Upload
as-fort
View
100
Download
0
Tags:
Embed Size (px)
Citation preview
1
11,681,248.78
Project No J7AU0VC2 00 XZ Project Name
UNIT PRICE AMOUNT
I
1.00323264.91 KG 16.30 5,269,218.033
2.001182486.22 KG 16.30 19,274,525.39
3.00238949.51 KG 16.30 3,894,877.01
4.001780247.70 KG 16.30 29,018,037.51
5.00666584.64 KG 16.30 10,865,329.63
6.0085901.96 KG 16.30 1,400,201.95
7.001090866.31 KG 16.30 17,781,120.85
8.004339.940 KG 16.30 70,741.02
TOTAL Amount : 87,574,051.40
II
1.00
8.56 KG 310.00 2,653.60
2.00
196.69 KG 70.00 13,768.30
3.00
20,313.05 KL 560.00 11,375,308.00
PANAY POWER PLANT 82MW - 300T/H x 2 UNITS : CFB CIVIL WORKS
ARMAA33 R
Mixed Gravel: Ø(0.074mm ~ 13.33mm)Sp Gravity = 1.6 碎石級配 0.074mmΦ-13.33mmΦ 總 比重 1.600 詳規範
ARSGR3 R
Rebar SD280 (G40) 10mmØ CNS560 (include unloading by crane)
ARSDB8 S 0
Rebar SD280 (G40) 13mmØ CNS560 (include unloading by crane)
ARSDB9 S 0
MATERIALS
Plaster Bond 20000 海菜粉 粘度 20000
ARMAA1 R
PVC Vinyl Tile Adhesive 12KG/CN PVC地磚用 接著劑 南亞 12KG/TK
Rebar SD420 (G60) 36mmØ CNS560 (include unloading by crane)
ITEM Material Description and Construction List MATERIAL CODE QUANTITY
PRICE
MATERIAL AND CONSTRUCTION LIST
Rebar SD420 (G60) 25mmØ CNS560 (include unloading by crane)
ARSDB19 S 0
Rebar SD420 (G60) 32mmØ CNS560 (include unloading by crane)
ARSDB21 S 0
SUPPLIED BY FHI
Rebar SD280 (G40) 16mmØ CNS560 (include unloading by crane)
ARSDB10 S 0
Rebar SD420 (G60) 19mmØ CNS560 (include unloading by crane)
ARSDB17 S 0
Rebar SD420 (G60) 22mmØ CNS560 (include unloading by crane)
ARSDB18 S 0
2
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
4.00
1,396.22 KL 630.00 879,618.60
4.aa
7,146.62 KL 630.00 4,502,370.60
5.00
1,680.97 KL 650.00 1,092,630.50
6.00
- ST 140.00 -
7.00
- ST 460.00 -
8.00
- ST 560.00 -
9.00
- ST 75.00 -
10.00
- ST 245.00 -
11.00
- ST 760.00 -
12.00
27.44 KG 40.00 1,097.53
Anchor Bolt L-Type; A307 Gr. B with 2 nuts M22mm x 1064MM x P2.5 Galvanized(20mg/sqm)
BONAP262 R
Anchor Bolt L-Type; A307 Gr. B with 2 nuts M32mm x 1402MM x P2.5 Galvanized(20mg/sqm)
BONAP265 R
Waterproof Additive for Plastering CEPAD1 R
Anchor Bolt L-Type; A307 Gr. B with 2 nuts M36mm x 1000MM x P2.5 Galvanized(20mg/sqm)
BONANF52 R
Anchor Bolt L-Type; A307 Gr. B with 2 nuts M48mm x 1000MM x P2.5 Galvanized(20mg/sqm)
BONANF74 R
Anchor Bolt J-Type; A307 Gr. B with 2 nuts M16mm x 500MM x P2.5 Galvanized(20mg/sqm)
BONANL71 R
Fine Sand [Plastering] 溪砂 細砂
ARSNS1 R
Aggregates Ø3/4 規格石Φ3/4"
ARSSST154 R
Anchor Bolt L-Type; A307 Gr. B with 2 nuts M20mm x 800MM x P2.5 Galvanized(20mg/sqm) 基礎螺栓L型鍍鋅鋼A307Gr.B M20 X 800mml X P2.5 連重型雙螺帽
BONANF31 R
ARSNS1 R
Fine Sand [Backfill] 溪砂、細沙(回填)
3
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
13.00
1,635.90 BX 176.00 287,918.40
14.00
BX 545.00 -
15.00
3,913.16 KL 2,000.00 7826320.00
16.00
30,083.09 KL 2,270.00 68,288,614.30
17.00
15,951.40 KL 2,570.00 40,995,098.00
18.00
418.18 KL 2,670.00 1,116,540.60
19.00
- KL 2,600.00 -
20.00
- KL 2,700.00 -
21.00
- KG 50.00 -
22.00
- ST 15,700.00 -
23.00
- ST 34,950.00 -
Analok Aluminum Swing Door & Jamb 1.5mm thk x 120cmW*210cmH; including Lockset, Closer, Accessories and Installation
DORMD98 R
SUS304 Panel Door: 140cm x 200cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
DORMFK51 R
Structural Concrete 280kg/cm²(4000 psi) - 28days Type II Cement
CEPRM292 R
Expansion Grout 280kg/cm²(4000 psi) - 28days Type II Cement
CEPRM299 R
Paint Thinner XYLENE CHEOR488 R
Structural Concrete 210kg/cm²(3000 psi) - 28days 預拌混凝土 210kg/cm2 水泥210Kg1型水泥
CEPRM233 R
Structural Concrete 280kg/cm²(4000 psi) - 28days 預拌混凝土 280kg/cm2 水泥240Kg 1型水泥
CEPRM235 R
Expansion Grout 280kg/cm² (4000 psi) - 28days CEPRM259 R
Portland Cement 50KG/BX Type P1 水泥 50KG/BX 卜特蘭第1種
CEPCE1 R
White Cement 50KG/BX 白水泥 50KG/BX
CEPCE3 R
Lean Concrete 140kg/cm²(2000 psi) - 28days 預拌混凝土 140kg/cm2 水泥170Kg 1型水泥
CEPRM231 R
4
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
24.00
- ST 34,950.00 -
24.aa R
3.00 ST 22,480.00 67,440.00
25.00
2.00 ST 43,000.00 86,000.00
26.00
- ST 71,925.00 -
26.aa
7.00 ST 64,197.52 449,382.64
26.bb
1.00 ST 59,442.15 59,442.15
26.cc R
1.00 ST 104,052.00 104,052.00
27.00
- ST 1,530.00 -
28.00
- ST 43,000.00 -
28.aa
2.00 ST 46,440.00 92,880.00
29.00
14.00 ST 34,950.00 489,300.00
SUS316 Swing Door: 120cm x 250cm with Jamb 1.5mmthk Frame/1.5mmthk Panel w/ Viewing Glass, Auto-Closer, Bar Handle + Installation
DORSD611 R
SUS304 Swing Door: 90cm x 210cm with Jamb 1.5mmthk Frame/1.5mmthk Panel w/ Viewing Glass, Auto-Closer, Bar Handle + Installation
DORSD906 R
SUS304 Panel Door: 180cm x 260cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
DORMFK53 R
SUS304 2-Panel Door: 275cm x 220cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
DORMFK56 R
PVC Door 75cm x 200cm; White including Jamb, Lockset + Installation
DORPV132 R
SUS316 Single leaf Door: 270cmH x 120cmW & Jamb 1.5mmthk Frame/1.2mmthk Panel, Doorlock, Footbolt and Door Closer + Installation
SUS304 2-Panel Door: 250cm x 350cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
R046
SUS304 Panel Door: 102cm x 206cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
DORMFK52 R
SUS304 2-Panel Door: 180cm x 300cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
SUS304 2-Panel Door: 250cm x 200cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
SUS304 Panel Door: 75cm x 180cm & Jamb 1.5mmthk Frame/1.2mmthk Panel w/ Viewing Glass, Doorlock, Footbolt and Door Closer + Installation
R049
5
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
30.00
8.00 ST 40,000.00 320,000.00
31.00
- ST 28,735.00 -
31.aa
1.00 ST 23,945.83 23,945.83
32.00
- ST 46,900.00 -
33.00
- ST 120,000.00 -
33.aa
2.00 137,142.85 274,285.70
33.bb
1.00 ST 71,428.57 71,428.57
33.cc
1.00 ST 92,857.14 92,857.14
34.00
- ST 59,000.00 -
35.00
- ST 37,000.00 -
36.00
- ST 30,500.00 -
Galvanized SS400 Roll-Up Door: 3.0mm thk 600cmW x 400cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ27 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 500cmWx250cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ29 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 290cmWx195cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ30 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 400cmW x 400cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ25 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 600cmW x 700cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ26 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 600cmW x 800cmH; Motor Operated-220Vx1/2hP including Installation and Painting
Galvanized SS400 Roll-Up Door: 3.0mm thk 500Wx500H; Motor Operated-220Vx1/2hP including Installation and Painting
Galvanized SS400 Roll-Up Door: 3.0mm thk 650Wx500H; Motor Operated-220Vx1/2hP including Installation and Painting
SUS304 Swing Door: 120cm x 210cm with Jamb 1.5mmthk Frame/1.0mmthk Panel w/ Viewing Glass, Auto-Closer, Bar Handle + Installation
DORSD918 R
SUS304 Swing Door: 100cm x 210cm with Jamb 1.5mmthk Frame/1.2mmthk Panel, Auto-Closer, Bar Handle + Installation
SUS304 Swing Door: 120cm x 210cm with Jamb 1.5mmthk Frame/1.2mmthk Panel, Auto-Closer, Bar Handle + Installation
DORSDJ24 R
6
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
37.00
2.00 ST 33,700.00 67,400.00
38.00
- ST 30,500.00 -
39.00
- ST 39,200.00 -
39.aa
1.00 ST 42,875.00 42,875.00
40.00
- ST 34,900.00 -
40.aa
1.00 ST 32,718.75 32,718.75
41.00
35.00 PC 375.00 13,125.00
42.00
12.01 SM 2,500.00 30,025.00
43.00
226.51 SS 13,000.00 2,944,630.00
44.00
6.00 PC 1,000.00 6,000.00
45.00
- SF 320.00 -
Galvanized SS400 Roll-Up Door: 3.0mm thk 400cmWx350cmH; Motor Operated-220Vx1/2hP including Installation and Painting
Raised Flooring Sytem; Galvanized 500KG / 60CMx60CM including accessories and installation (1SS = 3.306 SqM)
DRDFM4 R
Faucet DRNBP156 R
Smoke Wired Glass 6mmt including accessories, silicon and installation
DWPGP33 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 300cmWx320cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ34 R
Stainless Roof Drain w/ Strainer; 4"Ø DRABS26 R
PVC Cubicle Partition for CR inlcuding all accessories and installation
DRDCO44 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 300cmWx230cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ32 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 400cmWx300cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ33 R
Galvanized SS400 Roll-Up Door: 3.0mm thk 300cmWx300cmH; Motor Operated-220Vx1/2hP including Installation and Painting
Galvanized SS400 Roll-Up Door: 3.0mm thk 350cmWx250cmH; Motor Operated-220Vx1/2hP including Installation and Painting
DORSEZ31 R
7
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
45.aa1,913.01 SF 266.67 510,142.38
46.00
MT 1,800.00 -
47.00
KG 39.00 -
48.00
425.22 KG 235.00 99,926.70
49.00
515.59 KG 230.00 118,585.70
50.00
2,990.39 KG 230.00 687,789.70
51.00
- KG 230.00 -
52.00
- KG 230.00 -
53.00
1,521.51 KG 63.00 95,855.13
54.00
- PC 475.00 -
54.aa
2,279.32 PC 540.00 1,230,832.80
Smoke Wired Glass 5mmt including accessories, silicon and installation
Self Levelling Epoxy - Alkali Acid Free Top Coating; Color Green HT1A(21KG/CA)+HT1B(7KG/CA) with fiber glass
FLTPM49 R
Fiber Glass Insulation 300g/m² x 1M [Sound Installation inside Calcium Silicate Board]
HIGGT4 R
Calcium Silicate Board 1.0kg/cm³ 8mmthk*1220mm*2440mm
HIMMH184 R
Calcium Silicate Board 1.0kg/cm³ 9mmthk*1220mm*2440mm
HIMMH184 R
Self Levelling Epoxy Alkali Acid Free - First Coating; Color Green FU1A(21KG/CA)+FU1B(7KG/CA)
FLTPM25 R
Self Levelling Epoxy - Alkali Acid Free Top Coating; Color Green FT1A(21KG/CA)+FT1B(7KG/CA)
FLTPM26 R
Self Levelling Epoxy - Alkali Acid Free applied with fiber and primer coating, color green HUIA(21KG/CA)+HU1B(7KG/CA)
FLTPM44 R
Asphalt Mix: IV-C FLTAC2 R
Asphalt Prime Coat #70 FLTAC3 R
Epoxy Primer Coat PO2A(21KG/CA) + FU1B (7KG/CA)
FLTPM22 R
8
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
55.00
- PC 330.00 -
56.00
16,974.22 PC 23.00 390,407.06
57.00
- M 345.00 -
58.00
- M 147.00 -
59.00
- M 130.00 -
60.00
304.30 GL 340.00 103,462.00
61.00
152.15 GL 340.00 51,731.00
62.00
- PC 2,630.00 -
62.aa
3,909.00 PC 1,095.80 4,283,482.20
63.00
- PC 1,500.00 -
63.aa
11.00 PC 1,358.47 14,943.13
PVC Sanitary Pipe series 1000: 4" x 3.7mm x 5M including accessories and consumables
Concrete Enamel Paint # 69 1 GL/CA Primer White PASPR50 R
RCCP: Culvert Pipe 60cm x 2.4M PIORP101 R
PVC Pipe: 6" x 5.1mm x 5M PLPRP183 R
PVC Coated and Galvanized Wire Mesh: SWG#12(2.64MMØ)*50mm*1.8M
MENCH45 R
Mild Steel Tubular 40mm*40mm*3mm MEPSQ20 R
Concrete Enamel Paint # 69 1 GL/CA Top Coat Gloss White
PASFP241 R
RCCP: Culvert Pipe 60cm x 1.0M
Calcium Silicate Board 1.0kg/cm³ 5mmthk*1220mm*2440mm
HIMMH211 R
Styrofor Boards 3CM*30CM*30CM HISIB5 R
PVC Coated and Galvanized Wire Mesh: SWG#10(3.25MMØ)*50mm*1.5M
MENCH29 R
9
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
63.bb
8.00 PC 1,018.85 8,150.80
63.cc
21.00 PC 184.30 3,870.30
64.00
2,226.95 KG 145.00 322,907.75
65.00
4,453.90 KG 110.00 489,929.00
66.00
607.35 KG 125.00 75,918.75
67.00
- PC 100.00 -
68.00
172.77 SS 575.00 99,342.75
69.00
- PC 95.00 -
70.00
3,064.91 M 160.00 490,385.60
71.00
- ST 6,200.00 -
71.aa
2.00 ST 6,458.30 12,916.60
PVC Sanitary Pipe series 1000: 3" x 3.8mm x 5M including accessories and consumables
PVC Potable Water Pipe Series 8: ¾" x 2.40mm x 5M for waterlines including accessories and consumables
PVC Water Stop 150 mm X 4.0 with Center Bulb
PVPWS5 R
Analok Aluminum Sliding Window Frame 1.5mmt*180cmW*120cmH; including Installation w/o glass
R001 R
Analok Aluminum Sliding Window Frame 1.5mmt*150cmW*150cmH; including Installation w/o glass
PVC Baseboard 100mm x 4M per PC PVPBB7 R
PU Waterproof Material US-10 Top Coat Application - 10KG/CA
PUDBA11 R
PU Waterproof Material US-10 Mid Coat Application - 20KG/CA
PUDBA12 R
PU Waterproof Material US-10 Primer Coat Application - 15KG/CA
PUDBA5 R
PVC Vinyl Tiles 2.0mm thk x 1' x 1' PVPT1146 R
PVC Wall Panels: 8' Long; White Color PVPWP124 R
10
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
72.00
- ST 3,350.00 -
72.aa
2.00 ST 5,583.33 11,166.66
73.00
- ST 3,600.00 -
74.00
2.00 ST 4,350.00 8,700.00
74.aa
3.00 ST 2,416.67 7,250.01
75.00
- ST 7,750.00 -
76.00
- ST 9,900.00 -
77.00
- ST 5,800.00 -
78.00
- ST 6,600.00 -
79.00
- ST 4,100.00 -
79.aa
6.00 ST 4,100.00 24,600.00
R006 R
Analok Aluminum Sliding Window Frame 1.5mmt*226cmW*130cmH; including Installation w/o glass
R007 R
Analok Aluminum Sliding Window Frame 1.5mmt*320cmW*60cmH; including Installation w/o glass
R008 R
Analok Aluminum Sliding Window Frame 1.5mmt*120cmW*60cmH; including Installation w/o glass
R002 R
Analok Aluminum Sliding Window Frame 1.5mmt*320cmW*130cmH; including Installation w/o glass
Analok Aluminum Sliding Window Frame 1.5mmt*160cmW*60cmH; including Installation w/o glass
R009 R
Analok Aluminum Sliding Window Frame 1.5mmt*150cmW*80cmH; including Installation w/o glass
R003 R
R004 R
R005 R
Analok Aluminum Sliding Window Frame 1.5mmt*100cmW*60cmH; including Installation w/o glass
Analok Aluminum Sliding Window Frame 1.5mmt*120cmW*80cmH; including Installation w/o glass
Analok Aluminum Sliding Window Frame 1.5mmt*126cmW*60cmH; including Installation w/o glass
Analok Aluminum Sliding Window Frame 1.5mmt*180cmW*60cmH; including Installation w/o glass
Analok Aluminum Sliding Window Frame 1.5mmt*220cmW*130cmH; including Installation w/o glass
11
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
80.00
- ST 5,380.00 -
81.00
2.00 ST 5,660.00 11,320.00
82.00
- ST 6,930.00 -
82.aa
4.00 ST 8,085.00 32,340.00
83.00
19.00 ST 7,795.00 148,105.00
84.00
- ST 7,000.00 -
85.00
2.00 ST 13,450.00 26,900.00
86.00
- ST 15,700.00 -
86.aa
6.00 ST 7,963.77 47,782.62
86.bb
2.00 ST 17,065.22 34,130.44
87.00
6.00 ST 6,700.00 40,200.00
Analok Aluminum Swing Door 180cmW*300cmH; 2-Panel whole glass including Lockset, Closer, Accessories and Installation
Analok Aluminum Swing Door 120cmW*210cmH; 2-Panel whole glass including Lockset, Closer, Accessories and Installation
R015 R
Analok Aluminum Sliding Window Frame 1.5mmt*200cmW*140cmH; including Installation w/o glass
R010 R
Analok Aluminum Sliding Door 90cmW*210cmH; Upper half-Glass and Lower half-Alum including Lockset, Accessories and Installation
R014 R
R011 R
R016 R
Analok Aluminum Swing Door 90cmW*210cmH; whole glass including Lockset, Closer, Accessories and Installation
R017 R
Analok Aluminum Sliding Window Frame 1.5mmt*200cmW*120cmH; including Installation w/o glass
R012 R
Analok Aluminum Sliding Window Frame 1.5mmt*240cmW*120cmH; including Installation w/o glass
R013 R
Analok Aluminum Sliding Window Frame 1.5mmt*240cmW*160cmH; including Installation w/o glass
Analok Aluminum Sliding Window Frame 1.5mmt*130cmW*130cmH; including Installation w/o glass
Analok Aluminum Swing Door 180cmW*276cmH; 2-Panel whole glass including Lockset, Closer, Accessories and Installation
Analok Aluminum Swing Door 180cmW*210cmH; 2-Panel whole glass including Lockset, Closer, Accessories and Installation
12
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
88.00
- ST 12,800.00 -
89.00
- ST 7,650.00 -
90.00
- ST 6,700.00 -
91.00
- ST 8,950.00 -
92.00
- ST 8,950.00 -
93.00
- ST 7,300.00 -
94.00
- ST 7,100.00 -
95.00
- ST 5,000.00 -
96.00
- ST 10,000.00 -
96.aa
5.00 ST 20,000.00 100,000.00
97.00
- ST 7,700.00 -
R027 R
R020 R
Analok Aluminum Swing Door 80cmW*240cmH; Upper half-Glass and Lower half-Alum including Lockset, Closer, Accessories and Installation
R024 R
Analok Aluminum Fixed Window 180cmW*120cmH; with 10mmThK Glass including Installation
R025 R
Analok Aluminum Fixed Window 300cmW*120cmH; with 10mmthk glass including Installation (Double Layer)
R026 R
R021 R
Analok Aluminum Swing Door 100cmW*237cmH; Single Panel w/ 5mmThK glass including Lockset, Closer, Accessories and Installation
R022 R
Analok Aluminum Swing Door 90cmW*238cmH; Upper half-Glass and Lower half-Alum including Lockset, Closer, Accessories and Installation
R023 R
Analok Aluminum Swing Door 135cmW*206cmH; 2-Panel w/ glass including Lockset, Closer, Accessories and Installation
R018 R
Analok Aluminum Swing Door 104cmW*206cmH; Single Panel w/ 5mmThK glass including Lockset, Closer, Accessories and Installation
R019 R
Analok Aluminum Fixed Window 600cmW*120cmH; with 10mmthk glass including Installation (Double Layer)
Analok Aluminum Swing Door 1000mmW*2446mmH; Single Panel w/ 5mmThK glass including Lockset, Closer, Accessories and Installation
Analok Aluminum Fixed Window 300cmW*120cmH; with 10mmthk Glass including Installation
Analok Aluminum Swing Door 81cmW*206cmH; Single Panel w/ 5mmThK glass including Lockset, Closer, Accessories and Installation
13
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
98.00
- ST 8,550.00 -
99.00
23.00 ST 5,500.00 126,500.00
100.00
- ST 21,900.00 -
101.00
- ST 3,700.00 -
102.00
- ST 7,800.00 -
102.aa
18.00 ST 7,605.63 136,901.34
103.00
- ST 7,800.00 -
103.aa
1.00 ST 7,394.37 7,394.37
103.bb
2.00 ST 7,394.37 14,788.74
103.cc
2.00 ST 8,986.21 17,972.43
104.00
- ST 27,000.00 -
Analok Aluminum Fixed Window 284cmW*130cmH; with 10mmthk Glass including Installation
R032 R
Analok Aluminum Fixed Window 250cmW*140cmH; with 5mmthk Glass and Insect Screen ; including Installation
Analok Aluminum Fixed Window 250cmW*140cmH; with 5mmthk Glass and Insect Screen with sliding glass including Installation
Analok Aluminum Fixed Window 240cmW*120cmH; with 5mmthk Glass and Insect Screen with sliding including Installation
R033 R
Galvanized SS400 Roll-Up Door: 200W*250H; Motor Operated 220Vx 1hP; including Installation
R035 R
R030 R
Analok Aluminum Fixed Window 108cmW*130cmH; with 10mmthk Glass including Installation
R031 R
Analok Aluminum Fixed Window 340cmW*120cmH; with 10mmthk Glass including Installation
R028 R
Analok Aluminum Fixed Window 200cmW*120cmH; with 10mmthk Glass including Installation
R029 R
Analok Aluminum Fixed Window 200cmW*180cmH; with 10mmthk Glass with sliding window including Installation
Analok Aluminum Fixed Window 284cmW*130cmH; with 6mmthk Glass and Insect Screen ; including Installation
Analok Aluminum Fixed Window 1000cmW*120cmH; with 10mmthk Glass including Installation
14
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
105.00
3.00 ST 5,600.00 16,800.00
105.aa
6.00 ST 7,000.00 42,000.00
106.00
2.00 ST 4,200.00 8,400.00
107.00
10.00 ST 1,900.00 19,000.00
108.00
3.00 ST 1,900.00 5,700.00
109.00
- PC 2,450.00 -
110.00
- ST 2,300.00 -
110.aa
1.00 ST 2,038.64 2,038.64
110.bb
1.00 ST 1,960.23 1,960.23
110.cc
1.00 ST 1,411.36 1,411.36
110.dd
3.00 ST 1,254.55 3,763.64
Analok Aluminum Sliding Window Frame 1.5mmt*120cmW*120cmH; including Installation w/o glass
R036 R
Analok Aluminum Fixed Window Frame 1.5mmt*150cmW*120cmH; including Installation with glass
Faucet 1/2" x 8" dual Control SANLS104 R
Mirror 5mm thk x 1100mm x 1200mm; chamferred sides with sealant
SANMI102 R
Mirror 5mm thk x 900mm x 800mm; chamferred sides with sealant
SANLA193 R
Lavatory SANLA50 R
Slop sink SANLA97 R
Counter Top for two(2) Lavatory and accessories including Installation
Mirror 5mm thk x 900mm x 1300mm; chamferred sides with sealant
Mirror 5mm thk x 900mm x 1250mm; chamferred sides with sealant
Mirror 5mm thk x 900mm x 900mm; chamferred sides with sealant
15
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
111.00
8.00 PC 500.00 4,000.00
112.00
8.00 ST 2,450.00 19,600.00
113.00
8.00 ST 3,150.00 25,200.00
114.00
8.00 PC 500.00 4,000.00
115.00
8.00 ST 4,350.00 34,800.00
116.00
6,209.00 PC 15.00 93,135.00
117.00
- PC 3,350.00 -
118.00
- PC 3,000.00 -
119.00
- PC 6.80 -
120.007,129.62 PC 8.50 60,601.77
121.00
- KG 3.50 -
Toilet Paper Holder SANPF126
SANUF105 R
Urinal Electronic Flush Sensor SANUF104 R
Urinal Flush Assembly SANUF195 R
Ceramic Tile 200mm x 200mm
TACWT365 R
Ceramic Tile 200mm x 200mm WEDCT34 R
WEDCT79 R
Water Closet SANWC14 R
Concrete Hollow Block: 190mm x 190mm x 390mm STBHB4 R
Computer Table with Formica Topping: 180cmL*60cmL*75cmH including Installation
TACWT286 R
Washed Out Pebbles: Supply of Materials WEDFA2 R
Urinal Set Floor Mounted
Computer Table with Formica Topping: 120cmL*60cmL*74cmH including Installation
16
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
122.00
- ST 3,600.00 -
123.00 R
4.00 ST 12,636.90 50,547.60
124.00
2.00 ST 36,752.14 73,504.27
125.00
1.00 ST 38,589.74 38,589.74
126.00 R21.30 PC 1,320.00 28,116.00
127.00 R56.92 PC 1,470.00 83,672.40
128.00 R253.00 KG 39.60 10,018.80
129.00 R4,878.00 M 120.00 585,360.00
130.00 R
220.04 GL 342.00 75,253.68
131.00 R
220.04 GL 349.00 76,793.96
132.00 R
220.04 GL 349.00 76,793.96
133.00
1,211.75 KG 114.00 138,139.50
C-Purlins: 100mmh x 50mma x 20mmc x 3mmt
HIGGL65
NALCRETE CEMENT PRIMER#69 white 1GL/CA PAINT [Water Based Paint]
NALCRETE CEMENT PAINT#69 cement paint white light 1GL/CA [Water Based Paint]
PASPR40
PASFP184
PLPRP117
PVC Pipe Grade A: 4 "x 3.1mmt x 5M
PASFP186
Angle bars: 50mmw x 50mmh x 4mmt x 9M/PC MESEA194
NALCRETE CEMENT PAINT#69 cement paint white 1GL/CA [Water Based Paint]
MESDC6
Fiber Glass Insulation
Painted galvanized steel door t=1.5mm 90cmW x 210cmH including installation
R043
Analok Aluminum FixedWindow Frame 2.0mmt*120cmW*120cmH; including Installation
WINMW301 R
Aluminum louver: 1.6mmt x 200cmw x 200cmh including installation
Aluminum louver: 1.6mmt x 200cmw x 210cmh including installation
METPG195 R
Repainted Longspan Sheet CGC570-20 0.6mm x 4ft wide
17
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
134.00 Floor Drain9.00 ST 2,000.00 18,000.00
135.00 Soap Dispenser4.00 ST 2,000.00 8,000.00
136.00 Handryer3.00 ST 9,000.00 27,000.00
137.00 Shower1.00 ST 2,000.00 2,000.00
138.00 Coat Hook7.00 ST 3,000.00 21,000.00
139.00 Oversized Boulders 3,337.48 KL 1,200.00 4,004,976.00
140.00 16m Sheet Piles88,320.00 Kgs 41.50 3,665,280.00
141.00 Ceiling Board 600mm x 600mm x 15mm5,545.73 PC 290.00 1,608,261.70
162,470,075.42
1.00 ST 5,686,452.64
168,156,528.06
III1.00
99,982.00 SM 12.00 1,199,784.00
2.00 Relocation SurveySM 4.00 -
3.0020,330.23 KL 60.00 1,219,813.80
3.aa5,900.75 KL 270.00 1,593,202.50
4.0067,118.84 SM 35.00 2,349,159.40
5.00 Manual ExcavationKL 240.00
AAB25 L
AAB21 L
MATERIAL MANAGEMENT FEE 3.50%
TOTAL FOR MATERIALS
SUB-TOTAL FOR MATERIALS
LABOR
Site Development: Levelling works including excavation, backfill and compaction w/in 15cm
AAB11 L
Layout Survey AAA11 L
AAA13 L
Equipment Backfill of Mixed Gravel including Compaction AAB02 L
Manual Backfill of Mixed Gravel including Compaction
18
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
6.00153,452.57 KL 50.00 7,672,628.50
7.0066,154.30 KL 60.00 3,969,258.00
8.0011,900.09 KL 270.00 3,213,024.30
9.00153,452.57 KL 50.00 7,672,628.50
10.0078,054.39 KL 70.00 5,463,807.30
11.00- M 170.00 -
12.0022,231.00 M 330.00 7,336,230.00
13.00150.00 SM 225.00 33,750.00
14.001,000.00 M 1,000.00 1,000,000.00
15.00- SM 238.00 -
16.001.20 ST 635,000.00 762,000.00
17.0020,811.56 M 400.00 8,324,624.00
18.005,182,862.12 KG 4.00 20,731,448.48
19.0050,365.83 KL 280.00 14,102,432.40
20.0055,441.13 SM 460.00 25,502,919.80
Labor for Concrete: Placing, Pumpcrete Charges, Vibratory Application and Curing
AAD0C L
Exposed Form, ≥14.5 Marine Plywood Including Frames and Scaffolds and Stripping Works Materials and Labor
AAD22 L
Continuous Dewatering during excavation until completion as necessary: Materials and Labor
AAC1B L
Steel Sheet Pile ≥9 M: Drive and Remove AACx1 L
Rebar Fabrication and Installation: Including Tie wire, spacer and working platform
AAD01 L
Horizontal Supports of Driven Sheet Piles AAC17 L
Wire Rope Support of Driven Sheet Piles AAC18 L
Slope Protection for Sheet Piling Works AAC19 L
Excavation and Hauling: Within 3 KM distance (sum of total backfilling works)
AAB2L L
Vertical Supports or H-Beam Rail Piles AAC11 L
Steel Sheet Pile ≤ 9 M: Drive and Remove AAC13 L
Equipment Backfill including Compaction AAB25 L
Manual Backfill including Compaction AAB29 L
Disposal inlcuding leveling at diposal site (Hauling from Excavation works)
AAB2F L
Equipment Excavation AAB23 L
19
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
21.00152.21 SM 510.00 77,627.10
22.00- SM 400.00 -
23.0013,304.24 SM 180.00 2,394,763.20
24.0023,995.35 SM 418.00 10,030,056.30
25.00488.99 SM 200.00 97,798.00
26.00- SM 220.00 -
27.00425.62 SM 280.00 119,173.60
28.003,064.91 M 50.00 153,245.50
29.002,057.68 SM 100.00 205,768.00
30.001,543.11 SM 210.00 324,053.10
31.002,299.73 M 80.00 183,978.40
32.0011,498.67 M 35.00 402,453.45
33.008.40 SM 322.00 2,704.80
34.0032,796.58 KG 75.00 2,459,743.50
35.0012,502.34 KG 310.00 3,875,725.40
36.002,903.68 KG 75.00 217,776.00
Mortar Waterproof - Wall; 1:2 Mix Labor AAE03 L
Mortar Waterproof - Floor; 1:2 Mix Labor
AAE01 L
Washed Out Pebbles application AAE02 L
Steel Deck: Materials and Labor AAD27 L
Shoring Jack above 4M: Set Up and Removal Materials and Labor
Embedded Angle Bar including welding works, sandblast and painting: Materials and Labor
AAG12 L
Embedded SUS Angle Bar including Argon Welding; Materials and Labor
AAG14 L
Cast Iron Manhole Cover with Asphalt Covering: Materials and Labor
AAG17 L
Expansion Joint with Asphalt Application: Materials and Labor
AAE1E L
Installation of PVC Door with Jamb and Accessories: Labor & Mat'ls
AAF12 L
Installation of PVC Waterstop: Labor Only AAE05 L
PU Waterproof painting application including CR AAE07 L
Heat Insulation Bricks Alignment & Washing; (Waterproofing)
AAE0Q L
AAE1B L
Expansion Joint: Styrofor Spacing: Materials and Labor(Preformed filler Polystyrene)
Circular Form Including Frames and Scaffolds: Materials and Labor
AAD24 L
AAD28 L
Ordinary Form including Frames and Stripping: Materials and Labor
AAD2A L
20
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
37.00893.66 KG 320.00 285,971.20
38.00213.76 M 4,500.00 961,920.00
39.00- M 3,800.00 -
40.001,325.61 M 1,200.00 1,590,732.00
41.0054,069.07 KG 80.00 4,325,525.60
42.00- ST 135,000.00 -
43.008.00 ST 550.00 4,400.00
44.008.00 ST 550.00 4,400.00
45.0010.00 ST 475.00 4,750.00
46.0056.65 SF 110.00 6,231.50
47.008.00 ST 150.00 1,200.00
48.0010.00 ST 550.00 5,500.00
49.002.00 ST 275.00 550.00
50.005.00 ST 1,375.00 6,875.00
51.004.00 ST 35.00 140.00
Installation of Eye Washing Machine including fittings and accessories
AAHIC L
Installation of Counter Top for 2-Lavatory Set including fittings and accesssories
AAH1C L
Vent Thru Roof ( VTR ) Pipe: Including accessories Materials and Labor
AAH21 L
Installation of Mirror including consumables AAH19 L
Installation of Toilet Paper Holder including Fittings and Accessoreis
AAH1A L
Installation of Slop Sink, including Fittings and Accessories AAH1B L
Installation of Water Closet including Fittings/Accessories
AAH13 L
Installation of Urinal including Fittings/Acccessories AAH14 L
Installation of Lavatory including Fittings and Accessoreis AAH15 L
B.I. Handrail (1-1/2 Ø Pipes)include Painting: Materials and Labor (Measured by Linear Meter)
AAG1N L
Embedded Items including Sandblasting and Painting: Materials and Labor
AAG1P L
SUS 5KL Capacity Water Tank with Support: Include Piping Works; Materials and Labor
AAGX1 L
SUS Cover: Materials and Labor AAG1A L
SUS Ladder (1-1/2 Ø Pipes) including Painting (measured by Linear Meter): Materials and Labor
AAG1C L
SUS Handrail(1-1/2 Ø Pipes)include Painting: Materials and Labor (Measured by Linear Meter)
AAG1D L
21
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
52.003.00 ST 75.00 225.00
53.007.00 UN 135,000.00 945,000.00
54.00SM 250.00 -
55.00- ST 1,200.00 -
56.00M 1,590.00 -
57.00861.87 SM 850.00 732,589.50
58.0027,368.36 SM 200.00 5,473,672.00
59.00409.70 SM 200.00 81,940.00
60.00337.98 M 40.00 13,519.20
61.00- M 850.00 -
62.00381.82 SM 360.00 137,455.20
63.0069.09 SM 245.00 16,927.05
64.00216.09 SM 315.00 68,068.35
65.007,613.64 SM 188.00 1,431,364.32
66.0021,755.65 SM 55.00 1,196,560.75
AAK13 L
Scaffolding <4M (Horizontal Area): Including Set-up and Removal Materials and Labor [Shoring jack below 4m slab]
Manual Concrete Chipping including disposal AAJ27 L
Ø4"- Wall Concrete Opening on Concrete Including Stripping
Wall Ceramic Tile Installation Including grout ABA0E L
Plastering; 1:3 Mixture: Materials and Labor
ABB02 L
Fresh Concrete Finishing Mechanical Float ABB11 L
Construction Fence Rental: Material and Installation Including Maintenance for 12 mos.
AAK28 L
Install Conrete Hollow Block; 39cm x 19cm x 19cm ABAX1 L
AAK18 L
Safety Life Line AAK25 L
Floor Ceramic Tile Installation Including grout ABA0A L
Scaffolding (Vertical Area): Including Set-up and Removal: G.I Pipe Scaffoldings: Materials and Labor
AAJ91 L
Special Scaffolding installation for Concrete Structure: Materials and Labor
AAJX1 L
Install SUS Drain Pipe Ø4" AAH22 L
PVC Sanitary Pipelines: Labor only AAH24 L
Installation of Wire Mesh including Accessories and Consumables
AAI01 L
22
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
67.0032,432.33 SM 55.00 1,783,778.15
68.009,850.21 SM 65.00 640,263.65
69.0093.75 SS 160.00 15,000.00
70.00- M 15.00 -
71.005,071.69 SM 55.00 278,942.95
72.0043.79 SS 350.00 15,326.50
73.001,526.65 SM 70.00 106,865.50
74.005,071.69 SM 250.00 1,267,922.50
75.001,966.57 SM 180.00 353,982.60
76.006,286.89 SM 80.00 502,951.20
77.00 - SM 175.00 - 78.00
1,031.17 SM 53.00 54,652.01
79.005,071.69 SM 100.00 507,169.00
80.001,000.00 M 40.00 40,000.00
81.00- SM 80.00 -
82.00- ST 200.00 -
83.00- ST 300.00 -
Anchor Bolt Ø16mm and below - Installation: including Survey Alignment and Anchor Frame
ADA12 L
Anchor Bolt Ø19mm - 36mm Installation: including Survey Alignment and Anhor Frame
Painting of Silicate Boards Surface; 3 coats ACC1B L
Road Paint Marking; 10cmW X 0.1mmt: Materials and Labor
ACC06 L
Floor Epoxy Coat with Fiber; 3.3 m/m
ACB01 L
Fresh Concrete Finishing Manual Float ABB12 L
ACB33 L
PVC Baseboard Installation ACBOE L
Calcium Silicate Board Installation Including accessories and consumables
ACB0G L
PVC Ceiling Installation at CR Including accessories and consumables MaterialS and Labor
ACB0S L
Concrete Chipping-Preparatory Works: Including Disposal ABB19 L
Installation of PVC Vinyl Tile including Waxing
ADA13 L
ACC1D L
ACC0P L
Floor Epoxy Coat, 2 m/m 0qOP L
Silicate Board Ceiling Installation: Including accessories and consumables
ACB0T L
QDE Paint 3 coats: Labor Only ACC1F L
Cement Surface Painting; 3 Coats
Wall / Partition Frame 75mm Metal Furring Including accessories and consumables: Materials and Labor
ACB24 L
Acoustic Ceiling Frame Including accessories and consumables : Materials and Labor
23
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
84.00- ST 300.00 -
85.00- KL 25,000.00 -
86.00PC 100.00 -
87.002.00 PC 200.00 400.00
88.0038,214.41 KG 60.00 2,292,864.60
89.0079,411.81 KG 80.00 6,352,944.80
90.007,975.84 M 300.00 2,392,752.00
91.00654.94 M 500.00 327,470.00
92.00255.00 PC 725.00 184,875.00
93.002,958.00 PC 345.00 1,020,510.00
94.00SM 50.00 -
95.003,909.00 PC 950.00 3,713,550.00
96.001.00 UN 875,740.51 875,740.51
97.001.19 UN 900,000.00 1,071,000.00
98.001.19 UN 2,000,000.00 2,380,000.00
99.001.19 UN 6,000.00 7,140.00
ADA1D L
Rebar Implant with Epoxy (#6 and up): Including Drilling of Holes: Material and Labor
ADA1K L
Safety Ladder at Excavated Sites: Materials and Labor
AXX02 L
Ø50cm Pile Cutting (Pile too High) include Disposal CFC22 L
Ø50cm Pile Grouting for Pile Cap CFC25 L
Installation of Checkered Plate: Mat'ls & Labor ADAX1 L
Installation of Galvanized Steel Grating: Including consumables: Materials and Labor
ADB2K L
Safety Barrier at Excavated Sites: Materials and Labor AXX01 L
Temporary Water and Power Materials and Labor CHA12 L
Safety and Housekeeping Materials and Labor CHA14 L
Safety Reports and Documentation MH5043 L
Labor and Equipment Cost for Asphalt Application: 5CM thk CGA02 L
RCCP: Culvert Installation 40-60cmØ including excavation and backfill
CGAP7 L
Material Handling and Warehousing of Rebars CHA11 L
Non-Shrink Grout: Material and labor ADA1A L
Rebar Implant with Epoxy (#4-5): Including Drilling of Holes: Material and Labor
Chemical Bolt Ø19mm-25mm, Including Drilling of Holes: Materials and Labor
ADA16 L
24
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
100.00187.00 PC 831.88 155,560.63
101.0016.00 PC 627.00 10,032.00
102.002,577.00 SM 114.00 293,778.00
103.00755.69 SM 1,305.34 986,432.38
104.001,172.60 SM 930.12 1,090,658.71
105.005,071.69 SM 80.00 405,735.20
106.001,966.57 SM 30.00 58,997.10
107.00144.51 SM 30.00 4,335.30
108.002,931.71 M 86.00 252,127.06
109.0068.82 M 190.00 13,075.80
110.00Floor Drain installation 9.00 ST 700.00 6,300.00
111.00Soap Dispenser Installation 4.00 ST 700.00 2,800.00
112.00Handryer Installation 3.00 ST 3,000.00 9,000.00
113.00Shower Installation 1.00 ST 700.00 700.00
114.00Coat Hook Installation 7.00 ST 700.00 4,900.00
115.00Geotextiles (Materials & Labor) for sea wall 898.56 sq.M 2,000.00 1,797,120.00
Fabrication & Installation of Sea Water Intake Fence: Materials and Labor
Fabrication & Installation of Substation Fence & Main Transformers: Materials and Labor
Block-Out or Shear key [200mm x 200mm x 850mm] for Diesel Oil Tank
Installation of Fiber Glass Insulation
Ceiling Board Installation
PVC Ceiling Board Installation
Concrete floor cutting
PVC Pipe Grade A: 4 "x 3.1mmt x 5Mt Installation
Block-Out or Shear key [550mm x 55mm x 400mm] for Boiler , TG & Conveyor
PVC cloth Installation (TG, Boiler)
25
UNIT PRICE AMOUNTITEM Material Description and Construction List MATERIAL
CODE QUANTITY PRICE
116.00Armor Rock piling for sea wall including Materials & Labor 2,420.50 cu.M 2,500.00 6,051,250.00
117.005,607.70 SM 100.00 560,770.00
118.0275.37 KG 189.00 52,045.38
119.0113.58 SM 190.00 21,580.20
120.0113.58 SM 15.00 1,703.70
121.041.00 M 247.00 10,127.00
187,962,223.44
1.00 ST 28,194,333.52
216,156,556.96
GRAND TOTAL (MATERIALS + LABOR) NTD 384,313,085.01
11,681,248.78$
SUB-TOTAL FOR LABOR
LABOR MANAGEMENT FEE 15%
TOTAL FOR LABOR
Polythelene Waterproof installation applied to all interior Ground Slab [Materials & Labor]
Stainless Gutter Installation including accessories (Materials and Labor)
ADB49 L
G.I Sht (PVDF) for Roofing Installation ADB4D L
Bending of Color Roof ADBR3 L
Bending of Flashing ADBR4 L