IEC 60870 gateways needed for SLDC 05.02.2015

IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

  • Upload
    others

  • View
    15

  • Download
    4

Embed Size (px)

Citation preview

Page 1: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC 60870 gateways needed for SLDC

05.02.2015

Page 2: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

Contents

• Connection to SLDC

– 60870 Basic

• Demonstrator 60870

Page 3: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

iPLON Magic Box IEC-60870OVERVIEW

Page 4: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

iPLON – “Magic Box”

Page 5: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

iPLON Magic Box Standard Interface between the PV plant (rooftop or

Power Plant) and the Energy Utility Company

Based on the technical specifications of theGerman requirements of BDEW.

Control of the PV plant is achieved by theactive control of the inverters used in theplant.

Suitable for new plants as well as integratedin existing Power plants.

iGATE Datalogger (with IEC 60870-5-101/104protocols)

Connectivity to cloud based system and SLDCswith DSL, GPRS, VPN, RT, PLCC

I/O system

Supports Modbus, TCP/IP, LON

Page 6: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

iPLON Magic Box Premium Interface between the PV plant (rooftop or Power Plant) and

the Energy Utility Company

Based on the technical specifications of the German

requirements of BDEW

The control of the PV plant is achieved by the active control

of the inverters used in the plant

Used for new plants but also be integrated in existing Power

plants

iGATE Datalogger (IEC 60870-5-101/104 protocols)

Connectivity to cloud based system and SLDCs with DSL,

GPRS, VPN, RT, PLCC

Firewall , Scalable I/O system, Time synchronisation through

GPS (opt.)

Supports Modbus, TCP/IP, LON

Page 7: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

India - Transmission Media

Page 8: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required
Page 9: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC 60870 origin• International Electrotechnical Commission 60870

Standards (IEC 60870)

• 60870 standards are developed by IEC Technical

Committee 57 (Working Group 03)

– Define systems used for telecontrol (supervisory control

and data acquisition) in electrical engineering and power

system automation

– For controlling electric power transmission grids and other

geographically widespread control systems.

– use of standardized protocols, equipment from many

different suppliers can be made to interoperate.

Page 10: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC 60870 – Six Parts

defining general

information

Operating Conditions

Electrical Interfaces

Performance Requirements

Data Transmission

Protocols

Page 11: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC 60870-5 Protocol Standards

• IEC 60870-5-101 Telecontrol tasks (serial communication)

• IEC 60870-5-102 Meter Count

• IEC 60870-5-103 Protection data disposal (within a switchgear)

• IEC 60870-5-104

Telecontrol tasks in IP networks (Network access for IEC 60870-5-101 using standard transport profiles )

Page 12: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC 60870-5-101

• IEC 60870-5-101 [IEC101] is a standard for power system monitoring, control & associated communications for telecontrol, teleprotection, and associated telecommunications for electric power systems

Page 13: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-101 Addressing

Page 14: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC Data types I

Page 15: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-101 Telegrams

Page 16: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-101 Control Field

Page 17: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-101 Balanced / Unbalanced

Page 18: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC Data types II

Page 19: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC Data types III

Page 20: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-101 Data types IV

Page 21: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-101 Interoperability

Page 22: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC-104 Telegram Format

Page 23: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

60870 Test Tools : Mitraware

Page 24: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

60870 Testing Tools : Wireshark

Page 25: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

Future: IEC 61850

Page 26: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

IEC 60870 Interoperability

Page 27: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

Advantages of iPLON – “Magic Box”

• Control unit for decentralized energy production

• Realtime information out of the energy production

• Needed for grid stabilization

• Combination of different energy producer

• Wind, solar, hydro power, diesel engine, storage systems etc.

• Active control of:

• Energy output, Cos Phi, stand by reserve, forecast

Page 28: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

SLDC- Project Developer (PD) Organizational Workflow

Contents Preface : ........................................................................................................................................................... 2

1. Contact Details ......................................................................................................................................... 2

1.1 SLDC........................................................................................................................................................ 2

1.2 Project Developer................................................................................................................................... 2

2. Letter of Recommendation ...................................................................................................................... 2

3. Datapoint List ........................................................................................................................................... 2

3.1 Modbus/Modtcp Datapoint ................................................................................................................... 2

3.2. IEC 60870-5-101/104 Datapoints .......................................................................................................... 2

3.3. Interoperability List ............................................................................................................................... 3

4. Connectivity Details ................................................................................................................................. 3

4.1. 104 ......................................................................................................................................................... 3

4.2.101 ......................................................................................................................................................... 3

5. Time Stamp .............................................................................................................................................. 3

6. Checklist ................................................................................................................................................... 3

Page 29: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

Serial / TCP/IP Serial / TCP/IP

Page 30: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

SLDC- Interoperability Check list

Process information in monitor direction

<1> := Single-point information M_SP_NA_1

<2> := Single-point information with time tag M_SP_TA_1

<3> := Double-point information M_DP_NA_1

<4> := Double-point information with time tag M_DP_TA_1

<5> := Step position information M_ST_NA_1

<6> := Step position information with time tag M_ST_TA_1

<7> := Bitstring of 32 bit M_BO_NA_1

<8> := Bitstring of 32 bit with time tag M_BO_TA_1

<9> := Measured value, normalised value M_ME_NA_1

<10> := Measured value, normalised value with time tag M_ME_TA_1

<11> := Measured value, scaled value M_ME_NB_1

<12> := Measured value, scaled value with time tag M_ME_TB_1

<13> := Measured value, short floating point value M_ME_NC_I

<14> := Measured value, short floating point value with time tag M_ME_TC_1

<15> := Integrated totals M_IT_NA_1

<16> := Integrated totals with time tag M_IT_TA_1

<17> := Event of protection equipment with time tag M_EP_TA_1

<18> := Packed start events of protection equipment with time tag M_EP_TB_1

<19> := Packed output circuit information of protection equipment with time tag M_EP_TC_1

<20> := Packed single-point information with status change detection M_PS_NA_1

Page 31: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

SLDC- Test scriptsContents

1. Test Procedure in SLDC ........................................................................................................... 2

i. Establish Connection between SLDC Scada System and Magic Box ........ 2

ii. Establish Connection between Magic Box and Modbus/Modtcp Slave

Simulator (PC) ................................................................................................................................... 2

iii. Simulation of Configured Datapoints in Modbus/Modtcp Slave

Simulator (PC) ................................................................................................................................... 2

iv. Verification of Simulated Datapoints in SLDC Scada System ...................... 2

2. Test Procedure in Pant ............................................................................................................ 2

i. Establish Connection between Modbus/Modtcp Devices and Magic

Box ............................................................................................................................................................. 2

ii. Establish Connection between Magic Box and IEC-60870-5-101/104

Master Simulator (Mitraware running on PC) ............................................................. 3

iii. Configuration of IEC-60870-5-101/104 Master Simulator with

required Datapoints ...................................................................................................................... 3

iv. Verification of Configured Datapoints in IEC-60870-5-101/104

Master Simulator ............................................................................................................................. 3

3. SLDC – Plant (End to End) Test. .......................................................................................... 3

i. Establish Connection between Magic Box(Plant) to the SLDC Scada

System ..................................................................................................................................................... 3

ii. Verification of Configured Datapoints in SLDC Scada System and

Real-Time Plant Data .................................................................................................................... 3

iii. Confirmation / Handover from SLDC & Plant Incharge ................................. 3

Page 32: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

SLDC IEC-Modbus Mapping

S No Mapping document Description Resposibility Checkbox

Availability date

1 Modbus/ModTCP Datapoints PD o

2 IEC 60870-5-101/104 Indication PD/SLDC o

Control PD/SLDC o

Analog input PD/SLDC o

Page 33: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

Live Demonstration

Page 34: IEC 60870 gateways needed for SLDCre2tn.org/wp-content/uploads/2015/02/iPLON_Victor_Grid... · 2015. 5. 2. · Configuration of IEC -60870 -5 -101/104 Master Simulator with required

Thank You!