Key Facts The iconic IKEA brand Fast Turnaround requirements Strict noise pollution containment requirements. ETS Designed and Installed modified exhaust systems to four existing gas generators, utilizing Miratech silencers, to capture enough waste heat for the creation of 5.6MW of additional mine cooling capacity via absorption chillers. While only a relatively small project for us, installing the back up power generator at the brand new IKEA facility in Canberra such that it would meet strict noise pollution requirements was nevertheless a challenge. The project also had tight deadlines around the handover and opening dates for the facility. We therefore had to ensure everything was fully coordinated ahead of time so that, once our four -week window for installation opened up, we would be able to get in complete our work and get out again within the required timeframe. We achieved all timeframes and deadlines and the project was completed on-time and under budget. All installation and commissioning was completed without incident keeping our zero harm record in tact. And, IKEA being the iconic brand that it is, we are proud to be associated with its new facility in Canberra. . IKEA Canberra

IKEA Canberra - ETS · While only a relatively small project for us, installing the back up power generator at the brand new IKEA facility in Canberra such that it would meet strict

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IKEA Canberra - ETS · While only a relatively small project for us, installing the back up power generator at the brand new IKEA facility in Canberra such that it would meet strict

Key Facts

The iconic IKEA brand

Fast Turnaroundrequirements

Str ict noise pol lut ion containment requirements.

ETS Designed and Instal led modif ied exhaust systems to four exist ing gas generators , ut i l iz ing Miratech si lencers, to

capture enough waste heat for the creat ion of 5.6MW of addit ional mine cool ing capacity v ia absorpt ion chi l lers.

Whi le only a relat ively smal l project for us, instal l ing the back up power generator at the brand new IKEA faci l i ty in

Canberra such that i t would meet str ict noise pol lut ion requirements was nevertheless a chal lenge.

The project also had t ight deadl ines around the handover and opening dates for the faci l i ty . We therefore had to ensure

everything was ful ly coordinated ahead of t ime so that , once our four -week window for instal lat ion opened up, we would

be able to get in complete our work and get out again within the required t imeframe.

We achieved al l t imeframes and deadl ines and the project was completed on-t ime and under budget.

Al l instal lat ion and commissioning was completed without incident keeping our zero harm record in tact.

And, IKEA being the iconic brand that i t is , we are proud to be associated with i ts new faci l i ty in Canberra.

.