The project involves:
• Building just under 2 miles of power line
• Installation of switch equipment
The improvements:
• Provide power to South Central Power
• Ensure power grid functionality and operation
• Support a projected increase in electricity demand
WHAT WHY
I L E S B O R OIMPROVEMENTS PROJECT
AEP Ohio representatives plan power grid upgrades
in northern Vinton County. The project involves
building just under 2 miles of 138-kilovolt
transmission line and a switch to isolate equipment
from the power grid. Upgrades improve power grid
functionality and operation.
PROJECT SCHEDULE
PROJECT ANNOUNCEMENTSummer 2020
RIGHT-OF-WAY ACTIVITIESSummer 2020–Spring 2022
FIELD SURVEYS & ENGINEERINGLate Summer 2020–Spring 2021
PRE-CONSTRUCTION ACTIVITIESLate 2021–Spring 2022
TRANSMISSION LINE CONSTRUCTIONSpring 2022–Summer 2022
*Timeline subject to change.*Timeline subject to change.
2020 2021 2022 2023
Company representatives are evaluating
power line route options in northern Vinton
County. Input from the community helps
determine the location of the final line route.
WHERE
93
93
56
FAIRVIEW RDFAIRVIEW RD
SHUR
TZ R
D
SHUR
TZ R
D
HOCKING COUNTYHOCKING COUNTY
VINTON COUNTYVINTON COUNTY
21
AEP OHIO VALUES YOUR INPUT ABOUT THIS PROJECT. PLEASE SEND COMMENTS AND QUESTIONS TO:
*Exact structure, height and right-of-way requirements may vary
05/27/202005/27/2020
Structure type varies depending on location and engineering design. Company engineers strive to limit the impact of the line on its surroundings while maintaining a buildable design.
Structure Height Range: 60-100 feet*Right-of-Way Width: Approximately 100 feet*
TYPICAL STRUCTURES
AEP Ohioc/o Maggie Beggs8600 Smiths Mill RdNew Albany OH 43054
(380) 205-5178
www.AEPOhio.com/ilesboro
ILESBORO IMPROVEMENTS PROJECT
ROUTE OPTION FOR TRANSMISSION LINE TO BE BUILT
EXISTING TRANSMISSION LINE
POTENTIAL SWITCH LOCATION
SOUTH CENTRAL POWER SUBSTATION