SEMINAR | May 11th, 2017

Andrea Bonetti – FMTP POWER AB [email protected]

Relay Protection Applications, Real Time Power System Simulation Tests

IEC 60255-1xx Standards

Page 2: IEC 60255-1xx Standards - OPAL-RT

2013: IEC 1906 Award for the work on Distance Protection Standard

Page 3: IEC 60255-1xx Standards - OPAL-RT

TC 95 – MT4 (Maintenance Team 4)

3

Page 4: IEC 60255-1xx Standards - OPAL-RT

PUBLISHED STANDARDS BY TC 95 – MT4

4

Page 5: IEC 60255-1xx Standards - OPAL-RT

STANDARDS ON THEIR WAY TO GET APPROVED 2017/2018

5

Page 6: IEC 60255-1xx Standards - OPAL-RT

CLOSE LOOK AT IEC 60255-121: DISTANCE PROTECTION

6

Page 7: IEC 60255-1xx Standards - OPAL-RT

WHY?

Page 8: IEC 60255-1xx Standards - OPAL-RT

DISTANCE PROTECTION CHARACTERISTIC… BEFORE

Page 9: IEC 60255-1xx Standards - OPAL-RT

DISTANCE PROTECTION CHARACTERISTIC… IEC 60255-121

9

Page 10: IEC 60255-1xx Standards - OPAL-RT

DISTANCE PROTECTION CHARACTERISTIC… IEC 60255-121

10

Page 11: IEC 60255-1xx Standards - OPAL-RT

DISTANCE PROTECTION CHARACTERISTIC… IEC 60255-121

11

Page 12: IEC 60255-1xx Standards - OPAL-RT

DEFINITION OF OPERATE TIME AND TYPICAL OPERATE TIME

Page 13: IEC 60255-1xx Standards - OPAL-RT

DEFINITION OF OPERATE TIME AND TYPICAL OPERATE TIME

13

Page 14: IEC 60255-1xx Standards - OPAL-RT

DO WE HAVE TOOLS TO PERFORM THE REQUIRED TESTS?

Page 15: IEC 60255-1xx Standards - OPAL-RT

SIR Diagrams

Page 16: IEC 60255-1xx Standards - OPAL-RT

DO WE HAVE TOOLS TO PERFORM THE REQUIRED TESTS?

16

Page 17: IEC 60255-1xx Standards - OPAL-RT

HARMONICS DURING FAULTS

Page 18: IEC 60255-1xx Standards - OPAL-RT

CVT-SIR DIAGRAMS

Page 19: IEC 60255-1xx Standards - OPAL-RT

DO WE HAVE TOOLS TO PERFORM THE REQUIRED TESTS?

19

Page 20: IEC 60255-1xx Standards - OPAL-RT

PLEASE DO NOT FORGET…

20

Page 21: IEC 60255-1xx Standards - OPAL-RT

DOUBLE INFEED TESTS

Page 22: IEC 60255-1xx Standards - OPAL-RT

DOUBLE INFEED TESTS

22

Page 23: IEC 60255-1xx Standards - OPAL-RT

DOUBLE INFEED TESTS

23

Page 24: IEC 60255-1xx Standards - OPAL-RT

DOUBLE INFEED TESTS

24

Page 25: IEC 60255-1xx Standards - OPAL-RT

CT REQUIREMENTS

25

Page 26: IEC 60255-1xx Standards - OPAL-RT

CT REQUIREMENTS

26

Page 27: IEC 60255-1xx Standards - OPAL-RT

CT REQUIREMENTS

27

If is the maximum primary steady-state short-circuit CT current for the considered fault case

Ipr is the CT rated primary currentIsr is the CT rated secondary currentKtot is the total over-dimensioning factor (including

the transient dimensioning factor and the remanence dimensioning factor)

Rct is the CT secondary winding resistanceRba is the total resistive burden, including the

secondary wires and all relays in the circuit.

f

alreq tot sr ct ba

pr

IE K I R R

I

Provided by the relay manufacturer

CT Dimensioning

CT Dimensioning

Application

Application

Page 28: IEC 60255-1xx Standards - OPAL-RT

CT REQUIREMENTS

Page 29: IEC 60255-1xx Standards - OPAL-RT

CT REQUIREMENTS … BEFORE

Page 30: IEC 60255-1xx Standards - OPAL-RT

CONCLUSION