7/25/2019 Imola Site Survey
1/10
Rx Imola Installation
Site Survey
1. Instructions
The Field Engineer or Sales Representative must schedule a preliminary Site Survey visit in
accordance with local branch operating procedures.
Conduct the survey in cooperation with the customers biomedical or maintenance engineer. You
must define acceptance or reection of each re!uirement listed in the Site Survey form by
chec"ing Acceptedor Rejectedin the #reliminary $isit section.
%escribe the reason for the reection of any parameter& and inform the customer of allunacceptable parameters and the reasons for reection.
'f any parameters are mar"ed Rejectedduring a preliminary site visit& a final visit must be made
to ensure that all unacceptable conditions have been satisfied. Time must be allowed for
corrective action to be ta"en before the final visit. 'f& after the final site survey visit& there are still
unacceptable conditions& notify the customer and Service (anager.
The Service (anager should notify the customer that specific system installation re!uirements
have not been met and that delivery of the system may be delayed if all the site problems are not
resolved before the scheduled installation date.
2. Distribution
Forward a completed copy of the site survey forms to)
a. Customer *+aboratory Supervisor,
b. Rando- ffice
3. Customer Details
Institution:
Address
City: County:
ost Code: Country:
!elep"one:
#ab Director:
rimary Contact: !elep"one:
R- 'mola Site Survey%ecember /001
1
7/25/2019 Imola Site Survey
2/10
$. Installation Route2nalyser dimensions are as follows)
3idth %&' mm %epth ()2 mm
4eight *%' mm 3eight 1(' +,
#rovide a brief description of the route the analy5er will ta"e from the delivery area to theproposed installation site. #articular attention should be made to doorways& staircases& etc.
(. o-er Reuirements
The R- 'mola re!uires a 67pin *or /7pin depending on site location, power outlet with a ground
*27Type& S7Type or 7Type, within the reach of the analysers accessory power cable.
o-er outlet installation must be re/erred to uali/ied personnel only
Speci/ications
#ower %'' 0A
(a-imum Current %raw 8
Circuit 9rea"er Ratings 8
'nput $oltages 8
%oes the 2C power outlet meet the re!uired specifications *,8 Yes :o
The system should not be installed near sources of high fre!uency noise *i.e. centrifuges ordischarge units,.
's the proposed installation site free of such noise *,8 Yes :o
I/ Rejected state reasons.
R- 'mola Site Survey%ecember /001
Accepted Rejected
2
7/25/2019 Imola Site Survey
3/10
*. SThe ;#S should be capable of supplying 123' -attsfor the R< 'mola = #C system.Furthermore& the re!uired ma-imum power re!uirements should ta"e into account thelaboratory water system. The ;#S needs to maintain this supply for as long as the power outsituation lasts or as determined by the customer.
(a-imum #ower Consumption *3atts,
R- 'mola %''
%ell E>16F# >1? (onitor 1*$
%ell ptiple- @
7/25/2019 Imola Site Survey
4/10
). Draina,e ReuirementsThe drainage system must capable of removing at least >A + of waste per hour.
The drainage outlet should be positioned at least 100 mm lower than the proposed analy5erposition.
Analyser
('' mm
6aste 9utlet
%oes the drainage system meet the re!uired specifications *,8 Yes :o
I/ Rejected state reasons.
R- 'mola Site Survey%ecember /001
Accepted Rejected
4
7/25/2019 Imola Site Survey
5/10
%. nvironmental ReuirementsThe analyser installation site must satisfy the following environmental conditions)
Tas" *,
:o direct sunlight
%ust free environment
:o vibration or e-cessive sound levels
2 floor and supporting wor"top capable of holding the analyser weight *B>0 "g,
#lacement on a hori5ontal surface
:o variation in voltage supply *less than D >0 ,
2void placement under fluorescent lighting
2re all environmental conditions satisfied *,8 Yes :o
I/ Rejected state reasons.
R- 'mola Site Survey%ecember /001
Accepted Rejected
5
7/25/2019 Imola Site Survey
6/10
1'. !emperature ; 4umidity ConditionsThe analyser must meet the following criteria)
Tas" *,
'ndoor temperature) >1 60GC
$ariation) H /GC per hour
@ood air ventilation
'ndoor humidity) I1 A1 *without condensation,
:o e-posure to air conditioning or heat e-changers
2re all temperature and humidity conditions satisfied *
,8 Yes :o
I/ Rejected state reasons.
R- 'mola Site Survey%ecember /001
Accepted Rejected
6
7/25/2019 Imola Site Survey
7/10
11. SpaceRefer to the diagram below for re!uired installation space. This is essential for maintenance and fore-haust ventilation. *;nit) mm,
Jspace for e-haustH >10K
C600K 600K Analyser 600K
>6I0 L0
00
LM0 100K
Front
/IM0
2re all space conditions satisfied *,8 Yes :o
I/ Rejected state reasons.
R- 'mola Site Survey%ecember /001
Accepted Rejected
7
7/25/2019 Imola Site Survey
8/10
12. 4ost ConnectionsConditions for communication with the host #C and analyser #C are defined below *boldindicates default settings,)
9aud Rate Selection of baud rate) 1%2''= L00 = IA00 = /I00 = 600 bps
%ata 9it %ata bit length) M=)bits
Stop 9it Stop bit length) >=2bits
#arity 9it #arity) 6A>,
7/25/2019 Imola Site Survey
9/10
;se the space below to s"etch a proposed location of the system in the laboratory& withparticular reference to)
a. 2ppro-imate laboratory dimensionsb. %istances from the system water supplyc. 3aste drain
d. Electrical supply
R- 'mola Site Survey%ecember /001
9
7/25/2019 Imola Site Survey
10/10
Site Survey Report Revie-ed by #aboratory ersonnel:
reliminary 0isit:
Date:
Si,nature: ===============================
>inal 0isit:
Date:
Si,nature: ===============================
>ield n,ineer ; Sales Representative er/ormin, Survey:
reliminary 0isit:
Date:
Si,nature: ===============================
>inal 0isit:
Date:
Si,nature: ===============================
Is t"e site ready /or installation ? @ Bes