IGCC and Co-Production in China

Prof. XIAO, YunhanThe National Joint Expert Group for IGCC and Co-

Production Demonstration Engineering

2007’ International Workshop on IGCC & Co-Production and CO2 Capture & Storage

May 23, 2007Beijing, China

Page 2: IGCC and Co-Production in China - Belfer Center

IGCC/Co-production

Solution to the issues with of coal, power, and oilClean and efficient power generation from coal Ultra-clean fuels and chemicals from coalFuel and product flexible

Consistent with hydrogen economy, CCSTo build a stable, economic, clean and secure Energy supply system

Gasification

Fuels and Chemical Products Production Subsystems

Power Generation System

Coal

Fuels(liquid, H2, etc.)Chemical Products

Electricity

Mass and energy integration

Synthesis

IGCC

Page 3: IGCC and Co-Production in China - Belfer Center

ASU

Gasifier Purification GT

HRSG

ST

GTL

HeatRecovery

H2/CO2

S Recovery

Chemicals

Liquid Fuels

Electricity

S

CC

IGCC

Co-Production

Zero EmissionSystem

IGCC/Co-production

Page 4: IGCC and Co-Production in China - Belfer Center

ConceptualResearch

31.2%1st Generation

39~45%2nd Generation

45~50%3rd Generation

70’s

80’s

90’s

00’s

60%Adding FC/GT

Near Zero Emission

75%Adding Co-productNear Zero Emission

2015—

Advanced Technologies• Chemical Energy Release• Purification• Power Conversion• Air/Gas Separation• High T Heat Exchange• Syngas Conversion to Fuels and Chemicals

China Vision

Progres

s

IGCC/Co-production

Page 5: IGCC and Co-Production in China - Belfer Center

1970’s, Suzhou IGCC pilot plant -Abortion Platform

1990’s, Yantai 300~400MW IGCC demonstration plant-not start construction yet

Dependent on imported technologiesHigh capital costHigh COE

The Course and Evolution of IGCC and Co-production in China

Page 6: IGCC and Co-Production in China - Belfer Center

The Course and Evolution of IGCC and Co-production in China

Page 7: IGCC and Co-Production in China - Belfer Center

863 Project——High-Tech Research and Development Program of China (2001~2005)

Yankuang 240,000 t/a methanol and 60MWe Co-production demonstration1000 TPD coal slurry feed gasification

The Course and Evolution of IGCC and Co-production in China

Page 8: IGCC and Co-Production in China - Belfer Center

IGCC & Co-Production Development in China——Yankuang 240,000 t/a methanol and 60MWe Co-Production Demo Plant

Page 9: IGCC and Co-Production in China - Belfer Center

IGCC & Co-Production Development in China——Yankuang 240,000t/a methanol and 76MWe Co-Production Demo Plant

New type slurry feed gasifier: 1150 TPD×2Investment 1.58 billion RMBFinancial investment recovery in 8.1years (construction period included)Operating, totally >6000 hours achieved by now

Commercial Operation since Apr. 2006

Page 10: IGCC and Co-Production in China - Belfer Center

Gasificationnew-style coal-water slurry gasification

scale:1150 tons/dayoperation times up to 5130 hours

dry pulverized coal pressurized gasification (1)

scale:24 tons/dayoperation times up to 2100 hours

dry pulverized coal pressurized gasification (2)

scale:45 tons/day

Page 11: IGCC and Co-Production in China - Belfer Center

Synthesis750 tons per year pilot plant of CTL

7 operation experimentsIn 2004, operation with full load 1500 hourssufficient operation experience and engineering data through 5000 hours run of the plant

5000 tons per year pilot plant of CTL

operation for 6068 hoursfull load operation times up to 4706 hours

Page 12: IGCC and Co-Production in China - Belfer Center

IGCC & Co-Production Development in China——Advantages, Barriers and Strategies Research

Barriers RecognizedPolicy barriers

No special policiesLack of market measures or incentivesEnvironmental policies and standards need further improvement

Institutional/organizational barriers Unfavorable sectoral structure and divisionLow investmentlack of market mechanism and effective government supervision

Technical barriersKey TechnologiesSystem integration & design

Financial barriers

Breakthrough NeededHigh-Tech

Gasification & Syngas PreparationSyngas Gas TurbineFuels and Chemical SynthesisHydrogen Production and CCS

Industrial ReformPower UtilityCoal Chemical IndustryTechnology providers, engineering design, equipment manufacturing

Cooperation MechanismGovernmentIndustryInstituteUniversity

Page 13: IGCC and Co-Production in China - Belfer Center

IGCC & Co-Production Development in China——Coal Co-production Technology Roadmap

Goals: provides a blueprint for the coordinated, long-term, efforts required

Develop unified roadmapMaintain high-level approach

Supported byMinistry of Science and Technology, ChinaChina Academy of SciencesNRDC

Implementation byIET, CAS863 Clean Coal Technology Experts Group

Page 14: IGCC and Co-Production in China - Belfer Center

IGCC & Co-Production Development in China——Coal Co-production Technology Roadmap

Energy System Innovation IntegrationStep-by-step Strategy

Mature Individual Technologies IntegrationKey Technologies BreakthroughNear Zero Emission Technologies

Combined StrategyState Guide and Enterprises Voluntary ParticipateIndustrial Development and Technological innovation International Cooperation and Self Creation

Page 15: IGCC and Co-Production in China - Belfer Center

Technology Development Strategies——Roadmap Goals

Overall GoalForm the clusters of the Clean Coal Technologies, support the development of China’s energy manufacturing industry, achieve the efficient, clean, and affordable of coal

Stage Goal2010

commercial demonstration power plantcoal gasification based co-production of oils and power system

2020Installed capacity of IGCC to reach 20,000MWeSynthetic oil and chemical products to substitute 50 million tons of crude oil on annual basisConversion of coal into hydrogen and electricity, and near-zero emission of CO2

Page 16: IGCC and Co-Production in China - Belfer Center

IGCC & Co-Production Roadmap in China

Page 17: IGCC and Co-Production in China - Belfer Center

The 11th Five-Year Plan Co-Production Projects

High Technology Research and Development Program of China (863 program)RMB 350 million from governmentRMB 25000 million from industries

Page 18: IGCC and Co-Production in China - Belfer Center

The 11th Five-Year Plan Co-Production Projects——863 Major Project, 2006-2010

Key Technologies R&D and Demonstration

New style Slurry Feed

Gasifier

1150 TPD

2000 TPD

Dry Feed Gasifier

Pilot Scale

2000 TPD

Fuel Flexible Gasifier

Laboratory Scale

1000 TPD

low emissions GT Retrofit

B Class Single Burner

B/E Class Multi Burner

CTL

750 t/a 5000 t/a

0.1-1 Mton/a

3 IGCC Demo Plants 2 Power and CTL Co-Product Plants

Operation Control

System Integration

2001-2005

2006-2010

Power and CTL Co-Product

IGCC&0.1-1Mton/a Power and CTL Co-

Product

Key Tech.

Operation and Control Technologies System Integration Technologies

Page 19: IGCC and Co-Production in China - Belfer Center

IGCCHuaneng Group Project

Bohai Rim

IGCCHuadian Group Project

Yangtze River Delta

Co-ProductShanxi Lu’an Group Project

Coal Mine

Co-ProductYankuang Group Project

Coal Mine

IGCCDongguan Electrzation Industry

Ltd. ProjectPearl River Delta

Page 20: IGCC and Co-Production in China - Belfer Center

The 11th Five-Year Plan Co-Production Projects——Projects

60

200

250

200

120,200

PowerClass /MW

GT RetrofitCTLSystem int.Oper. & Contr.

Fix-bed GasifierB Class GTCTL

160,000Shanxi Lu’an

Slurry Gas.GT RetrofitCTLSystem int.

Slurry GasifierB Class GTCTL

1000,000YankuangPower and

CTL Co-Production

Dry Feed Gas.Oper. & Contr.

Dry Feed Gas.E Class GT—Huaneng

Slurry Gas.GT RetrofitSystem int.

Slurry GasifierE Class GT—Huadian

Fuel Flex. Gas.GT RetrofitSystem int.Oper. & Contr.

Fuel Flexible GasifierB/E Class GT

—Dongguan

IGCC

Joint Key Tech. R&D Projects

FeaturesCTL

tons/aDemo

Projects

Page 21: IGCC and Co-Production in China - Belfer Center

The 11th Five-Year Plan Co-Production Projects——Administrative Framework of the Project

Ministry of Science and TechnologyOffice of Energy Field

Expert Group

Office of Project

Mandatory Supervision Comp.

Page 22: IGCC and Co-Production in China - Belfer Center

The 11th Five-Year Plan Co-Production Projects——Administrative Framework of the Project (cont.)

Expert GroupBureau of High-technology Research and Development, CAS

Head: Prof. Xiao, Yunhan

Nanjing Turbine & Electric Machinery Co., LTD.Senior Engineer Liu, Weining

Shanghai Electric Power Generation GroupSenior Engineer Zhou, Yigong

China Huadian CorporationSenior Engineer Ma, Zhiming

Yankuang GroupSenior Engineer Sun, Qiwen

GreenGen Corporation, China Huaneng GroupSenior Engineer Xu, Shisen

East China University of Science and TechnologyProf. Wang, Fuchen

Huazhong University of Science and TechnologyProf. Xu, Minghou

Zhejiang UniversityProf. Luo, Zhongyang

Tsinghua UniversityProf. Cai, Ningsheng

Members:

Page 23: IGCC and Co-Production in China - Belfer Center

GovernmentCASUniversitiesInstitutesIndustries

IGCC and Co-production

Alliance

Cooperation:• FutureGen• Tech & Eng. Advisory• Policy …• RDD?……

The Alliance for IGCC and Co-production

Page 24: IGCC and Co-Production in China - Belfer Center

The Alliance for IGCC and Co-production ——Organization of the Alliance

Integration of Industries, Universities and Institutes

Industries:Manufacturer, Designing Institutes, Coal Companies, Power CompaniesInstitutesUniversities

Start with current participants in the IGCC and co-production demonstration engineering

Page 25: IGCC and Co-Production in China - Belfer Center

The Alliance for IGCC and Co-production ——Functions of the Alliance

Coordinate R&D2 activities on IGCC and co-production technologiesJointly develop and construct platform for key technologies R&D2

Accumulation of information and experience, assessment of technical direction, promote application and development Form industrial norms and standardsProvide consultation and suggestions for formulating national policies

Page 26: IGCC and Co-Production in China - Belfer Center

The Alliance for IGCC and Co-production ——Functions of the Alliance (cont.)

Provide a platform for international cooperation

Speed up the learning process of IGCC and Co-production technologiesJoint R&D2 on IGCC and Co-production technologiesInternational cooperation on CCS

Page 27: IGCC and Co-Production in China - Belfer Center

70’s 90’s 2001-2005 2006-2010

Suzhou PilotIGCC

YantaiIGCC

YankuangCo-production

IGCC & Co-production

Projects

Concept Study Preliminary Research National 863 National 863

IGCC Design Integration& Dynamic Performance

Basic Research of the Coal Pyrolysis and Gasification

and High Temp. Purification

1150 t/d New Slurry-Feed Gasifier Tech.

36 t/d Dry-Feed Gasifier Tech.

Syngas GT Combustor Retrofit Tech.

2000 t/d New Slurry-Feed Gasifier Tech.

2000 t/d Dry-Feed GasifierTech.

1000 t/d Fuel Flexi. Gasifier Tech.

Low Emission Syngas GT Combustor Retrofit Tech.

Large-Scale Efficient Entrained Flow Coal

Gasification Tech.

High Temp. Purification Tech.

Project

R&D

KeyTechnologies

Page 28: IGCC and Co-Production in China - Belfer Center

IGCC/Co-production is very important to China. It is the direction of the development of clean coal technology and an option to resolve energy problems of coal, power, oil and transportationEfforts and progresses were made and will continueGovernmental support and right decision, combination of industry, university and institute, effective international collaboration are needed

Remarks

Page 29: IGCC and Co-Production in China - Belfer Center

Thanks for Your Attention!