Illiana Rail Bypass ConceptA Railroad fo r the 21s tCentury
Presentation to Chicago Chapter
Transportation Research ForumMay 29, 2013
7/30/2019 Illiana Rail Bypass Concept
2/38
Great Lakes Basin, LLC - Confidential 2
Introduction
Make no little plans. They
have no magic to stir mens
blood and probably
themselves will not be
realized. Make big plans;aim high in hope and work,
remembering that a noble,
logical diagram once
recorded will never die.
Danie l Hudson Burnham
Creator of the original IllianaMultimodal Bypass Concept.
7/30/2019 Illiana Rail Bypass Concept
3/38
2012 Illinois State Rail Plan says
The rail lines built
more than a century
ago were not
conf igured for thevolumes and types of
freight being carr ied
cur rently, and Chicago
has become the largestU.S. rai l freight
chokepoint.
Great Lakes Basin, LLC - Confidential 3
7/30/2019 Illiana Rail Bypass Concept
4/38
Great Lakes Basin, LLC - Confidential 4
The Wrigley Field Syndrome
21stCentury Trains on 19thCenturyROWs
Belt Railway Company ofChicago (red): 1883
Indiana Harbor Belt
Railroad (blue): 1897 PCC&StL Western Ave.
Corridor (purple): 1869
B&OCT Western Ave.
Corridor (purple): 1887
PFtW&C-PRR Main Line(yellow): 1859
7/30/2019 Illiana Rail Bypass Concept
5/38
Great Lakes Basin, LLC - Confidential 5
The Illiana Rail Bypass Concept
1. Provide a modern state-of-the art freight railbypass route around the Chicagometropolitan region.
2. Create a massive rail-based regionaleconomic development opportunity acrossIllinois and Indiana.
3. Delivera proactive solution for the regionsmultitude of rail infrastructure congestionissues.
7/30/2019 Illiana Rail Bypass Concept
6/38
Great Lakes Basin, LLC - Confidential 6
Illiana Belt Railroad Phase I
7/30/2019 Illiana Rail Bypass Concept
7/38
Great Lakes Basin, LLC - Confidential 7
7/30/2019 Illiana Rail Bypass Concept
8/38
Great Lakes Basin, LLC - Confidential 8
Yes We Can!
In December 2008 CMAP Executive DirectorRandy Blankenhorn wrote,
As with our highway system, CMAP
recognizes that the region cannot build its wayout of (rail) congestion..
Yes We Can! With completion of the Illiana Rail
Bypass Route the Chicago region can build itsway out of current (and future) rail congestionproblems.
7/30/2019 Illiana Rail Bypass Concept
9/38
Great Lakes Basin, LLC - Confidential 9
In Support of the Bypass Concept
As a fifth term alderman (4th Ward), I understand alltoo well the negative impact of freight traincongestion in Chicago. Many south sidecommunities have long borne the brunt of pollution,
traffic delays and safety concerns created by freightcongestion.
While my primary focus may be on the positiveimpact of fewer trains in the communities I serve, Ifully recognize that the entire region and nation will
benefit from the smoother flow and expeditedtransport of freight through the Midwest.
Then-alderman Ton i Preckw ink le, June 2008
7/30/2019 Illiana Rail Bypass Concept
10/38
The Illiana Rail Bypass SolutionTransforming Transportation for Tomorrow
Great Lakes Basin, LLC - Confidential 10
7/30/2019 Illiana Rail Bypass Concept
11/38
Great Lakes Basin, LLC - Confidential 11
Illiana Route Across Illinois
7/30/2019 Illiana Rail Bypass Concept
12/38
Great Lakes Basin, LLC - Confidential 12
Chicago Terminal vs. Illiana Railroad
FRA Class 2 3
Top Speed = 40 mph
Average = 10-20 mph
Interlockings: 15 betweenElwood and Portage(Indiana).
Grade crossings: 50+
FRA Class 4
Top Speed = 60 mph
Average = 40 mph
Interlockings: Nonebetween Coal City andWellsboro (Indiana).
Grade crossings: None
7/30/2019 Illiana Rail Bypass Concept
13/38
Great Lakes Basin, LLC - Confidential 13
Chicago Terminal vs. Illiana Railroad
Transit time = 8-12 hrs.across the terminal*.
Limited sites open to
reciprocal switching. All UPRR mainline
corridors under restrictedaccess.
Require CMAQ grants fornew environmentallyfriendly locomotives.
Transit time = 2.25 hrs.across the terminal (25miles shorter).
100% open access; nocaptive shippers.
No restricted access mainlines on Illiana.
New environmentallyfriendly locomotives (Tier
4) will be self-funded.
Great Lakes Basin, LLC - Confidential
7/30/2019 Illiana Rail Bypass Concept
14/38
Chicago Terminal vs. Illiana Railroad
Multiple owners, 20-plusdispatch centers (notalways in Chicago).
Metra curfews, multipleAmtrak intercity routes.
Most routes have286,000lb. GWR limit.
Single owner, singledispatch center locallybased.
Main lines are freightonly.
Illiana main lineconstructed with
315,000lb. GWR limit.
Great Lakes Basin, LLC - Confidential 14
7/30/2019 Illiana Rail Bypass Concept
15/38
Great Lakes Basin, LLC - Confidential 15
Chicago Terminal vs. IllianaRailroad
Requires an additional $2billion of free public
money (sourcesunknown) to complete
CREATE.
Original route laid out inthe 1880s; no room for
expansion today.
Overloaded and
outdated per IDOT.
Combination of privateinfrastructure funds andUSDOT loan programsalready in existence (i.e.
no public money).
Original route laid out in2013; 25-foot trackcenters.
A Railroad for the 21stCentury.
7/30/2019 Illiana Rail Bypass Concept
16/38
Great Lakes Basin, LLC - Confidential 16
Key Illiana Operational Benefits
An alternate route for themore than 25% of Chicagoarea rail traffic that doesnot originate or terminate in
the region. Stakeholder outreach
revealed that municipalitieswould like freight rail not
terminating in the region tobypassthe region as muchas possible, CMAP GOTO2040 Regional Plan.
7/30/2019 Illiana Rail Bypass Concept
17/38
Great Lakes Basin, LLC - Confidential 1717
Hazardous Materials Unit Trains
The NTSB has stated,Unit trains that carry
hazardous materials
present a special risk
because of the highconcentration of
hazardous materials.
Should there be a lessrisky, more competitiveroute around Chicago?
7/30/2019 Illiana Rail Bypass Concept
18/38
Great Lakes Basin, LLC - Confidential 18
CDOT Endorses Illiana Concept
Freight Rail Futures goals
were to:
Increase the efficiency offreight movement in the City.
Improve the city's economicdevelopment opportunities.
Support redevelopment ofurban neighborhoods.
City of Chicago Departmentof Transportation, November2003.
7/30/2019 Illiana Rail Bypass Concept
19/38
Great Lakes Basin, LLC - Confidential 19
CDOT Rationalization Scenario
The premise.is that the railroads and governmentagencies, faced with worsening rail congestion in theChicago area, seek to improve the fluidity of the regionsthrough traffic with investment in high-capacity rail
bypass corridors. High capacity railroad corridors to divert through traffic
and to improve fluidity of local traffic was assumed toprovide significant increased capacity for service to
shippers located in the region.
7/30/2019 Illiana Rail Bypass Concept
20/38
Study Findings on a Bypass Route
Using the conclusions in the Critical Cargo Study, and the
input from several railroad executives, we assumed that at aminimum, about 100-miles of high-capacity grade separatedcorridor or corridors would be required to support Chicagos
anticipated traffic growth. Suffice it to say that there is not a consensus on which route
or combination of routes provides the best solution toChicagos transportation needs.
Absent a sponsoring agency and well funded study (as wasthe case in the Alameda Corridor) carriers are focusing theirefforts on maintaining the efficiency of the current routenetwork.
Great Lakes Basin, LLC - Confidential 20
7/30/2019 Illiana Rail Bypass Concept
21/38
Great Lakes Basin, LLC - Confidential 21
Conclusions & Recommendations
Rationalization of the rail freight system would increasethe citys Gross Regional Product (GRP) by more than
$1 billion per year by the year 2020 and provide morethan 8,000 additional jobs.
Redevelopment of land freed up by rationalizationwould more than double these benefits.
While rationalization forfeits rail facilities in the city
(many of them redundant), the service improvementsunderrationalization would actually attract businessgrowth to Chicago.
7/30/2019 Illiana Rail Bypass Concept
22/38
Great Lakes Basin, LLC - Confidential 22
Northwest Indiana Rail Tsunami
Virtually all rail freight comingfrom East Coast to Chicagomust squeeze through a NWIndiana rail corridor with sixmainline tracks, myriad railconnections and more than864 at-grade highwaycrossings.
Illiana Rail Bypass will
provide significant amount ofmitigation and congestionrelief for Northwest Indianas
Rail Tsunami problem.
7/30/2019 Illiana Rail Bypass Concept
23/38
23
The CREATE Script (circa 2011)
Even building all of CREATE (including the
passenger projects) by itself will not suffice in the
long run.
It now also seems likely that, in planning for the long term,something more than what is now contained in the CREATEScript may be needed.
Given the competing demand for track capacity nowexpected from growing passenger services, it is likely that
new projects, not now on the list will be needed.
If all CREATE projects built, freight delay minutes are stillprojected to increase 65% in 20 years
Great Lakes Basin, LLC - Confidential
7/30/2019 Illiana Rail Bypass Concept
24/38
24
Doubling Rail Freight by 2035
LOS Grade F
UP Geneva Sub
CSX Garrett Sub
NS Chicago Line
LOS Grade E
BNSF Chillicothe
Sub UP Villa Grove Sub
Great Lakes Basin, LLC - Confidential
7/30/2019 Illiana Rail Bypass Concept
25/38
Great Lakes Basin, LLC - Confidential 25
The Future of Crude Oil Logistics
7/30/2019 Illiana Rail Bypass Concept
26/38
The Importance o f Rai l
Great Lakes Basin, LLC - Confidential 26
If you have rail, you have a scarce
resource. If you have dual rail service
sites, you have a crown jewel resource.
Mark Sweeney (McCallum Sweeney Consulting) at
2004 International Economic Development Council Site
Selectors Panel.
7/30/2019 Illiana Rail Bypass Concept
27/38
27Great Lakes Basin, LLC - Confidential 27
Existing Development Obstacles
The Chicago Metropolis 2020 Freight Plan
Technical Report Conclusions
There is a limited supply of well placed industrial land in
the region.
There are very few locations in the six county regionwhere large tracts are available on major rail lines andclose to interstate expressways.
Preferred industrial sites with both road and railaccessare relatively rare in the Chicago region.
7/30/2019 Illiana Rail Bypass Concept
28/38
Great Lakes Basin, LLC - Confidential 28
The 90-mile Linear Industrial Park
More than 50,000 acresof rail-served developableland along proposedroute;
Equals one-third the landmass of the City ofChicago.
Provides opportunity fordevelopment of multiple
1,000-acre Megasites. The Rochelle
Syndrome on steroids.
7/30/2019 Illiana Rail Bypass Concept
29/38
Rail-Based Tourism Development
Great Lakes Basin, LLC - Confidential 29
7/30/2019 Illiana Rail Bypass Concept
30/38
Building Blocks for Metra
Assist with local matchfor financing MEDextension to Peotoneand Kankakee.
Construct new MEDstation and servicingyard at South SuburbanAirport industrial park.
SouthEast ServiceCrete to Beecher ROW.
Great Lakes Basin, LLC - Confidential 30
7/30/2019 Illiana Rail Bypass Concept
31/38
Collateral Benefi ts
Financial support forNICTD West LakeExtension to Dyer andLowell, Indiana via
ex-Monon Route.
South Shore FreightConnection at
Burnham, Illinois andaccess to Port ofChicago.
Great Lakes Basin, LLC - Confidential 31
7/30/2019 Illiana Rail Bypass Concept
32/38
HSRAmtrak Benefits
Alternate main lineroute for UP St. Louisto Chicago (Joliet)intermodal trains.
Preservation ofChicago to IndianapolisHSR route.
Amtrak Chicago toToledo, Cleveland.
Great Lakes Basin, LLC - Confidential 32
7/30/2019 Illiana Rail Bypass Concept
33/38
7/30/2019 Illiana Rail Bypass Concept
34/38
Great Lakes Basin, LLC - Confidential 3434
Alternative Regional Bypass Routes
NYC-NS Kankakee Belt Manual block single track.
Few sidings.
Closed access, ownership.
Poor eastern connections.
G&Ws TP&W Line
Manual block single track. Poor overall condition.
Poor eastern connections.
7/30/2019 Illiana Rail Bypass Concept
35/38
Great Lakes Basin, LLC - Confidential 35
Illiana Corridor Financing Strategy
RRIF RailroadRehabilitation andImprovement Finance
TIFIA TransportationInfrastructure Financeand Innovation Act
Private Activity Bonds(IL Finance Authority)
Private InfrastructureFunds
7/30/2019 Illiana Rail Bypass Concept
36/38
Great Lakes Basin, LLC - Confidential 36
Supported by GOTO 2040
The region will need to be proactive in terms ofplanning for changes in terms of freight travelpatterns and global market dynamics. The
resiliency of the freight system will be enhancedby,
sufficient right of way and corridor
protection for freight systems;
preserving and enhancing multimodaltransportation options; and
providing operational flexibility.
7/30/2019 Illiana Rail Bypass Concept
37/38
Great Lakes Basin, LLC - Confidential 37
CMAP GOTO 2040
By proactively planning forresiliency in thefreight system, the region can substantiallybenefit by making the region ready-to-go
for economic development opportunitiesthat require global access or a central locationfor Midwest and national markets.
(Current Market Conditions - Addressing MarketDynamics, GOTO 2040 ComprehensiveRegional Plan, Chapter 12.2, page 311.)
7/30/2019 Illiana Rail Bypass Concept
38/38
G L k B i LLC C fid i l 38
What Comes Next???
Chicago DOT and ReebieAssociates made the casefor the Illiana Rail Bypassplan in Freight Rail
Futures for the City ofChicago (November2003).
The Illiana Rail Bypass
Concept represents theopportunity of a generation,perhaps of our lifetime.