Highway Improvement Program For FY 2015 26TH ILLINOIS SENATE DISTRICT Page 1 Route/ City Location Type of Work Estimated Cost (Dollars) Project Nbr County Type Of Funds STATE CONSTRUCTION PROJECTS U.S. Routes ELA RD TO LAKE COOK RD S RESURFACING (3P) MILLED RUMBLE STRIP PEDESTRIAN RAMPS/ADA 4.08 Miles 1-78438-0000 4,720,000 US 12 RAND RD DEER PARK LAKE ZURICH KILDEER LAKE 2014 Capital Program Illinois Routes CHURCH ST TO ILL 60 (TOWNLINE RD) S RESURFACING (3P) NEW MEDIAN MEDIAN REMOVAL 3.27 Miles 1-78494-0000 2,800,000 ILL 21 MILWAUKEE AVE LIBERTYVILLE VERNON HILLS LAKE 2014 Capital Program AT OLD BARRINGTON RD 0.8 MI W OF ILL 59 NHS, S TRAF SIGNAL INSTALLATION CHANNELIZATION 1-77221-0100 1,380,000 ILL 22 NORTH BARRINGTON LAKE 2014 Capital Program AT BARRINGTON RD CMAQ, S TURNING LANES 1-78858-0000 500,000 ILL 62 ALGONQUIN RD SOUTH BARRINGTON COOK W OF PRAIRIE LAKES RD TO ILL 62 (ALGONQUIN RD) HSIP, S NEW SHOULDERS MILLED RUMBLE STRIP GUARDRAIL END-SECT REPL SIGNING (NEW) 1-78586-0000 1,120,000 ILL 68 DUNDEE RD EAST DUNDEE BARRINGTON HILLS KANE COOK KANE CO LINE TO ILL 62 (ALGONQUIN RD) NHS, S RESURFACING (3P) 2.89 Miles 1-78427-0000 1,570,000 ILL 68 DUNDEE RD BARRINGTON HILLS COOK 2014 Capital Program

Illinois Routes - The Barrington Hills Observer · 2015-02-15 · county project nbr type of funds state engineering projects illinois routes ill 120 (belvidere rd) to ill 137 & at

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Illinois Routes - The Barrington Hills Observer · 2015-02-15 · county project nbr type of funds state engineering projects illinois routes ill 120 (belvidere rd) to ill 137 & at

Highway Improvement Program For FY 2015

26TH ILLINOIS SENATE DISTRICT

Page 1

Route/

CityLocation Type of Work

Estimated

Cost

(Dollars)Project NbrCounty

Type

Of

Funds

STATE CONSTRUCTION PROJECTS

U.S. Routes

ELA RD TO LAKE COOK RD S RESURFACING (3P)

MILLED RUMBLE STRIP

PEDESTRIAN RAMPS/ADA

4.08 Miles

1-78438-0000 4,720,000US 12

RAND RD

DEER PARK

LAKE ZURICH

KILDEER

LAKE

2014 Capital Program

Illinois Routes

CHURCH ST TO ILL 60 (TOWNLINE RD) S RESURFACING (3P)

NEW MEDIAN

MEDIAN REMOVAL

3.27 Miles

1-78494-0000 2,800,000ILL 21

MILWAUKEE AVE

LIBERTYVILLE

VERNON HILLS

LAKE

2014 Capital Program

AT OLD BARRINGTON RD 0.8 MI W OF ILL 59 NHS, S TRAF SIGNAL INSTALLATION

CHANNELIZATION

1-77221-0100 1,380,000ILL 22

NORTH BARRINGTON

LAKE

2014 Capital Program

AT BARRINGTON RD CMAQ, S TURNING LANES 1-78858-0000 500,000ILL 62

ALGONQUIN RD

SOUTH BARRINGTON

COOK

W OF PRAIRIE LAKES RD TO ILL 62

(ALGONQUIN RD)

HSIP, S NEW SHOULDERS

MILLED RUMBLE STRIP

GUARDRAIL END-SECT REPL

SIGNING (NEW)

1-78586-0000 1,120,000ILL 68

DUNDEE RD

EAST DUNDEE

BARRINGTON HILLS

KANE

COOK

KANE CO LINE TO ILL 62 (ALGONQUIN RD) NHS, S RESURFACING (3P)

2.89 Miles

1-78427-0000 1,570,000ILL 68

DUNDEE RD

BARRINGTON HILLS

COOK

2014 Capital Program

Page 2: Illinois Routes - The Barrington Hills Observer · 2015-02-15 · county project nbr type of funds state engineering projects illinois routes ill 120 (belvidere rd) to ill 137 & at

Highway Improvement Program For FY 2015

26TH ILLINOIS SENATE DISTRICT

Page 2

Route/

CityLocation Type of Work

Estimated

Cost

(Dollars)Project NbrCounty

Type

Of

Funds

ILL 59 (HAWTHORNE RD) TO E OF ILL 53 S RESURFACING (3P)

8.38 Miles

1-78654-0000 4,255,000ILL 68

ILL 53

DUNDEE RD

ARLINGTON HEIGHTS

BARRINGTON HILLS

BARRINGTON

INVERNESS

PALATINE

COOK

2014 Capital Program

AT BARRINGTON RD CMAQ, S TURNING LANES 1-78288-0000 600,000ILL 68

DUNDEE RD

BARRINGTON

COOK

O'PLAINE RD TO ILL 21 (MILWAUKEE AVE) S RESURFACING (3P)

2.39 Miles

1-77329-0000 1,900,000ILL 137

BUCKLEY RD

GREEN OAKS

LAKE

2014 Capital Program

ILL 21 (MILWAUKEE AVE) TO BUTTERFIELD RD S RESURFACING (3P)

1.38 Miles

1-78589-0000 1,275,000ILL 137

BUCKLEY RD

LIBERTYVILLE

LAKE

2014 Capital Program

US 45 (ANTIOCH RD) TO ILL 83 (IVANHOE RD) S RESURFACING (3P)

1.81 Miles

1-78446-0000 880,000ILL 137

ANTIOCH RD

GRAYSLAKE

LAKE

2014 Capital Program

US 12 (RAND RD) TO 0.2 MI E OF HILL TOP

TERRACE

S RESURFACING (3P)

5.20 Miles

1-78445-0000 2,315,000ILL 176

LIBERTY ST

WAUCONDA

LAKE

2014 Capital Program

AT BROWN ST NHS, S TRAF SIGNAL INSTALLATION 1-77221-0300 560,000ILL 176

LIBERTY ST

WAUCONDA

LAKE

2014 Capital Program

Page 3: Illinois Routes - The Barrington Hills Observer · 2015-02-15 · county project nbr type of funds state engineering projects illinois routes ill 120 (belvidere rd) to ill 137 & at

Highway Improvement Program For FY 2015

26TH ILLINOIS SENATE DISTRICT

Page 3

Route/

CityLocation Type of Work

Estimated

Cost

(Dollars)Project NbrCounty

Type

Of

Funds

STATE ENGINEERING PROJECTS

Illinois Routes

ILL 120 (BELVIDERE RD) TO ILL 137 & AT

ATKINSON RD

S P.E. (PHASE II) 1-75972-0122 700,000ILL 83

BARRON BLVD

GRAYSLAKE

LAKE

LOCAL CONSTRUCTION PROJECTS

ISLAND LAKE

056-6350)(Bridges:

12-00024-00-BR)(Sec. #

STP, L BRIDGE REPLACEMENT 1-21253-0000 1,000,000LAKEVIEW DR

ISLAND LAKE

MCHENRY

LAKE

AT CRYSTAL LAKE AVE

12-00116-00-CH)(Sec. #

STP, L RECONSTRUCTION

0.01 Miles

1-21371-0000 1,694,000MAIN ST

CRYSTAL LAKE

MCHENRY

LOCAL ENGINEERING PROJECTS

ISLAND LAKE

056-6350)(Bridges:

12-00024-00-BR)(Sec. #

STP CONSTRUCTION

ENGINEERING

1-21253-0003 80,000LAKEVIEW DR

ISLAND LAKE

MCHENRY

LAKE

AT CRYSTAL LAKE AVE

12-00116-00-CH)(Sec. #

STP CONSTRUCTION

ENGINEERING

1-21371-0003 145,000MAIN ST

CRYSTAL LAKE

MCHENRY

Page 4: Illinois Routes - The Barrington Hills Observer · 2015-02-15 · county project nbr type of funds state engineering projects illinois routes ill 120 (belvidere rd) to ill 137 & at

Highway Improvement Program For FY 2015

26TH ILLINOIS SENATE DISTRICT

Page 4

Route/

CityLocation Type of Work

Estimated

Cost

(Dollars)Project NbrCounty

Type

Of

Funds

LOCAL LAND ACQUISITION PROJECTS

FLINT CREEK

049-6049)(Bridges:

12-00020-00-BR)(Sec. #

STP LAND ACQUISITION 1-21360-0004 160,000CUBA RD

BARRINGTON HILLS

LAKE

MCHENRY

Page 5: Illinois Routes - The Barrington Hills Observer · 2015-02-15 · county project nbr type of funds state engineering projects illinois routes ill 120 (belvidere rd) to ill 137 & at

l

l

l

l

ll

l

.-,90

.-,90.-,90

.-,90

:9120

:9120

:9120

.-,294

.-,294

:931

:931

:931

:931

:943:972

:972

:972

:972

:959

:925

:925

:919

:9176

:9176

:9176

:9176

:9176

0/20

.-,94

.-,94

.-,94

0/14

0/14

0/14

0/41

0/41

0/41

0/14

0/14

0/14

0/14

:958

:958:958

:958

:9137

:9137

:943

:943

:943

:943

:922

:922

:922

0/45

:983

:983

:983

:947

:947

:983

:983

:9131

:9131

:947

:962

:962

:921

:921

:9132

:9120

:9120

:968:968

0/12

0/12

0/12

:959

:959

0/12

:947

:921

:921

0/45

:968:962

:960

:953

:9134

:968

0/45

:953.-,290

:960

0/45

:983

:960

:953

:960

:947

:968:959

:958

:968

:9176

:953

:947

:9120

Fox RiverValley Gardens

Woodstock

Wonder Lake Johnsburg

TroutValley

Prairie Grove

Oakwood Hills

Mchenry

Mccullom Lake

Lakewood

Lakemoor

Lake In The Hills

Huntley

Holiday Hills

Fox RiverGrove

Crystal LakeCary

Bull Valley

Algonquin

Volo

Wauconda

Vernon Hills

TowerLakes

Third Lake

RoundLakePark

Round Lake Bch

Round Lake

Riverwoods

ParkCity

NorthChicago

NBarrington

Mundelein

Mettawa

Long GroveLincolnshire

Lake Barrington

Kildeer

Libertyville

Lake Zurich

LakeForest

Lake Bluff

IslandLake

IndianCreek

Highwood

HighlandPark

Hawthorn Woods

Hainesville

Gurnee

Grayslake

Green Oaks

Deer Park

Deerfield

Barrington

Bannockburn

West Dundee

Pingree Grove

Gilberts

Elgin

East Dundee

Sleepy Hollow

Carpentersville

South BarringtonRolling Meadows

ProspectHts

Inverness

Hoffman Estates

Wheeling

BuffaloGrove

Northbrook

Palatine

Mt Prospect

Northfield

Barrington Hills

Des Plaines

GlenviewArlington Hts

26

32

3329

27

30

31

922

28 810Senate District 26Dan Duffy

Proposed Improvements for Illinois Highways FY 2015