2
Allow 50#/sq. ft. for future wearing surface. LOADING HL-93 vert. cl. 2'-0" min Bedding Filter fabric SECTION A-A No salvage one lane of traffic at all times. out to out of deck. The existing structure will be replaced. Stage construction will be utilized to maintain pile bent abutments and solid wall piers. The structure is 118'-0'' back to back of abutments and 33'-8'' The existing three span structure consists of continuous cast-in-place concrete T-girders supported on Existing Structure: S.N. 038-0023 was built in 1953 as S.B.I. Route 1, Section 15-R-B, at Station 1151+70. Bench Mark: Chiseled "square" on S.E. wingwall ±Sta. 1152+25.75, ±18'-9'' Lt., Elev. ±659.86 ELEVATION PLAN Top of bank Elev. 649.2 ± Top of bank Elev. 649.2 ± Elev. 650.90 Elev. 650.78 2 ' - 8 " 4'-0" Class A4 Stone Riprap, Type 6 (Std. 631031) typ. Traffic Barrier Terminal FIELD UNITS fy = 50,000 psi (M270 Grade 50W) fy = 60,000 psi (Reinforcement) f'c = 4,000 (Superstructure) f'c = 3,500 psi DESIGN STRESSES Specifications, 9th Edition 2020 AASHTO LRFD Bridge Design DESIGN SPECIFICATIONS Directional Distribution: 50:50 Two-Way Traffic Posted Speed: 55 m.p.h. Design Speed: 55 m.p.h. DHV: 300 (2042) ADTT: 355 (2022); 423 (2042) ADT: 2,781 (2022); 3,321 (2042) Functional Class: Principal Artierial F.A.P. Rte. 332 - IL. Rte. 1 HIGHWAY CLASSIFICATION F F 43" Web ¢ Girder (Fully Composite) Streambed Elev. 637.5 1 : 2 ( V : H) a tR t. ' s 1 : 2 ( V : H) a t R t. ' s Elev. 659.40 Sta. 1151+16.15 Bk. N. Abut. 106'-4" Bk. to Bk. Abutments typ. 10'-0" slab, typ. 30' Bridge approach t yp . 20 ' - 0 " Elev. 659.27 Sta. 1152+22.49 Bk. S. Abut. Boring 1 Boring 2 38 ' - 10 " Ou t t o Ou t 18 ' - 0 " 18 ' - 0 " 1 ' - 5 " 1 ' - 5 " Sta. 1151+70.00 Local Tangent at Con s t . St a g e I Con s t . St a g e II 10° typ. existing structure Limits of Sta. 1151+69.32 ¡ Structure N Fl o w A A SHEET 1 of 2 SHEETS SECTION COUNTY ILLINOIS FED. AID PROJECT 332 TOTAL SHEETS SHEET NO. RTE. 15R-BR CONTRACT NO. IROQUOIS DEPARTMENT OF TRANSPORTATION STATE OF ILLINOIS DESIGNED - - - - DENNIS A. POP CHECKED DRAWN CHECKED 3/11/2021 10:32:40 AM F I LE NAMEMODEL 0380209- 66932- TSL - 001 pw:\\ pa nr oo m . do t . illi no s . gov P W I DOT\ Do c um e nt s \ I DOT Off i ce s \ Bur ea u o f Br dge s a nd St r uc t ur e s \ P r o ec t s \ 0380209\ CADD P a ns \ 0380209- 66932. dgn F.A.P. JOSUE D. ORTIZ-VARELA 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 1 : 2 3 Spaces at 20'-0" = 60'-0" 20'-0" Spacing DS-11 Scupper D.H.W. Elev. 652.4 Range 12W, 2ND P.M. Twp . 26 N LOCATION SKETCH N Structure Proposed - 0 . 12 % (¡ IL. Rte. 1) PROFILE GRADE 6 " 1 ' - 4 " J.O.V. / R.J.C. E.W.S. Elev. 641.9 STRUCTURE NO. 038-0209 STATION 1151+69.32 IROQUOIS COUNTY F.A.P. RTE. 332 - SECTION 15R-BR IL. RTE. 1 OVER COON CREEK GENERAL PLAN & ELEVATION Piling, typ. Temporary Sheet (with Shoes), typ. Metel Shell Piles C h a nn e l w i d t h ± 35 ' - 0 " A A RICHARD J. CHAPUT Soil Site Class = D Design Spectral Acceleration at 0.2 sec. (SDS) = 0.178 g Design Spectral Acceleration at 1.0 sec. (SD1) = 0.112 g Seismic Performance Zone (SPZ) = 1 SEISMIC DATA & P.G. ¡ IL. Rte. 1 3 ' - 0 " El e v . 659 . 53 V. P. I . St a . 1150 +04 . 00 El e v . 659 . 14 V. P. I . St a . 1153 +36 . 00 1151 1152

ILLINOIS FED. AID PROJECT

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Allow 50#/sq. ft. for future wearing surface.

LOADING HL-93

vert. cl.

2'-0" min

Bedding

Filter fabric

SECTION A-A

No salvage

one lane of traffic at all times.

out to out of deck. The existing structure will be replaced. Stage construction will be utilized to maintain

pile bent abutments and solid wall piers. The structure is 118'-0'' back to back of abutments and 33'-8''

The existing three span structure consists of continuous cast-in-place concrete T-girders supported on

Existing Structure: S.N. 038-0023 was built in 1953 as S.B.I. Route 1, Section 15-R-B, at Station 1151+70.

Bench Mark: Chiseled "square" on S.E. wingwall ±Sta. 1152+25.75, ±18'-9'' Lt., Elev. ±659.86

ELEVATION

PLAN

Top of bank Elev. 649.2 ±Top of bank Elev. 649.2 ±

Elev. 650.90 Elev. 650.78

2'-

8"

4'-0"

Class A4

Stone Riprap,

Type 6 (Std. 631031) typ.

Traffic Barrier Terminal

FIELD UNITS

fy = 50,000 psi (M270 Grade 50W)

fy = 60,000 psi (Reinforcement)

f'c = 4,000 (Superstructure)

f'c = 3,500 psi

DESIGN STRESSES

Specifications, 9th Edition

2020 AASHTO LRFD Bridge Design

DESIGN SPECIFICATIONS

Directional Distribution: 50:50

Two-Way Traffic

Posted Speed: 55 m.p.h.

Design Speed: 55 m.p.h.

DHV: 300 (2042)

ADTT: 355 (2022); 423 (2042)

ADT: 2,781 (2022); 3,321 (2042)

Functional Class: Principal Artierial

F.A.P. Rte. 332 - IL. Rte. 1

HIGHWAY CLASSIFICATION

FF

43" Web ¢ Girder (Fully Composite)

Streambed Elev. 637.5

1:2 (V:H) at Rt.

�'s1:2 (V:H) at Rt. �'s

Elev. 659.40

Sta. 1151+16.15

Bk. N. Abut.

106'-4" Bk. to Bk. Abutments

typ.

10'-0"

slab, typ.

30' Bridge approach

typ.

20'-

0"

Elev. 659.27

Sta. 1152+22.49

Bk. S. Abut.

Boring 1

Boring 2

38'-

10"

Out to

Out18'-

0"

18'-

0"

1'-

5"

1'-

5"

Sta. 1151+70.00

Local Tangent at

Const.

Stage I

Const.

Stage II10° typ.

existing structure

Limits of

Sta. 1151+69.32

¡ Structure

N

Flo

w

A

A

SHEET 1 of 2 SHEETS

SECTION COUNTY

ILLINOIS FED. AID PROJECT

332

TOTAL

SHEETS

SHEET

NO.RTE.

15R-BR

CONTRACT NO.

IROQUOIS

DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

DESIGNED -

-

-

-

DENNIS A. POP

CHECKED

DRAWN

CHECKED -3/11/2021 10:32:40 AM

FIL

E N

AM

E:

MO

DE

L:

0380209-6

6932-T

SL-0

01

pw:\\pla

nroo

m.d

ot.illinois.g

ov:P

WID

OT\D

ocu

ments\I

DO

T Offic

es\B

ureau of

Brid

ges and Str

uctures\Proje

cts\0

380209\C

AD

D Pla

ns\0

380209-6

6932.d

gn

F.A.P.JOSUE D. ORTIZ-VARELA

1:2

1:2

1:2 1:2

1:2

1:21

:2

1:2

1:2

1:2

1:2

3 Spaces at 20'-0" = 60'-0" 20'-0"

Spacing

DS-11 Scupper

D.H.W. Elev. 652.4

Range 12W, 2ND P.M.

Tw

p.

26

N

LOCATION SKETCH

N

Structure

Proposed

-0.12%

(¡ IL. Rte. 1)

PROFILE GRADE

6"

1'-

4"

J.O.V. / R.J.C.

E.W.S. Elev. 641.9

STRUCTURE NO. 038-0209

STATION 1151+69.32

IROQUOIS COUNTY

F.A.P. RTE. 332 - SECTION 15R-BR

IL. RTE. 1 OVER COON CREEK

GENERAL PLAN & ELEVATION

Piling, typ.

Temporary Sheet

(with Shoes), typ.

Metel Shell Piles

Channel w

idth±35'-

0"

A

A

RICHARD J. CHAPUT

Soil Site Class = D

Design Spectral Acceleration at 0.2 sec. (SDS) = 0.178 g

Design Spectral Acceleration at 1.0 sec. (SD1) = 0.112 g

Seismic Performance Zone (SPZ) = 1

SEISMIC DATA

& P.G.

¡ IL. Rte. 1

3'-

0"

Ele

v.

659.5

3

V.P.I.

Sta.

1150

+04.0

0

Ele

v.

659.1

4

V.P.I.

Sta.

1153

+36.0

0

1151 1152

varelaj
BBS Approved

2'-

0"

min.

1'-

0"

min.

3'-

6"

Bk. of Abut.

Const. joint

1'-

0"

2'-0"

1

1

1'-

0"

Wall Drain

Geocomposite

Approach slab

French Drains

Geotechnical Fabric for

Drainage Aggregate

pipe underdrain

4" Ø Perforated

SECTION THRU INTEGRAL ABUTMENT

4"

1'-0"

(Horiz. dim. @ Rt. �'s)

PI Sta. = 1144+19.85

¬ = 14°-07'-42'' (RT)

R = 8617.86'

T = 1067.94'

L = 2125.05'

E = 65.92'

P.C. Sta. = 1133+51.91

P.T. Sta. = 1154+76.96

S.E. = 1.56%

S.E. attained from Sta. 1131+71.91 to Sta. 1134+11.91

S.E. removed from Sta. 1154+16.96 to Sta. 1156+56.96

HORIZONTAL CURVE DATA

106'-4"

Sta. 1151+70.00

Local Tangent @

Sta. 1152+22.49

Sta. 1151+70.00

Sta. 1151+16.15

10° typ.

Bk. S. Abut.Bk. N. Abut.

R = 8617.86'

¡ Rdwy.2"

¡ Structure 1151+69.32

CROSS SECTION

(Looking South)

"83

"8

71

"83

"8153'-10 "8

752'-5

OFFSET SKETCH

1'-10"1'-10"

6 Spaces at 5'-7" = 33'-6" 2'-8"2'-8"

¢ Girder

43" Web

Stage I RemovalStage II Removal

1'-5"1'-5"

2'-10" 13'-0" Stage I Traffic

"211'-5

38'-10" Out to Out

(Fully Composite)

43" Web ¢ Girder

WATERWAY INFORMATION

50

100

4770

5560

7490500Max. Calc.

Scour Check

Base

Design

Flood

Drainage Area = 40.4 sq. mi.

Yr.

Freq. Opening Sq. Ft.

C.F.S.

Q

Exist. Prop.

791 974

1021831

914 1118

Low Grade Elev. 658.64 @ Sta. 1156+00

H.W.E.

Nat. Head - Ft.

Exist. Exist.

Headwater El.

Prop.

0.4

0.5

0.8 655.2

653.7

653.00.6652.4

652.9 0.8

1.3653.9

Prop.

652.8

653.4

654.7

PG & ¡ Rdwy.

12'-0" (Radial)

to 6'-0" (Radial)

Varies from 5'-7"

to 6'-0" (Radial)

"81Varies from 6'-5

3'-

3" typ.

barrier, typ.

Temporary concrete

10 2980 683 846 651.010 Yr.

200 6400 1065868 653.4

0.2 0.1 651.3 651.2

1.0 0.6 654.4 654.0

Sla

b

8"

Proposed 10 Year Average Velocity - 3.6 ft/s

Existing 10 Year Average Velocity - 4.6 ft/s

SECTION COUNTY

ILLINOIS FED. AID PROJECT

332

TOTAL

SHEETS

SHEET

NO.RTE.

15R-BR

CONTRACT NO. DEPARTMENT OF TRANSPORTATION

STATE OF ILLINOIS

DESIGNED F.A.P.

IROQUOIS

-

-

-

-

DENNIS A. POP

CHECKED

DRAWN

CHECKED -3/11/2021 10:33:15 AM

FIL

E N

AM

E:

MO

DE

L:

0380209-6

6932-T

SL-0

02

pw:\\pla

nroo

m.d

ot.illinois.g

ov:P

WID

OT\D

ocu

ments\I

DO

T Offic

es\B

ureau of

Brid

ges and Str

uctures\Proje

cts\0

380209\C

AD

D Pla

ns\0

380209-6

6932.d

gn

SHEET 2 of 2 SHEETS

JOSUE D. ORTIZ-VARELA

State

Event / Limit

Q100

Q200

Design

Check

N. Abut. S. Abut.

Design Scour Elevations (ft.)Item 113

DESIGN SCOUR ELEVATION TABLE

8

650.90

650.90

650.90

650.90

650.78

650.78

650.78

650.783 Spaces at 5'-7" = 16'-9"

min.

6"

Scupper, DS-11

Drainage

2 Spaces at 5'-7" = 11'-2"

2"

12'-0" (Radial)

for Structures

Granular Backfill

J.O.V. / R.J.C.

STRUCTURE NO. 038-0209

STATION 1151+69.32

IROQUOIS COUNTY

F.A.P. RTE. 332 - SECTION 15R-BR

IL. RTE. 1 OVER COON CREEK

DETAILS

12'-0" Stage II Traffic

Structure Excavation

Excavation is paid for as

2'-7"3'-0"

22'-5" Stage II Construction 16'-5" Stage I Construction

3'-0""211'-6"2

12'-5

Local Tangent

¡ Structure &

0" - 2"

Varies from

RICHARD J. CHAPUT

(with Shoes)

Metal Shell Piles

1:2 (V:H) @ Rt.

�'s

Slope 1.56%

varelaj
BBS Approved