Upload
lamliem
View
226
Download
0
Embed Size (px)
Citation preview
IDS CRONOSIndustry Experience
Complete Reliable Operable NOtam System
IDS Dynamic AIM Solution
Eurocontrol|20 May, 2014
Enzo Brunetti Product [email protected]
Marcello Davide Mannino [email protected] Sales & Marketing
Presentation Overview1) Experience in Dynamic AIS
i. Reference Projectsii. Origins of CRONOS
2) xNOTAM Projecti. Overviewii. Capabilitiesiii. Architectureiv. Compliance to Event Specs
3) The System ‐ CRONOS1) Overview2) Logical Architecture3) (x)NOTAM4) MET
5) Flight Planning6) Briefing
4) ADQ / ADP
5) Conclusions
22/05/2014 2All rights reserved
22/05/2014 3All rights reserved
EXPERIENCE in DYNAMIC AISCRONOS – IDS Dynamic AIS Management System
22/05/2014 All Rights Reserved 4
Pilots & Airlines NOF Operators Aeronautical Users
XNOTAM drivers
Deeply Integrated within IDS AIS System (no duplicated data, PLXintegrated)Web Service orientedGraphical interaction with data on WEB GISStatic database integration
all rights reserved 5
IDS support and contribution
OGC OWS‐8/OWS‐9:Contribution to the implementation of the module for the « dissemination of Digital NOTAM: IDS Broker
SESAR – Support to ENAV on WP7 and WP13 SESAR SWIM Demo:
dissemination of Digital NOTAM via SWIM SWIMMaster Class:
implementation of communication interfaces with CFMU via B2B Services
Eurocontrol Digital NOTAM Event Specification Focus Group:presentation of Digital NOTAM (compliant Event Specification 1) support for the evolution of Event Specification 2
EUROCONTROL “Digital NOTAM and Digital Integrated Briefing Support” (WP 13.2.2):support to the definition of validation plan &report relevant to the Digital NOTAM e digital briefing
22/05/2014
Dynamic AIS Reference Projects
22/05/2014 6
ENAV ‐ Italian ANSPDigital NOTAM Project
TTCAA ‐ Trinidad & Tobago ANSPNOTAM, MET, FPL, & PIB
AEROTHAI ‐ Thailand ANSPNOTAM, MET, FPL, & PIB
Aerocivil – Colombia ANSPNOTAM, MET, & PIB
CAAB – Botswana ANSPNOTAM, MET, FPL, & PIB
IDAC – Dominican Republic ANSPNOTAM, MET, FPL, & PIB
NACL – Zambia ANSPNOTAM, MET, FPL, & PIB
NAATC – Curacao ANSPNOTAM, MET, FPL, & PIB
Oro Navigacija – Lithuania ANSPNOTAM, MET, & PIB
JCAA – Jamaica ANSPNOTAM, MET, FPL, & PIB
Open Geospatial ConsortiumOWS‐8 (2011) & OWS‐9 (2012)
EUROCONTROLDigital NOTAM Event Specification Focus Group
All rights reserved
Digital NOTAM System• Digital NOTAM management• Full SDO AIXM5.1• Wizard FPL Creation• Advanced Briefing• SWIM interfaces
22/05/2014
• Event driven Dynamic AIS data management• Advanced Briefing Functionality• Full SDO AIXM 5.1 Database• SWIM services and AMHS & AFTN• High Availability Architecture• Dual Environment for NOTAM and D‐NOTAMs
7
Traditional NOTAM Management System• NOTAM, OPMET, FPL management &
dissemination• minSDO AIXM Database• Briefing Functionality• High Availability & Replication• AMHS & AFTN Interoperability
All Rights Reserved
Introduction to CRONOS
22/05/2014 8All rights reserved
EXPERIENCE in DYNAMIC AISCRONOS – IDS Dynamic AIS Management System
XNOTAM
xNOTAM Overview
22/05/2014 9
ENAV together with IDS has beencooperating on a three‐year Project (dividedin 3 phases) aimed at implementing aprototype for NOTAM messages digitalizationaccording: AIXM 5.1 standards AIXM 5.1 temporality model GML standards
The aim of the xNOTAM Project is toprovide a framework, resources andsubstantiated proof‐of‐concept of digitalNOTAM concept, in order to support anaccurate and always up‐to‐date commonsituational awareness of aeronauticaloperations environment
All rights reserved
xNOTAM Project
22/05/2014 10
xNOTAM Phase 1:Implementing Dynamic Database linked to AeroDBTraditional NOTAM acquisition and digital translation
xNOTAM Phase2:Flight Plans and Pre‐Flight Information BulletinEnquiry of NOTAM Messages (Digital or TraditionalFormat)
MapWidget Implementation for Web GIS
xNOTAM Phase 3:Digital NOTAM Aeronautical Event Production
A3322/06 NOTAMNQ)LIXX/QXXXX/IV/M/E/000/999/4007N01358E330A)LIMM LIRR LIBBB)0607092045 C)0607092115E)SPECIAL NOTICE: GERMANY 2006 FIFA WORLD CUP -WINNER : ITALYCAMPIONI DEL MONDOCHAMPIONS OF THE WORLDMEISTER DER WELTCHAMPIONS DU MONDECAMPEONES DEL MUNDOCAMPE/ES DO MUNDOMESTERE AV VERDENENKAMPIOENEN VAN DE WERELD
All rights reserved
xNOTAM ENAV project
22/05/2014 11
Pilots & Airlines NOF Operators Aeronautical Users
Enav Project results has been tested with AIS & NOF Operators the results have been tracked – the success of the overall Project identifies other
requirements to be implemented, such as management of Events even for static data Once more, this project has proved the constructive partnership between ENAV and
IDS ENAV potentially could be among the first to go digital
All rights reserved
Compliance to Event Specifications
22/05/2014 12
All Events included into ECTL – Digital NOTAM Event Specification,including the ones defined as “work in progress”
Published special activity area – Activation
Published ATS Airspace –Activation or Deactivation
Ad‐Hoc special Activityarea – creation
Ad‐Hoc ATS airspace –Creation
Route Portion Closure Route Portion Opening
Aerodrome Closure Runway Closure Navaid unserviceable
New Obstacle Other Event
All rights reserved
ENAV CONTACT
• For any question regarding the result of the project you can contact :
Giulio MelilliAir Navigation Service DepartmentAeronautical Information Service
Head of Aeronautical Data Management/Quality and Production [email protected]
22/05/2014 13
22/05/2014 14All rights reserved
IDS CRONOS SYSTEMCRONOS – IDS Dynamic AIS Management System
CRONOS
CRONOS Overview
22/05/2014 15All rights reserved
Single Product Inherits core capabilities of each product Repositions these capabilities to reflect the future paradigm of AIM
Event Driven data management of NOTAM, D‐NOTAM, MET, and FPL informationAdvanced briefing capabilitiesFully Integrated with AIXM 5.1 databaseInteroperable with AMHS, AFTN & SWIM and b2b SvcsInteroperable with other IDS’s ToolsHigh‐availability deployment configuration
22/05/2014 16
CRONOS’ Architecture
22/05/201417
Integration and Communication Patterns
AeroDBAeroDB
CRONOS DBCRONOS DB
ParsingValidationSave
File System
Web‐Services
TCP‐IP
JMS Queue
CRONOS Network Gateway
All Rights Reserved
FTPS‐FTP
SADIS
AFTN
AMHS
SWIM
• PIB query types:Narrow Route, Standard Route, Airspace, & Aerodrome
• PIB direct from FPL• PIB contains consolidatedNOTAM & MET information
• Customizable PIB formats• PIB output in ASCII, HTML/XML, PDF
• Management of ARO MSGs:FPL , SPL, CHG, DLA, CNL, DEP, ARR,EST, CDN,ACP, ALR, RCF, CPL, LAM,RQP, & RQS
• Sends/receives FPL messages to/fromAFTN or AMHS
• ICAO DOC 4444 compliant forms for FPLmessage creation (including 2012 FPL format)
• Validation engine for both domestic and foreign FPLs• Support for Repetitive Flight Plans [RPL]• Flexible FPL querying & reporting• Geographical FPL Route visualization• Automated response to received RQS/RQP messages
• Management of Meteo MSGs: METAR(SA), SPECI(SP), TAF(FT/FC), SIGMET(WS/WC/WV), AIRMET(WA), ARFOR(FA), GAMET(FA), SYNOP(SM),AIR Report (UA), WINTEM(FB), ADWarnings(WO), Tropical Cyclone Advisory(FK), & Volcanic Ash
Advisory(FV)• Sends/receives MET messages to/from AFTN/AMHS and SADIS
• WMO compliant forms for the creation of MET messages
• Validation engine for both domestic and foreign MET messages
• Flexible MET querying & reporting• Automated response to RQM
• Management of NOTAM MSGs: NOTAM (N, R, C), SNOWTAM, ASHTAM, BIRDTAM
• ICAO compliant forms for the creation of all NOTAM types• Validation engine for both domestic and foreign NOTAMs• NOTAM distribution by series• Automatic Checklist generation• Automatic validation of foreign Checklistsand RQN issuance
• Automated response to receivedRQN/RQL/RQO messages
• Flexible NOTAM querying & reporting• Geographical visualization ofNOTAMs
22/05/2014
NOTAM Module
MET Module
Briefing Module
Flight Plan
Module
18
Traditional NOTAM Capabilities
All Rights Reserved
22/05/201419
(Runway and Taxiway)Aerodrome• Closure• Limitation•Other Event• Trigger
ATS Airspace
• Activation / De‐Activation• Creation•Other Event• Trigger
(Waypoints)NavAIDS• Creation• Unserviceable•Other Event• Trigger
(Routes)Airways• Route Portion Closure• Route Portion Opening
(Routes)Airways• Closure•Opening •Other Event• Trigger
SAA Airspace
• Activation / De‐Activation• Creation•Other Event• Trigger
Obstacle• Obstacle Creation• Obstacle Withdrawn•Obstacle Other Event•Obstacle Trigger
• Airport Surface Contamination
Digital NOTAM Capabilities
All Rights Reserved
Aeronautical Event creation/updateDigital NOTAM disseminationDigital NOTAM ReplacementDigital NOTAM CancelationEvents’ ListWizard‐driven creation processEnhanced interaction with Web GIScomponents and aeronautical data
22/05/2014 20
Aeronautical Message Publishing
NOTAM proposal creation/updateNOTAM disseminationNOTAM ReplacementNOTAM Cancelationx‐TAM ListsTraditional ICAO TemplatesMessage Templates
All Rights Reserved
22/05/2014 21All Rights Reserved
Aeronautical Digital Message Publishing
22/05/2014 22All Rights Reserved
Aeronautical Digital Message Publishing
NOTAM Validation Module
22/05/2014 All rights reserved23
High‐Configurable NOTAM Message Validation Engine
Validation Levels per each of the NOTAM fields
Event List per status:Saved/UpdatedIn SendingSubmittedReceivedInvalid Received
22/05/2014 24
Aeronautical Message Auditing
x‐TAM Lists per statusSaved/UpdatedIn sendingSubmittedReceivedInvalid Received Message Auditing
NOTAM History
All Rights Reserved
Collection of OPMET messagesand data from External Systems
Fully compliant MET bulletincollection and distribution
Storage of graphical METproducts
WebGIS visualization of METinformation
MET Capabilities
22/05/201425
All Rights Reserved
Flight Planning Capabilities
22/05/201426
FPL as a Digital Object towhich linking updates
Flight Plan RegistrationWizard based toolAutomatic RoutingFPL Route Assistance usingweb‐GIS interaction andvisualization
Flight Plan 3D VisualizationFPL approval processPIB from FPL production
All Rights Reserved
Flight Planning Interoperability
22/05/201427
SWIM Standard – CFMU IFPSinteroperability
Compose Flight Plans by usingpublished aeronautical valid dataPropose Route for approvalValidate RouteSend FPL and Store Flight ObjectGet Response messages (ATS) fromCFMU
ACKREJDLNCHG…
All Rights Reserved
Flight Planning Capabilities
22/05/201428
SWIM Standard – CFMU IFPS Interoperability
All Rights Reserved
Briefing Capabilities
22/05/201429
5 Types of PIB:FPLArea (2)AirwayAerodrome
PIB Outputs:GraphicalTextual (ASCII)HTML, XML, PDF
IncrementalNotifications:
Triggered Email
All Rights Reserved
22/05/2014 30All rights reserved
ADQ ADPCRONOS – IDS Dynamic AIS Management System
31
User Assisted
Product Assisted
What matters is the information, not how it is distributed or organized in DBs
All Rights Reserved
Dynamic Data Integration
Dynamic Data Integration Event Concept
32
Has a timeof validity
Represents Changes to:Aeronautical dataMeteorological dataFPL data
May be published viadifferent communicationpaths:
eAIP, AIP, ChartWeb
May be Notified viaAeronautical Networks:
AMHSWSAFTN
EVENT
All Rights Reserved
Dynamic Data Integration
Raw Data Events Validated Events Products
Collection Analysis Validation Publication
33All Rights Reserved
Dynamic Data Integration
Dynamic Data IntegrationADP
all rights reserved 34
AIP PublicationsNOTAM Creation/Validation/Submission
ADQ/ADP Chain as is
22/05/2014 All rights reserved35
Data Originator
Not Compliant to ADQ IR Articles:Art. 6 – Quality of the dataArt. 8 – Requirements on tool and softwareArt. 9 – Data Protection
Private Pilot
BriefingFPL Submission NOTAM Proposal
via FAX
Data Receiver,AIS Admin
FAX Receival& Data Entry
Aviation Weather
Not Compliant to ADQ IR Articles:Art. 6 – Quality of the dataArt. 8 – Tools and SoftwareArt. 9 – Data Protection
AIS Operator
Not Compliant to ADQ IR Articles:Art. 4 – datasetArt. 5 – data exchangeArt. 6 – Data qualityArt. 8 – Tools and SoftwareArt. 9 – Data Protection
AMHSAFTN
ADQ/ADP Chain to be
22/05/2014 All rights reserved36
Private Pilot
Advanced BriefingFPL Submission
Digital Aviation Weather
Digital Entry Point with graphical selectionof Aeronautical Static Published DataMetadata (Date/Time of the Information)Structured ITEM E / Aeronautical EventCRC
Data Originator
AMHS
AIS OperatorData ReceiverAIS Admin
(Digital) NOTAM with graphical selection ofAeronautical Static Published Data
Aeronautical Information BriefingDistributed Access to Static and Dynamic Aeronautical Information in acommon and integrated environmenteAIP connectivityIncremental Notification Updates for Pilots
AuditingEfficient Tracking of the main activities on aeronautical data (Who doeswhat, and when)
TechnologyMET InteroperabilitySOA – Compliancy to SWIM standards ready to be usedInteroperability system‐to‐systems and b2b services
Strategic – Leadership in implementing Digital NOTAMLeadership in improving data quality and integrity
Advantages
37All Rights Reserved
Conclusion
22/05/2014 All rights reserved
…..Proven system for traditional message management….compliance to all “+” Digital NOTAM event specifications….event driven data management….SWIM ComplianceDedicated GUIs to CFMU interaction
38
22/05/2014 39
Implementation Services & Architecture
All Rights Reserved