IIITDM J minutes...1000 KVA DG set — Installed — Under testing — 95% work completed. Lecture...
10
IIITDM J minutes...1000 KVA DG set — Installed — Under testing — 95% work completed. Lecture Hall and tutorial Complex — 75% work completed. — Likely to be completed by Narmada