Implementation of Energy

Conservation Building Code (Andhra

Pradesh and Telangana)

Administrative Staff College of India

Natural Resources Defense Council

International Institute of Information Technology

Hyderabad

DRAFT

ECBC in Andhra Pradesh and Telangana: Work that went into the code, and next steps

• Empanelment of

architects - completed

• Training completed –

more than 750

government officials, real

estate developers and

architects in AP and

Telangana

• Extensive stakeholder consultations and awareness

building about ECBC

• Formation of a steering committee and a technical

committee to inform process and adapt ECBC to local

bylaws

• Notification of ECBC through amendment to G.O.M.S.168

i.e., G.O.M.S. 30 dt. 28.01.2014.

• Implementation of ECBC in the state of Andhra Pradesh

and newly formed Telangana2

Needs

Assessment

Workshops

on Energy

Efficiency

ECBC

Technical

Steering

Committee

formed

Coalition

Building

and

Outreach

Notification

of Code

Adoption

G.O. 30

Capacity

Building

and

Training

Hyderabad

Pilot

Compliance

Framework

2010-11 2011-12 2014-152013-142012-13 2016-17

Bifurcation into Andhra Pradesh and

Telangana

DRAFT

Building Approval Process – Hyderabad Model

3

DRAFT

ECBC Implementation status

• For effective implementation of ECBC and achieve higherlevel of compliance following activities were completed inthe state with the support of Administrative Staff College ofIndia (UNDP-GEF-BEE funding)– Empanelment of Third Party Assessors for ECBC compliance

verification and issuing the certificate. 42 Third Party Assessorsare empanelled in first phase and 34 individual TPAs areempanelled with GHMC in second phase

– More than 750 participants which includes government officialsfrom town & country planning, municipal bodies, electricityutilities etc. and private people like Architects, Real EstateDevelopers and Engineers etc. are trained in the state of AndhraPradesh as part of capacity building.

– More than 120 participants are trained through robust 5 daycertification program to create a pool of experts to strengthenthe effective ECBC compliance framework in Telangana

4

DRAFT

Support Action

• Regular conduct of Technical Committee (set by GO 1328) meetings to review ECBC implementation – Top level commitment

• Released easy TS-ECBC Guidelines and Frequently Asked Questions -Supportive Resources

• Strengthen the implementation framework by incorporation of ECBC in Online Building Approval System – Ease of Compliance

5

DRAFT

Further Action

• Strengthen the implementation framework by defining rules and regulation and creating formats for TPAs for easy ECBC compliance

• Identifying key upcoming projects and handholding through ECBC compliance

• Directions for Commercial building approval committees at each ULB level to scrutinize ECBC as 15c of GO 168 in the application forms

• Strengthen the Online Building Approval System by linking it with EMIS kind of monitoring and verification tools

• Continuous Capacity Building, Promotion and outreach plan for ECBC

6

7 Steps to develop ECBC compliance Framework

– Learning from AP and TS Model

Steps Particulars Activities Key Stakeholders

Step 1 Formation of high level

committee for ECBC

implementation

�Issuing the

Government Order

at State Level by

changing bye-laws

�Review of ECBC

compliance

through all line

departments

Chief Secretary

Pr Secretary (MAUD)

Pr Secretary (Energy)

SDA

DTCPO

Electricity Utilities

Institutional Partners

Associations of REDs,

MEPs, Architects

Step 2 System Updating (Ease of

Compliance)

�Incorporating ECBC

in existing building

construction

approval process

ULBs

Building

Construction

Approval Committee

DTCPO

7 Steps to develop ECBC compliance Framework

– Learning from AP and TS Model….Cont.

Steps Particulars Activities Key Stakeholders

Step 3 Supportive Resources �Developing content

�Frequently Asked

Questions

�Guidelines

preparation

ULBS, SDA,

Institutional

partners,

Associations of

different

stakehoders

Step 4 Strengthening Third Party

Assessor Model

�Empanelment of

TPAs

�Preparation of

formats,

documents for

ECBC compliance

�Establishing a

system for easy

ECBC compliance

through TPAs

ULBs

Building

Construction

Approval Committee

DTCPO

Trained ECBC

professionals and

Institutional partners

7 Steps for Effective ECBC compliance Framework –

Learning from AP and TS Model….Cont.

Steps Particulars Activities Key Stakeholders

Step 5 Enforcement by

Building Approval

Committee

�Changing formats of final

building permit orders and

occupancy certificates clearly

showcasing ECBC Compliance

Building Construction

Approval Committee at

ULBs with the support

from institutional

partners

Step 6 Massive Capacity

Building Program

�Train the ULB officials, R&B

officials

�Create the pool of experts

who can either become TPAs

or guide REDs for energy

efficient construction

�Train the trainers

�Incorporate the ECBC in

syllabus of Architecture and

Facility Services and Planning

Engineering

ULBs, MAUD, Energy

Department and

Institutional Partners

7 Steps for Effective ECBC compliance Framework –

Learning from AP and TS Model….Cont.

Steps Particulars Activities Key Stakeholders

Step 7 Effective

Monitoring and

Verification Tool

Development

Linking online building

construction approval with

Energy Management

Information System

Development of data

framework for state level ECBC

compliance and linking the

framework to validating EMIS

AND

Introduce and advance a

critical Building Energy

Regulation and Disclosure

policy (BER&D)in the state.

State Government,

MAUD, Energy

Department, SDA, BEE

and other institutional

partners

Few Screenshots to understand the process of

ECBC compliance implementation in Greater

Hyderabad Municipal Corporation

DRAFT

GHMC Building Application- ECBC incorporation

Administrative Staff College of India 12

• Provisions for ECBC empanelled TPA are to be incorporated in Part I, table C

point 4 of building application form of GHMC as shown below

DRAFT Administrative Staff College of India 13

GHMC Building Application- ECBC incorporation• Provisions for ECBC compliance documents (compliance report) in Part I,

table E, point 33 of building application form of GHMC as shown below

DRAFT Administrative Staff College of India 14

GHMC Building Application- ECBC incorporation• Provisions for ECBC compliance certificate (issued by empanelled TPA) in Part III

table A, point 13 of building application form of GHMC as shown below

Incorporation of ECBC in GHMC online

Building Approval System

Incorporation of ECBC in GHMC online

Building Approval System

Incorporation of ECBC in GHMC online

Building Approval System

Supportive Resources -

http://ghmc1.ghmc.gov.in/index.asp

Expression of Interest for

Empanelment of Third Party

Assessors for implementation

of ECBC in Telangana

FAQs on Online

Compliance System for

ECBC

Further Action

Requested

GHMC to

incorporate

ECBC

compliance in

its final Building

Permit Order

Administrative Staff College of India 20

Thank YouRajkiran V. Bilolikar,