implementation of measures which will allow to reach the GES forthe remaining WBs for the 2021 and 2027.
� to ensure the supply of quality water, and to achieve environmental,economical and social sustainability.
RBMPObjective of the RBMP for the - 2015
10
Objective 2015
GES 67% of WBs(55% infernal
basins)
RBMPObjective of the RBMP for the - 2015
11
� To reduce vulnerability to extreme events such as waterscarcity and drought
� Allow the use of each water resources due to their qualityand quantity
� To ensure environmental flows� Sustainable use of the aquifers� Using locale water resources during crisis and
emergencies
General CriteriaRBMP
12
The Programme of Measure
Programmeof Measure
Hydromorfological andbiological quality
Measures oriented toachieve good ecological
status for the physicalhabitat and for the biological
community associated toeach WBs
IrrigationUpgrade and optimization ofthe irrigation network in thewhole Catalonia.
Water qualityMeasures to maintain and
increase quality of water(sanitation and control of diffuse
contamination).
Water demand andresourcesMeasures oriented to ensurewater availability for actual andfuture demands.
Four main ambits
13
Investments 915,9 M €Internal basins 833,4 M €Ebro watershed 82,4 M €
Hydromorfological and biological quality of WBs
44%
26%
12%6%
6% 5% 1%
Flood prevention
Recovery of riparian areas
Implementation EnvironmentalFlowsControl of invasive species
Increasing river connectivity
Recovery of wetlands andreservoirsIncreasing of coastline quality
The Programme of Measure
14
Water quality
74%
8%7%
6% 5%Sanitation of urban and industrialwaste waterReduction of agri diffusecontaminationReduction of saline contamination
Reduction of priority substances
Protection and management ofaquifers
Investments 2.509,6 M €Internal basins 1.875,1 M €Ebro watershed 634,5 M €
EDAR’s
95% of the urbanwaste water arealready treated
The Programme of Measure
15
Upgrade and optimization of irrigationInvestments 1.400,7 M €
Internal basins 84,0 M €Ebro watershed 1.316,7 M €
Descripció actuació
Modernització de la CR Molí de Pals (Marge Dret riu TER) (3000 Ha)Modernització de la CR Delta Ebre Marge Dret (13581 Ha)Modernització de la CR MUGA Marge Dret (1280 ha)Modernització de la CR Canal de Pinyana (13891 Ha)Modernització de la CR Canal d’Urgell (69912 Ha9Modernització de la CR Canal Aragó i Catalunya (38185 Ha)Modernització de la CR Tremp (4634 Ha)Modernització de la CR Ulldecona (1800 Ha)Modernització de la CR Alt Urgell “Canalet” (1401 Ha)Modernització de la CR Hortes de Torres de SEGRE (1152 Ha)
CostParàmetre
Descripció Valor Unit. Cost Inversió (€)Cabal estalviat 3,76 hm3/any 22.000.000Cabal estalviat 13,73 hm3/any 100.000.000Cabal estalviat 0,70 hm3/any 30.000.000Cabal estalviat 14,88 hm3/any 200.000.000Cabal estalviat 62,92 hm3/any 1.125.000.000Cabal estalviat 15,73 hm3/any 300.000.000Cabal estalviat 2,99 hm3/any 75.000.000Cabal estalviat 1,62 hm3/any 21.600.000Cabal estalviat 0,70 hm3/any 21.015.000Cabal estalviat 0,85 hm3/any 22.620.000
Potential water save:
Between 145 and 225hm3/year
The Programme of Measure
16
Water demand and resources
Water availability willincrease of 389 hm3
year.
Investments 3.902,3 M €Internal basins 3.476,7 M €Ebro watershed 425,6 M €
90%
9% 1%
Ensure water supply
Regeneration of treated water
Increase of control and regulation190
231243
101
20
Water regenerationRecovery ofaquifersIncreasing of waterregulationIncreasing qualityof systemsIncreasing watertreatmentDesalination
(Cifras en hm3 anuales)
The Programme of Measure
17
1.019356
1.644 5.540
170
ACA + ATL Otros Dept. GeneralitatEntes locales Adm. Gral. EstadoUsuarios
Economic data of the Programme of Measures
Distribution of the investment budget amongthe four ambits (M Euros)
1.401 916 3.9022.510
Gestión de la demandaMejora de la calidadModernización de regadiosMejora calidad hidromorf. y biolog.
Distribution of investment budget betweenactors (M Euros)
The total planned investment for the period 2006-2015 is 8.728,5 M€for the entire Catalonia
(*)
(*) De los cuales ya se han ejecutado en el periodo 2006-2009, 1.882 M€ quedando por ejecutar 3.657,6 M€ entre 2010-2015
The Programme of Measure
18
Costs generated by the implementation of the PoM in 2015 (M€)Total costs of the services in 2015 (2009) of water cycle: 2.165 M€ (1.684 M€)
0
100
200
300
400
500
600
700
800
900
158
(113)
668
(547)
817
(611)
288
(193)93(92)
143(127)
The Programme of Measure
19
1,702,08 2,15 2,33 2,48 2,61 2,75 2,99
0,0
0,5
1,0
1,5
2,0
2,5
3,0
3,5
Precio medio actual 2009 2010 2011 2012 2013 2014 2015
euros / m3
Cost of water (per unit - €/m3)
Hipótesis: costes de explotación, personal y estructura, gastos financieros ydepreciación de activos a partir de 2009
RBMP
20
Public ParticipationThe public participation process has been developed in parallel with the RBMP with the goal toenrich the plan and include the proposal coming from the process.The Basin Councils, which are been created, will coordinate and regulate the public participationduring next years.
Public administration (102)Industrial and business sector (102)Agriculture (69)Stakeholders, envir. and social associations, NGOs (78)Experts and academic (78)
21
� 1.529 proposals� 13 different ambits, more than
2.300 participant.� 300 meetings� 4 thematic groups:
� Water safe and water supply.� Hydromorfological and biological quality.� Urban and industrial contamination and
sanitation.� agriculture and livestock contamination.
0100200300400500600700
Already included in the RBMP
In study
Rejected
Proposals transmitted to otheradministrations
Results of the process:
• 6 out of 12 proposals already included in the RBMP.• 3 out of 12 proposals to be studied and eventuallyimplemented.• 3 out of 12 proposals are not competencies of the wateradministrations.• 4 out of 100 proposals rejected.
Public Participation
22
� Programme of Measures implementation – state of theart.
� Synergy with other sectors and policies
Where we are?Even though the RBMP has not been legally approved yet, theCatalan Water Agency is working on its implementationsince 2006 especially for what concerning BASIC measuresin compliance of previous directive (i.e. 97/272) and toensure water supply and availability. Moreover efforts toensure synergies with other policies have been done.
23
Programme of Measures implementation – state of the artDistribution of the investment budget among
the four ambits (M Euros)
1561.260466
Gestión de la demandaMejora de la calidadModernización de regadiosMejora calidad hidromorf. y biolog.
The total investment made by the ACA for the period 2006 – 2009 is1882 M€ (out of 5540 planned until the 2015).
24
1. The importance of the hot water for domestic uses ...
� Water saving and associated energy saving
2. Climate Change mitigation Plan of the Generalitat and the plannedmeasures in the water cycle
� The example of the Sustainable Plan for water saving and energyefficiency of Aigues Ter i Llobregat (ATL)
Synergy with other sectors and policies: water, energyand emission
25
Energy consumption in water sector
ReutilitzacióSanejamenti depuració
Altres usosindustrials ide serveis
(nomésorientatiu,pendent
d'estimar valors)
Aiguacalenta
sanitària
Distribució
TractamentCaptació itransport
GESTIÓ DEL CICLEINTEGRAL DE
L’AIGUA (FREDA)
USOS DEL’AIGUA
The HWD in Catalonia consumesaround 19% of the energyconsumption for domestic uses,which represents 3% of the totalenergy consumption…thereforelooking at the global picture, HWDconsumes around six times respectsto the “cold” water cycle
In terms of Tons of CO2 emitted, the entire water cycle to manage “cold” water inCatalonia (abstraction and transport, potabilization, distribution, sanitation andregeneration), corresponds to 0,6 % of 60 MTons emitted in the whole region.In terms of consumption of energy (electricity only), the “cold” water cycle needsbetween 800 and 1.000 GWh years, which represents a bit more than 2% of thetotal consumption of Catalonia.
Hot Water for Domestic uses(HWD) :
26
GWh anuals
0
1000
2000
3000
4000
5000
6000
7000
2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015
Desalinització Altres captacions i tractaments Distribució ACS Depuració Regeneració
Energy costs (Gwh) of “cold” water cycle services vs. HotWater for Domestic Uses.
Around 5.000 GWhfor the HWD vs.1.430 GWh for therest of services
27
Evolucion of water demand and energy consumption - theimportance of a water saving strategy.
Uns 871 Hm3
respecte uns 710
Water saving observed in cataloniaduring recent years supose a total of500 GWh saved for the period 2003-10 in the “cold” water cycle and 400GWh for the HWD. These resultswould not have been possible with outa water saving strategy implementedin Catalonia.
Hm3 anuals distribuïts o facturats
500600700800900
10001100
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
2024
2025
2026
2027
D'acord al Pla de Gestió Tendencial (sense mesures actuals i previstes)Revisió més recent i evolució més probable Evolució real
GWh anuals totals (sense ACS)
0250500750
100012501500175020002250
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
2013
2014
2015
2016
2017
2018
2 019
2020
2021
2 022
2023
2024
2025
2026
2 027
D'acord al Pla de Gestió Tendencial (sense mesures actuals i previstes)Revisió més recent i evolució més probable Evolució real
1.660 GWh/yearrespect to 1.354
28
Climate Change Mitigation Plan of the Generalitat
Specific strategies in water issues:
�Constant upgrades of the energy eficience forthe sanitation precesses and for the WWTPsludge programme .�Programme of water saving and energyeficience of ATL�Collaboration between ICAEN to achive betterresults in energy saving for HWD.
http://www20.gencat.cat/portal/site/canviclimatic/...
29
Programme of water saving and energy efficiency of ATL�Renewable energy plan: up to 41 GWh year starting in 2012
from photovoltaic panels, hydraulic micro turbines, biomass andwind energy.
� Programme of research and development for technology andenergy
30
GESFER is a consortium composed by:Several authority of the Generalitat of Catalonia:� Agriculture, food and rural action department� Environmental department:� ACA (Catalan Water Agency)� ARC (Catalan Waste Agency)� Economic and financial department� Catalan Energy Institute (ICAEN)Several farmer and agriculture sector associationsMission:To define a correct practices and control the organic matter and animalmatter that is being used as organic fertilizer in Catalonia. The main goalis to protect environmental quality and develop a sustainable agriculturein Catalonia.
Synergy with other sectors and policies: water andagriculture and farming
31
32
IN THE URBAN REGULATION OF CATALONIA ARTICLE 6RECOGNIZE THE NORMATIVE CARÁCTER OF THE DELIMITATIONOF FLUVIAL AREA AND THE DEFINITION OF THE USES ALLOWED
IN THESE AREAS.
Synergy with other sectors and policies: urban regulationand flooding
33
Delimitation
FLUVIALZONE
Objective and delimitation UsesPreservación de la calidad del agua y delos ecosistemas asociados al cauce. Se
delimita a partir de la Q10 y de la ribera mín.
Según la definición de la Ley deaguas. Es la delimitación de la zona
definida a partir del Q500.
Vía preferente de desagüe en avenida.Se delimita a partir del Q100.
FLOODINGZONE
HYDRAULICSYSTEM
Posible construcción yedificación concondiciones.
Delimitation
34
Example of delimitation of fluvial space
35
http://aca-web.gencat.cat/aca
36
Thanks for yourattention.
This presentation is a property of the Agencia Catalana del AguaThis presentation is a property of the Agencia Catalana del Agua. Both texts and. Both texts andgraphics content are for exclusive use of the personal of the Aggraphics content are for exclusive use of the personal of the Agency.ency.©©Copyright AgCopyright Agèència Catalana de lncia Catalana de l’’AiguaAigua ..