12
Illinois Impact Overview Capstone 14 Exercise

Illinois Impact Overview

Embed Size (px)

DESCRIPTION

Illinois Impact Overview. Capstone 14 Exercise. General Impact. Building Damage. Total Number of Injured. Total Number of Fatalities. Shelter Seeking Populations. Power Disruptions. Water System Disruptions. Immediate Priorities ( E+72hrs). Illinois Resource Assessment. - PowerPoint PPT Presentation

Citation preview

Page 1: Illinois Impact Overview

Illinois Impact OverviewCapstone 14 Exercise

Page 2: Illinois Impact Overview

General ImpactOverview

Total Structures Damaged

18, 347

Total Injured 12,900

Total Fatalities 382

Total Seeking Shelter

125,242

Total Without Power

1.2 million +

Total Without Water

900,000 +

Page 3: Illinois Impact Overview

Building DamageBreakdown of Damage

Residential 17,430

Commercial, Industrial and

Other

917

Total 18,347

Page 4: Illinois Impact Overview

Total Number of Injured Breakdown of Injuries

Medical Aid Needed

8,385

Hospital Care Needed

3,225

Life Threatening 1,290

Total 12,900

Page 5: Illinois Impact Overview

Total Number of FatalitiesFatalities

Total 382

Page 6: Illinois Impact Overview

Shelter Seeking Populations Shelter Seeking

Total 125,000 +

Page 7: Illinois Impact Overview

Power DisruptionsNumber Affected

Total 1.2 million +

Page 8: Illinois Impact Overview

Water System DisruptionsNumber Affected

Total 900,000 +

Page 9: Illinois Impact Overview

Immediate Priorities (E+72hrs)Priorities

Major Supply Routes (MSRs)

Joint, Receiving, Staging, On-Ward Movement and Integration (JRSOI)State Forward Operating Bases (SFOBs)

Regional Commodity Distribution Points (RCDPs)

Critical Locations

Phillips 66 Wood River Refinery

Marathon Robinson Refinery

Scott Air Force Base

Williamson County Airport

Southern Illinois University

Honeywell Uranium Processing Plant

Page 10: Illinois Impact Overview

Illinois Resource Assessment

0

5

10

15

20

25

30

35

40

45

USAR

Tea

m TRT

SAR

Type

III I

MT

Type

II IM

TTy

pe I

IMT

EOC

Team

EMAC

A-

Bldg

Insp

Brid

ge In

spHA

ZMAT

Ambu

lanc

eM

ed E

RTW

ater

Com

mo

STDe

bris

Law

Crow

d

In-State

Available

NeededShortfall

Page 11: Illinois Impact Overview

Planning Metrics• USAR – Major metropolitan areas, population of 100,000 or more with multi-

story/multi-family structures• TRT – One per County for initial response• SAR – One per County for initial response (Ground & Aerial)• IMT – Per Area Command, State Forward Operating Base, and established JRSOI• EOC Team – Per State EOC• EMAC A-Team – Per State EOC (24/7 shifts)• Bldg/Bridge Inspection – Per County• HAZMAT – Known infrastructure assessment (refineries, chemical plants, etc)• Ambulance Strike Team – Based on population density, casualty estimates, and

transport distance (10 ambulance per team)• Med ERT – Per Damage Estimate of Medical Infrastructure (2 per hospital)• Water Rescue – Per major waterway in impacted area• Commo Strike Team – 2 Per Area Command, 1 per State Forward Operating Base,

and 1 per established JRSOI• Debris Removal – 1 per county • LE Strike Team – 2 per Area Command. 2 additional for population >100,000• Crowd Control - Major metropolitan areas, population of 100,000 or more

Page 12: Illinois Impact Overview

Planning Metrics

QUESTIONS?