FREEWAY OPERATIONS STUDIES WORK ORDER # 22 CONTRACT No. (86) 06-03-A3-AG (58545P5007) FOR IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY TRAFFIC ENGINEERS. INC. FORT WORTH, TEXAS SEPTEMBER 1986 --------------- !TRAFFIC ENGINEERS, INC. I __ ........

IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

Embed Size (px)

Citation preview

Page 1: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

FREEWAY OPERATIONS STUDIES

WORK ORDER # 22

CONTRACT No. (86) 06-03-A3-AG

(58545P5007)

FOR

IH 30 EB TO SB CONNECTION TO US 287

IH 30 WB BETWEEN HENDERSON AND SUMMIT

SUBMITTED BY

TRAFFIC ENGINEERS. INC.

FORT WORTH, TEXAS

SEPTEMBER 1986

--------------- !TRAFFIC ENGINEERS, INC. I __ ........

Page 2: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

TABLE OF CONTENTS

PAGE NO. ----

INTRODUCTION . 1

IH 30 EASTBOUND TO SOUTHBOUND CONNECTION TO US 287

A. STUDY LOCATION

B. PROBLEM/TASK STATEMENT .

C. DATA COLLECTION

D. OBSERVATIONS/ANALYSIS

E. CONCLUSIONS AND RECOMMENDATIONS

F. APPENDIX

1986 24-Hour Counts

IH 30 WESTBOUND BETWEEN HENDERSON AND SUMMIT

A. STUDY LOCATION

B. PROBLEM/TASK STATEMENT .

C. DATA COLLECTION

D. OBSERVATIONS/ANALYSIS

E. CONCLUSIONS AND RECOMMENDATIONS .

F. APPENDIX

24-Hour Approach Counts Peak Hour Turning Movement Counts 24-Hour Area Ramp Counts

2

2

2

2

9

1 1

1 1

1 1

11

16

'--------------- !TRAFFIC ENGINEERS, INC. I --....

Page 3: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

LIST OF FIGURES

FIGURE NO. PAGE NO.

1

2

3

4

5

6

7

8

9

IH 30 EASTBOUND TO SOUTHBOUND CONNECTION TO US 287

STUDY LOCATION ..

COLLISION DIAGRAM ...... .

STUDY AREA AND 24 HOUR COUNTS .

PEAK HOUR WEAVING PATTERNS ...

EXISTING AND PROPOSED SIGNING ..

IH 30 WESTBOUND BETWEEN HENDERSON AND SUMMIT AVENUE

STUDY LOCATION ....... .

STUDY AREA AND 24 HOUR COUNTS ... .

TURNING MOVEMENT COUNTS .... .

COLLISION DIAGRAM .

3

4

5

6

8

• 1 2

. . 1 3

• 1 4

15

10 EXISTING GEOMETRICS AND RECOMMENDED IMPROVEMENTS .. 17

I TRAFFIC ENGINEERS, INC. J __ ._.

Page 4: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

LIST OF TABLES

TABLE NO. PAGE NO.

IH 30 EASTBOUND TO SOUTHBOUND CONNECTION TO US 287

1 IMPROVEMENT COST ESTIMATE ............. 10

2

IH 30 WESTBOUND BETWEEN HENDERSON AND SUMMIT AVENUE

IMPROVEMENT COST ESTIMATE .......... . 19

I TRAFFIC ENGINEERS, INC. ! __ .....

Page 5: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

INTRODUCTION

For freeways and expressways to operate safely and efficiently, interchanges with arterial streets and other freeways must be properly designed. Interchange ramp systems must allow traffic to move from one facility to the other without disruption of high speed traffic flow on adjacent freeways and with the utmost convenience to the motorist. Ramp systems must provide for the safe weaving, deceleration and acceleration required for traffic to move from one facility to another. Signing and markings must guide the motorist to reach his destination safely. When· safety or operations' problems occur at interchanges, these elements must be analyzed to determine the cause of the problem.

This work order is a FSIP identification safety problems.

study of two locations, identified by the process, which experience ramp related

I TRAFFIC ENGINEERS, INC. l 1

Page 6: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

IH 30 EB TO SB CONNECTION TO US 287

._. _____________ ,TRAFFIC ENGINEERS, INC.I---....

Page 7: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

FREEWAY OPERATIONS STUDY

IH 30 Eastbound to Southbound Connection to US 287

A. Study Location

The subject location is the exit and related ramp system from eastbound IH 30 to southbound US 287 (Figure I). The situation is complicated by ramps to both eastbound and westbound US 80 (Lancaster Avenue). The study location on IH 30 is only 0.4 miles east of the on ramps from northbound and southbound IH 35.

B. Problem/Task Statement

The eastbound to southbound connection between IH 30 and US 287 presents the potential for safety and operational problems due to the geometrics and driver load that exist. It is the objective of this work order to identify existing safety and traf fie flow problems and to recommend actions to correct or alleviate those problems.

C. Data Collection

In order to identify and analyze problems ramp system, traffic accident and count Accident data (Figure 2) was collected for to US 287, and on all of the off ramps (Lancaster Ave).

associated with this data were obtained. IH 30 near the exit

to US 287 and US 80

Twenty four hour traffic counts (Figure 3) were made on the off ramps to US 287 southbound and to US 80 (Lancaster Ave) eastbound and westbound. In addition, a PM peak hour weaving study (Figure 4) was made on the multiple lane section of the IH 30 eastbound off ramp to US 287 /US 80 to determine lane changing movements during heavy traffic conditions.

D. Observations/Analysis

An analysis of the accidents showed a significant problem only at or just west of the gore area of the eastbound IH 30 exit to US 287/US 80. Few accidents were found within the ramps to US 287 or US 80 or at on ramp termini at US 287.

Twenty (20) of the twenty-two (22) total accidents identified occurred at the IH 30 exit gore (Figure 2). Of these, twelve (12) occurred during daytime, off peak periods. The remaining accidents were divided among the AM peak (3), PM peak (2), and at night (3). Most of the daytime accidents were rear end or sideswipe collisions.

[ TRAFFIC ENGINEERS, INC. j 2

Page 8: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

. ..:.L_ .. ,_...Jl,].yMMlj!n~--· ........ --

TRAPPJC ENGJNEERB, INC. STUDY LOCATION

HOUSTON• AUS'J1N • PORT WORTH IH 30 EB TO SB CONNECTION TO US 287

FORT WORTH, TEXAS FIGURE 1

Page 9: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

US 287 SB

Accident Pavement Number Date Time Condition Injuries

1 1-02-85 930 Icy 0 2 1-09-85 1330 Dry 0 3 1-23-85 2300 Dry 0 4 4-03-85 915 Dry 1 5 4-24-85 1430 Dry 0 n 6 6-16-85 1515 Dry 0 7 7-06-85 1400 Dry 2A, lB 8 7-16-85 1620 Dry 2C 9 7-30-85 2115 Dry 0

10 8-05-85 2315 Dry 0 11 8-21-85 1100 Dry 1 C, 1 B 12 11-05-85 703 Dry 0 13 11-28-85 2020 Dry IC 14 12-07-85 1515 Dry 0 15 12-30-85 705 Dry IA 16 3-24-86 1600 Dry 0 1 7 4-06-86 1520 Dry IB 18 4-06-86 1520 Dry 0 19 4-06-86 1520 Dry lC 20 5-16-86 1300 Dry 0 2 1 5-30-86 1445 Dry IC 22 6-02-86 815 Dry 0

COLLISION DIAGRAM TRAFFIC ENGINEERS, INC.

HOUSTON• AUSTIN• FORT WORTH IH 30 EB TO SB CONNECTION TO us 287'

FOAT WORTH, TEXAS FIGURE 2

Page 10: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

16,916

us 217 SI

661

LEGEND

c::, COUNT LOCATION

XXX TRAFFIC VOLUME (TEI 1/10/11)

STUDY AREA AND 24 HOUR COUNTS T1lAFFIC ENGINEERS, INC.

HOUSTON• AUSTIN• FORT WORTH IH 30 EB TO SB CONNECTION TO US 287 FORT WORTH, TEXAS

VI FIGURE 3

Page 11: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

"' "' 0 .. X M

1,302

I

MOVEMENT # 1

.. ... 0 ,., X M

I I

MOVEMENT # 2

.. ... 0 .. X M

NOTE : RAMP TO SB 287 BACKS UP TO IH 30 5:05-5:15 PM

DATA COLLECTED 9/11/86

TRAFFIC ENGINEERS, INC.

HOUSTON• AUSTIN• PORT WORTH

PEAK HOUR WEAVING PATTERNS IH 30 EB TO SB CONNECTION TO US 287 FORT WORTH, TEXAS

I

MOVEMENT # 3

FIGURE 4

Page 12: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

The large number of daytime, off peak accidents can likely be attributed to driver uncertainty and indecision. Field observations and several trips on different approaches to this area showed two probable causes:

1. Existing signing (Figure 5) for the US 287/US 80 exit may be inadequate. Signs are well placed on the main ramp lanes at the gore area to direct drivers to southbound US 287, eastbound US 80, and westbound US 80. However, no signs are present on IH 30 in advance of the interchange to indicate an upcoming exit. As shown in Figure 5, signs are placed on IH 35, both northbound and southbound, as well as on eastbound IH 30 west of the IH 35 interchange to direct drivers to southbound US 287 via eastbound IH 30. However, once this traffic reaches IH 30 east of IH 35, there is no additional indication of the necessity to exit from IH 30 until the gore area signing can be seen. An unfamiliar or partially familiar driver who followed US 287 signing through the IH 35 and IH 30 interchange could be faced with a hasty and possibly very hazardous decision when he or she unexpectedly realized the need to exit IH 30 in order to reach to US 287 or US 80.

2. Since the former ramp connection from southbound IH 35 directly to southbound US 287 is closed, traffic desiring to use US 287 has been rerouted temporarily to US 287 via eastbound IH 30. This movement requires a difficult movement for motorists who enter IH 30 from the left and must weave across the heavily travelled main lanes to exit to the right at US 287 approximately 1,700 feet to the east. Test runs through this area showed this weave to be extremelly difficult even for a familiar, aggressive motorist. During the PM peak two attempts to make this weave were unsuccessful.

Traffic volume counts made on the off ramps to US 287 and US 80 (Lancaster Ave) showed a disproportionate distribution relative to the number of lanes provided on the ramps. The single lane ramp to southbound US 287 carried 16,916 vehicles in a 24 hour period, including a peak PM hour of 1,795 vehicles. In comparison, the two lane ramp to eastbound US 80 carried only 3,031 vehicles in 24 hours, and the single lane ramp to westbound US 80 carried only 661 vehicles. The heavy volume on the ramp to southbound US 287 created queuing in a single lane back to the IH 30 through lanes during the PM peak hour. The lack of traffic demand in adjacent lanes servicing US 80 during the same period caused a significant amount of lane changing on the off ramp. Vehicles would use the empty off ramp lanes to eastbound US 80 and make last second maneuvers into the southbound US 287 ramp (Figure 4).

I TRAFFIC ENGINEERS, INC. I 7

Page 13: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

··.·.

----- \\\ I.A .. ,.

111C:•srr,. ::,.

\

H a ® 6 IAIT 8 1••111

'\ D•llu

....................... , ... :'::.::;_:,.. .... %}\\;_:: ......

®88 IAIT

Dolloo ~

'\88 ..... D0llo1 ...

8 ... ,. TO® IHI ®6

...

EXISTING TRAFFIC ENGINEERS, IMC.

AND

8 t3 hit •,. 1111•

PROPOSED SIGN TO

BE MOUNTED ON WEST

SIDE OF BRIDGE

····•···•·

. .. ,. 8 8 .... , ... ......

. .. , 8 #

8 .... ,

PROPOSED SIGN TO BE INSTALLED IN RAMP GORE

[. L••costn Ava. ... ... PROPOSED SIGN TO REPLACE EXISTING

CENTER PANEL ON OVERHEAD SIGN

PROPOSED SIGNING

HOUSTON • AUfflN • PORT WORTH IH 30 EB TO SB CONNECTION TO US 287 FORT WORTH, TEXAS

E. L onca111r ...... :;;· 1 ·;·

IOVTN

8

' 8 .... ,

[. L•co1t1, Aw1.

-

LANCASTER AYE

FIGURE 5

8

Page 14: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

E. Conclusions and Recommendations

Based on the analyses and field observations, several conclusions were reached regarding the safety and operations with the eastbound IH 30 to southbound US 287 connection.

1. There is a significant accident problem only at the exit point from IH 30. Factors contributing to this problem include:

2 .

a) The lack of advance exit signing for eastbound IH 30 traffic advising of the US 287/US 80 exit;

b) The difficult left to for southbound IH 35 US 287/US 80 exit.

right weave required traffic to reach the

Traffic volume on the single lane ramp eastbound IH 30 to southbound us 287 exceeds end capacity during part of the PM peak hour. is demonstrated by observed backups to the lanes on IH 30 and by the fact that the 24 traffic volume of 16,916 already exceeds the estimated volume of 13,550.

from ramp This main hour 1999

Although the proposed new interchange of IH 35 and IH 30 will correct signing deficiencies on IH 30 at US 287/US 80 and will eliminate the difficult left to right weave for southbound IH 35 to US 287 /US 80 traffic, interim measures should be taken to alleviate the current safety problem. Specifically, an additional exit guide sign should be installed to alert IH 30 motorists of the upcoming exit to US 287/US 80 (Figure 5).

Additionally, a connection is under construction on IH 35 at US 287 to provide a temporary replacement of the old connection for southbound IH 35 traffic to southbound US 287 while the new IH 35 and IH 30 interchange is under construction. Completion of this connection will permit the removal of the existing unsafe southbound IH 35 to southbound US 287 situation which exists. In the construction of the new IH 35 and IH 30 interchange, consideration must be given to constructing a two lane ramp connection from eastbound IH 30 to southbound US 287 rather than the single lane as is proposed. The current demand of almost 17,000 vehicles per day already exceeds the capacity of the proposed single lane ramp connection to southbound US 287.

The total estimated Table 1.

cost to be

of the $1,750.

recommended A detailed

signing improvements cost estimate is shown

I TRAFFIC ENGINEERS, INC.!

is in

9

Page 15: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

ITEM

1 2 3

TABLE 1

IMPROVEMENT COST ESTIMATE

IH 30 EASTBOUND TO SOUTHBOUND CONNECTION TO US 287

Signing Improvements

ITEM PESCRIPTION

Advance Guide Sign Gore "Exit" Sign "Lancaster Ave" Panel

QUANTITY UNIT

1 1 1

UNIT PRICE

$1,000.00 250.00 200.00

SUBTOTAL 10% MOB SUBTOTAL 10% ENG.

TOTAL

COST

$1,000.00 250.00 200.00

$1,450.00 145.00

$1,595.00 155.00

$1,750.00

I TRAFFIC ENGINEERS, INC. I -----10

Page 16: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

APPENDIX

..... -------------- !TRAFFIC ENGINEERS, INC.! __ .....

Page 17: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

15 ~lNUTE, 1 CHANNEL vEHICLE COJhi REFERENCE: Work Order 22 CORRECTION FACTOR: 1.00 LOCATION: EB 130 off-ra1p to SB US 287 Ft Worth, TX

HOUR BE61NS

12: 00 12: 15 12: 30 12:45 1: 00 1: 15 1: 30 1:45 2:0(1 2: i5 2:30 2:45 3:00 :.: 15 3; 30 3:45 4:00 4:15 4:30 4:45 5: (ll) 5:15 5:30 5:45 b: 00 6:15 6: :.o 6:45 7: (l(I 7:15 7:3(1 7:45 B:00 8: 15 6:3(i

8:45 ~:00 ~·: 15 9:30 9:45

10:00 10: 15 1 (I: :.o 10:45 11: 00 11: 15 11: 30 11:45

WEATHER: Dry OPERATOR: DG/01

l'IONDAY 8

f

f

* * f

f

f

f

f

f

f

t

* f. f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f.

f

f

f

f.

f

f

f.

f.

f

f

f

t

f

t

f

f

f

f

AM TOTALS

PEA( HOUR BEGINS VOLUME PHF

(I

(I

0

(I

(I

i)

0

0

0

0

(i

(i

(i

f

* f.

TUESDAY WEDNESDAY 9 10

f

f

f

f

f

t

t

f

f

f.

f

f

f

f

f

f

f.

f.

f

f

f

f

f

f.

* f.

f

f.

f

f

f

f.

f

f

f.

* f

f

f

f

t

f

t

* t

f.

*

(I

(i

(I

(I

(I

l)

(i

0

(I

i)

(i

(t

(I

t

f

f

f.

f

f.

t

f

f.

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

* f.

f

f

f

f

f

f

f

f

f

f.

f

f.

f

f.

f

f.

f

t

f

f

f

THURSDAY 11

63 /:.2 85

0 103 313 69 48 41

0 42 200 34 23 27

(i 24 108 2(1

29 39

0 iii 104

0 3(1 i 12 29 45 38

0 84 196 81

i 20 174

0 202 230 206 251

(I 256 943

208 187

0 192 81c; 177

(I

176 179 175 707

156 176

0 180 687 181 176 208

0 212 785

i)

f

f

*

C'C'C'' J.J, . .11

7:30 947

l), 92

FRIDAY 12

* t

f

t

t

f

f

f

f

f

f

t

f

f

f.

f:

f

f

t

t

t

f

f.

* f

f

f

f.

f.

f

f

f.

f

f

f

f

t

f

f.

f

f

f

f.

f

f

f

f

(i

0

0

0

(i

0

(i

(i

(i

(I

0

(t

(t

t

* f

IIEffDAY AVERAGE

63 62 8:,

103 313 d 48 41 42 200

23 27 24 108 20 2~' 39 16 104 32 21 25' 30 112 29 45 38 84 1 '16 81

120 174 202 230 206 r,r ~ .LJ.1

577

256 943

208 187 1~2 819 '.77 171::> 179 175 707 175 156 176 180 687 189 176 208 212 785

5551

7:30 947

0.92

PAGt 1 OF 2

FILENAME: FW6SU2B7 WEDNESDAY SEPTEl'IBER 10, 1986

SATURDAI' 13

t

t

f

f.

t

t

f

f

f

t

f

f:

f

f

f

t

f.

f:

f.

f

f

f

t

t

t

f

t

t

f

f

* f

f

f

* f.

f

f

f

f

f

t

t

f

f

f

(I

I)

0

(l

(I

0

(I

(i

0

(1

0

i)

f.

f

f

SUNDAY 14

t

f:

f:

f:

f

t

t

f

f

f:

f

f

f

f

f

t

t

f

f

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

t

f.

f

t

f

t

f

t

f:

f

f

(I

(i

(i

(i

0

0

I)

0

(I

0

(i

0

f

f

f

7 DAY AYERAGE

63 62 85

103 313 69 48 41 42 200 34 23 27 24 108 20 29 39 16 104 32 21 29 30 112 2~· 45 38 84 196 81

120 174 202 230 206 251

577

256 943 232 208 187 192 819 177 176 i79 175 175 156 176

707

180 687 189 176 208 212 785

5551

7:30 947

0.92

Page 18: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 NINUTE, 1 CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: EB 130 off-ra1p to SB US 287 WEATHER: Dry

Ft Worth, TX

OPERATOR: DB/CW

HOUR BE6INS

12:00 12: 15 12:30 12:45 1: 00 1: 15 1: 30 1:45 2:00 2: 15 2:30 2:45 3:00 3: 15 3:30 3:45 4:00 4: 15 4:30 4:45 5:00 5: 15 5:30 5:45 6:00 6: 15 6:30 6:45 7:00 7:15 7:30 7:45 B:00 B: 15 B:30 8:45 9:00 9:15 9: 30 9:45

10:00 10: 15 10:30 10:45 11: 00 11: 15 11: 30 11:45

PH TOTALS

NONDAY 8

f

f

f

f

f

f

f

f

t

f

f

t

f

f

f

f

f

f

f

f

f

t

t

t

f

f

f

f

f

t

.f

f

f

f

* f

f

f

f

f

f

* f

f

* f

f

f

PEAK HOLIR BE61 NS VOLUNE PHF

0

0

(I

0

(I

(I

0

(I

(I

(I

(I

(I

(I

f

f

f

TUESDAY 9

f

f

f

f

f

f

* * f

f

f

f

f

f

f

f

f

f

f

* * f

f

f

f

f

f

f

f

f

f

f

f

t

* * * f

f

f

f

f

f

t

f

f

* f

0

(I

0

0

0

0

0

WEDNESDAY THURSDAY 10 11

f

f

f

f

f

f

t

f

t

f

f

* f

f

t

* f

* f

f

f

f

f

f

f

* f

* * *

229 243 195

0 197 864 202 201 195

0 205 803 221 269 239

0 259 988 256

305 0 329 1143

394 417 428

0 447 1686 440 434 474

0 401 1749 418 334 311

0 235 1298 214 217

1 204 0 1 0 142 777

t 179 * 166 * 175

0 1 0 143 663 1 117 1 1B3 1 140

O t O 142 582 * 123 1 136 1 102

(i 8 8 115 476 119 98 98 120

102 * 0 66 3B5 1 218

0

f

* f

393

11: 00 385

O.B1

11247

4:45 1795 0.95

FRIDAY 12

f

f

f

f

f

f

t

f

* f

t

* f

* f

f

f

t

f

t

f

f

t

* f

f

t

f

f

f

* t

t

f

f

f

t

f

t

f

f

f

f

* f

f

f

*

0

0

0

0

0

(I

(i

I)

(I

0

I)

I)

0

t

f

f

WEEKDAY AVERAGE

229 243 195 197 864 202 201 195 205 B03 221 26S· 239 259 988 256 253 305 329 1143 394 417 428 447 1686 440 434 474 401 1749 418 334 311 235 1298 214 217 204 142 777 179 166 175 143 663 117 183 140 142 582 123 136 102

62 423 109 109 102 b6 386

11361

4:45 1795 0.95

PASE 2 OF 2

FILENANE: FW6SU287 WEDNESDAY SEPTENBER 1 O, 1986

SATURDAY 13

f

f

f

f

f

t

f

f

f

f

f

f

t

f

f

f

f

t

t

f

f

f

f

f

t

f

f

f

f

f

f

f

t

f

f

f

f

t

* f

f

f

* f

t

f

f

f

0

(l

0

0

(I

0

0

0

(I

(I

(I

(i

(l

f

f

f

SUNDAY 14

f

f

f

f

f

f

f

f

t

t

f

f

t:

f

f

f

f

f

f

t

f

f

t

t

* f

f

f

f

f

f

f

t

t

f

f

f

f

f

f

f.

t

f

f

f

* f

f

0

0

0

(i

0

0

0

(I

(I

0

0

(I

0

f

f

t

7 DAY AVERAGE

229 243 195 197 864 202 201 195 205 B03 221 269 239 259 9B8 256 253 305 329 1143 394 417 428 447 1686 440 434 474 401 1749 418 334 311 235 1298 214 217 204 142 777 179 166 175 143 663 117 183 140 142 582 123 136 102 62 423

109 109 102 66 386

11361

4:45 1795 0.95

Page 19: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 NINUTE, 1 CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: EB 130 off-ra1p to WB Lancaster Ft Worth, TX WEATHER: Dry

HOUR BE6INS

12:00 12:15 12:30 12:45 1: 00 1:15 1: 30 i:45 2:00 2: 15 2:30 2:45 3:00 3: 15 3:30 3:45 4: 0(1 4:15 4:3() 4:45 5:00 5:15 5:30 5:45 6: (1(1

6: 15 6:30 6:45 7:00 7: 15 7: ~.(I

7:45 8:(i(l

B: 15 8:30 8:45 9:00 9:15 9:30 9:45

10:00 10: 15 10:30 10:45 11: 00 1i: 15 11: 30 11: 45

OPERATOR: 06/CW

NONDAY 8

f

f

f

f

f

f

f

f

t

t

f

f

t

f

f

f

t

f

f

f

f

t

f

f

f

f

f

f

t

f

t

t

t

f

t

f

f

f

f

t

f

f

f

f

I

f

f

f

AH TOTALS

PEAK HOUR BE61NS VOLUME PHF

(I

(I

(I

0

(I

0

(i

0

(i

(I

(I

(I

(i

f

f

f

TUESDAY WEDNESDAY THURSDAY 9 10 11

f

f

f

I

I

f

t

I

t

t

f

f

f

f

f

f

t

t

f

I

f

f

f

f

f

f

f

f

f

f

f

t

f

f

t

t

t

f

t

f

f

f

f

f

f

f

t

t

0

(I

0

(I

I)

i)

0

(I

(I

(I

(I

(I

(I

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

+.

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

f.

f

f

f

0

(I

(I

0

(I

(I

5 1 0 2 (I

4 (I

(I

(I

0 (I

(I

(I

4 (I

3 (i

3 (I

6 2 5

6

6

0

4

6

0 6 19 3 7 5

0 15 3(1 9 9

23 0 15 56

25 19 1 (I

0 14 68 11 2 9

0 21 43 7 9 9

0 6 31 22 14 22

0 10 68

0

f

f

f

337

7:30 82

O.B2

FRIDAY 12

f

f

f

f

f

f

t

f

t

I

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

• f

t

f

f

I

f

f

f

f

f

f

f

(I

(I

(i

(i

(I

I)

(I

(I

0

0

(I

(I

0

f

f

f

WEEKDAY AVERAGE

f

5

f

2 f

4 f

f

f

f

f

f

t

4 f

3

• 3 f

6 2 5

6

6

(I

4

6

6 19 3 7 5

15 30 9 9

23 IS 56

19 10 14 68 11 2 9

21 43 7 9 9 6 31

22 14 22 10 68

337

7:30 82

0.82

PAGE 1 OF 2

FlLENANE: FN6NBLAN WEDNESDAY SEPTENBER 10, 1986

SATURDAY 13

f

f

I

f

f

f

f

f

f

I

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

t

f

f

f

f

f

t

f

f

I

t

f

f

f

f

0

(I

(I

(i

(I

SUNDAY 14

f

f

f

f

f

f

f

f

f

t

f

I

f

f

f

f

I

f

t

f

f

f

f

(I f

f

f

f

(I f

f

f

·* (I f

t

f

f

0 f

f

f

f

(I f

f

f

(I f

f

I

f

0 f

(I

f

I

t

(I

(I

(I

0

0

(I

(I

(I

0

0

(I

(I

0

f

f

f

7 DAY AVERA6E

f

5

f

2 t

4 I

f

f

f

f

f

f

4 f

3 f

3 f

6 2 5

6

6

0

4

6

6 19 3 7 r oJ

15 30 9 9

23 15 56 25 19 10 14 68 11 2 9

21 43 7 9 9 6 31

22 14 22 10 68

337

7:30 62

0.82

Page 20: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 IIINUTE, 1 CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: EB 130 off-ra1p to WB Lancaster Ft Worth, TX WEATHER: Dry OPERATOR: D6/CW

HOUR BE6INS

12:00 12: i5 12:30 12:45

1: 00 1: 15 1: 30 1: 45 2:00 2: 15 2:30 2:45 3:00 3: 15 3:30 3:45 4:00 4:15 4:30 4:45 5:00 5: 15 5:30 5:45 6:00 6:15 6:30 6:45 7:00 7:15 7: 30 7:45 8:00 B:15 B:30 B:45 9:00 9: 15 9:30 9:45

10: QI)

10: 15 10:30 10: 45 11: 0(1

11: 15 11: 30 11:45

Pti TOTALS

IIONDAY B

f:

f:

f:

f:

f:

f:

f:

f

f:

f

f

f.

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f.

f

* f

f

f

f

f

f

f

f

f

*

PEAK HOUR BEGINS VOLLll'IE PHF

(I

(l

(I

(I

0

0

(I

(i

0

0

0

(I

0

* f

f

TUESDAY WEDNESDAY THURSDAY 9 10 11

f:

f:

f:

f

f

f:

f

f

f:

f

f

f

f.

f

f

f

f:

f:

f

f

f

t

f

* f

* f

f

f

f

f

f

f

f

f

f

f

f.

f

f

f

f

f

f

f

f

f

f:

(I

0

(l

I)

(i

0

(i

(I

0

(i

0

0

(I

f:

f

f:

f

f

f:

f

f

f:

f

f

f

f

f

f

f:

f

f

f

f

f:

f

f

f

* f

f

f:

f.

f

f

f

f

f

* f

f

f:

f

* f

f

f

f

6 3

B 21 B

0 9 46 18 14 1 (I

0 6 48

(I

(I

(I

(I

(J

(I

(I

(I

15 16 7

12 12 5

14

50

12 43 10 6 8 B 32

11 2

8 22 5 7 6

19 7 5 5 2 19 2 B ., ,.)

0 13

4 4

0 b

12

2 11 2 5 (I

9 2 'i L

2 2 8

19

10:15 13

(1.54

* f 5

318

12: 15 56

0.67

FRIDAY 12

f

f

f:

f:

f

f

f

f

f

f

f

* f

f.

* f

f

f

f:

f

f

f

f

f

f

f

f

* f

f

f

f

f

f

f

f

f

f

f

f

f

f

f:

* f

* * *

0

0

0

(i

(i

(I

0

(I

(i

0

(i

0

0

f

f

*

WEEKDAY AYERA6E

8 21 B 9 46

lB 14 10 6 48

15 i6 7

12 12 5

14 12 10 6 8 B

11 2 1 8 C"

·' 7 6

50

43

32

1 19 7 C" .!

C"

·' 2 19 2 B 3 + 13

4 4 1 12 f

6 2 2 10 4 2 "• i.

2 10

324

12: 15 56

(1.67

PASE 2 OF 2

FILENANE: FW6WBLAN WEDNESDAY SEPTEMBER 10, 1986

SATURDAY 13

f

f

f

f:

f:

f:

f

f

f

f

f

f:

* f

f

f

f

f:

f

f:

f

f

f

f

f

f

f:

f:

f

f

f

f

f

f

* f

f

f

f

f

* f

f

f:

f

f

f

f

(I

0

0

0

0

(I

(I

(I

(I

0

0

(i

(I

* f

f

SUNDAY 14

f

f:

f:

f:

* * f:

f

f

f

f:

f

f

f

f

(I

0

(I

* (I

f:

f

f:

f: . (l

f

f

f

* (I

f

f

f

* f

f

* f

* * f

f

f

f

f

f

f

f

f

f

* f

f

f

0

(i

0

0

(I

(I

(I

f:

f

f

7 DAY AVERA6E

B 21 8 9 46

18 14 10 6 48

15 16 7

12 12 5

14

50

12 43 10 6 B 8 32

11 2 1 B 22 5 7 6 1 19 7 5 5 2 19 2 B 3 * 13

' •' 4 4 1 12 f

6 2 2 10 4 2 2 2 10

324

12:15 56

0.67

Page 21: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 0 15 NINUTE, 1 CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 (Southbound to US 287) LOCATION: EB Lancaster Off-Raap to US 287

WEATHER: Dry OPERATOR: DG/CW

HOUR BEGINS

12:00 12: 15 12:30 12:45 1: 00 I: 15 1:30 1: 45 2:00 2:15 2:30 2:45 3:00 3: 15 3:30 3:45 4:00 4:15 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6: 15 6:30 6:45 7:00 7:15 7:30 7:45 8:00 8: i5 8:30 8:45 9:00 9:15 9:30 9:45

10: 00 10: 15 10:30 10:45 11: 00 11: 15 11: ~.(I

11:45

AM TOTALS

NONDAY B

t

t

t

t

t

t

* t

* f

f

f

f

f

f

f

f

f

f

f.

f

f

f

f

• t

t

f

f

t

f.

* f

f

f

t

t

f

f

f

f

f

f

f

t

f

f.

PEAK HOUR BEGiNS VOLUME PHF

0

0

(i

(I

0

(I

(I

(I

I)

(I

(I

(I

(i

t

f

f

TUESDAY WEDNESDAY THURSDAY 9 10 11

t

t

t

t

f

t

t

t

t

f

f

f

f

t

f

f

f

f

f

f

t

f

*

0

0

(I

(I

(i

t 0

* * f

t 0 f

f

t t : (I

t

* f

f

f

f

* f

f

f

f

f

f

f

f

f

(i

0

(I

0

(I

f

f

f

f

t

t

t

t

f

t

f

t

f

f

f

f

f

f

f

• f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

* f

f

f

f

f

* +

* f

f

f

* f

f

(I

(I

(I

(I

(I

(i

(I

(I

9 0

10 4 5 3 3 I 3 2 7

12

5 17

(I

(I

(I

1 I

5 4 '1 L

6 5 7 9

17 21 B

17 31 29 21

6

12

27

63

0 20 101 15 15 13

0 22 65 13 12 19

0 ii 55 1B i6 i2

0 25 71

(I

t

f

t

453

B:00 101

0.81

FRIDAY 12

t

f

t

t

t

t

t

t

f

f

t

f

t

f,

f

f

f

f

f

f

t

f

f

f

f

t

t

f

f

t

f.

f

* * t

* f

t

f

t

f

f

+ f

t

f

f

t

(I

(I

(I

(I

(I

(I

0

(I

(I

0

0

(I

(I

f

t

t

WEEKDAY AVERAGE

9 t

10 4 5 3 3 l 3 2 7

23

12

5 17

* * f

j

3 1

" •' 4 ,, :..

6 " .!

7 9 li 21 B

17 31 2~· 21

6

12

27

63

20 i 01 15 15 13 22 6S 13 12 19 11 55 18 16 12 2S 71

453

8:00 101

O. Bl

PRSE I OF 2

FILENANE: FW6SB2B7 WEDNESDAY SEPTENBER 10, 1986

SATURDAY 13

t

t

t

f

t

t

t

t

t

t

f

f

f

t

f

t

f

* f

f

f

t

* f

f

f

f

f

f

* f

* f

t

t

f

f

f

f

f

f

f

f

f

f

f

t

t

(I

0

(I

(I

(I

(i

(i

(I

(I

(I

0

(I

(I

f

* f

SUNDAY 14

t

t

t

t

t

t

f

t

t

t

t

t

f

t

f

f

f

t

* t

f

t

f

* t

f

t

f

f

t

f

* f

f

f

f

f

f

+ t

+ t

* t

+ f

f

f

(I

(I

(I

(I

(I

(I

(I

0

(I

(I

(l

(!

(l

+ f

f

7 DAY AVERAGE

9

* I 0 4 5 3 3 1 3

7

23

12

S 17 l

* f

t

1 l 3

" .!

4 2 6 5 7 9

17 21 B

17 31 29 21

6

12

27

63

20 i 01 15 JS 13 22 6S 13 12 19 11 55 18 16 12 25 71

453

8:00 101

(1, 81

Page 22: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 0 15 NINUTE, 1 CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: EB Lancaster Off-Raap to US 287 WEATHER: Dry

(Southbound to US 287)

HOUR BESINS

12:00 12: 15 12: 30 12:45 1 :00 1: 15 1: 30 1: 45 2:00 2: 15 2:30 2:45 3: 00 3:15 3:30 3:45 4:00 4:i5 4:30 4:45 5:00 5: 15 5:30 5:45 6:00 6:15 6:30 6:45 7:00 7: 15 7:30 7:45 B:00 8: i5 8:30 B:45 9:00 9: 15 ~·: 30 9:45

10:00 10:15 10:30 10:45 11: 00 11: 15 11: 30 11:45

OPERATOR: DS/CW

NONDAY 8

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

PM TOTALS

PEAK HOUR BESINS VOLUNE PHF

0

(i

0

(I

0

0

0

(i

(I

(I

0

0

0

f

f

t

TUESDAY 9

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

t

f

f

f

f

f

t

f

f

f

f

f

f

f

f

0

0

(I

(I

0

(l

(i

0

(I

I)

(I

(I

(I

f

f

f

WEDNESDAY 10

THURSDAY 11

f

f

f

f

f

f

f

f

f

f

f

f

i

f

f

* f.

f.

f

f

f

f

f

f

f

f

f

f

f

f

f

24 25 21

0 18 BB lb 22 lb

0 18 72 28 20 20

0 31 99 ,c ,•.J

34 29

0 49 147 37 32 48

0 63 180 74

133 95

0 bb 368 35 34 34

0 14 117 20 13 15

* O 11 59 f

f

f

13 12 11

t (I 20 56 t

f

f

f (i

f

f

f

t (i

3 13 5 7 28

28

11: 00 28

0.54

12 23 15 11 bl 10 10 9

11 40 11 15 6 t 32

1319

5:00 368

0.69

FRIDAY 12

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f.

f

f

t

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

0

(I

(I

(I

0

0

(i

0

(I

0

(i

0

0

t

f

f

WEEKDAY AVERASE

24 25 2i !B BB lb 22 lb 18 72 28 20 20 31 99 7C •.h . .'

34 29 49 147 37 32 40 63 180 74

133 95 bb 368 35 34 34 14 117 20 13 15 11 59 13 12 11 20 56 12 ·1< Ls'

15 11 bl 10 10 9

1i 40 7

14 b 7 34

1321

5:00 368

0.69

PASE 2 OF 2

FILENANE: FW6SB2B7 WEDNESDAY SEPTENBER 10, 1986

SATURDAY 13

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

f

t

f

f

(i

(I

(i

0

(I

()

(I

(I

(l

(I

(i

(I

(I

f

f

f

SUNDAY 14

f

f

f

f

f

f

f

f

f

f

f

f

f.

f

f

f

f

f

f

f

f

f.

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

t

f

f

0

0

(I

(I

(i

(I

(I

(i

(I

0

(I

(i

(I

f

f

f

7 DAY AVERASE

24 25 21 lB BB 16 22 16 18 72 28 20 20 31 99

34 29 49 147 37 32 4B 63 180 74

133 95 66 368 7C ,l,J

34 34 14 117 20 13 15 11 13 12 11 20 12 23 15 11 10 10 9

11 7

14 b 7

59

c• .JO

61

40

34

1321

5:00 36B

0.69

Page 23: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 NINUTE, l CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: EB 130 off-raap to EB Lancaster WEATHER: Dry

Ft Worth, n

OPERATOR: D6/CW

HOUR BE6INS

l'IONDAY 8

12:00 12:15 12: 3(1 12:45 1: (1(1 1: 15 1: 3(1 1:45 2:(1(1 2:15 2:30 2:45 3:00 ~.: 15 3:30 3:45 4: 00 4:15 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6: 15 6:!,0 6:45 7:00 7:15 7:30 7:45 8:00 8: 15 8:3(1 8:45 9:00 9: 15 9: 3(1 9:45

10:00 10:15

. 1 (i: 30 10: 45 11: 00 11: 15 11: 30 11:45

AN TOTALS

PEAK HOLIR BEGINS VOLUME PHF

t

t

t

t

t

t

t

t

t

* t

* t

t

* t

t

* * f

f

* f

* * * t

* * f

t

* * t

* t

* t

f

* * * * t

f:

* t

*

(I

(l

(I

0

(I

0

0

(I

(I

(I

I)

(I

(I

t

t

t

TUESDAY 9

t

t

t

* t

t

t

t

* t

t

t

t

t

t

* * * * t

t

t

t

t

t

t

t

t

* t

* * t

*

* t

* t

t

* t

t

t

* t

t

t

(l

0

(I

(1

(I

(I

(i

(I

(I

0

0

(I

(I

t

t

t

WEDNESDAY 10

t

t

t

t

t

t

t

t

* * t

t

t

f.

t

* t

t

t

* t

* t

t

* t

t

* * * t

* * * t

* t

t

t

f:

t

* t

t

* * f

*

THURSDAY 11

1(1 14 9

0 6 39 8 9 7

0 7 31 5

(i

(I

(I

9 3 6 23 2 2 (I

4 3 7 -.)

4

8

2 12 0 7 ,!

11 0 11 31

19

40 0 50 132

65 40 63

0 75 243 78 65 51

0 53 247 72 28 48

0 46 194 55 51 48

(l .).) 187 40 44 45

0 34 163

(I

t

t

t

1310

7: 30 281

0.90

FRIDAY 12

t

* t

t

* t

t

t

t

t

* * t

t

* * t

t

t

* * t

* * t

t

* t

t

t

t

t

f

* * t

* * t

t

t

t

t

* * * t

f

(I

0

(I

(I

(I

0

(l

(I

(I

0

(I

(I

(I

t

* t

WEEKDAY AVERAGE

10 14 9 6 39 B 9 7 7 31 5 9 3 6 23 2 2 t

4 3

4

B

2 12 6

' •. 11 11 31 19

40 50 132 •c­o.• 40 63 75 243 7B 65 51 53 247 72 28 48 46 194 55 51 4B ~\.) 187 40 44 45 34 163

1310

7:30 281

0.90

PASE l OF 2

FILENANE: FW6EBLAN WEDNESDAY SEPTENBER 10, 1986

SATURDAV 13

t

t

t

t

t

t

t

t

t

t

t

t

* t

t

t

t

* t

t

* t

* t

* f:

* t

t

t

t

t

f

* t

t

t

f:

t

t

t

t

* t

* t

t

t

(I

(I

(I

(i

(I

(i

(I

(I

(i

(i

(I

0

(I

* t

t

SUNDAY 14

t

t

t

t

f:

t

t

t

t

* t

* * * t

* * t

t

t

t

t

t

t

* t

* t

t

t

f.

t

* t

* * t

* t

* t

* t

t

t

* t

t

0

0

(I

(I

(I

(I

(I

(I

(I

I)

0

(I

(i

t

t

t

7 DAY AVERAGE

1 (I 14 9 6 3S· B 9 7 7 31 5 9

0 23 2 2 t

4 3 3 4

8

2 12 6 < •.

11 11 3i 19 23 40 50 132 65 40 63 75 243 78 65 51 53 247 72 28 48 46 194 55 51 48 33 187 40 44 45 34 163

1310

7:30 281

0.90

Page 24: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Worx Order 22 15 HlNUTE, l CHANNEL vEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: EB 130 off-ra1p to EB Lancaster Ft Worth, TX WEATHER: Dry

HOUR BEGINS

12:00 l2:i5 12:30 12:45 1: 00 1: 15 1: 30 1:45 2:00 2: 15 2:30 2:45 3:00 3:15 3:30 3:45 4:00 4: i5 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6: 15 6:30 6:45 7:00 7:15 7:30 7:45 8:00 B: 15 8:30 8:45 9:0(1 9: 15 9:30 9:45

10: 00 10:15 10: 3t)

10:45 11: 00 11: 15 11: 30 11:45

OPERATOR: D6/CW

MONDAY 8

f

f

f

f

f

f

f

f

f.

f

f

f.

f

f

* i:

f

t

f

f

f

f

f

f

f

f

f

f

* t

f

t

* t

* t

f

f

f

f

f

f

f

t

f

f

f

PH TOTALS

PEAK HOUR BEGINS VOLUNE PHF

i)

0

(I

(I

(I

1)

i)

0

(I

(I

(I

t)

0

f

f

f

TUESDAY WEDNESDAY THURSDAV 9 10 11

t

t

f

f

f

* t

* f

t

f

f

f

f

f

* t

f

f

* f

f

f

t

t

f

f

* f

f

* * f

f

f

f

f

f

* f

t

f

t

f

f

f

f

0

(I

(l

(I

0

(i

0

f

f

f

f

f

* f

f

* f

f

f

t

t

f

t

* f

t

f

f

f

f

f

f

f

f

f

f

f

63 63 36

0 48 210 54 39 51

0 50 1'i4 6(1

I)

63 55 44 222 54 IJ4 56

0 58 232 67 57 47

0 46 217 63 35 29

0 41 168 31 3(1

0 29 122 21 29

* 36 0 1 0 12 98

* 12 * i5 * 32

0 * 0 24 83 t 20 t 21 1 24

0 t O 14 79 1 17 * 20 t 14

0 18 18 11 62 14 12 5 1

7 1

0 5 31 t 12

0

f

f

f

49

10:45 44

0.61

1699

3:15 245

0.91

FRIDAY 12

f

t

f

t

t

f

f

t

f

* f.

f

t

* f

t

t

f

f

f

f

t

f

f

t

f

f

f

f

f

* * f

t

f

f

f

f

f

t

f

f

f

f

f

f

f

t

(I

0

I)

0

(l

0

I)

0

0

0

0

0

0

f

f

f

WEEKDAY AVERAGE

63 63 36 48 210 54 39 51 50 194 60 63 55 44 54 64 56

222

58 232 67 57 47 46 217 63 35 29 41 168 31 30 32 29 122 21 29 36 12 98 12 15 32 24 83 20 21 24 14 79 17 20 14 15 66 13 5 7 5 30

1721

3:15 245

0.91

PA5E 2 OF 2

FILENAHE: FW6EBLAN WEDNESDAY SEPTEMBER 10, 1986

SATURDAY 13

f

f

f

t

f

t

f

t

t

t

f

t

f

t

f

t

f

f

f

f

f

f

f

* f

* t

t

f

f

f

t

f

f

f

t

f

t

f

f

f

t

f

t

f

f

f

f

(I

0

i)

i)

(I

0

0

(I

(I

I)

(I

(I

(I

f

f

t

SUNDAY 14

f

f

f

f

f

f

f

f

* f

f

f

* t

t

f

f

f

f

f

* t

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

(I

0

l)

(I

(I

(I

(I

(I

0

I)

0

0

0

f

f

f

7 DAY AVERAGE

63 63 36 48 210 54 39 51 50 194 bO 63 55 44 S4 64 56

,,.,,, i..i.L

SB 232 67 57 47 46 217 63 35 29 41 168 31 30 32 29 122 21 29 36 12 98 12 15 32 24 83 20 21 24 14 79 17 20 14 15 66 13 5 7 5 30

1721

3:15 245

0.91

Page 25: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

IH 30 WB BETWEEN HENDERSON AND SUMMIT

--------------- (TRAFFIC ENGINEERS, INC. I--.....

Page 26: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

FREEWAY OPERATIONS STUDY

IH 30 Westbound between Henderson and Summit

A. Study Location

The subject location is on westbound IH 30 between the on ramp from Henderson Avenue (SH 199) and the off ramp to Ballinger Avenue. These are two closely spaced ramps within a heavily travelled portion of IH 30 just west of downtown Fort Worth (Figure 6).

B. Problem/Task Statement

The section of westbound IH 30 between Henderson Ave and Ballinger/Summit Ave experiences safety and operations' problems due to the short distance between the on ramp from Henderson and the off ramp to Ballinger/Summit. The problem is complicated by horizontal curvature and other on/off ramps just east of the study location. It is the objective of this study to define safety and operations' problems present and to recommend corrective measures.

C. Data Collection

Twenty-four (24) hour machine traffic counts were taken on the Henderson and Ballinger/Summit ramps and at selected other locations (Figure 7). A peak hour turning movement count was conducted at the intersection of the Ballinger off ramp with Ballinger Avenue (Figure 8). Accident data was collected for the study section including westbound IH 30 accidents and intersection accidents for the Ballinger off ramp (Figure 9).

D. Observations/Analysis

Geometrics at the study location are restricted. Only 275 feet are available for weaving, acceleration, and deceleration movements for westbound IH 30 traffic and ramp traffic between the Henderson on ramp and the off ramp to Ballinger. This minimal length severely limits weaving capabilities, particularly for entering traffic from the Henderson on ramp. During peak traffic periods on ramp traffic must stop and wait for a significant gap in westbound IH 30 traffic before entering the freeway, rather than accelerating to freeway speeds and merging with IH 30 traffic as normally expected.

I TRAFFIC ENGINEERS, INC. I 11

Page 27: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

TRAFFIC ENGINEERS, INC.

HOUSTON• AUfflN • PORT WORTH

~••t••••O

j_ __ r l!!ill .. ~-,--·: • .! ......

STUDY LOCATION IH 30 we BETWEEN HENDERSON AND SUMMIT

FORT WORTH, TEXAS FIGURE 6

12

Page 28: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

..... w

j ~

I

LEGEND

4,774

1,767

5,040 (SB)

45,000 (*)

1,389 (NB)

X,XXX 24 HOUR VOLUME (TEI 9/86)

f*l COUNT BY OTHERS (85)

TRAFFIC ENGINEERS, INC.

HOUSTON• AUSTIN• PORT WORTH

STUDY AREA AND 24 HOUR COUNTS IH 30 WB BETWEEN HENDERSON AND SUMMIT

FORT WORTH, TEXAS

2,810 (*)

FIGURE 7

Page 29: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

N I

RIO GRANDE

1 / 0

13 /46

TRAPPIC ENOINEERB, INC.

HOUSTON• AUfflN • PORT WORTH

D: kl Cl z .J .J <(

m

"' .... .... CIO --- .... CIO

.... -) l

II) N

- 0 - -II) -

N N -

LEGEND:

XX / XX AM PEAK / PM PEAK

(7:00-8:00) (4:30-5:30)

9/ 8/ 86 9/ 9/86

TURNING MOVEMENT COUNTS IH 30 we BETWEEN HENDERSON AND SUMMIT FORT WORTH, TEXAS

FIGURE 8

14

Page 30: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

.-\JI

+ /

/

4

TRAFFIC ENGINEERS, INC.

7 4

HOUSTON• AUSTIN• FORT WORTH

~I

~ 12 ~ 2 3 ~I ~ 5 ~ • •

IH 30

~ ~

Accident Pavement Number Date Time Condition Injuries

1 3-04-85 1600 Dry 0 2 3-05-85 1855 Dry 0 3 4-16-85 1805 Dry 0 4 5-02-85 800 Dry 0 5 5-11-85 100 Dry 0 6 8-21-85 1650 Dry 0 7 11-08-85 1730 Dry 0 8 12-18-85 855 Dry 0 9 1-03-86 300 Dry 0

10 6-19-86 2110 Dry 0 11 6-23-86 920 Dry 0 12 6-23-86 920 Dry 0

COLLISION DIAGRAM IH 30 we BETWEEN HENDERSON AND SUMMIT FORT WORTH, TEXAS

FIGURE 9

Page 31: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

An analysis of the accident history of the study location confirmed the observed safety problem at the Henderson on ramp. Twelve (12) accidents occurred in 1985 and the first six months of 1986. Of these, seven (7) involved on ramp vehicles from Henderson. These were all either rear end collisions on the ramp itself or sideswipes involving on ramp vehicles and westbound IH 30 through vehicles. The remaining five (5) accidents showed no particular location or pattern.

The second problem at the study location is the short off ramp to Ballinger. As shown in Figure 10, this ramp is only 230 feet in length from the gore area to the stop line at Ballinger Avenue. This short length causes westbound IH 30 exiting vehicles to decelerate before they reach the exit point. This is particularly true when several vehicles are already queued on the ramp from the stop sign at Ballinger Avenue.

Although few accidents have happened on the off ramp to Ballinger Avenue, traffic queuing on the ramp at times interferes with westbound IH 30 through traffic and creates a potential safety problem. This situation could be alleviated by reducing intersection delay at Ballinger Avenue for off ramp traffic or by providing for additional vehicle queuing on the ramp itself. Field observations under various traffic conditions indicate that off ramp delays at Ballinger Avenue are already very short and the queuing problem is primarily due to heavy off ramp traffic and peaking characteristics. Signalization would not alleviate this situation. Additional vehicular storage is needed on the ramp itself.

E. Conclusions and Recommendations

The close proximity of the Henderson on ramp and Ballinger off ramp combined with their limited geometrics have created two unsafe conditions. An accident problem already exists with the Henderson on ramp. This is due to the lack of an adequate acceleration lane for this ramp. A potential problem is also developing for the Ballinger off ramp. This is caused by off ramp vehicles queuing back toward the main lanes of westbound IH 30.

Although permanent solutions to these problems are planned in the proposed widening and rebuilding of IH 30 in this area, several interim actions are recommended as shown in Figure 10. These recommendations are:

1. Close and remove the on ramp to IH 30 at Henderson Avenue (SH 199). As an interim measure, users of the ramp should be routed via Presidio and Summit to the next on ramp to IH 30 just west of Summit Avenue. Although this could add as many as 179 vehicles to the existing peak hour traffic of 588 on this ramp, ramp geometrics are adequate to carry this added traffic load. Field observations confirmed that considerable excess capacity exists on the ramp.

I TRAFFIC ENGINEERS, INC. I lE

Page 32: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

TRAPPIC ENGINEERS, INC.

HOUSTON• AUS11N • FORT WORTH

j ~

I

EXISTING

CLOSE ENTRANCE RAMP REROUTE TRAFFIC

VIA PRESIDO 8 SUMMIT TO NEXT ENTRANCE

RAMP

GEOMETRICS AND RECOMMENDED IH 30 we BETWEEN HENDERSON AND SUMMIT

FORT WORTH, TEXAS

j • I

WIDEN [IC.ISTING flAMP TO 22• &

MARK Al SHOWN

1.:1.1.c.1

CUT IACK ISL ANO TO ET [ HO

[XCEL /OECEL LAN[ IN THIS

ICC T ION

IMPROVEMENTS

FIGURE 10

17

Page 33: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

2. Extend the existing Ballinger off ramp an east.

deceleration lane to the additional 275 feet to the

3. Widen the Ballinger off ramp from 19.5 to 22 feet and mark the ramp for two lanes of traffic. Designate one lane for left turns and one lane for right turns at Ballinger Avenue.

The total cost of the improvements is estimated to be $23,350. A detailed cost estimate is shown in Table 2.

I TRAFFIC ENGINEERS, INC. ! 18

Page 34: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

TABLE 2

IMPROVEMENT COST ESTIMATE

IH 30 WESTBOUND TO BETWEEN HENDERSON AND SUMMIT

Ramp Modifications

ITEM ITEM DESCRIPTION QUANTITY UNIT

450 S.Y. 1500 S.Y.

500 L.F.

UNIT PRICE

$ 24.00 3.00 7.00

1 2 3 4

Ramp Pavement Remove Old Ramp Pavement Curb and Gutter Signing & Pavement Markings 1.0 L.S 500.00

'SUBTOTAL 10% MOB SUBTOTAL 10% ENG.

TOTAL

COST

$10,800.00 4,500.00 3,500.00

500.00

$19,300.00 1,930.00

$21,230.00 2,120.00

$23,350.00

.... -------------- ITRAFFIC ENGINEERS, INC.! -----1 q

Page 35: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

APPENDIX

--------------- !TRAFFIC ENGINEERS, INC.! ---

Page 36: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

AMBAL.DO 19:07:50 LOCATION IDENTIFIER:

I30WB OFF-RAMP AT BALLINGER JOB/CONDITIONS DESCRIPTION:

SUNNY AND DRY cw

APPROACH TALLY NORTH keys z a EAST keys .. =!" ·-· 4 SOUTH keys = [

WEST keys m n

SETUP: q 1 c:-..J 6

' .

b V

TALLY STARTING TIME: 07:00:00 ________________ RAM: 5069

TALLY# 1 FROM: 07:00 TO: 07:15 MOVES*RIGHT**THRLI**LEFT**SPEC*TOTAL* NORTH* 2 36 0 0 38 EAST *· 57 13 52 0 122 SOUTH* 0 17 1 0 18 WEST * C.':'

~1 1 0 0 6 TOTAL* 64 67 5:3 0 184

RAM: 4798 ----------------TALLY# 2 FROM: 07:15 TO: 07:30 MOVES*RIGHT**THRU**LEFT**SPEC*TOTAL* NORTH* 3 48 0 0 51 EAt.ff * 79 r:•-=!' oL..·-·

:3CJUTH* 0 .r··1c .::...J

WEST * 2 0 TOTAL* 84 96

RA1,·1:

::_;6 0 (i

c.=· .r

..Jb

4542

0 0 0 0

158 :2s

2 --:;·z t_ _.:_._I\..J

TALLY# 3 FROM: 07:30 TO: 07:45 MDVES*RIGHT**THRU**LEFT**SPEC*TOTAL* NORTH* 1 52 0 0 53 [{.;ST * 87 18 44 0 149 SOUTH* 0 2!::: . .::, 0 31 vJE-:ST * 2 0 0 0 ~.

..::.

TOT(-4L* ·;.;o 98 47 0 235 RA!'1: 4286 - -- .. _ -- - - - -· - -· -- -· - -- - -·

TALLY# 4 FROM: 07:45 TO: 08:00 MOVES*RIGHT**THRLl**LEFT**SPEC*TOTAL* NORTH* 2 41 0 0 43 EAST* 118 27 56 0 201 SOUTH* 0 52 1 0 53 WEST* 4 0 0 0 4 TOTAL* 124 120 57 0 301

09/08/87

4 INTERVAL PEAK MOVES: 956 ENDING@ 08:00 ________________ RAM: 4019

TEFWIINATED

TOTAL TALLY COUNTS MOVES*RIGHT**THRU**LEFT**SPEC*TOTAL* NOHTH*-' 8 177 0 0 185 EAST* 341 81 630 208 (l

SOUTH* 0 122 127 5 (l

WEST '*· 13 1 14 (l (l

TOTAL* 362 381 213 0 956 4 INTERVAL PEAK MOVES: 956 ENDING@ 08:00

File AMBAL.DO closed@ 08:05:30

Page 37: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

PMBAL.DO 10:24:34 LOCATION IDENTIFIER:

I30WB OFF-RAMP AT BALLINGER JOB/CONDITIONS DESCRIPTION:

SUNNY AND DRY cw

APPROACH TALLY NORTH keys z a EAST keys 3 4 SOUTH keys - [

WEST keys m n

SETUP: q 1 ~ 6 J

. ' . b V

TALLY STARTING TIME: 16:30:00 RAM: 3187

TALLY# 1 FROM: 16:30 TO: 16:45 MOVES*RIGHT**THRLI**LEFT**SPEC*TOTAL* NORTH* 4 152 0 0 156 EAST * 51 8 107 48 0 SOUTH* 0 18 23 5 0 WEST * 6 0 0 0 6 TOTAL* 61 ~7 0 J0 178 292 ________________ RAM: 2921

TALLY# 2 FROM: 16:45 TO: 17:00 MOVES*RIGHT**THRU**LEFT**SPEC*TOTAL* NORTH* 6 225 1 0 232 EAST* 63 11 32 SOUTH* WEST* TOTAL*

0 6

75

19 0

~~~

£JJ

0 35

________________ RAM: 2665

0 106 0 21 0 6 0 365

TALLY# 3 FROM: 17:00 TO: 17:15 MOVES*RIGHT**THRU**LEFT**SPEC*TDTAL* NORTH* 7 225 1 0 233 EAST * 41 C

J 33 SOUTH* 0 28 5 WEST * 25 0 0 TOTAL* 73 258 ~;9 ________________ RAM: 2409

0 0 0 0

79

370

TALLY# 4 FROM: 17:15 TO: 17:30 MOVES*RIGHT**THRU**LEFT**SPEC*TOTAL* NORTH* 1 171 0 0 172 EAST * 58 ~ 40 0 103 J

SOUTH* 0 37 ~ 0 40 0

WEST * 9 0 0 0 9 TOTAL* 68 213 43 0 324

4 INTERVAL PEAK MOVES: 1351 ENDING RAM: 2142

TERMINATED

TOTAL TALLY COUNTS 6MOVES*RIGHT**THRU**LEFT••SPEC*TOTAL* NORTH* 18 773 2 0 793 EAST * 213 29 153 0 395 SOUTH* 0 102 15 0 117 WEST ~~ 46 0 0 0 46 TOTAL* 277 904 170 0 1351

4 INTERVAL PEAK MOVES: 1351 ENDING File PMBAL.DO closed@ 17:32:14

09/09/87

@ 17:30

@ 17:30

Page 38: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 MINUTE, l CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATION: IH 30 Entrance Raap, West of Ballinger

HOUR BEGINS

12:00 12:15 12:30 12:45 1: 00 I: IS l: 30 1:45 2:00 2: IS 2: 3(1 2:45 3:00 3: IS 3:30 3:45 4:00 4: IS 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6: 15 6:30 6:45 7:00 7: 15 7:30 7:45 8:00 B: 15 B:30 8:45 9:00 9: 15 9:30 9:45

10:00 10:15 10:30 10:45 11 :00 11: IS 11: 3(1 11:45

WEATHER: Dry OPERATOR: CW/IJ

MONDAY 15

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

* f

f

f

f

• f

f

• f

f

f

i

+.

f

Al1 TOTALS

PEAK HOUR BESINS VOLLINE PHF

TUESDAY 16

7 7 s

0 2 21 4 3 2

0 4 13 2 4 4

0 S IS 0 2

(I 4 2 3 1

0 3 9 1 4 2

0 3 10 9

16 21

0 19 65 33 37 51

(I 75 196 57 72 40

0 46 2iS 52 49 68

0 83 252 66 51 80

0 70 267 63 89

121 0 109 382

0

f

* f

1449

11:00 382

0.79

WEDNESDAY 17

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

• f

• f

f

• f

f

• f

t

t

f

f

f

• f

t

f

t

t

t

f

t

f

0

0

0

0

0

0

0

0

0

0

0

0

0

f

* f

THURSDAY 18

f

t

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

• f

f

f

• f

f

f

f

f

* f

f

f

f

f

t

f

f

f

f

f

f

f

0

0

0

0

(I

0

(i

(I

0

0

(I

0

0

f

I

t

FRIDAY 19

f

f

f

f 0

• f

f

t 0 f

f

f

t 0 f

f

f

t O f

f

f

t 0 f

f

f

1· 0 t

t

f

f 0 f

f

t

t O f

* * f (I

• f

f

f 0 t

f

f

f (I

f

* f

f 0

(I

f

f

t

WEEKDAY AVERASE

7 7 5 2 21 4 3 2 4 13 2 4 4 5 15 t

2 1 1 4 2 3 1 3 9 1 4 2 ~ 10 9

16 21 19 65 33 37 SI 75 196 57 72 40 46 215

49 68 83 252 66 SI 80 70 267 63 89

121 109 382

1449

11:00 382

o. 79

PASE l OF 2

FILENAME: 22IH30WB NONDAY SEPTENBER 15, 1986

SATURDAY 20

f

f

t

t

f

f

f

f

t

t

t

f

f

t

f

f

f

t

f

t

t

f

f

f

f

f

f

f

t

• f

f

f

f

t

• f

f

f

t

f

f

f

t

• • f

f

0

0

0

(I

0

0

(I

0

0

(I

(I

0

0

f

f

SUNDAY 21

f

f

t

t

t

f

f

f

f

t

f

f

f

f

• t

f

f

t

f

f

f

f

f

f

f

t

f

f

• t

f

f

f

t

t

f

t

* f

t

f

f

* * f

f

f

0

(I

0

0

0

0

0

0

(I

0

0

(I

(I

f

f

t

7 DAY AVERASE

7 7 5 2 21 4 3 2 4 13 2 4 4 S 15 f

2 1 l 4 2 3 1 3 9 l 4 2 3 10 q

16 21 19 65 33 37 Sl 75 196 57 72 40 46 215

49 68 83 252 66 SI 80 70 267 63 89

121 109 382

1449

11: 00 382

0.79

Page 39: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 NINUTE, 1 CHANNEL VEHICLE COUNT

CORRECTION FACTOR: l.00 LOCATION: IH 3(1 Entrance Raap, West of Ballinger WEATHER: Dry OPERATOR: CW/IJ

HOUR BE6INS

l'IONDAY 15

TUESDAY WEDNESDAY

12:00 12:15 12:30 12:45 1:00 1: 15 1: 30 1:45 2:00 2: 15 2:30 2:45 3:00 3:15 3:30 3:45 4:00 4:15 4:30 4:45 :,: 0(1 5: 15 5:30 5:45 6:00 6: 15 6:30 b:45 7:00 7: i 5 7:30 7:45 B:00 B: 15 B:30 B:45 9:00 9: 15 9:30 9:45

10:00 i O: 15 10:30 10: 45 11:00 11: 15 11: 30 11:45

Pl'! TOTALS

PEAK HOUR BE6IN5 VOLUHE PHF

lb 17

t

t

t

f

t

t

t

t

f

f

f

f

f

t

t

f

f

t

t

f

f

f

t

t

t

f

f

117 97 65

(I B7 366 96 B4 75

0 78 333 107

97 9i

0 84 379 122 105 141

(I 110 478 135 121 164

0 142 562 161 127

9B 0 73 459

69 58 45

t O 75 24 7 t 42 t 41 t 44

36 36 27 154 34 0 32 0 46 t

35 147 t 0 29 26 18 16 B9 14 i3 25 6 58

18 13 8 9 48

378

7:45 14B

O.BO

t

f

t

* t

f

f

f

f

t

f

f

(I

(I

(I

2978

4:30 594

0.9l

t

f

t

f

t

f

t

t

t

t

f

t

f

f

f

f

t

t

t

f

t

f

t

f

t

f

f

t

f

f

f

f

i

f

f

t

f

t

t

t

t

f

f

f

t

t

f

f

(I

(I

(I

(I

(I

(i

(i

(I

(I

(I

(I

(I

(i

t

f

f

THURSDAY 18

f

t

f

t

t

f

f

t

f

f

f

f

t

t

f

t

t

t

f

f

t

f

f

f

t

t

f

t

t

f

f

f

t

t

t

f

t

t

f

t

f

f

f

f

f

t

t

t

(I

(I

(I

(I

0

I)

(i

0

(I

I)

(I

(I

(I

f

t

t

FRIDAY 19

t

f

t

t

f

t

t

t

t

f

f

f

t

f

t

f

f

f

f

t

f

f

t

t

t

t

t

t

f

t

t

i

t

f

t

i

f

t

f

i

f

f

t

f

f

t

f

t

0

(I

(I

(I

I)

(i

(I

(i

0

(i

(I

f

t

t

WEEKDAY AVERASE

117 97 65 B7 ~,66 9b B4 75 78 333

107 97 91 84 379

122 105 141 110 478 135 121 164 142 562 lbl 127 9B 73 459 69 58 45 75 247 42 41 44 ,JL 159 34 32 46 35 147 2S 26 18 16 89 14 13 •,e .:J

6 SB 18 13 8 9 48

3325

4:30 594

i). 91

PASE 2 OF 2

FILENANE: 22IH30WB NONDAY SEPTEl'IBER 15, 19Bb

SATURDAY 20

t

t

f

f

f

f

f

f

t

f

f

t

* f

t

f

f

f

f

f

t

f

f

f

t

t

f

f

t

f

: t

f

t

f

t

t

f

f

t

t

t

t

t

f

t

t

f

f

0

(I

(i

(I

(I

(I

0

(i

(i

(;

(I

I)

(l

* f

t

SUNDAY 21

f

f

f

f

f

* f

f

f

f

t

f

* * *

t

t

t

f.

t

f

t

t

f

f

* t

f

f

f

t

i

f

t

i

* * t

f.

f

f

t

t

f

t

t

t

0

(l

(l

(I

(I

0

(l

(l

(I

(i

(l

(i

(i

f

t

t

7 DAY AVERASE

117 97 65 87 366 96 84 75 78 333

107 97 91 84 ~.79

122 105 141 110 m 135 12i 1b4 142 5b2 161 127 98 73 459 69 58 45 75 247 42 41 44 32 159 34 32 46 35 147 29 26 18 16 89 14 13 25 6 58

18 13 B 9 48

3325

4:30 594

(i, 91

Page 40: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: Work Order 22 15 ~!NUTE, 1 CHANNEL YEHICLE COilNT

CORRECTION FACTOR: L 00 LOCATION: EB l 30 Off-Ramp~ ~en./5u1m1t IIIEATHER: Drt

Ft 11Drth 1 iX

HOUR BEGINS

12: 00

1::3(1 1:: 4:, 1: (i(I 1: 15 1: 30 1:45

2: 15 2: 3(1

2:45 3: 00 3: 15 3: 30 3:45 4:00 4: 15 4:30 4:45 5: (it) ~1: 15 ~,: 30 5:45 b: (ll)

6:15 6: 3(• b:45 7: l)(i 7: 15 7: 3(: 7:45 8: (i(i

B: 15 8:30 8:45 ~·: l)(i

9:30 9:45

i (,: 00 l 0: 15 lt): 30 10:45 11: 0(1 11: i 5 11: :.o i 1: 4 5

OPERATOR: Cili/lJ

MONDAY 15

f

t

t

t

t

* i

f

* f

i

t

* i

* f

t

t

t

t

t

i

t

f

t

f

t

f

t

t

f

f

f

t

t

t

t

t

* f

*

FEAY HOUR BE61NS 1/0LUME PrlF

l_i

I)

i)

ij

TL!ES[IAY 16

11 6 r: 'i"'! J i./

5 b

12 5 28

7 .;,,,

6 19

i5 14 7 9 45 9

31

86 72

0 105 3i7 i(;1

li8 15(;

G 123 4S2 126 113 111

i) 1 i)(i 4:,1) 106

cc: L'·-'

102 I) 1(18 40l

96 8b

io::; 0 ,8) )65

S!

0

0

t

t

*

E,7

71 "f L 341

7: 15 c--: -J l !

c,. B~

iiiEDNESDAY l7

f

t

t

* t

* * i

i

t

f

t

t

* i

t

i

i

* t

i

i

i

f

i

i

* * f

* f

t

f

t

f

t

t

i

t

f

* t

t

0

(I

(I

i)

(i

(i

0

0

0

(,

f

irlURSDAY 18

f.

i

t

t

t

i

i

f

i

i

t

f

t

i

i

t

f

i

f

* i

f

i

*

* i

i

t

t

i

f

* t

t

t

t

t

t

I)

0

(I

0

i)

(,

0

l)

0

(I

t

t

t

FRIDAY 19

* i

f

* i

i

i

t

f

t

t

t

i

t

f

f

f

i

t

f

* i

f

f

t

f

t

* f

* f

f

f.

i

t

i

(i

(,

0

I)

(I

0

(I

(,

0

(l

0

l:

liEEl'.DAY AYERAGE

1 i 6 5 27

i:,

12

2 4

6 3 3 6

'" IJ

i4 7

19

19

9 45 9

31 14 36 9(;

54 86 72

1 (15 317 i O 1 1l8 150 m 49: i2b 113 i 11 100 450 it)6

E:, 102 )(18 401 % 86

!03 8~ 368 9i

71 92 34 i

.. ,C'·--L-'"! f

' (

7: 15

• ASE 1 OF 2

FILENAME: 221h30EB MONDAY SEPTEMBER 15, 1986

SA TLIRDA\' 20

* f

t

* t

i

f

i

f

i

i

i

t

f

f

i

t

t

i

t

t

i

f

f

i

f

i

f

f.

t

f

t

f

t

t

t

t

i

t

l:

f

(I

(,

(i

(i

\)

0

(i

0

* l:

t

SiJNDA\

f

f.

t

t

t

t

f

i

* i

i

f

t

f

f

t

t

t

f

i

t

f

t

t

(I

0

(I

0

0

(i

(i

t

i

i

7 OAY AVERAGE

1 i 6 " ,-•-' i.. I

" ·' t•

12 5 28

4 7 6 7 J

3 b 7

15 i4 7

19

19

9 45 9

31 14 36 90 54 86 72

1(15 3ii 10i 118 15(.

123 492 126

1 (ii) 45(1 ! (i6

B5 1 (;2 108 4(i i

96 8b

1(13

87 71 92 341

:.i 7 O.B6

Page 41: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFEREhCE: Work Order 22 15 ~!NUTE, l CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LOCATIQM: EB I 3(1 Otf-Rall!p ~ fien./SuR!llit Ft worth, TX WEATHER: Ory OPERA TOR: CW/ l J

HOi.lR 8E6JNS

MONDAY 15

TUESDAY WEDNESDA\'

12: (l(l 12: 15 12: 30 12:45 1:00 1: 15 J: 3(1

i:45 2: [)(I 2: 15 2:~,(I

2:45 3:00 3: i ~. 3:30 3:45 4: (l(l

4:30 4:45 5:00 5: i5 5:30 5:45 6: 00 6: l::i

6: 30 6:45 7:00 7: 15 7: 30 7:45 B: •iO 8: i5 8:~(! 8:45

9: i5 9:30 9:45

IO: (;(I 10: 15 10:31)

1 l: l)i) I,: 15 11: 30 11: 45

PM !OTALS

PEAK HOUR BEGINS VO;.UME F'H~

16 17

t

t

t

t

t

f

f

t

f

t.

f

* t

f

f

t

t

t.

f

t

* f.

* * f

f .. ,.., i.l

94 BO 92

0 ~4 35(1 85 B2 79

0 B5 331 91

(i

1 i)3 80 80 354 79 86 85

0 ;6 346

(i

59 67 70 71 267 69 62 76

0 u 274

(I

65 67

88 272 53 "' ,J.;,

f

58 119 2(1

t 106 f.

27 26 33 21 -.~ i.t.

27 17 27 23 17 22 13

i2 i2

I 06

87

89

7: 15 rn

0. 60

f.

* * f.

* t

f.

f

t

* *

I)

(,

(i

23(,(l

I: 45

* t

t

t

f

f

t

f

f

f

f

f.

f

t

t

t

f.

i

* f

t

f

f

f.

f.

f.

f

f.

i

* * t

f

t

f

t

t

t.

f

t

t

t

*

0

0

0

i)

(i

0

0

0

0

(I

(I

t.

t

THURSDAY 18

f

f

t

f

* f

* f

* f

t.

f

t

f.

f

t

f

t

t

f

f

t

t.

f

f.

t

* f

* * f

* f

t

f.

f

t

t.

t

f.

t

* f

t

i)

(i

i)

(I

u

(i

(i

t.

f

t.

FRiDAY 19

t

f

f

* f

f.

f

t

t

t

* * t

t

t

f.

f

* t

t

f

t

f.

f

* f

f

t

t

* f.

f

f.

t

f

f.

f

t

f

t

t

f.

t

f

(I

(I

0

I)

(i

0

(i

(i

(_i

(l

(i

f.

WEEKDAY A'~ERA5E

~4 8(, 92 84 350 85 82 79 85 331 9i

j (i~,

80 80 354

36 85 96 346 59 67 70 71 267 60 62 7b 67 274 65 67 52 88

40 34 58 i85 20 27 1t,

21 I"!-"'· i...:..

1. j

I,

17

!5 11 .:..:.

01 L'f

89

'"i"! t 7 i.!1..:.•

i:45 35i

0.87

PA8E 2 OF 2

FILENANE: 221H30EB MONDAY SEPTEHBER 15, 1986

SATURDAY 2(1

t

* t

f

* t

f.

t

f

f.

t

* * * f

f

* f

f

t

t

f

f

* f.

* f

f

*

* f

*

f

f.

f

f

t

t

(1

(,

(i

0

(1

0

0

(i

(i

l.l

i)

0

t.

f.

t.

SUNDAY 21

* f

t

t

f

f

f

* f

f.

* f

t

* t

f

f.

t

* t

f

t.

f

f

f

f

t

t

* t

f.

t

f.

f

t

*

* t

f

*

0

(I

0

(i

(i

0

(r

(i

.. \}

(,

(I

f.

f

*

7 DAY AV ERASE

94 BO 92 84 ~.5(1

85 82 79 85 331 91

103 80 BO 79 b6 85 % 346 59 67 7(,

71 267 69

76 67 274 65 67 ;:.-, .. u.

88 272

40 34 58 185 20 27 26 .).::., ;i)6 21 .,.-. L~

ii 87 L./ .•,7 1....:.,

! j

22

''· LL

12

89

;: .-, ._lj_

i: 45 35~

,), 87

Page 42: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

15 MINUTE, 1 CHANNEL YEHICLE COUNT REFERENCE: WORK ORDER 22 CORRECTION FACTOR: 1.00 LOCATION: IH 30 WB ON-RAHP ~ HENDERSON FT ~ORTH, Tl

HOUR BEGINS

12: (>0 12: 15 12: 3(1 12:45

1:(1(1 1: 15 1: 3(1 1: 45 2:00 2: 15 2: ~.(I

2:45 3: (H)

3: 15 3:30 3:45 4:00 4:15 4:30 4:45 5:00 5: 15 5:30 5:45 6: 00 6: 15 o: 30 6:45 I: (H)

7: 15 7:30 7:45 B: 0(1

8:15 8: 30 6:45 9: 00 9: 15 9:30 9:45

10: 00 10: 15 10: 3(1

10:45 11: (H)

11: 15 11: 30 11: 45

ilEA THER: DRY OPERATOR: CW/HM

MONDAY B

* t

t

t

t

t

t

f

t

t

t

t

t

* t

t

f

t.

t

* t

t

f

f

t

* t

t

f

* * f

t

* t

t.

t

t

t

t

t

t

t

f

t.

t

Ari TOTALS

PEAK HOUR BE6iNS VOLUME PHF

TUESDAY WEDNESDAY 9 10

(i

I)

0

t)

0

0

(i

(i

~

I

5

7 ·.l

6 (I

1 2 4 3

(i

2 7 . .)

0

1.

'i L

0

6

6 ~

4 ~

15 13

0 25

,.,,-, i.i.

0 22

(i

22 32 32

"Fi ,)i.

40 31

14

10

1(1

5

6

4

16

32

67

92

123

0 ):! 13~

(I

t

* f

515

10: 3~; 141

0.88

f

t

t

t

t

t

f

t

t

t

t

t

t

t

f.

t.

* f

t

t

t

t

t

t

* * t

t.

t

* * * f

* f

* t

t

t

t

t

t

t

t

(1

(i

0

(i

0

(I

I)

(i

(1

0

(i

(,

(1

f

;:

t

THURSDAV 11

t

t

t

t

t

t

t

t

;:

t

t

* * t

t

f

t

f

t

f

t

t.

t

t

t

f

*

t

t

* t

t

* *

0

0

(i

0

(i

(I

0

0

1)

(I

(t

t

t

FRIDAY 12

t

t

f

f

f

t

* f

;:

f

* t

t

t

t

t.

t

t

f

t

f

f.

t

t

t

f

t

t

t

f

t

t

t

* t

t

t

t

t

f.

t.

t

t

t

f

(l

(i

(i

(I

(i

0

(i

t)

0

0

0

(i

(I

t

t.

t

WEEKDAY AVERAGE

7

1 ,•

6 t

4

t

.~,

t

2 2

2

t

6 9 4 5

14 14 15 13

14

10

10

r ~

b

4

16

32

25 67

22 25 22 2L

37

40 31

9'l .L

1 ",l' h'

36 139

518

10: 3(1

141 0.88

PASE 1 OF 2

FILENAME: FWbWBHEN MONDAY SEPTEMBER 81 1986

SATURDAY 13

t

f

t

t

t

t

t

t

f

t

t

f.

f

t

f

t

;:

* t

f

* f

t

t

f

f

f

t

f

t

f

f

t

f

t

f.

t

f

t

t

t

* t

t

f

(i

(I

(i

0

(i

(i

(1

(I

0

(:

t

f

t.

SUNDAY l 4

t

t

t

t

t

f.

f

t

* t

f

t

t

* f

f

f

t.

f.

t

t

t

f

t.

f

t

f

f

t

t

f

f

t

f

f.

t

t

f.

t

t.

t

t.

f

* t

(I

(i

0

(I

t)

(i

(1

I)

I)

(!

(I

t.

t

t

7 DAY AVERA6E

3 6 t

2 4

t

"/ ,•

2 2 1 2

t

6

"/ ,,

6 9 4 r ~

14 14 15 13

14

10

1 (I

5

6

4

16

., .• , ·.Ji..

25 67

'j,.., LL

LL

22 32 32 37 .j£.

4(,

31

92

3t, 139

5i8

lG:30 141

0.88

Page 43: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

IS HINUTE, I CHANNEL VEHICLE COUNT REFERENCE: WORK ORDER 22 CORRECTION FACTOR: I, 00 LOCATION: IH 30 WB ON-RAHP@ HENDERSON FT WORTH, TX NEATHER: DRY OPERATOR: CW/HH

HOUR BEGINS

HONOAY 8

TUESDAY WEDNESDAY

12:00 I 2: IS 12:30 12:4S I: 00 1: 1 S 1: 3(1

1:4S 2:00 2: 15 2:30 2:45 3:00 3:15 !,:30 3:45 4:00 4:15 4:30 4:45 5:00 5:15 5:3(1 5:45 6:00 6: 15 6:30 6:45 7: (i(I 7: IS 7:30 7:45 8:00 B: 15 8:30 B:45 9:00 9: IS 9:30 9:45

I 0: (1(1

10: 15 10: 30 10:45 11:00 11: 15 11 :3(1 11: 45

PH TOTALS

PEAK HOUR BEGINS VOLUME PHF

9 10

1 42 1 43 1 28 1 O 32 145 1 42 1 37 1 28 1 0 37 144 1 38 1 23 1 23 1 (I 34 118 + 35 1 34 1 33 t O 42 144 * 37 1 48 * 41 + (I 38 164 + 52 + 51 1 54 6 6 1 157

39 1

37 1

25 1

27 128 1 (I

17 * 19 1

23 1

2(1 79 1 (I

26 * i 7 + 8 1

14 65 1 (I

19 1

17 1

15 1

8 59 1 (i

7 1

9 1

3 1

6 25 1 0 2 6 5 2 15

377

6:00 128

0.82

f

f

f

f (i

872

4:45 195

o. 90

f

f

f

f

f

f

f

f

f

+ f

f

f

f

f

f

* + f

+ f

f

f

f

* f

f

f

* f

f

f

f

f

+ f

+ f

f

f

* + f

f

* f

f

+

(I

(I

0

0

(I

0

(I

(i

(l

(I

(I

(I

(I

+ f

f

THURSDAY 11

f

f

f

+ f

+ f

f

f

f

f

f

f

+ f

f

* t

f

+ f

f

f

+ + f

+ f

f

f

f

f

+ f

f

f

+ f

f

f

f

f

f

f

f

f

f

f

(I

(I

(I

(I

0

(I

0

(I

(i

(I

0

(I

(i

f

f

f

FRIDAY 12

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

+ + f

f

f

f

f

f

f

+

+ + + f

f

+ f

+ f

f

f

* f

* * f

f

+ f

0

(i

0

(I

(I

0

(i

0

(I

(I

(i

(I

0

f

+ f

WEEKDAY AVERAGE

42 43 28 32 145 42 37 28 37 144 38 23 23 34 118 7~ .J.J

34 33 42 144 37 48 41 38 164 52 51 54 6 163

39 37 25 27 128 17 19 23 20 79 26 17 B

14 65 19 17 15 8 59 7 9 3 6 25 •, L

6 5 2 15

1249

4:45 195

0.90

PASE 2 OF 2

FILENAME: FW6WBHEN MONDAY SEPTEMBER 81 1986

SATURDAY 13

f

f

f

f (I

f

f

f

f • (I

f

f

f

f (I

f

t

f

f (I

f

f

+ f (I

f

f

f

f (I

f

t

f

f (I

f

f

f

f (I

f

f

* f (1

f

* f

f (i

f

f

f

f (i

+ + f

f (I

(I

t

f

t

SUNDAY 14

f

t

t

t

t

t

f

t

t

t

+ t

f

t

t

t

t

t

* t

t

f

t

t

t

t

+ f

f

t

t

t

* t

* t

+ f

t

t

t

t

f

f

f

f

* f

(I

0

(I

(I

0

(I

(I

0

(I

(I

(I

0

(I

t

t

t

7 DAY AVERAGE

42 43 28 32 145 42 37 28 37 144 38 23 23 34 118 35 34 33 42 144 37 48 41 38 164 52 51 54 6 163

39 37 25 27 128 17 19 23 20 79 26 17 B

14 65 19 17 15 8 59 7 9 3 6 2S 2 6 5 2 15

1249

4:45 195

0.90

Page 44: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: WO 22 IS MINUTE, I CHANNEL VEHICLE COUNT

CORRECTION FACTOR: I. 00 SUMMIT LOCATION; IH 30 WB OFF-RAMP@ BALLINSER/

WEATHER: DRY OPERATOR: CW/HM

HOUR BE61NS

12:00 12: 15 12:30 12:45 I: 00 1: 15 I: 30 1:45 2:00 2:15 2:30 2:45 3:0(1 3:15 3:30 3:45 4:00 4: 15 4:30 4:45 5:00 5: 15 5:30 5:45 b:00 6: IS 6:30 6:45 7:00 7: 1S 7:30 7:45 • 8:00 8: 15 B:30 B:45 9:00 9: 15 9:30 9:45

1(>:0(1 10: I 5 10:30 .10:45 11: (l(I 11: 1 S 11: 30 11:45

Al'I TOTALS

MONDAY 8

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

4

f

f

f

f

f

f

f

f

f

f

f

f

f

f

PEAK HOUR BEGINS VOLUME PHF

TUESDAY WEDNESDAY THURSDAY 9 10 11

15 20 12

0 5 52 11 8 1

0 6 26 1 3 4

0 5 13 B 4 6

0 4 22 2 3

1(1

0 17 32 11 9

15 0 23 58

48 6b

103 0 141 358

150 121 152

0 152 575 212 21(1

215 (I 172 809

167 147 123

0 113 550 116 115 118

0 105 454 121 107 118

0 118 464

(I

f

f

f

3413

8:00 809

o. 94

f

f

f

f

f

f

f

f

f

f

f

f

f

•• f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

* f

f

f

f

f

f

f

f

f

* f

f

f

f

(l

(l

(I

(I

0

(I

(i

(I

0

(I

0

(i

(i

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

4

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

(I

(I

(i

(l

0

(i

0

(I

0

(I

(I

(I

0

f

f

f

FRIDAY 12

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

0

(I

0

0

I)

0

0

I)

0

(I

0

0

0

f

f

f

WEEKllAY AVERASE

15 20 12 5 52

11 B I 6 2b 1 3 4 5 13 B 4 b 4 22 2 .,. ·'

10 17 32 11 9

15 23 SB 48 66

103 141 358 150 121 152 152 575 212 210 2i5 172 167 147 123 113 116 115 118 105 121 107 11 B 118

809

550

454

464

3413

8:00 809

0.94

PASE 1 OF 2

FILENAME: FW6BA5l1 MONDAY SEPTEMBER 8, 1986

SATLIRDAY 13

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

4

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

(I

0

0

(l

I)

(I

(i

(i

(i

0

0

0

(i

f

f

f

SUNDAY 14

f

f

f

f

f

f

f

4

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

(I

0

0

(I

0

(I

0

(I

(I

(I

(I

(I

0

f

f

f

7 DAY AVERASE

15 20 12 S 52

11 8

6 26

3 4 5 13 8 4 6 4 22 2 3

I (l 17 32 11 9

IS 23 SB 48 66

103 141 358 150 121 152 152 575 212 210 215 172 8(1'1 167 147 123 113 550 116 115 118 105 454 121 107 118 118 464

3413

8:00 809

0.94

Page 45: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: iiO 22 15 NINUTE, I CHANNEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 SLIHNIT LOCATION: IH 30 WB OFF-RANP @ BALLINSER/

WEATHER: DRY OPERATOR: CW/HN

HOUR BEGINS

NONDAY 8

TUESDAY 9

12:00 12: 1 S 12:30 12:45 1: 00 1: 15 1: 30 1:45 2:00 2: 15 2:30 2:45 3:00 3:15 3:30 3:45 4:00 4: IS 4:30 4:45 5:00 5: IS 5:3(1 5: 45 6:00 6: 15 6:30 6:45 7:00 7: 15 7:30 7: 45 8:00 B: 15 8:3(1 B:45 9:00 9: 15 9:30 9:45

10:0(1 10: 15 10:30 10:45 11: (i(l 11: 15 11: 30 11:45

PM TOTALS

PEAK HOUR BEGINS VOLUNE PHF

t 105 t 102 t 9B t O 107 412 t 11 S t 112 t 131 t O 153 511 t 163 t 137 t 152 t O 127 579 t 129 t 119 t 129 t O 96 473 t 120 t 83 t 110 t O l 02 415 t 107 t 73 t 102 t O 89 371 t 82

30 t

75 t

65 170 t 82 73 t

61 t

45 54 233 5(1 34 32 24 140 24 14 21 24 B3 20 41 SB 30 149 21 18 16 l 56

B31

6:3(1 274

0.91

f

* f

f

t

t

f

f

t

f

f

f

f

t

t

t

t

f

(I

(I

(I

(I

(I

2843

1:45 605

0.93

WEDNESDAY 10

t

t

t

f

t

t

t

t

t

f

f

f

t

t

t

t

f

t

t

f

t

f

f

f

f

t

f

f

f

f

t

f

f

f

f

t

t

f

f

t

t

* f

f

* t

t

t

0

0

(i

(I

0

0

0

(I

(i

0

(I

(I

(I

t

f

f

THURSDAY 11

t

t

t

t

f

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

f

f

t

t

f

f

f

f

t

f.

f

f

t

f

f

t

f

f

t

f

f

f

f

f

t

f

f

(I

(I

(I

0

(I

0

(I

0

0

(i

0

(i

(i

f

f

f

FRIDAY 12

f

t

t

t

t

t

t

t

t

f

t

t

t

f

f

t

t

f

f

t

f

t

t

f

t

f

t

f

f

t

f

t

f

t

f

t

t

t

f

t

f

* f

f

f

t

f

f

0

0

0

0

(I

(I

(I

(I

(I

0

0

(i

0

f

f

f

WEEKDAY AVERAGE

105 102 98

107 412 115 112 131 153 Sil 163 137 152 127 579 129 119 m 96 473

120 83

110 102 415 107 73

102 89 371 82 30 75 65 252 73 61 45 54 233 so 34 32 24 140 24 14 21 24 83 20 41 58 30 149 21 1B 16

56

3674

1:45 605

0.93

PAGE 2 OF 2

FILENANE: Fii6BASN NONDAY SEPTEHBER B, 1986

SATURDAY 13

t

t

t

t

t

t

t

t

t

t

t

f

t

f

t

t

t

f

t

f

f

f

f

f

f

f

f

t

f

f

f

f

f

t

f

f

f

t

f

f

f

f

t

t

f

f

f

t

(I

(i

0

(I

(I

(I

0

0

0

0

(I

0

0

f

t

f

SUNDAY 14

t

f

t

t

t

t

t

t

f

t

t

t

t

f

t

t

t

t

t

t

t

f

t

t

f

f

f

t

t

f

t

t

f

t

f

t

t

t

f

f

t

t

t

f

t

t

t

t

0

0

0

(i

0

(I

0

(I

7 DAY AVERASE

105 102

9B 107 412 115 112 131 153 S 11 163 137 152 127 579 129 119 129 96 473

120 83

110 102 415 107 73

102 89 371 82 30 75 65 252 73 61 45 54 233 50 34 32

(i 24 140 24 14 21

0 24 83 20 41 58

0 . 30 149 21 18 16

0 1 56

0

t

t

t

3674

1:45 605

0.93

Page 46: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: WORK ORDER 22 LOCATION: NB BALLINGER@ IH 30 WEATHER: DRY OPERA TOR: CW

15 I\INUTE, 1 CHANNEL VEHICLE COUNT CORRECTION FACTOR: 1.00

FT WORTH, TX

HOUR BEGINS

IIONDAY B

TUESDAY 9

WEDNESDAY THURSDAY 11

FRIDAY 12

WEEKDAY AVERAGE

12:00 12:15 12:30 12:45 1:00 1: 15 1: 30 1:45 2:0(1 2: 15 2:30 2:45 3:(1(1 3: 15 3:30 3:45 4: (1(1 4: 15 4:30 4:45 5:00 5:15 5:30 5:45 6:00 6: 15 6:30 6: 45 7:00 7: 15 7: 30 7:45 B:00 8:15 B:30 8:45 9:00 9: 15 9:3(1 9:45

10:00 10: 15 10:30 10:45 11: (1(1 11: 15 11: 3(1 11:45

M TOTALS

PEAK HOUR BESINS VOLUI\E PHF

f

f

f

f

f

f

f

f

* t

* * t

t

f

t

f

* f

f

t

t

t

f

* t

t

* f

t

* f

t

t

t

* f

t

t

t

* t

t

t

f

t

t

f

0

0

(i

0

(i

f

t

f

f

f

t

f

t

* t

t

t

t

t

t

t

f

f

t

t

t

* t

(I

0

0

(I

0

(i f (I

f

t

t

(i t (I

f

t

t

(i t 0 t

32 25

0 29 B6 36 2t, 22

(1 18 102 1B 19 24

(1 29 9(1

26 26 21

0 27 10(1

0

t

f

t

378

B:15 122

0.85

10

0 0 2 0 0 0 1 0 2 (I

(i

(i

(I

0

(i

(i

0 (I

2 ,)

2

2

2

., L

0

5 12 5

11 7

17 40 13 23 40 39 115 43 34 27

t 104 * t

f

t (i

* f

t

t

t

f

f

*

(I

(I

278

7:30 156

0.91

f

f

f

f

f

f

t

f

* t

t

t

t

* t

t

f

* f

t

* t

* f

f

f

* t

f

t

* t

t

f

t

* f

t

* * t

t

t

t

f

f

t

t

0

(I

(I

(i

0

0

0

0

(I

(I

0

0

(I

* t

*

f

f

f

f

f

f

f

t

f

* t

t

f

* f

t

t

t

f

t

t

t

t

f

f

t

t

t

f

t

t

t

f

t

t

* * t

* t

t

t

t

f

t

t

t

f

(I

(i

(i

0

0

0

0

(I

0

(I

(I

(I

(I

t

f

*

f

t

2 * f

t

f

2 t

f

t

f

t

f

* f

t

2 3 2

2

2

2

(I

5 12 5

11 7

17 40 13 23 40 39 115 43 33

26 29 131 36 26 22 18 102 1B 19 24 29 90 26 26 21 27 100

597

7:30 155

0.90

PAGE 1 OF 2

FILENAIIE: FW6NBBAL TUESDAY SEPTEIIBER 9, 1986

SATURDAY 13

f

f

t

t

f

t

f

t

t

f

f

f

t

t

f

f

t

* f

t

t

f

f

t

f

t

t

f

t

t

f

t

t

t

t

t

f

t

t

t

t

t

t

t

t

t

t

f

(I

(I

(I

(I

(I

(i

0

0

(I

(i

(i

(I

(I

t

* *

SUNDAY 14

f

f

f

f

f

f

f

f

f

f

f

t

t

t

t

t

f

t

* * f

f

* f

f

* * f

* * * f

t

f

t

t

* * f

t

t

t

f

t

* * * t

0

(I

(I

I)

0

0

(I

0

0

(i

(i

(i

(i

t

t

t

7 DAY Al/ERASE

t

t

2 t

t

f

* 2 f

f

t

f

*

t

t

t

f

2 3 2

2

2

2

0

5 12 5

11 7

17 40 13 23 40 39 115 43 33 26 29 131 36 26 22 18 102 18 19 24 29 . 90 26 26 21 27 100

597

7:30 155

0.90

Page 47: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

15 NINUTE, 1 CHANNEL VEHICLE COUNT CORRECTION FACTOR: 1.00 REFERENCE: WORK ORDER 22

LOCATION: NB BALLIN6ER@ IH 30 WEATHER: DRY

FT WDRTH, TX

HOUR BE61NS

12:00 12: 15 12: 30 12:45 1: 00 1: 15 1:::.0 1: 45 2:00 2: 15 2:30 2:45 3:00 3: 15 3:30 3:45 4:00 4: 15 4:30 4:45 5:00 5: 15 5:30 5:45 6:0(1 6: 15 6:30 6:45 7:00 7: 15 7:3(1 7:45 B:00 B:15 8:30 B:45 9:00 9: 15 9:30 9:45

10:00 10: 15 10:30 10:45 1 l: 0(1 11: 15 11: 30 11:45

OPERATOR: CW

NONDAY 8

4

4

4

4

4

t

4

t

t

4

4

t

t

t

t

t

t

f

t

t

t

t

4

4

4

4

t

t

t

t

t

* t

f

t

t

t

4

t

t

t

t

t

t

t

t

t

t

PH TOTALS

PEAK HOUR BE6lNS VOLUNE PHF

TUESDAY 9

36 28 26

0 34 124 38 22 23

0 24 107 30 34 23

0 26 113 23

0

0

48 21,

35 132 30 20 25 25 1(>0 :.1 31 24

(I 20 106 8 4 9

0 7 28 12 9 3

0 6 30 7

(I

(I

0

(I

(I

t

t

t

3 6 3 3 4 4 3

3 4 ., .J

2 2 2

19

14

10

9

792

3:15 139

o. 72

WEDNESDAY 10

t

t

4

4

4

t

t

t

t

4

t

4

t

4

t

t

t

t

t

t

t

t

t

4

t

t

t

t

t

t

t

t

f.

t

t

t

t

t

t

t

t

t

f

t

t

t

t

(I

0

(I

(I

0

(i

(i

(I

0

(I

(I

(i

t

t

t

THURSDAY 11

t

4

t

4

t

t

t

t

4

t

t

t

t

t

4

t

t

t

t

t

t

t

t

t

t

t

4

t

t

t

t

t

t

t

t

4

t

4

t

t

t

4

t

t

t

4

t

4

0

0

(I

0

(i

0

(I

(I

0

0

(i

0

0

t

4

t

FRIDAY 12

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

4

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

4

4

t

t

t

t

t

4

4

4

t

f

0

0

(I

0

0

(I

(I

(I

0

0

0

0

0

t

t

t

WEEKDAY AVERA6E

36 28 2b 34 124 38 22 23 24 107 30 34 23 26 113 23 48 26

30 20 25 25 31 31 24

132

100

20 106 B 4 9 7 28

12 9 3 b 30 7 3 6 3 3 4 4

19

3 14 I 2 3 4 10 1 ,•

2 2 2 9

792

3: 15 139

0.72

PASE 2 OF 2

FILENANE: FW6NBBAL TUESDAY SEPTENBER 91 1986

SATURDAY 13

t

t

t

4

t

t

f

t

f

4

t

t

t

t

f

4

t

4

t

t

t

4

f

t

f

4

t

4

t

f

t

4

t

4

4

t

t

t

t

4

f

4

f

t

f

t

4

4

0

0

(I

0

0

(I

(1

(I

0

0

0

(I

(I

f

t

f

SUNDAY 14

f

t

t

t

4

t

t

t

t

t

t

t

f

f

f

t

t

t

t

t

t

t

t

t

t

t

t

t

t

4

t

t

t

f

t

t

t

4

t

f

t

4

f

4

4

t

t

f

0

0

(1

0

0

(I

0

0

(I

(I

(I

0

(i

t

4

f

7 DAY AVERA6E

36 28 26 34 124 38 22 23 24 107 30 34 23 26 113 23 48 26

30 20 25

132

100 31 31 24 20 106 B 4 9 7 28

12 9 3 6 30 7 3 6 "?

" 3 4 4

19

3 14

2 3 4 10 ~ . 2 2 2 9

792

3: 15 139

0.72

Page 48: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: WO 22 0 LOCATION: SB BALLINGER@ IH 30 WEATHER: DRY OPERATOR: CW/HN

15 NINUTE, 1 CHANNEL VEHICLE COUNT CORRECTION FACTOR: 1.00

NEAR WB OFF-RANP

HOUR BEGINS

NONDAY B

TUESDAY 9

WEDNESDAY THURSDAY FRIDAY 12

WEEKDAY AVERASE

12:00 12: 15 12:30 12:45 1: 00 1: 15 1: 30 1:45 2:0(1 2: 15 2:3(1 2:45 3:00 3: 15 3:30 3:45 4:00 4: 15 4:30 4:45 5:00 5: 15 5:30 5:45 6:00 6: 15 6:30 6:45 7:00 7: 15 7:30 7:45 B:00 B: 15 8:30 B:45 9:00 9: 15 9:30 9:45

10:00 10: 15 10:30 10:45 11: 1)(1

11: 15 11:30 11:45

AN TOTALS

PEAK HOUR BEGINS VOLUHE PHF

f:

f:

f:

f

t

t

t

t

f:

f

f

f

t

f

f

f

t

f

f

f:

f:

t

f:

f:

f:

f

f

f

f

t

f

f:

f

f

f:

* f:

f

f:

f

f

f

f:

f

f

f

f

f

0

(I

0

(i

0

10 6 3 2 21 5 3 1 2 11 (I

3 2 1 b 3 5

3 12 0 (I

(I

4 4 2 4 5

0 5 lb 9 9

17 0 23 58

31 43 5(1

0 53 177 44 74 5b

0 50 224 63 95 97

0 95 35(1 102 92 96

(1 101 391 115

99 110

0 113 437

0

t

f:

f

1707

11:00 437

0.95

10 11

f:

* f

t

f

f:

f

* t

t

f

t

f

f

f

f

f

f

f

f

f

f

f

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

0

0

(I

0

0

(I

0

0

(I

(I

(I

(I

0

f

f

*

t

t

f

* t

t

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

* f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

0

(I

0

(I

0

(I

(i

0

(I

(I

0

(I

0

f

* f

f

f

t

t

f

f

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

f

* f

f

f

f

f

f

f

f

f

f

* f

f

f

f

f

f

f

* f

f

(I

(I

0

(I

(I

(I

(i

(i

0

0

(I

0

(I

f

f

f

10 6 3 2 21

3

2 11 f

3 2 1 6 3

3 12 f

f

f

4 4 2 4 J

5 16 9 9

17 23 58 31 43 50 53 177 44 74 56 50 224 b3 95 97 95 350

102 92 96

101 391 115

9~' 110 113 437

1707

11: 00 437

0.95

PAGE 1 OF 2

FILENANE: FWbSBBAL NONDAY SEPTENBER B, 1986

SATURDAY 13

f

t

t

* f

t

t

f

f

t

f

f

f

f

f

f

f

f

f

f

f

t

f

f

* f

f

f

f

f

f

f

f

f

f

.. f

f

f

f

f

f

f

f

* f

f

(I

0

(I

(I

(I

(i

(I

(I

(I

(I

(I

(I

(I

f

f

f

SUNDAY 14

f

f

t

t

f

t

f

f

f

f

f

f

f

f

f

f

f

f

f

f

.. f

f

f

f

f

f

f

f

f

f

f

.. t

f

f

t

f

f

f

f

* * f

f

f

* f

0

0

(I

0

0

(l

(I

(l

0

(I

0

0

0

f

f

f

7 DAY AVERAGE

10 6 3 2 21 5 3 1 2 11 f

3 2

b

5

3 12

* t

f

4 4 2 4

5 16 9 9

17 23 58 31 43 50 53 177 44 74 56 50 224 63 95 97 95 ~.so

102 92 96

101 391 115 99

110 113 437

1707

11: 00 437

0.95

Page 49: IH 30 EB to SB Connection to US 287, IH 30 WB … · IH 30 EB TO SB CONNECTION TO US 287 IH 30 WB BETWEEN HENDERSON AND SUMMIT SUBMITTED BY ... Although the proposed new interchange

REFERENCE: iW 22 0 IS IIINUTE, 1 CHA~NEL VEHICLE COUNT

CORRECTION FACTOR: 1.00 LDCATION: SB BALLINSER@ IH 30 WEATHER: DRY

NEAR liB OFF-RAIIP

OPERATOR: Cli/HII

HOUR B£6INS

IIDNDAY B

TUESDAY WEDNESDAY

12: 00 12: 1 S 12:30 12:4S

1: 00 1: IS 1 :30 1:4S 2:00 2: l S 2:30 2:4S 3:00 3: iS 3:30 3:4S 4:00 4: IS 4:30 4:4S 5:00 S: lS 5:30 S:4S b:00 6: lS 6:30 b:4S 7:00 7: lS 7:30 7:4S B:DO B: IS B:30 B:4S 9:00 9: 15 9:30 9:45

10:00 1 (,: 1 S l0:3i) 10:4S 11 :00 11: i 5 11 :30 11:4S

PH TOTALS

PEAK HOUR BES!NS VOLUIIE PHF

9 10

t

f

t

f

f

f

f

f

f

f

t

f

t

f

t

t

t

t

t

t

t

t

t

t

t

B5 66

138 120 134

0 98 490 74 68 79

0 69 29(1 i7 74 79

() 73 303 94

125 127

0 77 423 76

112 120

0 1S7 46S 226 242 161

0 137 766 t

t

t

38 189 41

t

t

t

t

t

t

t

t

f

t

t

t

t

t

f

t

t

t

t

t

f

(I

43 39 34 lS7 29 28 20 7 84

14 22 19 16 71 14 IS 11 13 S3 10 12 1 (I 10 42

S9b

6: lS 230

0.68

(I

(I

0

0

0

2737

4:45 786

o. 81

t

t

t

f

t

t

t

t

f

t

t

t

t

f

t

t

t

t

f

* * f

t

f

* t

t

t

f

t

t

f

t

t

* t

* * t

f

t

f

t

t

t

t

f

f

(I

(I

(I

0

0

(I

iHURSDAY 11

t

t

t

t

* t

* * * t

t

t

* f

* t

* t

t

f

f

f

* t

* t

t

(I f

f

f

t

(I f

t

t

t

(1 f

t

f

t

(I t

t

f

·t

0 f

f

f

f

(I t

0

* f

t

0

(I

(l

(i

(1

(i

(I

(I

(I

I)

(I

(I

(I

f

t

t

FRIDAY 12

t

t

t

t

t

* t

t

t

t

t

t

t

t

t

t

t

* t

t

t

t

t

t

t

t

* f

t

f

t

t

f

* t

t

* t

f

t

t

t

f

f

f

t

f

0

(i

0

0

(I

(i

0

(I

0

(i

0

(l

(I

t

f

f

WEEKDAY AVERASE

138 120 134 98 49(1 74 68 79 69 290 77 74 79 73 303 94

l2S 127 77 423 76

112 120 1 S7 46S 226 242 161 137 766

t

BS 66 3B 189 41 43 39 34 1S7 29 28 20 7 84

14 22 19 16 71 14 IS 11 13 S3 1(1

12 1 (I 10 42

3333 1"1 1>1

4:45 7B6

0.81

PASE 2 OF 2

FILENAIIE: FW6SBBAL IIONDAY SEPTEIIBER 81 1906

SATURDAY 13

t

t

t

t

f

t

t

t

t

t

t

t

t

t

t

t

t

t

t

t

f

f

t

f

t

t

f

f

f

t

f

t

t

* * f

f

t

t

t

f

t

t

t

t

f

(I

(I

(I

(I

(i

0

(I

(i

0

(I

(I

(I

0

f

t

f

SUNDAY 14

* t

t

t

* t

* t

t

t

* * * t

*

t

f

* * t

t

f

t

t

t

* t

t

f

t

t

f

f

* t

* f

f

t

t

t

f

f

f

t

t

f

(I

(l

(I

(I

0

(I

(l

0

(1

(l

(l

0

(I

t

t

f

7 DAY AVERASE

138 120 134 98 490 74 68 79 69 290 77 74 79 73 303 94

125 127 77 423 76

112 120 1S7 46S 226 242 161 137 766

t

BS 66 38 189 41 43 39 34 1S7 29 28 20 7 84

14 22 19 16 71 14 i5 11 13 53 10 12 10 10 42

3333

4:45 786

Cl.Bl