TC114 Plenary Meeting
Vancouver, Canada
April 24-25, 2014
IEC TC114 Plenary Meeting
CAB WG15 + IECRE
Jonathan Colby
Neil Rondorf
US National
Committee
of the IEC
• TRAPS distributed
netted acoustic
system for deep sea
operation
• THAAW sensor for
Arctic awareness
• ASW Continuous
Trail Unmanned
Vehicle (ACTUV)
• Hydrographic
survey remote
operations
• LBS-AUV
integration to
operational
bathymetry
pipeline
• MIW USV
integration
2
Maritime Systems Operation
• Survey operations
& bathymetry
products
• Precision cable
operations
ISR/ASW Sensors,
Systems and Processing
Marine Platforms Unmanned and Autonomous
Systems
High-fidelity Ocean
Modeling and Simulation
Hydrographic Survey and
Cable Operations
• High-fidelity
stimulation
• Training, trainers
& tactical decision
aids
• Tactical systems
development &
test
Sensor Node
in sleep mode
US National
Committee
of the IEC
Projects and Future On going project areas
Design
Moorings
Resource (tidal and
wave)
Power Performance (tidal
and Wave)
OTEC
Power Quality
Scale Testing
2nd location assessment
Future areas of work
Acoustics
River resource and power
performance
Load Measurements
Commissioning and De-
commissioning
Power assessment of
arrays
Personnel and Services
TC-114 Plenary meeting
Vancouver, BC April 2014
US National
Committee
of the IEC
CAB WG15 Details
Formed by the CAB to provide a
“Blueprint of the Conformity Assessment needs of
the Marine Energy Industry”
8 Countries Participating US, CA, GB, DE, SE, FR, JP, KR
Roughly 20 Total Members CBs, Technology Developers, CA Experts
IEC Central Office
Proposed a new CA System (IECRE)
Partnership with Solar (TC82) and Wind (TC88)
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
7th CAB WG Meeting
4/3 – 4/4, 2014 Geneva, IEC Central Offices (CCV)
Held in conjunction with IECRE Forum (4/2 + 4/3)
15+ Participants 5 CBs (2 DNV GL, Lloyd’s, ClassNK, CSA Group)
2 Developers (VP, Resolute Marine)
1 Utility (J Power)
2 CAB Representatives (CA, SE)
3 IEC (CAB, IECEx, IECEE)
3 Observers (Intertek, TC82, IEC)
6 Countries (US, CA, GB, DE, SE, JP)
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
Certification (Type + Project)
From TC88
(61400-22)
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
CAB WG15 Issues
Need IEC/ISO Standards for Certification
Absence of International Standards
Critical for TC114 and Industry
Questions about short term -100 and -200 are available for use (Test Reports)
Component certification (Existing Standards, ODs)
Propose new work item proposal to TC114
Process Management Plan
Need more participation
Technology Developers, End Users, etc.
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
CAB Accepted IECRE System
New CA System Draft Basic Rules completed
-Pending CAB approval June, 2014
CAB approved Renewable Energy CA System
-IECRE (Called IECRE Forum for now)
Include multiple Sectors/TCs:
-Solar (TC 82, TC117)
-Wind Power (TC88 + WT CAC)
-Fuel Cells (TC105)
-Marine Energy (TC114 + CAB WG15)
-Electrical Energy Storage (TC120)
Interface with CAB WG11 (WG12? / WG16?)
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
Conceptual Structure of IECRE System
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
IECRE Forum Next Steps
-Submit Basic Rules to CAB
-CAB Approval of Basic Rules
-IECRE System Becomes Active
-REMC formed and Sectors begin work
-WTCAC, CAB WG15 + IECRE Forum end
-REMC Kick-off Meeting (US – 9/14)
-Elect officers
-Establish Sector OMCs
-Establish Working Groups/Committees
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
CAB WG15 + IECRE Schedule
6/2014 CAB Meeting (Geneva)
Approve IECRE Basic Rules
Nominate Kerry McManama as Ex. Sec.
Call to NCs
Member Body, Officers, Meeting Dates
CAB WG15 Decommissioning 7/23/2014 Conference Call – RoP revision
8/20/2014 Conference Call – Doc preparation
9/2014 IECRE Kick-off Meetings (US) 2 Day REMC, 1 Day ME OMC `
TC114 Plenary Meeting
April 24-25, 2014
US National
Committee
of the IEC
Industry Next Steps and Needs
-Establish a NC Member Body for IECRE System Work in conjunction with TC82 and TC88
-Determine NC Member Body Governance
-Identify a NC Member Body Secretariat
-Nominate officers for REMC + ME OMC
-Approach CBs, TLs, etc. to join
-Request Stakeholders to join Member Body
TC114 Plenary Meeting
April 24-25, 2014