Designed and Edited by IT Support Unit of Engineering Division
The Israel Electric Corp. Ltd.
Engineering Projects Group
Engineering Division
Generic Project
KKS Dictionary
(I.E.C. Adaptation)
Document No.: ED-0779/14
Rev. 00 – 04/12/2014
Designed and Edited by IT Support Unit of Engineering Division
Content:
1. List of KKS Function Codes (I.E.C. Adaptation)
2. List of KKS Equipment Codes
3. List of KKS Component Codes
KKS Management System
Functions in Project
01/10/2014
11:50:00
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
A GRID AND DISTRIBUTION SYSTEMS
AC 380 - (420) kV systems
ACA 380 - (420) kV systems (Extra-HV System 400 KV) 08 08,26
AD 220 - (245) kV systems
ADA 220 - (245) kV systems 08 08,26
AE 110 - (150) kV systems !!! 161 kV
AEA 110 - (150) kV systems (HV System 110/161 KV) 08 08,26
AJ 20 - (25) kV systems
AJA 20 - (25) kV systems 08 08,26
AK 10 - (15) kV systems
AKA 10 - (15) kV systems 08 08,26
AP Control consoles
APA Control consoles 05,08 05,08,26
AQ Measuring and metering equipment
AQA Measuring and metering equipment 05,08 05,08,26
AR Protection equipment
ARA Protection equipment 05,08 05,08,26
Page 1 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
A GRID AND DISTRIBUTION SYSTEMS
AS Decentralized panels and cabinets
ASA Circuit breaker appurtenances 08 08,26
ASB Multiplication, conversion, decoupling 08 08,26
ASC Transducer appurtenances 08 08,26
ASJ Automated controls, closed-loop control 08 08,26
ASL Grid simulation, voltage group selection 08 08,26
ASM Measuring equipment 08 08,26
ASN Auxiliary power supply 08 08,26
ASP Recording 08 08,26
ASQ Metering 08 08,26
ASR Protection 08 08,26
ASS Synchronization 08 08,26
AST Transformation (SAT) 08 08,26
ASU Panels and cabinets for auxiliary equipment 08 08,26
ASV Group, intermediate and general terminal blocks 08 08,26
ASW Indication, manual operation, monitoring 08 08,26
ASX Alarm annunciation 08 08,26
AT Transformer equipment
ATA Transformer equipment 08 08,26
AU Open-loop control, checkback and auxiliary equipment
AUA Open-loop control, checkback and auxiliary equipment 08 08,26
AV Marshalling racks
AVA Marshalling racks 08 08,26
Page 2 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
A GRID AND DISTRIBUTION SYSTEMS
AW Instrument panels
AWA Instrument panels 08 08,26
AX Central equipment
AXA Central equipment 05,08 05,08,26
AY Communication equipment
AYA Telephone system (PABX) 05,08 05,08,26
AYB Control console telephone system 05,08 05,08,26
AYC Alarm system (acoustic) 08 08,26
AYD Alarm system (optical) 08 08,26
AYE Fire alarm system 08 08,26
AYF Clock system 08 08,26
AYG Remote control system 05,08 05,08,26
AYH Telemetry system 05,08 05,08,26
AYJ Remote metering system 05,08 05,08,26
AYK HF carrier telephone system 05,08 05,08,26
AYN Staff paging system, hardwired 05,08 05,08,26
AYP Optical monitoring system 08 08,26
AYQ General gas detection system (if not assigned to specific system) 08 08,26
AYS Radiotelephone system 05,08 05,08,26
Page 3 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
B POWER TRANSMISSION AND AUXILIARY POWER SUPPLY
BA Power transmission
BAA Generator leads
Limit: from excl. generator bushings, incl. current and voltage transformers, cooling and ventilation systems to excl. generator transformer low side bushings or to
excl. auxiliary power transformer high side bushings
03,08 03,26
BAB Foundation cabinets (Neutral Grounding System) 03,08 03,26
BAC Generator circuit breaker, also commutating pole circuit breaker, incl. cooling system 03,08 03,26
BAT Generator transformers, including cooling system (UMT) 08 08,26
BAU Earthing and lightning protection systems 03,08 03,26
BAY Control and protection equipment 03,08 03,26
BB Medium-voltage distribution boards and transformers, normal system
BBA MV distribution board (3.3/6.6/6.9 KV) 02,03,05,08,20,23 02,03,05,06,08,17,20,23,25,26,33
BBB MV distribution board (11/11.5/13.2/13.8/22/33 KV) 03,05,08 03,05,08,17,25,26
BBT MV auxiliary power transformers (UAT) 08 08,26
BBY Control and protection equipment 02,03,05,08,20,23 02,03,05,06,08,09,17,20,23,25,26,33
BC Medium-voltage distribution boards and transformers, general-purpose
BCA MV start-up distribution board 05,08 05,26
BCT Start-up, offsite, general-purpose transformers (RAT, CUST) 08 08,17,26
BCY Control and protection equipment 05,08 05,08,17,26
BD Medium-voltage emergency distribution boards and transformers, (diesel) emergency power system 1
BDA MV emergency distribution board 05,08 05,26
BDT MV transformator (SST) 08 08,26
BDY Control and protection equipment 05,08 05,08,26
Page 4 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
B POWER TRANSMISSION AND AUXILIARY POWER SUPPLY
BF Low-voltage main distribution boards and transformers, normal system
BFA LV main distribution board (Load Center) 02,03,05,08,20,23 02,03,05,06,08,09,16,17,20,23,25,26,33
BFB LV main distribution board (Normal MCC) 02,03,05,08,20,23 02,03,05,06,08,09,16,17,20,23,25,26,33
BFT LV auxiliary power transformer (LCT) 02,03,05,08,20,23 02,03,05,06,08,09,16,17,20,23,25,26,33
BFU LV auxiliary power transformer (Gas Heating) 08,20 20,26
BFV LV auxiliary power transformer (Fuel Heating) 08,20 20,26
BFY Control and protection equipment 02,03,05,08,20,23 02,03,05,06,08,17,20,23,25,26,33
BG Low-voltage distribution boards and transformers, (may be used in addition to *BF*, *BH*, *BJ*, *BK* and *BL*)
BGA LV distribution board (3P, 400/690 VAC) 02,03,05,08,20,23 02,03,05,06,07,08,09,15,17,18,20,23,25,26,33
BGP LV distribution board (3P, 230/400 VAC) for Lighting 00,08 00,02,03,05,06,07,08,09,15,16,17,18,20,21,22,23,24,26,33
BGT LV auxiliary power transformer 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BGY Control and protection equipment 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,1516,,17,18,20,23,25,26,33
BH Low-voltage main distribution boards and transformers, general-purpose
BHA LV main distribution board 05,08 05,26
BHT LV auxiliary power transformer 05,08 05,26
BHY Control and protection equipment 05,08 05,26
Page 5 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
B POWER TRANSMISSION AND AUXILIARY POWER SUPPLY
BJ Low-voltage subdistribution boards and transformers, normal system
BJA LV subdistribution board (1P, 230/400 VAC) 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BJT LV auxiliary power transformer 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BJY Control and protection equipment 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BK Low-voltage distribution boards and transformers, (may be used in addition to *BF*, *BH*, *BJ*, *BK* and *BL*)
BKA LV distribution board 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BKT LV auxiliary power transformer 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BKY Control and protection equipment 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BL Low-voltage subdistribution boards and transformers, general-purpose (local switchgear)
BLA LV subdistribution board 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BLT LV auxiliary power transformer 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
BLY Control and protection equipment 00,02,03,05,08,20,23 00,02,03,05,06,07,08,09,15,16,17,18,20,23,25,26,33
Page 6 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
B POWER TRANSMISSION AND AUXILIARY POWER SUPPLY
BM Low-voltage distribution boards and transformers, (diesel) emergency power system 1
BMA LV emergency distribution board (Essential MCC) 05,08 05,09,16,20,26
BMT LV auxiliary power transformer 05,08 05,09,16,20,26
BMY Control and protection equipment 05,08 05,09,16,20,26
BN Low-voltage distribution boards and transformers, (diesel) emergency power system 2 (protection against external impact)
BNA LV distribution board 05,08 05,09,16,20,26
BNT LV auxiliary power transformer 05,08 05,09,16,20,26
BNY Control and protection equipment 05,08 05,09,16,20,26
BP Power installations for variable-speed drives (e. g. for feedwater pump, excitation equipment, not power adjusters in switchgear)
BPA Power installations for variable-speed drives 02,03,05,08,20 02,03,05,20,25,26
BPY Control and protection equipment 02,03,05,08,20 02,03,05,20,25,26
BR Low-voltage distribution boards, uninterruptible (converter) power supply
BRA LV distribution board, uninterruptible (converter) power supply (UPS 230 VAC, 1P) 05,08 05,09,16,20,26
BRB LV distribution board, uninterruptible (converter) power supply (UPS 400 VAC, 3P) 05,08 05,09,16,20,26
BRC LV distribution board, uninterruptible (converter) power supply (UPS 120 VAC, 1P) 05,08 05,09,16,20,26
BRD LV distribution board, uninterruptible (converter) power supply (UPS 208 VAC, 3P) 05,08 05,09,16,20,26
BRT Converter (rotary) 02,03,05,08,20 02,03,05,20,25,26
BRU Converter (static), inverter 02,03,05,08,20 02,03,05,20,25,26
BRV Emergency power generating equipment (if not under *X* = Heavy Machinery) 05,08 05,09,16,20,26
BRY Control and protection equipment 02,03,05,08,20 02,03,05,20,25,26
Page 7 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
B POWER TRANSMISSION AND AUXILIARY POWER SUPPLY
BT Battery systems
BTA Batteries 05,08 05,08,26
BTL Rectifiers, battery chargers 05,08 05,08,26
BTW Common equipment 00,08 00,26
BV DC distribution boards, emergency power system 1
BVA DC distribution board (24 VDC) 03,05,08,20 03,05,06,08,09,16,17,18,20,25,26,33
BVB DC distribution board (48/60/125 VDC) 03,05,08,20 03,05,06,08,09,16,17,18,20,25,26,33
BVC DC distribution board (220 VDC) 03,05,08,20 03,05,06,08,09,16,17,18,20,25,26,33
BVP DC distribution board (220 VDC) for Lighting 00,08 00,05,20,26
BVY Control and protection equipment 00,03,05,08,20 00,03,05,06,08,09,16,17,18,20,25,26,33
BY Control and protection equipment
BYA Control and protection equipment 00,05,08 00,05,26
BYB Control and protection equipment 00,05,08 00,05,26
Page 8 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
C INSTRUMENTATION AND CONTROL EQUIPMENT
CA Protective interlocks
CAA Cabinets for protective interlocks 05,08,20 05,08,20,26
CB Functional group control, subloop control
CBA Cabinets for functional group control 05,08 05,26
CBP Cabinets for synchronization 05,08 05,08,26
CBQ Cabinets for auxiliary power changeover 05,08,20 05,08,20,26
CC Binary signal conditioning
CCA Cabinets for binary signal conditioning 05,08 05,08,26
CD Drive control interface
CDA Cabinets for drive control interface 00,03,05,08,20 00,03,05,06,08,17,18,20,25,26,33
CE Annunciation
CEA Cabinets for annunciation systems 05,08 05,08,26
CEJ Fault recording 05,08 05,08,26
CF Measurement, recording
CFA Cabinets for measurement 05,08 05,08,26
CFQ Cabinets for recording (meters, pen recorders) 05,08 05,08,26
CG Closed-loop control (excl. power section)
CGA Cabinets for closed-loop control 05,08 05,08,26
Page 9 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
C INSTRUMENTATION AND CONTROL EQUIPMENT
CH Protection (excl. reactor protection)
CHA Cabinets for generator and transformer protection 05,08 05,26
CHB Cabinets for transformer protection 05,08 05,08,26
CHC Cabinets for HV SWGR protection 05,08 05,08,26
CHE Cabinets for protection (excl. reactor protection) 05,08 05,08,26
CJ Unit coordination level
CJA Unit control system (including cabinets) (SCS) 05,08 05,08,26
CJD Start-up control, setpoint control (unit) (incl. cabinets) 05,08 05,26
CJF Boiler control system (incl. cabinets) 02,05,08 02,05,26
CJJ Instrumentation and control cabinets for steam turbine set (TCS for ST) 03,05,08 03,05,26
CJP Instrumentation and control cabinets for gas turbine set (TCS for GT) 05,08,23 05,23,26
CJU Instrumentation and control cabinets for other main and heavy machinery 02,03,05,08,23 02,03,05,15,17,18,23,26
CK Process computer system
CKA Online supervisory and diagnostic computer (PI) 05,08 05,26
CKJ Access control computer 05,08 05,26
CKN Process computer system (DPMS) 05,08 05,26
CKP Process computer system (GMS) 03,05,08 03,05,26
CM Instrumentation and control equipment
CMA Instrumentation and control equipment - TURBINE HALL AREA NONE 00,05,08 00,05,26
CMB Instrumentation and control equipment - BOILER AREA NONE 0 0
CMC Instrumentation and control equipment - OTHER AREA NONE 0 0
Page 10 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
C INSTRUMENTATION AND CONTROL EQUIPMENT
CP Separate Automation System
CPA Separate automation system (available for use) 00,05,08 00,05,26
CR Programmable process control systems and associated cabinets
CRA Automation system, non-fail-safe 00,05,08 00,05,26
CRJ Automation system, fail-safe 00,05,08,27 00,05,17,26,27
CRK Automation system, high-availability 00,05,08 00,05,26
CRL Enclosure (e.g. cabinet) 00,05,08 00,05,26
CRM Enclosure (e.g. local box) 00,05,08 00,05,26
CRN Process control system (PLC-CS) 00,02,03,05,08,20,23 00,02,03,05,15,17,20,23,25,26,33
CRP Process control system (SCADA) 00,02,03,05,08,20,23 00,02,03,05,15,17,20,23,25,26,33
CRQ Process control system (HVAC/Lighting) 05,08,20 05,06,07,08,20,25,26
CRR Communication (e.g. terminal bus) 05,08,20 05,08,20,25,26
CRS Communication (e.g. plant bus) 05,08,20 05,08,20,25,26
CRT Communication (e.g. field bus) 05,08,20 05,08,20,25,26
CRU Operation and monitoring (DCS) 05,08 05,26
CRV Engineering 05,08 05,26
CRW Control system diagnostics 05,08 05,26
CRX Process optimization 05,08 05,26
CRY Process control Cathodic Protection system 05,08 05,26
CS Instrumentation and control equipment
CSG Instrumentation and control equipment - GENERAL NONE 0 0
CSL Instrumentation and control equipment - LOCAL NONE 0 0
Page 11 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
C INSTRUMENTATION AND CONTROL EQUIPMENT
CU Closed-loop control (power section)
CUA Cabinets for power adjuster 400V AC, e. g. function unit 1 02,03,05,08,20 02,03,05,20,26
CUH Cabinets for power adjuster 02,03,05,08,20 02,03,05,20,26
CUL Cabinets for interposing relays for 24 V DC solenoid valves 02,03,05,08 02,03,05,26
CUM Cabinets for power supply of hardwired control room 05,08 05,26
CUN Cabinets for 24 V DC fuses 03,05,08,20 03,05,06,08,09,16,17,18,20,25,26,33
CUP Cabinets for 230 V DC fuses 03,05,08,20 03,05,06,08,09,16,17,18,20,25,26,33
CV Marshalling racks
CVA Marshalling racks 05,08,20 05,08,20,26
CW Control rooms
CWA Main control consoles 05,08 05,26
CWF Main control panels 05,08 05,26
CWQ Consoles and panels in control rooms 05,08 05,25,26
CX Local control stations (e. g. for solid fuel supply system, ash removal system, cooling water system, diesel engine plant, monitoring of generator
cooling, emergency control station)
CXA Local control station 00,02,03,05,08,20,23 00,02,03,05,17,18,20,23,25,26,33
Page 12 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
C INSTRUMENTATION AND CONTROL EQUIPMENT
CY Communication equipment
CYA Telephone system (PABX) 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYB Control console telephone system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYC Alarm system (acoustic) 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYD Alarm system (optical) 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYE Fire alarm system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYF Clock system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYG Remote control system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYH Telemetry system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYJ Remote metering system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYK HF carrier telephone system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYL Staff paging system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYP Optical monitoring system (Plant TV system) 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYQ General gas detection system (if not assigned to specific system) 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYS Radiotelephone system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
Page 13 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
C INSTRUMENTATION AND CONTROL EQUIPMENT
CY Communication equipment
CYT Intrusion detection system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYU Access control system 00,02,03,05,08,20,23 00,02,03,05,08,17,18,20,23,25,26,33
CYV Plant and production management system 05,08 05,26
CYY Telephone system for commissioning 05,08,22 05,22,26
Page 14 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
E CONVENTIONAL FUEL SUPPLY AND RESIDUES DISPOSAL
EC Distribution of solid fuels
ECA Distribution of solid fuels 0 17
ECY Control and protection equipment 0 17,26
EG Supply of liquid fuels
EGA Receiving equipment incl. pipeline
Limit: from excl. receiving point to excl. tank, incl. pump
DO 16 16
EGB Tank farm
Limit: from incl. tank inlet to incl. tank outlet
DO 16 16
EGC Pump system
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
DO 16 16
EGD Piping system
Limit: from excl. tank outlet to excl. temporary storage system or branch to user
DO 16 16
EGR Residues removal system DO 16 16
EGT Heating medium system
Limit: from excl. branch off supply system to excl. user and from excl. user to excl. inlet to other system
DO 16 16
EGY Control and protection equipment DO 08,16 16,26
Page 15 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
E CONVENTIONAL FUEL SUPPLY AND RESIDUES DISPOSAL
EK Supply of gaseous fuels
EKC Heating system
Limit: from incl. heater inlet to incl. heater outlet
NG 27 27
EKD Main reducing station, expansion turbine
Limit: from incl. main reducing station inlet, expansion turbine inlet to incl. main reducing station outlet, expansion turbine outlet
NG 27 27
EKE Mechanical cleaning, scrubbing
Limit: from incl. inlet of mechanical cleaning, scrubbing system to incl. outlet mechanical cleaning, scrubbing system
NG 27 27
EKG Piping system
Limit: from excl. receiving point to excl. branch to user
NG 27 27
EKT Heating medium system
Limit: from excl. branch off supply system to excl. user and from excl. user to excl. inlet to other system
FW 27 27
EKY Control and protection equipment NG 08,27 27,26
EP Treatment of other fuels (only for combinations of different
EPC Treatment of other fuels (only for combinations of different
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
EPG Treatment of other fuels (only for combinations of different
EX Fluid supply system for control and protection equipment
EXT Fluid supply system for control and protection equipment
Page 16 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
G WATER SUPPLY AND DISPOSAL
GA Raw water supply
GAC Piping and channel system
Limit: from excl. intake or from excl. outlet of other system to excl. inlet to other system
RW 12 12
GAD Storage system
Limit: from incl. storage system inlet to incl. storage system outlet, incl. intake and outfall
RW 12 12
GAF Pump system
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
RW 12 12
GAY Control and protection equipment RW 08,09,12 12,26
GB Treatment system (carbonate hardness removal) incl. cooling
GBB Filtering, mechanical cleaning system
Limit: from incl. separation equipment inlet to incl. separation equipment outlet
20 20
GBF Ton exchange reverse osmosis system (e g for carbonate
Limit: from incl. ion exchanger inlet or from incl. isolating valve of chemicals supply system or auxiliary fluid supply system upstream of ion exchanger
20 20
GBK Piping system, temporary storage system, pump system for
Limit: Piping system: from excl. intake or from excl. outlet of other system to excl. inlet to other system to incl. fluid treatment system outlet Temporary storage
system: from incl. temporary storage system inlet to incl. temporary storage system outlet
20 20
GBL Storage system outside fluid treatment system (if not part
Limit: from incl. inlet storage system to excl. outlet storage system incl. intake and outfall
GBP Regeneration flushing equipment
Limit: from incl. system inlet to excl. inlet to other system from excl. chemicals or auxiliary fluid supply system and flushing air supply system to incl. regenerating,
flushing equipment
20 20
GBY Control and protection equipment 08,20 20,26
Page 17 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
G WATER SUPPLY AND DISPOSAL
GC Treatment system (demineralization)
GCB Filtering, mechanical cleaning system
Limit: from incl. separation equipment inlet to incl. separation equipment outlet
DW 13 13
GCC Aeration, gas injection system
Limit: from excl. atmosphere or from incl. gas supply
DW 13 13
GCF Ion exchange, reverse osmosis system (e.g. for
Limit: from incl. ion exchanger inlet from incl. isolating valve of chemicals supply system or auxiliary fluid supply system upstream of ion exchanger
DW 13 13
GCR Flushing water and residues removal system incl. neutralization for Acid Cleaning
Limit: from excl. outlet of respective system to excl. discharge into disposal system
AC 20 20
GCY Control and protection equipment 08,09 13,26
GH Distribution systems (not drinking water)
GHB Distribution systems after treatment (carbonate hardness
Limit: to excl. inlet to other system
GHC Distribution systems after treatment (demineralization)
Limit: to excl. inlet to other system
DW 13 13
GHG Distribution systems (not drinking water) 20 20
GHY Control and protection equipment 08,09 13,26
GK Drinking water supply
GKB Storage, forwarding, distribution system 20 20
GKX Fluid supply system for control and protection equipment 20 20
GKY Control and protection equipment 08,20 20,26
Page 18 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
G WATER SUPPLY AND DISPOSAL
GM Process drainage system
GMA Process drainage system (free for use e.g. WM
GMB Process drainage system (free for use e.g.
GMF Process drainage system (free for use e g
GMG Process drainage system (free for use e.g.
GMH Process drainage system (free for use e.g.
GMK Process drainage system (free for use e.g.
GN Process drains treatment system
GNB Filtering, mechanical cleaning system
Limit: from incl. separation equipment inlet to incl. separation equipment outlet
GNK Piping system, temporary storage system, pump system for
Limit: Piping system: from excl. intake or from excl. outlet of other system to excl. inlet to other system to incl. fluid treatment system outlet Temporary storage
system: from incl. temporary storage system inlet to incl. temporary storage system outlet
WM 10 10
GNY Control and protection equipment 08,09 10,26
GQ Domestic waste water collection and drainage systems
GQK Domestic waste water collection and drainage systems 20 20
GQY Control and protection equipment 08,20 20,26
GU Rainwater collection and drainage systems incl. treatment
GUE Rainwater collection and drainage systems incl treatment 20 20
GUY Control and protection equipment 08,20 20,26
Page 19 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
H CONVENTIONAL HEAT GENERATION
HA Pressure system, feedwater and steam sections
HAA LP part-flow feed heating system (flue-gas-heated)
Limit: from incl. LP part-flow feed heating system inlet to incl. LP part-flow feed heating system outlet
CD/FW 2 2
HAB HP part-flow feed heating system (flue-gas-heated)
Limit: from incl. HP part-flow feed heating system inlet to incl. HP part-flow feed heating system outlet
2 2
HAC Economizer system
Limit: from incl. oiler inlet header to excl. evaporator inlet incl. control and auxiliary heat transfer surfaces
BW 2 2
HAD Evaporator system
Limit: from incl. evaporator system inlet to incl. evaporator system outlet and to incl. water/steam separator and water collecting vessel
BS,BW 2 2
HAG Circulation system
Limit: from excl. water/steam separator and water collecting vessel to excl. inlet to heat transfer surface system (removal systems are classified under *L..*) or to
excl. feedwater system
BW? 2 2
HAH HP superheater system
Limit: from excl. evaporator system outlet to incl. boiler outlet header
BS 2 2
HAJ Reheat system
Limit: from incl. reheater inlet header to incl. reheater outlet header
BS 2 2
HAN Pressure system drainage and venting systems
Limit: from incl. collecting point or from excl. final drain/vent valve to excl. discharge into other system
2 2
HAY Control and protection equipment 02,08 02,26
Page 20 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
H CONVENTIONAL HEAT GENERATION
HB Support structure, enclosure, steam generator interior
HBA Frame incl. foundations ? 2 2
HBB Enclosures ? 2 2
HBC Brick linings incl. insulating brickwork ? 2 2
HBD Platforms, stairways ? 2 2
HBE Pressure vessel (supercharged boiler) ? 2 2
HBK Steam generator interior
Limit: from excl. furnace to excl. flue gas exhaust
BB 2 2
HF Bunker, feeder and pulverizing system
HFB Feeder system
Limit: from excl. bunker outlet to excl. oversize reject shaft or pulverizing system
2 2
HFC Pulverizing system (incl. classifier)
Limit: from incl. pulverizing system inlet to excl. pulverized coal line
2 2
HFE Mill air system carrier air system
Limit: from incl. air inlet or from excl. branch off *HLA* to excl. downcomer shaft or to excl. pulverizing system or to excl. flue gas recirculation system
2 2
HH Main firing system (electric-powered as well)
HHA Main burners
Limit: from incl. respective fuel-side and air-side burner inlet
2 2
HHY Control and protection equipment 02,08 02,26
HHZ Electric heating system 02,08 02,26
Page 21 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
H CONVENTIONAL HEAT GENERATION
HL Ducting system air
HLA Ducting system
Limit: from incl. air inlet to excl. branch off firing system or mill air system, carrier air system or to excl. branch to *HFE*, excl. fan system, air heater system and
gas turbine exhaust gas system
2 2
HLB Forced draught fan system
Limit: from incl. fan system inlet to excl. fan system outlet
2 2
HLC Air preheating (not flue-gas-heated)
Limit: from incl. heater inlet to incl. heater outlet
2 2
HLD Air preheating system (flue-gas-heated)
Limit: from incl. heater inlet to incl. heater outlet
2 2
HLY Control and protection equipment 02,08 02,26
HN Flue gas exhaust (without flue gas treatment)
HNA Ducting system
Limit: from excl. boiler outlet or from excl. outlet of other system to excl. smoke stack, excl. air heater, flue gas dust handling system, induced-draught fan system,
gas scrubber system, chemical flue gas treatment system
6 6
HNC Induced-draught fan system
Limit: from incl. induced-draught fan system inlet to incl. induced-draught fan system outlet
6 6
HNE Smoke stack system (chimney)
Limit: from incl. inlet
7 7
HNY Control and protection equipment 03,06,08 06,26
Page 22 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
H CONVENTIONAL HEAT GENERATION
HS Chemical flue gas treatment system incl.residues removal, catalytic process - SCR
HSA Flue gas ducting system within *HS*
from excl. *HNA* to incl. evaporator system outlet and to excl. inlet to *HNA*
33 33
HSD Reactor (reduction)
Limit: from incl. inlet to incl. outlet
33 33
HSF Flue gas-side cleaning equipment for reactor
Limit: from excl. branch off supply system
33 33
HSG Reduction agent dilution system
Limit: from excl. outlet of other system or from incl. supply system to excl. reduction agent treatment system
33 33
HSJ Reduction agent supply system incl. storage 33 33
HSK Reduction agent treatment and distribution system
Limit: from excl. reduction agent supply to incl. reduction agent injection incl. coolant inlet
33 33
HSN Drainage systems
Task: water collecting, storage, return
33 33
HSY Control and protection equipment 33 33,26
Page 23 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
H CONVENTIONAL HEAT GENERATION
HT Chemical flue gas treatment system incl.residues removal, absorptive process- FGD
HTA Flue gas ducting system within *HT*
Limit: from excl. *HNA* to excl. inlet to *HNA*
NONE 25
HTD Flue gas scrubbing system
Limit: from incl. flue gas inlet to incl. moisture separator outlet
25
HTF Absorption cycle
Limit: from incl. inlet to incl. outlet
25
HTG Oxidation system incl. supply system
Limit: to excl. user or scrubber
25
HTJ Absorbent supply system incl.storage system
Limit: to excl. mashing (*HTK*)
25
HTK Absorbent preparation and distribution system
Limit: from incl. mashing, slaking to excl. user or scrubber
25
HTL Piping system for discharge of solids 25
HTM Thickening and solids dewatering system
Limit: from incl. inlet to incl. outlet
25
HTP (Solids/ product) forwarding, storage, loading system 25
HTQ Water supply and disposal system 25
HTS Chemicals and additives supply system 25
HTT Drainage systems
Task: water collecting, storage, return
25
HTW Sealing fluid supply system 25
HTX Fluid supply system for control and protection equipment 25
HTY Control and protection equipment 25
Page 24 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
H CONVENTIONAL HEAT GENERATION
HU Flue gas reheating system
HUY Control and protection equipment 25
HX Fluid supply system for control and protection equipment
HXA Fluid supply system for control and protection equipment 2 2
HY Control and protection equipment
HYA Control and protection equipment (free for use) 2 02,08 2
Page 25 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
L STEAM, WATER, GAS CYCLES
LA Feedwater system
LAA Storage, deaeration (incl. feedwater tank)
Limit: from incl. deaerator or tank inlet to incl. tank outlet incl. warm-up equipment and vapour condenser
CD 2 3
LAB Feedwater piping system (excl. feedwater pump and feedwater
Limit: from excl. feedwater tank outlet to excl. boiler inlet header or heat exchanger
FW 4
LAC Feedwater pump system
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
FW 2 3
LAD HP feedwater heating system
Limit: from incl. respective feed heater inlet to incl. respective feed heater outlet incl. desuperheater and cooler
LAE HP desuperheating spray system
Limit: from excl. branch off feedwater piping system to excl. user
FW 4
LAF IP desuperheating spray system
Limit: from excl. pump system discharge nozzle or from excl. branch off other system to excl. user
4
LAY Control and protection equipment 04,08 4
Page 26 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
L STEAM, WATER, GAS CYCLES
LB Steam system
LBA Main steam piping system
Limit: from excl. boiler outlet or from excl. heat exchanger to excl. turbine main stop valve or HP reducing station or turbine bypass or other user (system)
MS 4 4
LBB Hot reheat piping system
Limit: from excl. reheater or moisture separator/reheater outlet to excl. intercept valve or turbine inlet or turbine bypass or other user (system)
HR 4 4
LBC Cold reheat piping system
Limit: from excl. turbine outlet or high pressure reducing station to excl. reheater inlet excl. moisture separator or user (system)
CR 4 4
LBD Extraction piping system
Limit: from excl. branch off crossover line to excl. user (system)
LBF Overpressure suppression and safety device incl. injection
Limit: from excl. inlet to incl. outlet
EH 3
LBG Auxiliary steam piping system
Limit: from excl. receiving point from other system to excl. user (system)
SV,TG 4
LBH Start-up steam system, shutdown steam system
Limit: from excl. boiler outlet or from excl. branch off main steam line, incl. start-up condenser or from excl. outlet of other system to excl. inlet to other systems
ED 2
LBU Common dump line - BLOW OUT BO 20 20
LBW Sealing fluid supply system 4 4
LBY Control and protection equipment 04,08 04,26
Page 27 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
L STEAM, WATER, GAS CYCLES
LC Condensate system
LCA Main condensate piping system (excl. main condensate pump
Limit: from excl. condenser outlet to excl. deaerator inlet or to excl. feedwater pump system (in plants without feedwater tank)
CD 4
LCB Main condensate pump system
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
CD 03,28 3
LCE Condensate desuperheating spray system
Limit: from excl. branch off main condensate piping system or from excl. branch off branch turbine condensate piping system to excl. user
? ? ?
LCF Branch turbine condensate piping system
Limit: from excl. condenser outlet to excl. inlet to other system, excl. branch turbine condensate pump system
LCH HP heater drains system
Limit: from excl. heater outlet to excl. inlet to other systems
FW, CD 3
LCJ LP heater drains system
Limit: from excl. heater outlet to excl. inlet to other systems
HD 4 4
LCL Steam generator drains system
Limit: from excl. branch off pressure system or from incl. start-up flash tank to excl. inlet to other systems
LCM Clean drains system (collecting and return system)
Limit: from incl. collecting tank or from excl. final drain valve or from excl. inlet from other collecting system to excl. inlet to other systems
CD 03,04 03,04
LCP Standby condensate system, incl. storage and pump system
Limit: from excl. branch off other system to excl. inlet to other systems
LCQ Steam generator blowdown system
Limit: from excl. steam generator outlet from incl. blowdown flash tank (caustic flash tank) to excl. inlet to other systems
LCW Sealing and cooling drains system
Limit: from excl. branch off other system to excl. user, incl. recirculation
CD 03,04 03,04
LCY Control and protection equipment 03,08 03,26
Page 28 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
L STEAM, WATER, GAS CYCLES
LD Condensate polishing plant
LDB Filtering, mechanical cleaning
Limit: from incl. separation equipment inlet to incl. separation equipment outlet
CP 20 20
LDK Piping system, temporary storage system, pump system for
Limit: Piping system: from excl. intake or from excl. outlet of other system to excl. inlet to other system to incl. fluid treatment system outlet Temporary storage
system: from incl. temporary storage system inlet to incl. temporary storage system outlet
CP 20 20
LDX Fluid supply system for control and protection equipment
LDY Control and protection equipment 08,20 20,26
LF Common installations for steam, water, gas cycles
LFN Proportioning system for feedwater, condensate system,
LX Fluid supply system for control and protection equipment
LXA Fluid supply system for HYDRAULIC VALAVE ACTUATORS
Page 29 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MA Steam turbine plant
MAA HP turbine
Limit: from incl. steam admission (main stop valve) or combined main stop and control valve to incl. automatic/non-automatic extraction and exhaust nozzles and
to incl. the interfaces with other turbine-internal systems
MS 3 3
MAB IP turbine
Limit: from incl. crossover line, incl. control element or from incl. intercept valve to incl. automatic/non-automatic extraction and exhaust nozzles and to incl. the
interfaces with other turbine-internal systems
TA,HR,ED 3 3
MAC LP turbine
Limit: from incl. crossover line, incl. control element or from incl. intercept valve or steam inlet nozzle (in reheat system without intercept valve) to incl.
automatic/non-automatic extraction and exhaust nozzles and to incl. the interfaces with other t
TA 3 3
MAD Bearings 3 3
MAG Condensing system
Limit: from incl. condenser neck or inlet nozzle to incl. condenser outlet nozzle, incl. connected flash tanks, incl. instrumentation equipment associated with
condenser
CD 03,28 3
MAJ Air removal system FROM CONDENSER
Limit: from excl. condenser outlet to excl. inlet atmosphere
CD 03, 28 3
MAK Transmission gear between prime mover and driven machine
MAL Drain and vent systems
Limit: from incl. collector point or from incl. final drain to excl. discharge into other system
?
MAM Leak-off steam system
Limit: from excl. branch off seal leak-off to excl. discharge into other system
TG 3 3
MAN Turbine bypass station, incl. desuperheating spray system
Limit: from incl. bypass valve and from incl. desuperheating spray valve to incl. steam inlet to condenser
HR,LP 3 3
MAP LP turbine bypass
Limit: from excl. bypass valve and from excl. branch off steam system to excl. condenser
MAQ Vent system (if separate from *MAL*)
Limit: from incl. venting point to excl. discharge into other system
SW 3 3
Page 30 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MA Steam turbine plant
MAV Lubricant supply system
Limit: from incl. dedicated lubricant tank or common lubricant and control fluid tank or from excl. branch off lubricant supply system to excl. user and from excl.
user
TO 3 3
MAW Sealing, heating and cooling steam system
Limit: from excl. branch to excl. casing nozzle of seal steam user and leak-off to excl. condenser or to incl. gland steam condenser or to excl. heating/cooling steam
user
TG,ED 3 3
MAX Non-electric control and protection equipment, incl. fluid EH 3 3
MAY Electrical control and protection equipment 03,08 03,26
Page 31 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MB Gas turbine plant
MBA Turbine, compressor rotor with common casing
Limit: from incl. compressor inlet to incl. compressor outlet from incl. turbine inlet to incl. turbine outlet, incl. exhaust gas diffuser
23 23
MBB Turbine casing and rotor
Limit: from incl. turbine inlet to incl. turbine outlet, incl. exhaust gas diffuser
23 23
MBD Bearings 23 23
MBH Cooling and sealing gas system
Limit: from incl. extraction point to excl. user and from excl. user, incl. leak-off to incl. inlet to other system
23 23
MBJ Start-up unit 23 23
MBK Transmission gear between prime mover and driven machine, 23 23
MBL Intake air, cold gas system incl. intake air preheating
Limit: from excl. atmosphere to excl. combustion chamber or to excl. compressor inlet or to incl. exhaust gas heat exchanger, excl. compressor
23 23
MBM Combustion chamber (gas heating, combustion)
Limit: from incl. cold gas, fuel inlet to incl. hot gas outlet
23 23
MBN Fuel supply system (liquid)
Limit: from excl. branch off main supply line or from incl. temporary (day) tank to excl. combustion chamber or to excl. motive gas generating unit, incl. fuel return
system
23 23
MBP Fuel supply system (gaseous)
Limit: from excl. branch off main supply line to excl. combustion chamber or to excl. motive gas generating unit
23 23
MBQ Ignition fuel supply system (if separate)
Limit: from excl. branch off main supply line or from incl. storage tank to excl. combustion chamber or to excl. motive gas generating unit
23 23
MBR Exhaust gas system (open cycle)
Limit: from excl. combustion chamber or from excl. exhaust gas diffuser to excl. discharge into atmosphere, excl. turbine or to excl. inlet to other system (e. g.
combustion air system)
23 23
MBU Additive system
Limit: from incl. supply to incl. injection
23 23
Page 32 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MB Gas turbine plant
MBV Lubricant supply system
Limit: from incl. dedicated lubricant tank or common lubricant and control fluid tank or from excl. branch off control fluid supply system to excl. user and from excl.
user
23 23
MBW Sealing oil supply system
Limit: from incl. dedicated seal oil tank or from excl. seal oil pump suction line to excl. user and from excl. user
23 23
MBX Non-electric control and protection equipment, incl. fluid 23 23
MBY Electrical control and protection equipment 08,23 23,26
Page 33 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MJ Diesel engine plant
MJA Engine
Limit: from incl. fuel injection nozzle inlet or from incl. air intake nozzles or from incl. cooling water inlet nozzles to incl. exhaust nozzle outlet or to incl. cooling
water nozzle outlet, incl. engine-internal systems
20 20
MJB Turbocharger, blower
Limit: from incl. turbocharger or blower inlet to incl. turbocharger or blower outlet
20 20
MJG Liquid cooling system
Limit: from excl. engine cooling water nozzle outlet or from incl. turbocharger air cooling system inlet to excl. engine cooling water nozzle inlet or to incl.
turbocharger air cooler outlet
20 20
MJH Air intercooling system
Limit: from incl. intercoolerinlet to incl. intercooler outlet to excl. outlet to other cooling systems
20 20
MJK Transmission gear between prime mover and driven machine 20 20
MJN Fuel systems
Limit: from incl. temporary (day) tank or from excl. branch off piping system to excl. fuel injection nozzle inlet
20 20
MJP Start-up unit (incl. flywheel) 20 20
MJQ Air intake system
Limit: from excl. atmosphere to excl. turbocharger or to excl. engine air intake nozzles
20 20
MJR Exhaust gas system
Limit: from excl. engine exhaust nozzle outlet to excl. discharge into atmosphere
20 20
MJV Lubricant supply system
Limit: from incl. dedicated lubricant tank or common lubricant and control fluid tank or from excl. branch off control fluid supply system to excl. user from excl. user
20 20
MJY Control and protection equipment 08,20 20,26
Page 34 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MK Generator plant
MKA Generator, complete, incl. stator, rotor and all integral
Limit: to incl. generator bushing
03,08 3,26
MKB Generator exciter set, including set with electrical 03,08 3,26
MKC Generator exciter set, including set with electrical 03,08 3,26
MKD Bearings 3 3
MKF Stator/rotor liquid cooling system incl coolant supply
Limit: from excl. stator/rotor outlet to excl. stator/rotor inlet Task: dissipate heat produced by stator/rotor to liquid coolant Hint: for cooling oil see *MKU*
3 3
MKG Stator/rotor hydrogen (H2) cooling system, incl. coolant
Limit: from excl. stator/rotor outlet to excl. stator/rotor inlet Task: dissipate heat produced by stator/rotor to hydrogen coolant Hint: for nitrogen / carbon dioxyde
cooling see *MKH*
3 3
MKH Stator/rotor nitrogen (N2)/carbon dioxyde (CO2) cooling
Limit: from excl. stator/rotor outlet to excl. stator/rotor inlet Task: dissipate heat produced by stator/rotor to nitrogen / carbon dioxyde coolant Hint: for other gas
cooling see *MKG*
3 3
MKJ Stator/rotor air cooling system, incl. coolant supply
Limit: from excl. stator/rotor outlet to excl. stator/rotor inlet Task: dissipate heat produced by stator/rotor to air coolant Hint: for other gas cooling see *MKG* and
*MKH*
0 3
MKQ Exhaust gas system (if separate from *MKG* and *MKH*) 3 3
MKU Stator/rotor cooling oil cooling system, incl. coolant
Limit: from excl. stator/rotor outlet to excl. stator/rotor inlet Task: dissipate heat produced by stator/rotor to cooling oil coolant Hint: for other liquid cooling see
*MKF*
3 3
MKV Lubricant supply system (if separate system for generator) 3 3
MKW Sealing fluid supply system
Limit: from excl. branch off sealing oil supply system to excl. stator inlet and from excl. stator outlet to excl. inlet to other system or in closed systems from excl.
stator outlet to excl. stator inlet
3 3
MKX Fluid supply system for control and protection equipment 3 3
MKY Control and protection equipment 03,08 3,26
Page 35 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
M MAIN MACHINE SETS
MM Compressor plant
MMA Compressor incl. internal systems
Limit: from incl. air, cooling fluid inlet to incl. air, cooling fluid outlet
15 15
MMY Control and protection equipment 03,08,15 15,26
MP Common installations for main machine sets
MPB Sheathing 3 3
MPR Forced cooling system 3 3
MY Control and protection equipment
MYA Control and protection equipment (free for use) 03,08 3,26
Page 36 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
P COOLING WATER SYSTEMS
PA Circulating (main cooling) water system
PAA Extraction, mechanical cleaning for direct cooling
Limit: from incl. intake system to incl. mechanical cleaning system outlet
SW 9 9
PAB Circulating (main cooling) water piping and culvert system
Limit: from excl. outlet of circulating (main cooling) water extraction system (excl. any user) to incl. outfall in direct cooling system or from excl. cooling tower
outlet to excl. cooling tower inlet in recirculation cooling system
9 9
PAC Circulating (main cooling) water pump system
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
9 9
PAD Recirculating cooling system, outfall cooling system
Limit: from incl. hot water riser to incl. basin outlet
PAE Cooling tower pump system (if separate) SW 9 9
PAH Condenser cleaning system, incl. all appurtenances SW 9 9
PAR Make-up water piping system
Limit: from excl. intake to excl. inlet to other system
SW 9 9
PAX Fluid supply system for control and protection equipment 9 9
PAY Control and protection equipment 08,09 9,26
PB Circulating (main cooling) water treatment system
PBA Discharge from fluid treatment system (if not part of
Limit: from excl. fluid treatment system outlet to excl. inlet to other system
SW 9 9
PBB Filtering, mechanical cleaning system
Limit: from incl. separation equipment inlet to incl. separation equipment outlet
SW 9 9
PBE Acid proportioning system (e.g. for carbonate hardness
Limit: from incl. acid dosing equipment or from excl. branch off chemicals supply system to excl. inlet to other system
20 20
PBQ Injection system for main fluid
Limit: from incl. injection equipment or from excl. branch off chemicals supply system to excl. inlet to other system
PBY Control and protection equipment 08,09 9,26
Page 37 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
P COOLING WATER SYSTEMS
PC Service (secondary cooling) water system, conventional area
PCB Piping and culvert system
Limit: from excl. outlet of service (secondary cooling) water extraction system or from excl. branch off circulating water system to excl. inlet to other system, excl.
respective user and from excl. make-up water treatment and distribution system
SW 9 9
PCC Pump system
Limit: from incl. pump system suction nozzle to incl. pump system discharge nozzle
SW 9 9
PCY Control and protection equipment 08,09 09,26
PD Service (secondary cooling) water treatment system,
PDB Filtering, mechanical cleaning system
Limit: from incl. separation equipment inlet to incl. separation equipment outlet
SW 9 9
PDY Control and protection equipment 08,09 09,26
Page 38 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
P COOLING WATER SYSTEMS
PG Closed cooling water system for conventional area
PGA Closed cooling water system for conventional area
PGB Closed cooling water system for conventional area CW 11 11
PGC Closed cooling water system for BLOWDOWN COOLER CW 11 11
PGD Closed cooling water system for OIL ROOM CW 11 11
PGE Closed cooling water system for GENERATOR CW 11 11
PGF Closed cooling water system for conventional area CW 11 11
PGG Closed cooling water system for conventional area CW 11 11
PGH Closed cooling water system for conventional area CW 11 11
PGJ Closed cooling water system for conventional area CW 11 11
PGK Closed cooling water system for conventional area CW 11 11
PGL Closed cooling water system for conventional area CW 11 11
PGM Closed cooling water system for SAMPLING UNIT CW 11 11
PGN Closed cooling water system for conventional area CW 11 11
PGP Closed cooling water system for conventional area CW 11 11
PGQ Closed cooling water system for AUX. BOILER CW 11 11
PGY Control and protection equipment CW 08,09,11 11,26
PH Closed cooling water treatment system for conventional area
PHA Discharge from fluid treatment system (if not part of
Limit: from excl. fluid treatment system outlet to excl. inlet to other system
CW 11 11
PHY Control and protection equipment CW 08,09,11 11,26
Page 39 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
P COOLING WATER SYSTEMS
PM Closed cooling water system for transformers
PMG Closed cooling water system for transformers CW 11 11
PMY Control and protection equipment CW 08,09,11 11,26
PU Common equipment for cooling water systems
PUA Common equipment for cooling water systems (free for use) 11 11
PUN Proportioning system 11 11
PV Lubricant supply system
PVA Lubricant supply system (free for use)
PW Sealing fluid supply system
PWA Sealing fluid supply system (free for use)
PX Fluid supply system for control and protection equipment
PXA Fluid supply system for control and protection equipment
Page 40 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
Q AUXILIARY SYSTEMS
QC Central chemicals supply
QCA Central chemicals supply - HYDRAZIN SUPPLY CF 20 20
QCC Central chemicals supply - SODIUM PHOSPHAT SUPPLY CS 20 20
QCD Central chemicals supply - AMMONIA SUPPLY CF 20 20
QCE Central chemicals supply - TO AUX. BOILER CS, CF 20 20
QCY Control and protection equipment 08,20 20,26
QE General compressed air and carrier air supply
QEB Central compressed air and carrier air distribution system SA 15 15
QEY Control and protection equipment SA 03,08,15 15,26
QF General control air supply
QFA Central control air generation system IA 15 15
QFB Central control air distribution system IA 15 15
QH Auxiliary steam generating system
QHA Pressure system FOR AUX. BOILER SV 20 20
QHE Blowdown system, flash drain system - FROM AUX. BOILER SV 20 20
QHG Boiler water circulation system (also for electrode steam 20 20
QHH Main firing system (also for electric heating) 20 20
QHL Combustion air system (primary air, secondary air) 20 20
QHN Flue gas exhaust (without flue gas treatment) 20 20
QHX Fluid supply system for control and protection equipment
QHY Control and protection equipment 08,20 20,26
Page 41 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
Q AUXILIARY SYSTEMS
QJ Central gas supply, also inert gas
QJB Central gas supply, also inert gas
QJD Central gas supply, also inert gas- NITROGEN SUPPLY AND DISTRIBUTION NT 20 20
QJY Control and protection equipment 08,20 20,26
QL Feedwater, steam, condensate cycle of auxiliary steam
QLA Feedwater system 20 20
QLB Steam system 20 20
QLC Condensate system 20 20
QLD Condensate polishing plant 20 20
QLY Control and protection equipment 08,20 09,20,26
QU Sampling systems for conventional area
QUA Sampling systems FROM FW PS 4 4
QUB Sampling systems FROM BOILER PS 4 4
QUC Sampling systems FROM CD PS 4 4
QUG Sampling systems FROM CONDENSER PS 4 4
QUP Sampling systems - MONITORING SKID PS 4 4
QUY Control and protection equipment PS 04,08 4,26
Page 42 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
S ANCILLARY SYSTEMS
SA Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING
SAA Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAB Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAC Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAD Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAE Heating ventilation air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAF Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAG Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAH Heating ventilation air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAJ Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAM Heating, ventilation, air-conditioning (HVAC) systems for SPECIFIC BUILDING 20 20
SAY Control and protection equipment 08,20 20,26
SC Stationary compressed air supplies
SCA Compressed air generation system IA 15 15
SCB Compressed air distribution system SA 15 15
SCY Control and protection equipment 03,08 15,26
SD Cleaning system (decontamination equipment see *FK*)
SDR Cleaning system (decontamination equipment see *FK*) RW? 28
Page 43 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
S ANCILLARY SYSTEMS
SG Stationary fire protection systems
SGA Fire water system, conventional area FR 12 12
SGC Spray deluge systems, conventional area FR 12 12
SGE Sprinkler systems FR 12 12
SGF Foam fire-fighting systems FR 12 12
SGG Tank roof tank shell cooling systems FR 12 12
SGJ CO2 fire-fighting systems FR 20 20
SGY Control and protection equipment FR 08,09,12 12,26
SM Cranes stationary hoists and conveying appliances
SMA Cranes, stationary hoists and conveying appliances 0 20 20
SMB Cranes, stationary hoists and conveying appliances 0 20 20
SMC Cranes stationary hoists and conveying appliances 0 20
SMD Cranes, stationary hoists and conveying appliances 0 20
SME Cranes, stationary hoists and conveying appliances 0 20
SMM Cranes, stationary hoists and conveying appliances 0 20 20
SMR Cranes, stationary hoists and conveying appliances 0 20 20
SMY Control and protection equipment 0 08,20 20,26
SN Elevators
SNA Elevators (free for use e.g. building specific) 0 20 20
SNY Control and protection equipment 0 08,20 20,26
SR Workshop, stores, laboratory equipment and staff amenities
SRA Hot workshop equipment 0 21 21
SRY Control and protection equipment 08,21 21,26
Page 44 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UA Structures for grid and distribution systems
UAA Switchyard structure - FRONT OF STATION NONE 8 8
UAB Grid systems switchgear building 8
UAC Grid systems control building
UAE Structure for pneumatic control system
UAF Structures for grid and distribution systems (free for use) 8
UAG Structure for transformers 8
UAH Structure for supports and equipment 8
UAM Structure for grid and distribution systems (free for use) 8
UAX Special structure (plant-specific)
UAY Bridge structure
UAZ Ducting structure
Page 45 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UB Structures for power transmission and auxiliary power
UBA Switchgear building - ELEC. (+ CONTROL) BUILDING NONE 5 5
UBB Structure for power transmission and auxiliary power supply
UBC Structure for offsite system transformers 8
UBD Structure for low-voltage auxiliary power transformers 8
UBE Structure for medium-voltage auxiliary power transformers 8
UBF Structure for generator transformers 8
UBG Structure for start-up transformers 8
UBH Structure for oil collecting pits
UBJ Structure for transformer tracks
UBK Transformer assembly building
UBL Structure for busbars NONE 8 8
UBM Structure for transformer cooling systems
UBN Structure for emergency power generating sets (without central water chiller)
UBP Emergency power generating and central water chiller building
UBQ Structure for emergency power generator fuel supply system
UBR Structure for power transmission and auxiliary power supply
UBS Structure for power transmission and auxiliary power supply- LOAD CENTER TRANSFORMER
NONE 8
UBT Structure for power transmission and auxiliary power supply
UBU Structure for power transmission and auxiliary power supply
UBV Structure for power transmission and auxiliary power supply
UBW Structure for power transmission and auxiliary power supply
UBX Special structure (plant-specific)
Page 46 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UB Structures for power transmission and auxiliary power
UBY Bridge structure
UBZ Ducting structure - ELECTRICAL DUCT RUN NONE 26 26
UC Structures for instrumentation and control
UCA Unit control room building
UCB Control station building
UCL Structure for measuring equipment
UCP Cooling water monitoring structure
UCX Special structure (plant-specific)
UCY Bridge structure
UCZ Ducting structure
Page 47 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UE Structures for conventional fuel supply and residues
UEA Structure for unloading of solid fuels NONE NONE 17
UEB Structure for storage of solid fuels
UEC Structure for conventional fuel supply and residues
UED Structure for transport of solid fuels
UEE Structure for treatment of solid fuels
UEF Structure for transfer (e. g. junction tower)
UEG Structure for conversion of solid fuels
UEH Structure for unloading and reception of liquid fuels
UEJ Structure for storage of liquid fuels NONE 16 16
UEK Structure for conventional fuel supply and residues
UEL Structure for forwarding of liquid fuels (e. g. pump house)
UEM Structure for treatment and handling of liquid fuels
UEN Structure for transfer, conversion, storage of gaseous fuels - GAS SYS. STRUCTURES: PRMS+VALVES STATION
NONE 27 27
UEP Structure for conventional fuel supply and residues
UEQ Structure for conventional fuel supply and residues
UER Structure for forwarding of gaseous fuels
UES Structure for conventional fuel supply and residues
UET Structure for ash storage
UEU Structure for ash transport - FLY ASH NONE NONE 19
UEV Structure for ash settling pond - BOTTOM ASH NONE NONE 2
UEW Structure for combustion residues handling
UEX Special structure (plant-specific)
Page 48 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UE Structures for conventional fuel supply and residues
UEY Bridge structure - PIPE&CABLE BRIDGE STRU. FOR FUEL DISTRIBUTION NONE 16 16
UEZ Ducting structure
UG Structures for water supply and disposal
UGA Structure for raw water supply
UGD Structure for demineralization system NONE 13 13
UGE Structure for neutralization system
UGF Structure for fire water supply
UGG Structure for drinking water supply
UGH Structure for rainwater
UGJ Structure for cooling tower make-up water treatment
UGK Flocculant mixing chamber
UGL Flocculator structure, flocculator
UGN Treated water basin
UGP Sludge thickener
UGQ Sludge dewatering building
UGR Sludge storage structure
UGS Structure for water supply and disposal - STRUCTURE FOR WASTE WATER TREATMEN
NONE 10 10
UGU Structure for effluent disposal
UGV Structure for sewerage plant
UGX Special structure (plant-specific)
UGY Bridge structure
UGZ Ducting structure
Page 49 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UH Structures for conventional heat generation
UHA Steam generator enclosure steam generator building (boiler NONE 2 2
UHF Bunker bay
UHL Structure for boiler compressed air supply
UHN Smoke stack, incl. structure for flue gas circulation - CHIMNEY NONE 7 7
UHQ Structure for flue gas filtering system - ESP NONE 6 6
UHR Structure for conventional heat generation - STRU. FOR FLUE GAS TREATMENT SYSTEM (CALALYTIC PROCESS):SCR
NONE 33 33
UHU Structure for flue gas reheating system
UHV Structure for combustion air circulation (e. g. for forced draft fan)
UHW Boiler blowdown structure
UHX Special structure (plant-specific)
UHY Bridge structure
UHZ Ducting structure
Page 50 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UL Structures for steam-, water-, gas-cycles
ULA Feedwater pump house
ULB Emergency feed building
ULC Structure for condensate system NONE 20 20
ULD Structure for condensate polishing plant NONE NONE 20
ULE Structure for emergency supply systems (if separate)
ULN Structure for hydroelectric power plant water impounding works
ULP Structure for hydroelectric power plant intake systems
ULQ Structure for hydroelectric power plant tail-race systems
ULX Special structure (plant-specific)
ULY Bridge structure
ULZ Ducting structure
Page 51 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UM Structures for main machine sets
UMA Steam turbine building NONE 1 1
UMB Gas turbine building NONE 23 23
UMC Gas and steam turbine building (tandem arrangement)
UME Hydraulic turbine building
UMG Pumped storage turbine building
UMJ Diesel engine building
UMM Compressor system building
UMR Gas engine plant building
UMX Special structure (plant-specific)
UMY Bridge structure - PIPE&CABLE DUCT NONE 4 4
UMZ Ducting structure
UN Structures for process energy supply
UNX Special structure (plant-specific)
UNY Bridge structure
UNZ Ducting structure
Page 52 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UP Structures for circulating (cooling) water systems
UPA Circulating (cooling) water intake culvert - SW INLET CHANNEL NONE 9 9
UPB Service (secondary cooling) water intake culvert
UPC Circulating (cooling) water intake structure - MAIN COOLING WATER PUMP STATION NONE 9 9
UPD Service (secondary cooling) water intake structure
UPE Structures for circulating (cooling) water systems
UPF Structures for circulating (cooling) water systems - SW COOLING WATER POND NONE 9 9
UPG Structures for circulating (cooling) water systems - BREAKWATER NONE 9 9
UPH Circulating (cooling) water treatment structure - MARINE WASTE PLANT NONE 9 9
UPJ Service (secondary cooling) water treatment structure
UPK Structures for circulating (cooling) water systems
UPL Structures for circulating (cooling) water systems
UPM Structures for circulating (cooling) water systems
UPN Circulating (cooling) water inlet culvert
UPP Service (secondary cooling) water inlet culvert
UPQ Biocide treatment building
UPR Structures for circulating (cooling) water systems - CHLORINATION PLANT FOR COOLING WATER
NONE 14 14
UPS Debris trough
UPT Screen wash water cleaning structure
UPU Structures for circulating (cooling) water systems
UPV Structures for circulating (cooling) water systems
UPW Structures for circulating (cooling) water systems
UPX Special structure (plant-specific)
Page 53 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UP Structures for circulating (cooling) water systems
UPY Bridge structure
UPZ Ducting structure
Page 54 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UQ Structures for circulating (cooling) water systems
UQA Circulating (cooling) water pump building
UQB Service (secondary cooling) water pump building
UQC Structure for circulating (cooling) water systems
UQD Structure for circulating (cooling) water systems
UQE Structure for circulating (cooling) water systems
UQF Structures for circulating (cooling) water systems
UQG Circulating (cooling) water overflow structure, surge tank
UQH Screen wash water discharge culvert
UQJ Circulating (cooling) water seal pit, incl. circulating -SEAL WELL NONE 9 9
UQK Circulating (cooling) water venting structure
UQL Service (secondary cooling) water surge pond
UQM Service (secondary cooling) water collecting pond
UQN Circulating (cooling) water outfall culvert - SW DISCHARGE CHANNEL NONE 9 9
UQP Service (secondary cooling) water outfall culvert
UQQ Circulating (cooling) water outfall structure
UQR Service (secondary cooling) water outfall structure
UQS Circulating (cooling) water discharge culvert
UQT Service (secondary cooling) water discharge culvert
UQU Circulating (cooling) water spillway structure, incl. circulating (cooling) water aeration structure
UQV Structure for artificial circulating (cooling) water aeration
UQW Routing structure for circulating (cooling) water discharge
UQX Special structure (plant-specific)
Page 55 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UQ Structures for circulating (cooling) water systems
UQY Bridge structure
UQZ Ducting structure
Page 56 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UR Structures for circulating (cooling) water systems (e. g. recirculation cooling)
URA Cooling tower structure (circulating/main cooling water)
URB Cooling tower structure (service/secondary cooling water)
URC Structure for circulating (cooling) water systems
URD Cooling tower pump building (circulating/main cooling water)
URE Cooling tower pump building (service/secondary cooling water)
URF Structure for circulating (cooling) water systems
URG Cooling tower connecting structure
URH Cooling tower outlet structure
URJ Cooling tower outfall culvert
URK Cooling tower return structure
URL Cooling tower return culvert
URM Circulating (cooling) water distribution building
URN Cooling tower bypass structure
URP Cooling tower blowdown structure
URQ Cooling tower blowdown culvert
URR Structure for circulating (cooling) water systems NONE 11 11
URS Structure for circulating (cooling) water systems
URT Structure for circulating (cooling) water systems
URU Structure for circulating (cooling) water systems
URV Structure for circulating (cooling) water systems
URW Structure for circulating (cooling) water systems
URX Special structure (plant-specific)
URY Bridge structure
Page 57 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UR Structures for circulating (cooling) water systems (e. g. recirculation cooling)
URZ Ducting structure
US Structures for ancillary systems
USA Structure for heating, ventilation, air-conditioning (HVAC) systems
USB Structure for space heating systems
USC Structure for stationary compressed air supply system
USG Fire pump house
USH Structure for waterway facilities
USR Structure for conventional waste treatment
UST Workshop and stores building
USU Consumables storage building
USV Laboratory building
USX Special structure (plant-specific)
USY Bridge structure
USZ Ducting structure
Page 58 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UT Structures for auxiliary systems
UTA Supply systems building
UTB Central water chiller building, conventional area
UTC Central water chiller building, nuclear area
UTF Compressed air system building NONE 15 15
UTG Central gas supply systems building (no fuel supply)
UTH Auxiliary steam generator building
UTJ Smoke stack
UTS Chemical storage tank pit -STRUCTURE FOR CHEMICAL STORAGE NONE 20 20
UTX Special structure (plant-specific)
UTY Bridge structure
UTZ Ducting structure
Page 59 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UV Structures for chemical flue gas treatment incl residues
UVA Structure for flue gas-side heat exchanger
UVB Structure for flue gas fan system
UVC Structure for flue gas scrubber, reactor
UVD Structure for adsorbent/absorbent circuit
UVE Structure for reagent supply, incl. preparation/treatment, storage, forwarding
UVF Structure for thickening and solids dewatering, solids drying and compacting system
UVG Structure for chemical flue gas treatment - FGD NONE NONE 25
UVH Structure for (solids/product) forwarding, storage, loading
UVJ Structure for chemical flue gas treatment incl residues
UVK Structure for chemical flue gas treatment incl. residues
UVL Structure for chemical flue gas treatment incl. residues
UVM Structure for catalyst handling and storage
UVN Structure for chemical flue gas treatment incl. residues
UVP Structure for chemical flue gas treatment incl. residues
UVQ Structure for chemical flue gas treatment incl. residues
UVR Structure for chemical flue gas treatment incl. residues
UVS Structure for chemical flue gas treatment incl. residues
UVT Structure for chemical flue gas treatment incl. residues
UVU Structure for chemical flue gas treatment incl. residues
UVV Structure for chemical flue gas treatment incl. residues
UVW Structure for chemical flue gas treatment incl. residues
UVX Special structure (plant-specific)
UVY Bridge structure
Page 60 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UV Structures for chemical flue gas treatment incl residues
UVZ Ducting structure
Page 61 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UX Structures for external systems (power plant-specific)
UXA Structure for seawater desalination plant
UXB Structures for external systems (power plant-specific)
UXC Structures for external systems (power plant-specific)
UXD Structures for external systems (power plant-specific)
UXE Structures for external systems (power plant-specific)
UXF Structures for external systems (power plant-specific)
UXG Structures for external systems (power plant-specific)
UXH Structures for external systems (power plant-specific)
UXJ Structures for external systems (power plant-specific)
UXK Structures for external systems (power plant-specific)
UXL Structures for external systems (power plant-specific)
UXM Structures for external systems (power plant-specific)
UXN Structures for external systems (power plant-specific)
UXP Structures for external systems (power plant-specific)
UXQ Structures for external systems (power plant-specific)
UXS Structures for external systems (power plant-specific)
UXT Structures for external systems (power plant-specific)
UXU Structures for external systems (power plant-specific)
UXV Structures for external systems (power plant-specific)
UXW Structures for external systems (power plant-specific)
UXX Special structure (plant-specific)
UXY Bridge structure
UXZ Ducting structure
Page 62 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UY General service structures
UYA Office and staff amenities building
UYB Staff amenities building
UYC Administration building
UYD Canteen
UYE Gate house
UYF Security gate house
UYG Information center
UYH Training facilities
UYJ Medical center
UYN Railway engine shed
UYP Fire station
UYQ Garage
UYR Automobile workshop
UYS Filling station
UYX Special structure (plant-specific)
UYY Bridge structure
UYZ Ducting structure
Page 63 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
U Civil structures
UZ Structures for transport, traffic, fencing, gardens and other purposes
UZA Works roadways paths incl associated structures - ROADS NONE 22 22
UZC Yards
UZD Parking areas, incl. associated structures
UZE Railway structures
UZF Lifting gear structures
UZJ Fencing and gates
UZK Gardens, incl. structures
UZL Noise abatement structures
UZM Protective structures against external impact (EI)
UZN Structure for flood protection
UZP Structure for bank/shoreline stabilization
UZQ Structure for river regulation
UZR Jetty, quay
UZS Breakwaters
UZT Outdoor area, plots of land and land rights - POWER PLANT SITE NONE 0 0
UZU Site security structure
UZW Residential buildings, residential area
UZX Special structure (plant-specific), scrap yard
UZY Bridge structure
UZZ Ducting structure
Page 64 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
X HEAVY MACHINERY (NOT MAIN MACHINE SETS)
XA Steam turbuine plant
XAY Electrical control and protection equipment 03,08 03,26
XB Gas turbine plant
XBY Electrical control and protection equipment 08,23 23,26
XJ Diesel engine plant
XJA Engine (Diesel Generator)
Limit: from incl. fuel injection nozzle inlet or from incl. air intake nozzles or from incl. cooling water inlet nozzles to incl. exhaust nozzle outlet or to incl. cooling
water nozzle outlet, incl. engine-internal systems
08,20 20,26
XJY Control and protection equipment 08,20 20,26
XK Generator plant
XKA Generator frame, incl. stator, rotor and all integral cooling equipment
Limit: to incl. generator bushing
03,08 03,26
XKC Generator exciter set, including set with electrical braking system 03,08 03,26
XKY Control and protection equipment 03,08 03,26
XY Control and protection equipment
XYA Control and protection equipment 00,03,08,20,23 00,03,20,23,26
Page 65 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
Y MANAGEMENT AND ADMINISTRATION
Y0 Management&administration-project management
Y00 Management&administration-project management NONE 02,03,04,05,0708,09 ,10,11,12,1314,15,2
0,21,22,23,24,26,27,28,30
01,02,03,04,05,06, 07,08,09,10,11,12, 13,14,15,16,17,18, 19,20,21,22,24,25,
26,27,30,33
Page 66 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Project GEN Generic Project (PS + CC)
Code Function Description Old IEC Systems CC Subprojects PS Subprojects
Z WORKSHOP AND OFFICE EQUIPMENT
ZA Workshop and office equipment (free for use)
ZAA Workshop and office equipment (free for use) NONE 20,21,22 20,21,22
Page 67 of 67 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
KKS Management System
Equipment
04/12/2014
10:40:52
Code Equipment Description
Valid for all Projects
A Mechanical equipment
AA Valves, dampers, etc., incl. actuators, also manual; rupturedisk equipment
AB Isolating elements air locks
AC Heat exchangers heat transfer surfaces
AE Turning, driving, lifting and slewing gear (also manipulators)
AF Continuous conveyors, feeders (escalators)
AG Generator units
AH Heating, cooling and air conditioning units
AJ Size reduction equipment, only as part of process
AK Compacting and packaging equipment, only as part of process
AM Mixers, agitators
AN Compressor units, fans
AP Pump units
AS Adjusting and tensioning equipment for non-electrical variables
(to be applied only, if the actuator forms itself a constructive unit with another equipment unit)
AT Cleaning, drying, filtering and separating equipment, excl. *BT*
AU Braking, gearbox, coupling equipment, non-electrical converters
AV Combustion equipment
AW Stationary tooling, treatment equipment
AX Test and monitoring equipment for plant maintenance
Page 1 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
B Mechanical equipment
BB Storage equipment (tanks)
BE Shafts (for erection and maintenance only)
BF Foundations
BN Jet pumps, ejectors, injectors
BP Flow restrictors, limiters, orifices (not metering orifices)
BQ Hangers, supports, racks, piping penetrations
BR Piping, ductwork, chutes
BS Silencers
BT Flue gas catalytic converter modules
BU Insulation, sheathing
Page 2 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
C Direct measuring circuits (Data character A2 following DIN 19227, part 1, September 1973 edition, table 1, initial letter)
CD Density
CE Electrical variables (e.g. current, voltage, power, electr. frequency)
CF Flow, rate
CG Distance, length, position, direction of rotation
CH Manual input as manually operated sensor (e.g. fire detector)
CK Time
CL Level (also for dividing line)
CM Moisture, humidity
CP Pressure
CQ Quality variables (analysis, material properties), other than *CD*, *CM*, *CV*
CR Radiation variables
CS Velocity, speed, frequency (mechanical), acceleration
CT Temperature
CU Combined and other variables
CV Viscosity
CW Weight, mass
CX Neutron flux
CY Vibration, expansion
Page 3 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
D Closed loop control circuits (Data character A2 following DIN 19227, part 1, September 1973 edition, table 1, initial letter)
DD Density
DE Electrical variables (e.g. current, voltage, power, electr. frequency)
DF Flow, rate
DG Distance, length, position, direction of rotation
DK Time
DL Level (also for dividing line)
DM Moisture, humidity
DP Pressure
DQ Quality variables (analysis, material properties), other than *DD*, *DM*, *DV*
DR Radiation variables
DS Velocity, speed, frequency (mechanical), acceleration
DT Temperature
DU Combined and other variables
DV Viscosity
DW Weight, mass
DX Neutron flux
DY Vibration, expansion
Page 4 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
E Analog and binary signal conditioning
EA Open loop control (free for use)
EB Open loop control (free for use)
EC Open loop control (free for use)
ED Open loop control (free for use)
EE Open loop control (free for use)
EG Alarm, annunciation (free for use)
EH Alarm, annunciation (free for use)
EJ Alarm, annunciation (free for use)
EK Alarm, annunciation (free for use)
EM Process computer (free for use)
EN Process computer (free for use)
EP Process computer (free for use)
EQ Process computer (free for use)
ER Reactor protection
EU Combined analog and binary signal conditioning
EW Protection (free for use)
EX Protection (free for use)
EY Protection (free for use)
EZ Protection (free for use)
Page 5 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
F Indirect measuring circuits (Data character A2 following DIN 19227, part 1, September 1973 edition, table 1, initial letter)
FD Density
FE Electrical variables (e.g. electr. efficiency, power)
FF Flow, rate
FG Distance, length, position, direction of rotation
FK Time
FL Level (also for dividing line)
FM Moisture, humidity
FP Pressure
FQ Quality variables (analysis, material properties), other than *FD*, *FM*, *FV*
FR Radiation variables
FS Velocity, speed, frequency (mechanical), acceleration
FT Temperature
FU Combined and other variables
FV Viscosity
FW Weight, mass
FX Neutron flux
FY Vibration, expansion
Page 6 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
G Electrical, Instrumentation and Control equipment
GA Junction boxes and cable/bus bar penetrations (free for use)
GB Junction boxes and cable/bus bar penetrations (free for use)
GC Junction boxes and cable/bus bar penetrations (free for use)
GD Junction boxes and cable/bus bar penetrations (free for use)
GE Junction boxes and cable/bus bar penetrations (free for use)
GF Junction boxes and cable/bus bar penetrations (free for use)
GG Junction boxes and cable/bus bar penetrations (free for use)
GH Electrical and instrumentation and control installation units identified as per process system (e.g. cubicles, boxes)
GJ Processing and storage equipment for automation systems
GK Information display and operator control equipment for process computers and automation systems
GL Limiting equipment (i.g. short circuit current limiting reactor)
GM Junction boxes for light-current systems of national telecommunication services
GN Network equipment
GP Subdistribution/junction boxes for lighting
GQ Subdistribution/junction boxes for power sockets
GR DC generating equipment, batteries
GS Switchgear equipment if not identified under process equipment
GT Transformer equipment
GU Converter equipment
GV Structure-related earthing and lightning protection equipment, surge arrestors
GW Cabinet power supply equipment
GX Actuating equipment for electrical variables
GY Junction boxes for light-current systems (not of national telecommunication services)
GZ Hangers, supports and racks for electrical and telecommunication services)
Page 7 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
H Subassemblies of main and heavy machinery (only to be used in conjunction with *M* = Main machine sets and *X* = Heavy
machinery)
HA Machine stationary assembly
HB Machine rotating assembly
HD Bearing assembly
Page 8 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Equipment Description
Valid for all Projects
J Nuclear assemblies
JA Absorber assemblies
JB Fuel assemblies
(also includes block-type, cluster-type and spherical fuel elements)
JC Breeder assemblies
JD Flow restrictors (assemblies)
JE Burnable absorber assemblies
JF Reflector assemblies
JG Plenum assemblies
JM Moderator assemblies
JN Neutron sources
JS Shielding equipment
JZ Special assemblies
Page 9 of 9 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
KKS Management System
Components
04/12/2014
10:27:25
Code Component Description
Valid for all Projects
- Electrical components (To DIN 40719, part 2, September 1978 edition)
-A Assemblies and subassemblies
-B Transducers for non-electrical to electrical variables and vice-versa
-C Capacitors
-D Binary elements, delay devices, memory devices
-E Special components
-F Protective devices
-G Generators, power supplies
-H Signalling devices
-K Relays, contactors
-L Inductors
-M Motors
-N Amplifiers, controllers
-P Measuring instruments, testing equipment
-Q Power switchgear
-R Resistors
-S Switches, selectors
-T Transformers
-U Modulators, convertors from electrical to other electrical variables
-V Tubes, semiconductors
-W Transmission paths, waveguides, aerials
-X Terminals, plugs, sockets
-Y Electrical positioners, e.g. solenoids (not motors)
-Z Terminations, balancing equipment, filters, limiters, cable terminations
Page 1 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
K Signalling devices
KA Gate valves, globe valves, dampers, cocks, rupture disks, orifices
KB Gates doors dam boards
KC Heat exchangers coolers
KD Vessels/tanks, pools, surge tanks (fluid systems)
KE Turning driving lifting and slewing gear
KF Continuous conveyors feeders
KJ Size reduction machines
KK Compacting packaging machines
KM Mixers agitators
KN Compressors, blowers, fans
KP Pumps
KT Cleaning machines, dryers, separators, filters
KV Burners, grates
KW Stationary tooling and treatment machines for maintenance
Page 2 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
M Mechanical components
MB Brakes
MF Foundations
MG Gearboxes
MK Clutches, couplings
MM Engines, not electrical
MP Permanent connection (if MQ is not enough)
MQ Permanent connection
MR Piping components, ductwork components
MS Positioners, not electrical
MT Turbines
MU Transmission gear, non electrical, converters and boosters other than couplings and gearboxes
Page 3 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Q Instrumentation and control components (non-electrical)
QB Sensors if not structurally integral with *QP*, metering orifices
QH Signalling devices
QN Controllers flybolt governor
QP Measuring instruments, testing equipment
QR Instrument piping
QS Condensation chambers (datum reservoir) in measuring circuits
QT Thermowells and pockets for protection of sensors
Page 4 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
X Signal origins
XA Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XB Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XC Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XD Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XE Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XF Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XG Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XH Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XJ Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XK Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 5 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
X Signal origins
XL Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XM Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XN Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XP Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XQ Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XR Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XS Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XT Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XU Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XV Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 6 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
X Signal origins
XW Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XX Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XY Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
XZ Signal origins (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 7 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Y Signal applications
YA Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YB Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YC Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YD Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YE Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YF Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YG Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YH Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YJ Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YK Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 8 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Y Signal applications
YL Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YM Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YN Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YP Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YQ Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YR Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YS Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YT Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YU Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YV Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 9 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Y Signal applications
YW Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YX Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YY Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
YZ Signal applications (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 10 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Z Gated signals
ZA Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZB Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZC Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZD Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZE Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZF Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZG Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZH Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZJ Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZK Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 11 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Z Gated signals
ZL Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZM Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZN Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZP Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZQ Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZR Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZS Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZT Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZU Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZV Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 12 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי
Code Component Description
Valid for all Projects
Z Gated signals
ZW Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZX Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZY Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
ZZ Gated signals (free for use)
(Subgroups are established as appropriate to the type of instrumentation and control system and are therefore subject to agreement between the parties to the
project.)
Page 13 of 13 פותח והופק ע"י יחידת מחשוב אגף תכנון הנדסי