6
Illawarra Business Chamber

Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

Illawarra Business Chamber

Page 2: Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

Infrastructure Wins

IBC Rebuilding NSW Submission called for

Progress scorecard

1. M1 (F6) Extension – complete the extension of the Freeway between Waterfall to St Peters by 2020, including investigations to link to the Westconnex South.

• $11 million committed to F6 extension feasibility study

• $300 million Rebuilding NSW funding allocation to unblock critical constraints on the Gateway to the South A1, A3 and A6.

2. Reduce travel time on the Illawarra rail line to 60 minutes – complete engineering and timetabling upgrades to resolve structural issues

• Rebuilding NSW states a further reduction in the rail journey ‘will be investigated’

3. Maldon Dombarton – complete the construction of the dedicated freight rail corridor by 2020

• EOI process underway

4. Albion Park Rail Bypass – commence construction of the bypass by 2017

• Government has commited $550million ($350 million Rebuilding NSW funding allocation and $200 million from roads and freight budget)

5. Shoalhaven River Crossing – commence construction on the second bridge by 2020

• $11.6 million committed to complete planning

Page 3: Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

2015 NSW Election win: Boxing day trading in Wollongong

• Amending the boxing day retail trading laws has been a cause the Illawarra Business Chamber has championed

• The IBC made a submission on the retail trading laws back in 2011 and wrote to the then Treasurer Mike Baird in 2013

• The Government has listened to the business community and is getting rid of this archaic trading law

Page 4: Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

1. Skills & training 2. Reducing Illawarra’s

unemployment

3. Infrastructure

links to Sydney

Skills Priority Progress

Members’ top 3 policy priorities:

Page 5: Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

Building sales

Maintaining a work /life balance

Sourcing businessleads

Marketing

Policy & advocacy

Educationalworkshops/seminars

Events & networking

Business exposure &connections

777 members (2013)

934 members (2014)

1,262 members (2015)

Member growth

Member numbers: 62% increase in IBC membership over 2 years

Membership benefits: Key benefits of IBC membership:

Challenges: Key challenges facing members:

• Thank you to the 132 members who took part in the 2015 member survey

• The insights will be used to improve the IBC membership offering in 2015 and beyond………

Page 6: Illawarra Business Chamber · Waterfall to St Peters by 2020, including investigations to link to the Westconnex South. •$11 million committed to F6 extension feasibility study

Recent events

Last 6 months IBC events:

• 10 events

• 1,435 attendees...

• ?? connections