Page 1: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

IFPS Science Steering Team (ISST)-- a first status report to the S&T Committee --

S&T Committee VTC

28 May 2003

Page 2: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

ISST Vision

The IFPS Science Steering Team facilitates an efficient and effective process that allows the NWS to identify, collect, prioritize, and propose focused solutions and recommended courses of action to IFPS science issues. Recognized as a primary conduit between IFP operations and NWS Headquarters, this team of field experts serves to better ensure scientific and technological integrity in the digital forecast process.

Page 3: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

ISST Membership

• Brad Colman, team leader, WFO Seattle, WA• Peter Manousos, backup team leader, NCEP/HPC • Dan Baumgardt, WFO La Crosse, WI• Mark Jackson, WFO Salt Lake City, UT• Larry Lee, WFO Greenville-Spartanburg, SC• Andy Patrick, WFO Corpus Christi, TX• Eric Stevens, WFO Fairbanks, AK• Bill Ward, WFO Guam• Ken Waters, Pacific Region Headquarters• Kevin Schrab, facilitator, NWS Headquarters Office of

Science and Technology

Page 4: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Brief review of our short history…

• SOO whitepaper• Interest and support from Regional and National

Headquarters• Cliff Mass’ paper• S&T committee forms ISST• Western Region SOO/DOH workshop

Page 5: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Today’s briefing• Immediate opportunities

– MDL’s expanded MOS development– Verification efforts

• Early recommendations– Immediate and optimal use of SBN– AWIPS grid change procedure– Enhancements to the GFE

• Overarching challenges– Analysis of record– Incorporating probabilistic information

Page 6: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Objectives

• Approval of recommended courses of action• Discuss and validate potential directions on

overarching challenges• Recognize science needs and urgency• Reprioritize and reallocate resources, if

necessary

Page 7: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

S&T Committee Science Issues/Questions

1. What is the best mix of probabilistic and deterministic forecast information out to Day 7?

2. Are there scientific techniques to maximize forecast “value added”?

• Downscaling• Statistical guidance• Resolution of NDFD and model guidance

3. How do we assess forecast accuracy and skill?4. What are the science issues of adding a third dimension to

the NDFD?5. What analysis and short-term forecasting tools are needed?6. What are the best methods to ensure consistent surface

elements?

Page 8: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Immediate Opportunities• MDL currently expanding GFS MOS data (Science Issue 2)

– By Fall ’03 GFS MOS sites will include METAR, Co-Op, Buoy, and CMAN sites (MaxT/MinT to 10 days)

– Partially meets immediate need for enhanced statistical guidance – Could allow early proof-of-concept evaluation of gridded MOS– No formal plan in place for the distribution and use of these new data– We are talking with MDL to assess possible options

• Verification efforts (Science Issue 3)– MDL and WR starting prototype effort to verify NDFD

• MDL has grid verification software for NDFD• Western Region has 2.5 km ADAS analysis

– Existing Verification Working Group• Could provide basis for an overseeing, permanent team or working group with

broad representation to direct the IFPS verification system• ISST wants to endorse this effort and explore ways to enhance its role and impact

Page 9: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Early ISST recommendations

• Selected from WR SOO/DOH meeting brainstorming sessions earlier this month

• Each topic had strong endorsement at the meeting

• These are the high impact – likely attainable in a short time with limited resources – steps

• They are not ranked or presented in priority

Page 10: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Immediate and Optimal Use of SBN

• Identified Need:– Improved grids for IFPS

Smart Init process.

• Proposed Solution:– Use SBN ‘lulls’ to transmit

additional high resolution NCEP model data to the NWS field offices.

– Incorporates the idea of “data latency.”

• Recommended Course of Action:– Achieve solution by end

CY03 (within existing resources)

‘Lulls’

Science Issues: 2 and 6

Page 11: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

AWIPS Grid Change Procedure • Identified Need: A change management process that

plans for, programs, and delivers model improvements and best-available model grids to the field on the day they go operational.– Currently, the ability to add new model datasets are contingent to the

AWIPS Build Process (2 to 6 months).– This process takes too long and needs to be streamlined.– A better method for the delivery of AWIPS grid updates is needed.

• Proposed Solution: This involves decisions and actions regarding generation, transmission, and WFO/RFC receipt (including processing, storage, and display).

• Recommended Course of Action: S&T committee needs to validate this as a need/requirement and then pass on to appropriate groups for implementation.

Science Issues: 2, 4, and 6

Page 12: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Enhancements to the GFE

• Daily Forecast Critique• Ingest and use of real-time (Nowcast) data in

GFE• “Smart Init” improvements and modifications

(FSL feedback is that development work on these enhancements can begin as early as late July)

Page 13: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Daily Forecast Critique (DFC)

• Identified Need: Local verification and real-time gridded forecaster feedback within the GFE– Currently: Forecasters can only compare forecasts to observation points

and not grids.

• Proposed Solution:– Daily Forecast Critique (DFC) represents the best verification

foundation to build on at this time– Bring DFC within the GFE environment– Enhance to include gridded verification using gridded analysis

• Ability to incorporate verification grid into forecast grids– Flexible user framework to derive varying statistical feedback– Develop, test, and implement above solutions in RPP-like

process• Recommended Course of Action:

– Advocate this as a high priority for FSL

Science Issues: 2 and 3

Page 14: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

GFE Ingest and Use of Real-time Data • Identified Need: To provide gridded real-time information

in GFE to update the short-term and incorporate into short-term forecast process (0- to12-h)– Not for pure display purposes

• Proposed Solution:– Ingest satellite and radar data into the GFE– Satellite Data

• Convert to GFE-compatible gridded form • Modify GFE to ingest sub-hourly data• Need for algorithm development

– Radar Data• Development work needed (possible ROC involvement)

• Recommended Course of Action:– Advocate this as a high priority for FSL

Science Issues: 2 and 5

Page 15: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Enhancements to GFE Smart Initialization• Identified Need: An improved Smart Init process that takes

advantage of best-available grids to generate best possible base and derived forecast grids.

• Proposed Solution:– Provide full-resolution model data for initialization – Evaluate baseline and field-modified Smart Inits– GFE modifications necessary for additional GFS data

• IFPS 14 Patch, post OB2.1 (Fall ‘03)– Support formation of Smart Init Focus Team charged with incorporating

field modifications to Smart Inits into baseline• Close collaboration with COMET/NWP Team effort charged to assess

Smart Tools and Smart Init• Must include field (WFO) expert representation• Test Smart Inits on native resolution data at NCEP

• Recommended Course of Action:– Advocate this as high priority for FSL

Science Issues: 2 and 6

Page 16: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Overarching Challenges(for discussion and validation)

• An analysis of record– A real-time gridded analysis of the sensible weather elements

that are forecast within IFPS: temperature, precipitation, wind, etc.

• Incorporation of probabilistic information– Probabilistic information is needed as guidance within IFPS.

This is necessary to allow the NWS to identify opportunities that will allow us to deliver probabilistic forecasts and value-added information to a wide range of customers.

Page 17: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Analysis of Record

• Motivation:– Real-time seamless verification– Provides forecasters useful feedback– Allows forecasters to assess the initialization

and performance of NWP models– Serves as input to the GFE for use in short-

term forecasts– Contributes to the ongoing development of a

gridded climatology

Science Issues: 2, 3, 5, and 6

Page 18: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

• Considerations:– Be at the same resolution (both spatial and

temporal) as the forecast grids– Incorporate data from all sources: RAWS, COOP,

satellite, radar– Be as independent from the NWP models as

possible

• Potential directions:– A collaborative effort will likely be needed between

the NWS, ERL, and universities. – Opportunities for outsourcing should be explored– External peer-review process will be beneficial– A long-term effort is required. Work should begin

now, as it will likely be some time before results are available.

Page 19: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

• Motivation:– NRC Workshop summary 2003

• Exemplifies the need to communicate uncertainty to the end user

– NWS Vision 2005• Calls for NWS to provide weather, water, and climate

forecasts in probabilistic terms by 2005

– State of meteorological science demands such a direction

• High level objectives:– Intelligently convey uncertainty in a practical manner to

forecasters and end users– Facilitate the concise visualization and assimilation of

ensemble output into the forecast process

Incorporate Probabilistic Information

Science Issues: 1, 2, and 3

Page 20: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

• Considerations:– End users would benefit from the ability to produce a

wide variety of probabilistic output formats– Forecasters need access to proper ensemble output– Required training

• Forecaster training on the proper use of ensemble output• End user training to properly utilize available output formats

– Need to tap expertise in and outside the NWS

• Potential Directions:– Deliver ensemble gridded fields to WFOs– Develop forecaster training– Explore potential use of probabilistic density functions

(PDFs) derived from ensemble output– Work with NWS partners to identify high-priority

probabilistic forecasts

Page 21: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Summary of Decisions

• Approval of recommended courses of action:– MDL’s expanded MOS development– Verification efforts– Immediate and optimal use of SBN lulls– AWIPS grid change procedure– Enhancements to the GFE

• Validate priority and potential directions on overarching challenges:– Analysis of record– Incorporating probabilistic information

Page 22: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Final Comments

• First baby steps

• We look forward to an active dialogue with the S&T Committee

• Recognize the need and urgency

Page 23: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Background information follows

Page 24: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Core SOO Whitepaper Proposals

• Develop a National real-time, gridded verification system

• Provide full-resolution NCEP model grids• Objectively produce bias-corrected model grids for

WFO use• Implement methods to objectively downscale

forecast grids• Incorporate climatology grids into the GFE process• Deliver short and medium-range ensemble grids• Modify the GFE software to ingest real-time data • Optimize ways to tap forecaster expertise

Page 25: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

• Details Regarding Recommended Course of Action for the Immediate and Optimal Use of the SBN:– Analyze transmission timing scenarios (July; SEC -

Tuell). – Identify and prioritize new NCEP data sets for review

and concurrence. (June; ISST, SSDs and SOOs) – Complete necessary notifications, modifications, and

begin new SBN transmissions (August; OCCWS and OST)

– Incorporate required software update in OB 2.1 (August; SEC)

– Provide a patch to IFPS 14 for immediate use of new data sets (August; FSL/SEC).

– Incorporate modifications in IFPS 15 as baseline IFPS SmartInit (late ‘03).

Immediate and Optimal Use of SBN

Page 26: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Highest Priority NCEP Data for SBN: Target: IOC (9/03)• Transmitted on SBN with zero latency

– GFS additional levels at 80km • Sfc, BL (0-30,30-60,60-90,90-120,120-150,150-

180) 1000-500 x 25 mb, 500-100 x 50 mb (Z,T u, v, RH)

• thru 168 hrs– Eta 12 surface and BL thru 84 hrs

• Transmit on SBN with minimal latency– Eta 80km/40km data 60-84 hours at 3 hourly

increments.– Eta 12 pressure levels thru 84 hrs.

• 1000-500 x 25 mb, 500-100 x 50 mb • MREF 84-240 hrs (same fields as currently

available 0-84) (use WAN?).– GFS BUFR sounding data

Immediate and Optimal Use of SBN

Page 27: IFPS Science Steering Team (ISST) -- a first status report to the S&T Committee --

Detailed Benefits Associated with Streamlined AWIPS Grid Change Procedure:- Allows WFOs to acquire updates to AWIPS grid tables on monthly basis.- WFOs can have access to higher resolution model more quickly.- A delivery mechanism can be developed that is easily manageable.- WFOs can acquire this information and update AWIPS workstations at their own convenience. - Grid updates do not greatly perturb the AWIPS baseline greatly nor affect the AWIPS Build cycle (Bullock, FSL).

AWIPS Grid Change Procedure