4th Railway Package – Implementation of the Technical Pillar 10th PRIME Plenary Meeting, Sopron, 12 June 2017
Josef Doppelbauer, ERA Executive Director
Is There a Future for Rail?
2
Key Elements of the Technical Pillar
The Agency will issue single EU-wide vehicle authorisations and safety certificates to train manufacturers and railway undertakings
The Agency will be in a position to issue an approval required for the NSA authorisation of ERTMS trackside projects (a binding opinion on ERTMS trackside specifications)
All applications to the above processes will be handled by the so-called One-Stop-Shop developed by the Agency
• Covering applications at the Agency, but all national applications for Safety Certification, Vehicle authorisation, and trackside/infrastructure authorisation as well
3
Member States are encouraged to appoint their own programme managers
Timeline
e.i.f. of legal text 15/06/2016
2016 2017 2018 2019
Board of appeal (definition)
EC Working Group on 4RP implementation
Transposition in MS
Board of appeal (establishment)
Integrated Management System (IMS in ERA)
Phase 1 – Plan / Do Phase 2 - Check Phase 3 - Act
Shadow Running (ERA/NSAs) Shadow Running
(ERA/NSAs) Shadow Running (ERA/NSAs) Shadow Running
(ERA/NSAs)
ERA / NSAs
delivering 4RWP
Adoption by Mgt Board
BoA effective
ICS draft specs ICS Spec/Dev ICS Dev/Operation ICS Operation ICS Dev
Establisment of learning case phase Learning cases
Definition of fees&charges
Revision of the CSM on Ca and Supervision
Cooperation Agreement – Preparatory work Cooperation Agreement framework
Specific Cooperation Agreements
Study on fees & Charges
SSC process
15/06/2019 2019
IMS including 4RWP processes (in ERA)
Mgt Board Consultation EC legal act
Apportionment of fees&charges
ERA Internal Procedure for fees&charges
Definition Hard & soft skills
Agency internal staff competency
Establishment of a Pool of Experts
Practical Arrangements for SSC Guide for SSC
Internal procedures for SSC
VA process Practical Arrangements for VA Guide for VA Internal procedures
for VA
ERTMS approval process Guide for ERTMS Approval Internal procedures for ERTMS
approval
EC model for declaration of verification
Liability
Dissemination/training of new processes
4
Where are we – Safety Certificates and Vehicle Authorisation
• ERA recommendation on the revision of the CSM for assessing conformity with the requirements for obtaining a railway safety authorization – Delegated Act – Final consultation July 2017
• ERA proposal for Implementing Act Practical Arrangements on Vehicle Authorisation sent to the EC by mid of March 2017 – Vote at RISC expected in November 2017 – Clear distinction between Vehicle Authorisation for Placing on the Market and
Route Compatibility – IM involvement limited to identify and provide
• operational conditions to be applied for the use of the vehicle for tests on the network • any necessary measures to be taken on the infrastructure side to ensure safe and
reliable operation during the tests on the network • any necessary measures in the infrastructure installations to perform the tests on the
network.
– The infrastructure manager shall • participate in the pre-engagement upon the applicant’s request and support the
applicant for the conditions to use the vehicle for tests on the network; • provide information on the infrastructure in a non-discriminatory way for using the
vehicle for tests on the network, and • identify and provide conditions and measures to use the vehicle for tests on the network
within the given timeframe
5
Authorisation for Placing on the Market & Single Safety Certificate
Verification of the Vehicles
EC DECLARATION
Technical File
Single Safety
Certificate
Use of the Vehicles
Technical characteristics Condition and limits of use Operational and maintenance requirement related to design
Structural TSIs & Other Directives to
cover Essential Requirements.
Remaining National Rules - Open points, Specific cases - Legacy Systems CCS Class B
RU Safety Management System IM Safety Management System
TSI OPE (Harmonized Operational Rules)
Technical Compatibility with Route (based on list of parameters of structural TSIs)
Applicant
ERA
RETURN
OF
EXPERIENCE
Register of infrastructure
Remaining National Safety Rules - Legacy Systems CCS Class B - Not harmonized
Authorization for placing on the
Market
Technical File
Area of
use
Roles & Responsibilities
Slide 7
PLACING ON THE MARKET OF MOBILE
SUBSYSTEMS
1
VEHICLE AUTHORISATION for
PLACING ON THE MARKET in AREA of USE
CHECK BEFORE the USE OF authorised VEHICLE
2
3
Applicant
ERA and NSAs
Railway Undertaking
& NSA
1) Placing on the market of the mobile subsystems 2) Technical compatibility of the subsystems within the vehicle 3) Safe integration of the subsystems within the vehicle 3) Technical compatibility of the vehicle with the network in the area of use
Revocation
4 In case of non-compliance to essential requirements noticed during operation
by Railway undertakings or ultimately by NSA and inducing safety risks
(e.g. during supervision activities) authorisation can be revoked
>1 MS Only 1 MS
ERA or NSA (Applicant's
choice)
Railway Undertaking
OSS
EC Declaration
Technical File
Route compatibility on the basis of RINF, the relevant TSIs or any relevant information to be provided by the infrastructure manager free of charge and within a reasonable period of time, where such a register does not exist or is incomplete
Where are we – ERTMS Trackside Approval
ERA proposal for ERTMS trackside approval
• Principles agreed with stakeholders
– Conditional approval based on expected list of documentation and evidences for issues from the issue log (lessons learned from previous projects)
– Proposal to be tested during learning cases
• Final ERA proposal for EC recommendation (beginning of 2018)
8
The ERTMS trackside technical approval is based on the technical solutions envisaged
System Requirements specification
System architecture design
Software and hardware design
Software and hardware validation
Integration and installation tests
System test/validation
Technical solutions envisaged
ERTMS TS approval process
Signing of contract(s)
Final authorization
Tendering phase Authorization process
Conditional approval1)
1) Conditioned to NSA authorization process
NSA Authorization
We are Shaping the Future of Rail in Europe!
safe :: connected :: affordable
Single European Railway Area (SERA)
10