US National Committee of the IEC TC114 Plenary Meeting Vancouver, Canada April 24-25, 2014 IEC TC114 Plenary Meeting CAB WG15 + IECRE Jonathan Colby Neil Rondorf

IEC TC114 Plenary Meeting CAB WG15 + IECRE · IEC TC114 Plenary Meeting CAB WG15 + IECRE Jonathan Colby ... (Intertek, TC82, IEC) 6 Countries (US, ... Draft Basic Rules completed

Embed Size (px)

Citation preview

US National

Committee

of the IEC

TC114 Plenary Meeting

Vancouver, Canada

April 24-25, 2014

IEC TC114 Plenary Meeting

CAB WG15 + IECRE

Jonathan Colby

Neil Rondorf

US National

Committee

of the IEC

• TRAPS distributed

netted acoustic

system for deep sea

operation

• THAAW sensor for

Arctic awareness

• ASW Continuous

Trail Unmanned

Vehicle (ACTUV)

• Hydrographic

survey remote

operations

• LBS-AUV

integration to

operational

bathymetry

pipeline

• MIW USV

integration

2

Maritime Systems Operation

• Survey operations

& bathymetry

products

• Precision cable

operations

ISR/ASW Sensors,

Systems and Processing

Marine Platforms Unmanned and Autonomous

Systems

High-fidelity Ocean

Modeling and Simulation

Hydrographic Survey and

Cable Operations

• High-fidelity

stimulation

• Training, trainers

& tactical decision

aids

• Tactical systems

development &

test

Sensor Node

in sleep mode

US National

Committee

of the IEC

IEC/TC – 114 Member Countries

US National

Committee

of the IEC

Projects and Future On going project areas

Design

Moorings

Resource (tidal and

wave)

Power Performance (tidal

and Wave)

OTEC

Power Quality

Scale Testing

2nd location assessment

Future areas of work

Acoustics

River resource and power

performance

Load Measurements

Commissioning and De-

commissioning

Power assessment of

arrays

Personnel and Services

TC-114 Plenary meeting

Vancouver, BC April 2014

US National

Committee

of the IEC

IEC Structure

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

CAB WG15 Details

Formed by the CAB to provide a

“Blueprint of the Conformity Assessment needs of

the Marine Energy Industry”

8 Countries Participating US, CA, GB, DE, SE, FR, JP, KR

Roughly 20 Total Members CBs, Technology Developers, CA Experts

IEC Central Office

Proposed a new CA System (IECRE)

Partnership with Solar (TC82) and Wind (TC88)

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

7th CAB WG Meeting

4/3 – 4/4, 2014 Geneva, IEC Central Offices (CCV)

Held in conjunction with IECRE Forum (4/2 + 4/3)

15+ Participants 5 CBs (2 DNV GL, Lloyd’s, ClassNK, CSA Group)

2 Developers (VP, Resolute Marine)

1 Utility (J Power)

2 CAB Representatives (CA, SE)

3 IEC (CAB, IECEx, IECEE)

3 Observers (Intertek, TC82, IEC)

6 Countries (US, CA, GB, DE, SE, JP)

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

Certification (Type + Project)

From TC88

(61400-22)

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

CAB WG15 Issues

Need IEC/ISO Standards for Certification

Absence of International Standards

Critical for TC114 and Industry

Questions about short term -100 and -200 are available for use (Test Reports)

Component certification (Existing Standards, ODs)

Propose new work item proposal to TC114

Process Management Plan

Need more participation

Technology Developers, End Users, etc.

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

CAB Accepted IECRE System

New CA System Draft Basic Rules completed

-Pending CAB approval June, 2014

CAB approved Renewable Energy CA System

-IECRE (Called IECRE Forum for now)

Include multiple Sectors/TCs:

-Solar (TC 82, TC117)

-Wind Power (TC88 + WT CAC)

-Fuel Cells (TC105)

-Marine Energy (TC114 + CAB WG15)

-Electrical Energy Storage (TC120)

Interface with CAB WG11 (WG12? / WG16?)

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

CAB Accepted IECRE System

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

Conceptual Structure of IECRE System

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

IECRE Forum Next Steps

-Submit Basic Rules to CAB

-CAB Approval of Basic Rules

-IECRE System Becomes Active

-REMC formed and Sectors begin work

-WTCAC, CAB WG15 + IECRE Forum end

-REMC Kick-off Meeting (US – 9/14)

-Elect officers

-Establish Sector OMCs

-Establish Working Groups/Committees

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

CAB WG15 + IECRE Schedule

6/2014 CAB Meeting (Geneva)

Approve IECRE Basic Rules

Nominate Kerry McManama as Ex. Sec.

Call to NCs

Member Body, Officers, Meeting Dates

CAB WG15 Decommissioning 7/23/2014 Conference Call – RoP revision

8/20/2014 Conference Call – Doc preparation

9/2014 IECRE Kick-off Meetings (US) 2 Day REMC, 1 Day ME OMC `

TC114 Plenary Meeting

April 24-25, 2014

US National

Committee

of the IEC

Industry Next Steps and Needs

-Establish a NC Member Body for IECRE System Work in conjunction with TC82 and TC88

-Determine NC Member Body Governance

-Identify a NC Member Body Secretariat

-Nominate officers for REMC + ME OMC

-Approach CBs, TLs, etc. to join

-Request Stakeholders to join Member Body

TC114 Plenary Meeting

April 24-25, 2014