Catchment Area (m2) C Inlet time (min)
I 8,090 0.7 5
II 12,100 0.7 7
III 16,200 0.6 10
IV 16,200 0.6 10
V 20,200 0.5 15
VI 18,200 0.5 15
VII 18,200 0.5 15
A
B
C
D
E
I II
VIII IV
VI VIIGround elev. (m)
Sewer Length (m) Upstrm Downstrm
A-B 167.64 152.40 151.04
E-B 137.16 151.92 151.04
B-C 121.92 151.04 150.26