(IDC) INTEGRATED DATA COLLECTION TECHNOLOGY

Presented by: Kevin Pastotnik

Page 2: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Definition and Brief History to the Need

Page 3: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

INTEGRATED DATA COLLECTION TECHNOLOGY

What is IDC?

What drove the need for IDC?

• IDC is an external assessment tool that performs multiple Indirect testing techniques simultaneously; in a single pass.

• Regulations called for 1, 2 or 3 tools depending on inspection cycle

• Budget and time constraints required for multiple passes using legacy equipment

• Application and limitations of tools weren’t always considered• Comprehensive analysis on data couldn’t always be

performed given number of tools used and limitations on the tool itself

Page 4: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Why Were Integrated Surveys Needed?

212145

123116

8563

5834

CorrosionMaterial/Weld Failures

Excavation DamageEquipment

OthersNatural Forces

Incorrect OperationOther Outside Force Damage

Occurrence

Cause of Leak

36460

4341

31202015151210

Body of PipeValves

ComponentPipe Seam

PumpBolted Fitting

Girth WeldJoint

Welded FittingSump

Metering Facility

Occurrence

Location Of Leak

Cost of emergency response phase: , $120,003,070.00

Value of operator property damage, $97,580,657.00

Cost of environmental remediation,

$94,508,863.00

Value of product …

Other public costs,

$13,029,922.00

Public/Private property damages amount,

$11,827,529.00

Other operator costs:,

$261,481,417.00

Leakage Cost

The direct cost of these accidents surpassed $ 600 million. However, not considered was corporate share devaluation that may reach $ billions, as in the April 2010 BP Gulf of Mexico incident.

Source: PHMSA Significant Pipeline Incidents, 2002-2009.

Page 5: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

• From 1994 through 2013, there were an additional941 serious incidents with gas all system type, resulting in 363 fatalities and 1,392 injuries [1]

• A recent Wall Street Journal review found that there were 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline accidents are discovered by local residents, not the companies that own the pipelines [2]

[1] Wikipedia reference to - http://primis.phmsa.dot.gov/comm/reports/safety/serpsi.html?nocache=5339#_ngtrans[2] Alison Sider, Wall Street Journal, Jan. 20, 2014

Why Were Integrated Surveys Needed?

Page 6: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Introduction to the Technology

Page 7: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

IDC Simultaneously Collects:• ACCA – AC Current Attenuation Survey • ACVG – AC Voltage Gradient Survey• DCVG – DC Voltage Gradient Survey

Functionality of IDC

• CIS – Close Interval Survey• Sub-meter GPS Mapping• Pipe Location and Depth-of-Cover Survey• Optional Leak Detection Survey

Page 8: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

ACCA – AC Current Attenuation Survey

What is ACCA?

How does it work?

• A tool that uses an inductive signal to map out simulated current and flow direction

• A transmitter induces simulated current at various adjustable loads.

• A receiver displays the amount of simulated current pickup and current flow direction

What is it used for?• Mapping current flow, response

and distribution• Locating electrolytic and metallic

shorts

Page 9: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

ACVG – AC Voltage Gradient Survey

What is ACVG?• A tool that uses an inductive signal to locate and size coating anomalies

How does it work?• A transmitter induces a signal that

drains at coating anomalies• A receiver and probes locate areas

where the signal drains, then isolates and sizes anomalies based on signal measurements

What is it used for?• Locating and sizing coating anomalies• ACVG is able to find coating anomalies

that can be missed by DCVG

Page 10: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

DCVG – DC Voltage Gradient Survey

What is DCVG?• A tool that uses interrupted CP current to locate and size coating anomalies

How does it work?• Existing, or induced, CP current is interrupted• The interrupted DC potential is measured where CP collects at the coating anomaly • The measured DC IR is used to size coating anomaly

What is it used for?• Locating and sizing

coating anomalies

Page 11: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

CIS

What is CIS?• A tool that collects pipe-to-soil potential

measurements at select intervals to determine cathodic protection levels

How does it work?• A meter and probes are used to collect

DC potentials using wired connections to above ground appurtenances

What is it used for?• To determine cathodic protection levels• Interrupted (On/Off), Static and Native

are the most common types of CIS survey. Each survey type is used to determine different criterion specifications are achieved

– Close Interval Survey

Page 12: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Additional IDC Technologies

GPS Mapping• Sub-meter accuracy • Ability to track access routes and perform quality

control on the integrated data• Ability to GPS map in areas of high foliage and

cover

Pipe Location and Depth-of-Cover Survey• Pipe location and depth-of-cover integrated into

the data stream and used as part of the data analysis

Optional Leak Detection Survey• Ability to perform regulatory leak detection

surveys while GPS mapping areas of concern

Page 13: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Advantages of Application

Page 14: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

• ACCA, ACVG, DCVG, CIS, GPS, Leak Detection +

IDC ALLOWS FOR 6 OR MORE TOOLS IN A SINGLE PASS

Legacy equipment only allows for 1 tool in a single pass significantly increasing the amount of resources and time required to complete a comprehensive survey

Page 15: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Utilizing the data from all tools allows for complete analysis and a more accurate assessment of risk in areas of concern

For Example:• ACVG (vs) DCVG coating anomalies• CIS trends (vs) coating anomalies• CIS potentials (vs) ACCA metallic shorts• ACCA metallic shorts (vs) coating anomalies

IDC ALLOWS FOR INTEGRATED EXTERNAL DATA ANALYIS

Page 16: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Integrating IDC and ILI data allow the user to perform total analysis

For Example:• ACVG / DCVG coating anomalies

(vs) ILI metal loss• ACCA current mapping (vs) ILI below grade

flange location • Pipeline location and DOC (vs) ILI inclination

and POI’s• Historical IDC (vs) historical ILI comparison

IDC and ILI INTEGRATION

Page 17: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

• Reduction in personnel and time required to perform comprehensive survey

• Manages the risk with dig selections using data from only 1 or 2 tools

• Every data point and its coordinates are recorded and saved into an all data export which can later be imported into any data stream, or GIS system

• Every data point can be queried and compared to historical findings

IDC COST EFFECTIVENESS

Page 18: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

• Remotely review data to find additional defects that may have been missed during collection

• Collects continuous GPS and is able to track the equipment operator throughout the survey

• Able to set data point extremity notices so the operator can be advised of AOC’s in real-time

• Every data point is collected in sub-meter GPS, reducing the overall footprint of remediation if necessary

IDC QUALITY CONTROL

Page 19: (IDC) INTEGRATED DATA COLLECTION TECHNOLOGY · 4/30/2015  · 1,400 pipeline spills and accidents in the U.S. 2010-2013. According to the Journal review, four in every five pipeline

Questions