Upload
lymien
View
221
Download
0
Embed Size (px)
Citation preview
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
IGS Infrastructure Status Nacho Romero IGS Infrastructure Committee Chairman Navigation Support Office, ESA/ESOC IGS Workshop, Pasadena, CA, USA. 24/06/2014
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
• 20 years of IGS Infrastructure … • Reference Frame station progress
• Current Challenges
• Infrastructure moving forward
• Conclusions
Overview
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
400+ stations
40+ receiver types
~99 antenna+radome types
100+ organizations
IGS Network
60+ stations in long term outage IGS CB
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
• Infrastructure encompasses all the underpinnings that make the IGS … stations, data formats, data centers, etc.
• We have come a long way in 20 years … big increase of reference stations … the most important stations of all
20 years of IGS Infrastructure …
Network Distribution_44 − wk0731
−180˚
−180˚
−150˚
−150˚
−120˚
−120˚
−90˚
−90˚
−60˚
−60˚
−30˚
−30˚
0˚
0˚
30˚
30˚
60˚
60˚
90˚
90˚
120˚
120˚
150˚
150˚
180˚
180˚
−60˚ −60˚
−30˚ −30˚
0˚ 0˚
30˚ 30˚
60˚ 60˚
albh algo
brmu
brus
cro1
drao
fair
fort
godegold
graz
harv
holb joze
jplm
kiru
kokb
kosg
kour
madr mate
mdo1
mets
nlib
onsa
pert
pie1quin
sant
sio3
stjo
taiw
tidb
trom
tskbusudvndp
wes2wett
will
yar1
yell
zimm
N/A% OK1 station depth, 0 deg cutoff
1 2 3 4 5
Network Distribution_136 − wk1794 ITR
−180˚
−180˚
−150˚
−150˚
−120˚
−120˚
−90˚
−90˚
−60˚
−60˚
−30˚
−30˚
0˚
0˚
30˚
30˚
60˚
60˚
90˚
90˚
120˚
120˚
150˚
150˚
180˚
180˚
−60˚ −60˚
−30˚ −30˚
0˚ 0˚
30˚ 30˚
60˚ 60˚
albh algo
alic
amc2 ankr
artu
auck
bake
barhbjfs
bor1brew
brft
brstbucu
cedu
chti
chum
chur
coco
coyq
cro1
darw
drag
drao duboflin
glps
glsv
godegold
grasgraz
guam
harb
hersherthlfx
hnlc
hob2
hrao
iisc
invk
irkj
ispa
ista
joz2joze
jplm
karr
kely
kerg
kokb
kouc
lhaz
lroc
mac1
mana
mar6
mat1mate
mauimcil
mdvj
medi
mkea
mobs
morpnain
nano
nklg
not1
nrc1
nril
nrmd
nvsk
ohi2
onsa
palm
parc
pdelpie1
pimo
pol2
prds
qaq1
quin
ramo
rbay
reso
reun
riga
scor
sofi
ssia
stjo
suth
tah1
tcms
thti
tidb
tixi
tlse
tnml
tow2
tro1
urumusn3usno
uzhl
vndp
wes2
whit
will wsrtwtzr
wuhn
yarr
yebe
yell
yibl
zamb
zeckzimjzimm
N/A% OK1 station depth, 0 deg cutoff
1 2 3 4 5
1994 2014
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
• The position for the ITRF stations enable the orbits to disseminate the ITRF worldwide.. Having enough stable stations is critical …
Reference Frame Station progress…
AC Station usage
ITRF available weekly station position sln http://webigs.ign.fr/en/tfcc/
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
What we face
IGS Sta'on Network Need strong management from NC with IC, AC, MGEX, etc help.
IGS projects/experiments Need dedicated networks to be accepted to IGS ntwrk. IGS “Ntwk of Ntwks” NC/IC need to idenAfy more regional bodies with good acAve staAons to underpin all IGS efforts; SIRGAS, EUREF, AFREF,
IGS MGEX New Signal and Format Needs, Global + Regional
IGS RT Speed, RTCM, Global
IGS RF Stable long term Time Series, Global
Overall Challenge
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
Challenges
• GLONASS ephemerides “time of applicability” problem; April, 2014
• Due to heterogeneity and depth of IGS network no effect on products but several receivers stopped tracking GLO or showed problems…
Effect of GLONASS outage on GNSS receivers, Berglund et al, poster, session PS08
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
Challenges
NGA upgraded equipment to unknown ITT receivers/antennas, we have identified the equipment into rcvr_ant.tab, added calibration
from NGS to ANTEX but data has ½ phase cycle ambiguity, and most stations moved the antennas, NGA data continues to be out.
NGA added its stations for the repro1 effort, they consist of 22 double stations at 11 sites – stations have been out since ‘09
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
Challenges
Uncalibrated radomes are a significant problem at co-located sites, where their ITRF08 tie discrepancies reached 99 mm!!
Global processing solutions could not determine most radome effects (2/30), short baseline processing may be tried.
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
Moving Forward …
• IGS Site Log Manager Tool to manage the station configurations …
IGS CB Site Log Manager Tool, Maggert et al, poster session PS08
SLM Demonstration, D. Maggert, Infra Splinter Mtg, Wed 25 Jun 16:00, Room 101 (Lees-Kubota Lecture Hall)
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
Moving Forward …
• NavBits to store the navigation bits for open loop GNSS signal processing from many IGS stations …
Providing NBS for LEO occulattion processing, Romero et al, poster session PS08
IGS Infrastructure Status, N. Romero, IGS Workshop, Pasadena, CA, USA, 2014
Thank You!Please contact the IC with questions and concerns through one of its members or me: [email protected] Also contact the NC at: [email protected]
Infrastructure Splinter Mtg – Room 101 (Lees-Kubota Lecture Hall - Wed 16:00 – 17:30