IEM Daily Field Report Prepared By: Ashley Hastings IEM Representative Page 1 of 5 Signed In Signed Out Southwest Brooklyn Marine Transfer Station 1824 Shore Parkway Brooklyn, New York 11214 Date: September 27, 2017 Inspector: Ashley Hastings Location / Description: Project #: URLI1401 Site Time: 0655 to 1530 Assigned by: GMC Day Weather General Site Conditions Monday Thursday Clear Cloudy Snow Clear Tuesday Friday Overcast Windy Hot Muddy Wednesday Rain Cold Temperature Range: 75 ºF to 80 ºF General Contractor: Prismatic Development Corporation (PDC) Construction Manager: URS / LiRo G/C Name: Richard Tonnensen CM Name: Michael Balarezo / Michael Pokorny S/C&S/C Supervisor: NA CM Phone #: 917-983-5608 / 917-983-5616 Equipment and Machinery in Use (1) : Elevating Work Platforms Forklift with extendable arm (Lull) Excavator(s) Vibrating Compactor (1) List of equipment and machinery is based on field observations and is not inclusive of all equipment and machinery that may have been present at the site. Personnel on Site (1) : Personnel Organization Personnel Organization Personnel PDC Michael Balarezo URS / LiRo Terry Willforg Certified Safety Michael Pokorny URS / LiRo Louis Martinez III EnTech Roberto Vazquez URS / LiRo Tim Mitchell Louis Berger Tom Karas URS / LiRo Anthony Controneo Total Safety Consultant Victor Bogatyrev URS / LiRo Personnel Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of personnel on site is based on field observations and is not inclusive of every personnel that may have been present at the site. Observations: Time Stamp Details Time On-Site: 6:55 am 6:55 am EnTech set up four air monitoring stations at perimeter locations, forming a quadrangle around the anticipated work area, as specified by the CM. According to EnTech, air monitoring was occurring at the four air monitoring stations beginning at 6:50 am. The air monitoring station locations are depicted on the Sketch. 7:00 am to 3:00 pm Solar installing electrical wiring and conduit throughout the main building. 7:00 am to 2:00 pm A&A / Empire installing fluid dispensing equipment and a compressed air system throughout the site. 7:00 am to 2:00 pm Olympic installing, insulating, and testing piping throughout the site. 7:00 am to 3:00 pm Unicorn installing curb and sidewalk components in the western section of the site. Unicorn utilizing lull forklift to move materials around the site. Unicorn utilizing an excavator to excavate trench for curb installation in the southwestern portion of the site.

IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

IEM Daily Field Report

Prepared By: Ashley Hastings IEM Representative

Page 1 of 5

Signed In Signed Out Southwest Brooklyn Marine Transfer Station

1824 Shore Parkway Brooklyn, New York 11214

Date: September 27, 2017 Inspector: Ashley Hastings Location /

Description:

Project #: URLI1401 Site Time: 0655 to 1530 Assigned by: GMC

Day Weather General Site Conditions

Monday Thursday Clear Cloudy Snow Clear

Tuesday Friday Overcast Windy Hot Muddy

Wednesday Rain Cold Temperature Range: 75 ºF to 80 ºF

General Contractor: Prismatic Development Corporation (PDC) Construction Manager: URS / LiRo

G/C Name: Richard Tonnensen CM Name: Michael Balarezo / Michael Pokorny

S/C&S/C Supervisor: NA CM Phone #: 917-983-5608 / 917-983-5616

Equipment and Machinery in Use(1): Elevating Work Platforms

Forklift with extendable arm (Lull)

Excavator(s)

Vibrating Compactor (1) List of equipment and machinery is based on field observations and is not inclusive of all equipment and machinery that may have been present at the site.

Personnel on Site(1):

Personnel Organization Personnel Organization

Personnel PDC Michael Balarezo URS / LiRo

Terry Willforg Certified Safety Michael Pokorny URS / LiRo

Louis Martinez III EnTech Roberto Vazquez URS / LiRo

Tim Mitchell Louis Berger Tom Karas URS / LiRo

Anthony Controneo Total Safety Consultant Victor Bogatyrev URS / LiRo

Personnel Solar Inc., A&A / Empire, Olympic, K&M, Unicorn,

Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen

(1) List of personnel on site is based on field observations and is not inclusive of every personnel that may have been present at the site.

Observations:

Time Stamp Details

Time On-Site: 6:55 am

6:55 am

EnTech set up four air monitoring stations at perimeter locations, forming a quadrangle around the anticipated work area, as specified by the CM. According to EnTech, air monitoring was occurring at the four air monitoring stations beginning at 6:50 am. The air monitoring station locations are depicted on the Sketch.

7:00 am to 3:00 pm Solar installing electrical wiring and conduit throughout the main building.

7:00 am to 2:00 pm A&A / Empire installing fluid dispensing equipment and a compressed air system throughout the site.

7:00 am to 2:00 pm Olympic installing, insulating, and testing piping throughout the site.

7:00 am to 3:00 pm Unicorn installing curb and sidewalk components in the western section of the site. Unicorn utilizing lull forklift to move materials around the site. Unicorn utilizing an excavator to excavate trench for curb installation in the southwestern portion of the site.

Page 2: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

Day / Date: Wednesday / September 27, 2017 Client: URS / LiRo H2M Project No.: URLI1401

Prepared By: Ashley Hastings IEM Representative

Page 2 of 5

Time Stamp Details

10:00 am to 2:00 pm Concrete pouring for the curb located in the western portion of the site.

7:00 am to 2:00 pm Maryland Fabricators welding on the tipping level of the main building.

7:00 am to 2:00 pm FCS painting the floors on the loading level and the stairs on the tipping level of the main building.

7:00 am to 3:10 pm GC utilizing a Lull forklift to move materials around the site. GC constructing wooden formwork in the southern portion of the site.

7:00 am to 2:00 pm K&M installing and testing the fire sprinkler system throughout the site.

7:00 am to 2:00 pm Tonage installing rebar in formwork in the southern portion of the site.

7:00 am to 1:45 pm Jobin utilizing elevating work platforms to install roofing on the main building and siding on the eastern and western sides of the main building.

9:30 am to 10:00 am and 12:00 pm to 12:30 pm

Site work stops for a work break.

3:15 pm Site work stops for the day. EnTech removes air monitoring stations.

Time Off-Site: 3:30 pm

General Observations:

According to EnTech, particulate matter and total organic vapors were not detected at concentrations greater than the action levels.

The GC was not observed to utilize the water tank truck during the work day.

Issues discussed this date with Construction Manager: None

Persons Contacted: N/A

Status: N/A

Notes: N/A

Page 3: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

IEM Daily Field Report

SKETCH

Prepared By: Ashley Hastings IEM Representative

Page 3 of 5

Approximate Location of Air Monitoring Stations B3.

Approximate Location of Air Monitoring Stations B1.

Approximate Location of Air Monitoring Stations B4.

Approximate Location of Air Monitoring Stations B2.

Approximate Location of curb installation

Approximate Location of formwork and rebar area

Approximate Location of concrete pouring

Page 4: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

IEM Daily Field Report

TRUCK LOG

Prepared By: Ashley Hastings IEM Representative

Page 4 of 5

Counter Time In(1) License Plate No. Truck ID(2) Trucking Company Disposal Facility(3) Permit No.(2) Time Out(1) Notes

1 7:00 am NJ AT-779U #31 Muñoz with Manolos West Plant via IRRC NJ777 7:13 am NA

2 11:25 am NJ AT-779U #31 Muñoz with Manolos West Plant via IRRC NJ777 11:32 am NA

3 1:40 pm NJ AT-779U #31 Muñoz with Manolos West Plant via IRRC NJ777 1:47 pm NA

(1) Time In / Out are approximate and based on field observations.

(2) As displayed on the truck.

(3) Soil being transported off-site for final disposal at West Plant via IRRC. Details are provided on the manifests (Attachment A).

NA – Not applicable / available.

Page 5: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

IEM Daily Field Report

PHOTOGRAPH LOG

Prepared By: Ashley Hastings IEM Representative

Page 5 of 5

Page 6: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

ATTACHMENT A

MANIFESTS, AS PROVIDED BY THE CM

Page 7: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of

DSNY – South West Brooklyn Marine Transfer Station Project ID: S216-399A 400 Bay 41st Street, Brooklyn, N.Y.11214 Date: 09/27/2017

Summary Log of Manifests

Truck/License Nos. 31/AT-779U NJ

Load Counter Time In Time Out Disposal Facility License Plate No. Truck ID Trucking Company Permit No.

1 6:45am 7:13am IRRC Lyndhurst, NJ NJ AT-779U #31 Munoz with JC Tran. NJ777

2 11:25am 11:32am IRRC Lyndhurst, NJ NJ AT-779U #31 Munoz with JC Tran. NJ777

3 1:40pm 1:47pm IRRC Lyndhurst, NJ NJ AT-779U #31 Munoz with JC Tran. NJ777

Page 8: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of
Page 9: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of
Page 10: IEM Daily Field Report - New York · 9/3/2017  · Solar Inc., A&A / Empire, Olympic, K&M, Unicorn, Maryland Fabricators, FCS, Tonage, Jobin Ali Najifi Greeley & Hansen (1) List of