Ch15 Copyright © 2001 by Eugean Hacopians
1
Implementation and Integration• Implementations and integration are two different
phases performed in sequence• Problems with this approach
– To test a module independently, Development and SQA members need
• Stubs for modules that call other modules• Drivers for modules that are being called
– Isolating faults are more difficult during integration• To solve these problems these phases must be
performed in parallel
Ch15 Copyright © 2001 by Eugean Hacopians
2
Top-Down Implementation and Integration
• In this approach we develop modules in order:– Root modules
• Use stubs to test the modules it calls
– Expand stubs to create the actual modules• Reduces the stub waist
Ch15 Copyright © 2001 by Eugean Hacopians
3
Top-Down Implementation and Integration
• Advantages– Fault isolation
• Integration testing is done when each module is completed– Stubs are not wasted– Major design faults show up early
• By dividing the modules into two classes– Logic modules
» Decision making modules– Operational modules
» Perform the actual operations• In is important to code and test logic modules before operational
modules
Ch15 Copyright © 2001 by Eugean Hacopians
4
Top-Down Implementation and Integration
• Disadvantages– Lower level modules are not tested frequently
• If a program has 200 modules– Root is tested 200 times (highest)– Lowest modules are tested fewer times (lowest)
• Operational modules are tested the least– Reusable modules are not properly tested
• Logic modules are less likely to be reused– Problem specific
• Reused modules are most likely the lower modules– Operational modules
• Top-Down makes reuse risky due to poor testing
Ch15 Copyright © 2001 by Eugean Hacopians
5
Top-Down Implementation and Integration
• Defensive programming is when programmers test the input before use– Example:
if (x >= 0) y = computeSquareRoot (x, errorFlag);
– Subroutine is never tested with x < 0• This shields any fault cause by x < 0
– Reuse implications
Ch15 Copyright © 2001 by Eugean Hacopians
6
Bottom-Up Implementation and Integration
• In this approach we develop modules in order:– Operational (lower) level modules
• Use drivers to test the modules
– Logic (higher) level modules
Ch15 Copyright © 2001 by Eugean Hacopians
7
Bottom-Up Implementation and Integration
• Advantages– Operational modules are thoroughly tested
• Use drivers to test these modules• Bypass fault shielding
– Defensively programmed calling modules
– Fault isolation
• Disadvantages– Major design faults are detected late
Ch15 Copyright © 2001 by Eugean Hacopians
8
Sandwich Implementation and Integration
• Combination of top-down and bottom-up strategies– Making use of their strengths and minimizing their
weaknesses
• Development order– Logic modules are implemented and integrated top-down– Operational modules are implemented and integrated
bottom-up– Finally, the interfaces between the two groups are tested
Ch15 Copyright © 2001 by Eugean Hacopians
9
Sandwich Implementation and Integration
• Advantages– Major design faults are caught early– Operational modules are thoroughly tested
• They may be reused with confidence
– There is fault isolation at all times
Ch15 Copyright © 2001 by Eugean Hacopians
10
Implementation and Integration Summery
Ch15 Copyright © 2001 by Eugean Hacopians
11
Implementation and Integration of Object-Oriented Products
• Almost always using sandwich implementation and integration
• Objects are integrated bottom-up• Other modules are integrated top-down
– Logic modules such as Main
Ch15 Copyright © 2001 by Eugean Hacopians
12
Management Issues during the Implementation and Integration
• Finding out module interfaces does not work– M1 calls M2 with 4 parameters– M2 is defined with 3 parameters
• Documents must be controlled• SQA managers must have responsibility of deciding
which modules should be developed top-down and which will be developed bottom-up
• Testing must be performed by SQA Team
Ch15 Copyright © 2001 by Eugean Hacopians
13
Testing during the Implementation and Integration
• Module testing– Test new modules thoroughly– Integrate with previously integrated modules– Test to see the behavior did not change
Ch15 Copyright © 2001 by Eugean Hacopians
14
Testing during the Implementation and Integration
• Graphical User Interface– Test Cases
• Mouse clicks• Menus• Input fields
– Not easy to test GUI– Mostly manual process– Need CASE Tool to make it easy
• QAPartner• XRunner
Ch15 Copyright © 2001 by Eugean Hacopians
15
Testing during the Implementation and Integration
• Product testing– Performed by SQA team to ensure that the product will not
fail its acceptance test– Failing the acceptance test is a disaster for management
• The client may conclude that the developers are incompetent• Worse, the client may believe that the developers tried to cheat
– The SQA team must ensure that the product passes its acceptance test
– Black box test cases for the product as a whole– Robustness of product as a whole
• Stress testing (under peak load)• Volume testing (e.g., can it handle large input files?)
Ch15 Copyright © 2001 by Eugean Hacopians
16
Testing during the Implementation and Integration
• Product testing– Check all constraints
• Timing constraints • Storage constraints• Security constraints• Compatibility
– Review all documentation to be handed over to the client
– Verify the documentation against the product
Ch15 Copyright © 2001 by Eugean Hacopians
17
Testing during the Implementation and Integration
• Acceptance testing– The product (software plus documentation) is now
handed over to the client organization– The client determines whether the product satisfies
its specifications– Performed by either
• The client organization• The SQA team in the presence of client representatives• An independent SQA team hired by the client
Ch15 Copyright © 2001 by Eugean Hacopians
18
Testing during the Implementation and Integration
• Acceptance testing– Performed with actual data provided by client– Four major components of acceptance testing
• Correctness• Robustness• Performance• Documentation
– Precisely what was done by developer during product testing
Ch15 Copyright © 2001 by Eugean Hacopians
19
CASE Tools for Implementation and Integration Phase
• Version control tools• Build tools• Configuration Management tools
Ch15 Copyright © 2001 by Eugean Hacopians
20
CASE Tools for Complete Software Process
• CASE tools– Single tool– Performs one task – A small organization can usually manage with just CASE tools
• Workbench– Supports few activities – A medium-sized organization can probably manage with a workbench
• Environment– A complete solution for most of the process– A large organization needs an environment
Ch15 Copyright © 2001 by Eugean Hacopians
21
Integrated Environment
• Integrated CASE tools are those tools that have common interface– Similar “look and feel”
• Tool integration means that all tools communicate via the same data format– ASCII files
Ch15 Copyright © 2001 by Eugean Hacopians
22
Integrated Environment• Process integration refers to an environment that
supports a specific software process• Technique-based or method-based environment
– Supports specific technique• Structured systems analysis
– Usually comprises• Graphical support for specification, design phases• Data dictionary• Some consistency checking• Some management support
Ch15 Copyright © 2001 by Eugean Hacopians
23
Integrated Environment
• Technique-based or method-based environment– Support and formalization of manual processes
• Analyst/Designer, Rose, Rhapsody (for Statecharts)
– Advantage• Forced to use specific method, correctly
– Disadvantages• Forced to use specific method• Inadequate support of programming-in-the-many
Ch15 Copyright © 2001 by Eugean Hacopians
24
Environment for Business Applications
• Environment to build business oriented products– Emphases is ease of use– Includes number of standard screens (GUI)
• Can be easily modified
– Standard forms for input, output– Provides a capability to generate code
• Input is Detailed design – lowest level of abstraction
• Output is software code• Expect productivity rise
Ch15 Copyright © 2001 by Eugean Hacopians
25
Potential Problems with Environments
• No one environment is ideal for all organizations• Each has its strengths and weaknesses
– Choosing the wrong environment can be worse than no environment
– Enforcing a wrong technique is counterproductive
• CASE environments should be avoided until the organization is at CMM level 3– We cannot automate a nonexistent process– A CASE tool or CASE workbench is fine
Ch15 Copyright © 2001 by Eugean Hacopians
26
Metrics for The Implementation and Integration Phase
• The five basic metrics mentioned before• Complexity metrics• Number of test cases, percentage which resulted
in failure• Total number of faults, by types
Ch15 Copyright © 2001 by Eugean Hacopians
27
Challenges of The Implementation and Integration Phase
• Management issues are– Choosing an appropriate CASE tools– Test case planning– Communicating changes to all personnel– Deciding when to stop testing