Page 1: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

© 2011 Cisco and/or its affiliates. All rights reserved. Cisco Connect 1 1 © 2012 Cisco and/or its affiliates. All rights reserved.

Implementation of Cisco Data Center Solution Council of Ministers BiH

Ivana Šimić

Dubrovnik, Croatia, South East Europe

20-22 May, 2013

Page 2: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Agenda

• About CoM

• Problems in the past

• Goals

• Solution

• Results

Page 3: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Department for Maintenance and Development of IT Systems and E-Gov

• Established in 2010;

• Providing IT services to all BiH state-level institutions;

• Responsible for development of E-administration on state-level.

Page 4: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

1. Ministry of Defense

2. Ministry of Civil Affairs

3. Ministry of Comunication and Transport

4. Ministry of Finance and Treasury

5. Ministry of Human Rights and Refugees

6. Ministry of Justice

7. Ministry of Security

8. Ministry of vanjske trgovine i ekonomskih odnosa

9. Ministry of Foreign Affairs

10. Legislative Office

11. General secretariat of CoM

12. Veterinary Office of BiH

13. Procurement Review Body of civil servants

14. Office of the Coordinator of Brcko District

15. Directorate for Economic Planning

1. Directorate for European Integration

2. Directorate for Coordination of Police Bodies of BiH

3. Civil Service Agency of BiH

4. Foreign Investment Promotion Agency of BiH

5. Labour and Employment Agency of B

6. Personal Data Protection Agency

7. State Regulatory Agency for Radiation Safety and Nuclear Safety

8. Police Support Agency of BiH

9. Market Surveillance Agency of BiH

10. Institute of Metrology of Bosnia and Herzegovina

11. Service for Common Affairs of the Institutions of BiH

12. Office of Attorney General of BiH

13. Presidency of BiH

14. The Return Fund of BiH

Users of e-Government services

Page 5: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Old arhitecture

Page 6: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Goals

• Increase the level of services reliability,

• Decrease maintenance and exploitation cost,

• Unify operative and management platform,

• Implement core data center networking on 10Gb FCoE infrastructure,

• Create highly available virtual enviroment,

• Create scalable system,

• Consolidate SQL instance in production,

Page 7: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Solution

• Implemented by local partner LOGOSOFT

• Data Centre is based on the following products:

Data Centar Core Switching: 2x Nexus 5548UP- Layer3 module;

Data Centre Aggregation – 2x UCS 6248 Fabric Interconnect – Switches

Data Centre Server Platform – Cisco UCS 5108 blade Server chassis with 6 Cisco UCSB200 M3 servers;

Data storage - EMC VNX5100 Storage;

Back-up solutions - EMC Avamar

Page 8: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

© 2012 Cisco and/or its affiliates. All rights reserved. Cisco Connect 8

Layer 1 design

Page 9: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Layer 2

VLAN segmentation

Virtual PortChannel (vPC) protocol

Spanning tree configuration

Host Standby Router Protocol (HSRP)

Dynamic Routing- OSPF

Layer 3

Page 10: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Data Centre of CoM

Page 11: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

High availability

• Redundancy of hardware component with an automatic hardware failover;

• Redundant empower in all data centre devices;

• Redundant Layer 2 routes through network;

• Multi-Chassis Link Aggregation (MLAG) – Virtual Port Channel (vPC) for aggregation of link and redundant route;

• Layer 3 redundancy realised by Hot Standby Router Protocol

• For redundancy of routes the OSPF link state routing protocol is configured

Page 12: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

Results

• Consolidation and effective use of IT resources;

• Improved multiply infrastructure performances;

• Decreased IT structure complexity;

• Simpler, more unified and centralised administration;

• Decreased electric power costs for empowering and cooling of server room;

• Decreased space needs for server equipment in the server room.

Page 13: Implementation of Cisco Data Center Solution · Ivana Šimić Dubrovnik, Croatia, South East Europe 20-22 May, 2013 . Agenda

© 2012 Cisco and/or its affiliates. All rights reserved. Cisco Connect 13

Thank you.