Sl.No. RFP Ref
Page no
RFP Clause
no Existing clause Details Clarification Sought
Bank's Response
1 10 Section 1 : 8.6 The bidder must have successfully implemented CTS Application
Software in minimum two banks in India with at least one of the
Banks handling daily volume of minimum 2 Lakhs (2,00,000) cheque
transactions per day, spread over one or more grids taken together
(Self Declaration giving information regarding (i) Name of Banks,(ii)
Per day processing volumes in each of the banks,(iii) other
applications with which interface has been done; along with
Purchase Order / Agreement Copy to be submitted).
The volume of minimum 2 lakks cheque transactions per day
should be average volume or peak volume ?
Refer to the Corrigendum
2 34 Section 3 : 9.1 9.1. On successful completion of implementation, acceptability test,
receipt of deliverables, go –live, resolution of all issues raised within
3 months of go- live of all the 3 grids, setup of signature and Archival
system and its migration and completion of DR - drill etc, and after
the Purchaser (which shall not be deemed to be an obligation on
the Purchaser) is satisfied with the working of the System, the
Acceptance Certificate in the format given in Section-5, will be
issued to the successful vendor. The date on which such certificate is
signed shall be deemed to be the date of successful commissioning
of the System
The issuance of Acceptance Certificate is open ended and at
the discretion of the Bank. Request the bank to define outer
limit within which the Bank should be bound to issue
Acceptance certificate post Go Live
The Bank will issue the acceptance certificate on acceptance
of entire system.Such certificate will be issued on completion
of all activities as per scope of work and resolution of all
issues within 3 months of Go-Live and fulfill listed
requirements as per the RFP.
3 39 Section 3 : 22.2 22.2. Successful Bidder undertakes to promptly produce all records
and information relating to the Contract/this RFP for the purpose of
inspection and audit of IDBI Bank. Successful Bidder shall provide
access, to officers / employees / representatives / agents or auditors
of the Bank to the premises / places where such records are kept /
maintained. The Bank shall not be duty bound to give any prior
notice to Successful Bidder before carrying out the said inspection
or audit.
Request the Bank to modify provision of not requiring to give
any prior notice. This is to prevent any unauthorized malefide
access to records without due authority from the Bank by any
officer / employee / representative / agents or auditors
claiming to represent the Bank.
The sufficient notice will be given before carrying out Audit.
The authorised person of the Bank will be a part of it.
4 43 Section 3 : 29.1 29.1. In the event of termination of this Contract due to any cause
whatsoever, [whether consequent to the stipulated term of the
Contract or otherwise] the Purchaser shall be entitled to impose any
such obligations and conditions and issue any clarifications as may
be necessary to ensure an efficient transition and effective business
continuity of the project which the Bidder shall be obliged to comply
with and take all available steps to minimize loss resulting from that
termination/breach, and further allow the successor Bidder to take
over the obligations of the erstwhile Bidder in relation to the
execution/continued execution of the scope of this Contract
Request the Bank to exclude applicability of this clause when
the termination of Contract is effected under convenience of
the Bank.
The obligation continue to remain the same irrespective of
the cause and mode of termination.
Banks' Response to prebid queries - For Supply and Implementation of Centralised Image Based
Cheque Truncation System (CTS) solution For IDBI Bank
RFP Ref :- IDBI /PCELL/ RFP/2016-17 /006 dated 08-Aug-2016
IDBI Bank Ltd.
Page 1 of 25
5 44 Section 3 : 29.6 29.6. Termination survives the Contract Request the bank to remove as it is technically and legally not
possible for the termination clause to survive if the Contract is
terminated. Other oligations - fiduciary, privacy, non-disclosure
etc are the kind of secondary obligations that form part of the
contract that can survive the termination.
This is typo error. To be read as " The contract survives the
Termination."
6 47 Section 3 : 41.1 41.1. Purchaser/IDBI shall own and have a right in perpetuity to use
all Intellectual Property Rights which have arisen out of or in
connection with the implementation of the Contract, including all
processes and products which have been developed by the
Bidder/Vendor during the performance of Service(s) and for the
purposes of inter-alia, use or sub-license of Service(s) under the
Contract. The Bidder undertakes to disclose all Intellectual Property
Rights arising out of or in connection with the performance of the
Service(s) to the Purchaser/IDBI and execute all such
agreements/documents and file all relevant applications, effect
transfers and obtain all permits, approvals, consents and no
objections that may be necessary in this regard to effectively
transfer and conserve the Intellectual Property Rights of the
Purchaser/IDBI.
Please clarify if the Bank is looking only for bespoke
development of the CTS application, whose IPR shall be owned
by the Bank / transfered to the Bank. Is not the Bank willing to
accept License to Use an existing, proven Product , as then this
clause cannot be applicable when a Perpetual License to Use is
only being offered.
The Bank is proposing to p+F10rocure/accept non an existing
proven product with non exclusive right to use under license.
Bank will own the IPR for any customisation carried thereon.
7 48 Section 3 : 42.1 42.1. The User Acceptance Tests, which shall involve testing of the
entire set-up including the hardware, and its integration with
application software and within the time limit prescribed by IDBI
Bank with live and test data shall be conducted by Vendor at the
locations prescribed by IDBI Bank. The User Acceptance Test must
be completed to the satisfaction of IDBI, within a time frame
specified by IDBI.
Request the Bank to modify this clause so that it specifies that
the Bank will do the UAT and it is not the bidder's obligation to
do UAT
UAT will be conducted by the Bank as per Scope of Work
mentioned in RFP at locations prescribed by the Bank.
8 48 Section 3 : 42.5 42.5. On successful completion of acceptability test, receipt of
deliverables etc., and after IDBI Bank (which shall not be deemed to
be an obligation on the Purchaser) is satisfied with the working of
the System / CTS, the Acceptance Certificate in the format given in
Annexure, will be issued by IDBI Bank. The date on which such
certificate is signed shall be deemed to be the date of successful
commissioning of the CTS.
The issuance of Acceptance Certificate is open ended and at
the discretion of the Bank. Request the bank to define outer
limit within which the Bank should be bound to issue
Acceptance certificate post Go Live
The Bank will issue the acceptance certificate on acceptance
of entire system. Such certificate will be issued on
completion of all activities as per scope of work and
resolution of all issues within 3 months of Go-Live and fulfill
listed requirements as per the RFP.
9 50 Section 4 : 2.5 2.5. On-site support for one year from the date of Go Live ( support
start date will be based on mutual agreement between the vendor
and the Bank) shall be provided by technical experts conversant
with functionality of proposed CTS solution as envisaged in the RFP.
If Bank requires, the on-site support should extend services like
helpdesk, user management, database management / maintenance,
updating of data, maintaining integrity of data, loading application
upgrades, technical support for ad hoc queries, archival of data etc.
The onsite Resource should be well qualified & competent to handle
the entire project during warranty period.
Request the Bank to please clearly elucidate on the role of the
On-Site support personnel - as the listed expected functions
are both tehcnical support and bank operations. Bank
operations should not be part of the expected roles of such
technical support personnel
Bidder has to ensure that the onsite support resource(s)
should be capable for executing all listed operations
including entire proposed CTS Solution offered by the Bidder
as enumerated in the RFP.
Page 2 of 25
10 50 Section 4 : 3.1 a) The Cheque(s) Truncation solution should be implemented at IDBI
Bank and should be accessed and operated from IDBI Bank's offices
/processing units/ branches / off-site locations / Client Locations.
There are approximately 1851 branches at 1384 Centers (as on July
2016), across the country and employs around 17000 people.
Approximate no. of concurrent employees/users accessing the CTS
system on an average, across India is estimated to be about 2000
nos.
Concurrent user base of 2000 users seems to be very high basis
the no of branches and locations. Should this be interpreted as
named users ?
No change in RFP terms.
11 50 Section 4 : 3.1 b) b) Solution involves Image capturing in hybrid environment i.e.
distributed as well as in central processing environment (at various
Cheque collection points or branches /Central processing /service
branches level / off-site locations / Client Locations), Workflow
based Cheque clearing transaction data processing involving data
entry (i.e. Authorization levels involving Maker Checker concept),
Cheque clearing transactional data transfers and receipts,
Integration with IDBI Bank’s Core Banking solution, Integrating with
RBI / NPCI 's CHI system, Automated Cheque returns processing,
Implementation of Signature verification System and Archival
System, Images and transaction data Storage and Retrieval solution,
Integration with CBS for Clearing Files, Incremental Signature and
Account Master retrieval, On-line fetching of signatures and Account
master from CBS, Integration with various Remote Deposit Kiosks,
handhold devices and various CTS/UV enabled Cheque Scanners
available within the Bank or procured during the currency of the
contract.
Please provide details (Make / Model) of scanners available in
the Bank.
Details of various CTS Cheque Scanners models being used
by the Bank:
1. Neopost LA 400 Series
2. Neopost LSA 200 Series
3. Neopost LSI 100 Series
4. Seac Banche Orion (130 DPM)
5. Panini Vision X (100 DPM)
6. Canon CR 190i UV
7. Any other scanner model, which is not listed or procured
by the Bank during contract period will also have to be
integrated by the Bidder without any additional charges.
12 51 Section 4 : 3.1 e) e) Solution should have capability of handling Virtual Account
Numbers and transactions linked to Virtual Accounts, Credit Card
and Debit Cards as per Bank’s requirements. Solution should also
have provision of Integration, in case existing CBS (Finacle) is
migrated to higher version or new CBS is introduced by the Bank,
without any additional cost during the contract period
(Warranty/AMC).
This clause is asking the vendor to commit to undertake a task
in the future of which the quantum is unknown - at no
additional cost. Such changes can be committed to be
undertaken only under "Change Request" process as per
Section 4 : 4.4 Support - Point d). Request the Bank to modify
this clause
All exisitng integration requirements has to done by the
selected Bidder in the proposed CTS Solution. Further, any
integration requirement on the modules procured during the
contract period (Warranty/AMC) has to be done without any
additional charges.
13 52 Section 4 : 3.2 3.2. The bidders are required to only quote the cost of the
Application Software, Customisation Efforts, Installation Charges
and Third party software licenses. The hardware and third party
software licenses recommendations on which this software would
run are expected to be given by each Bidder. Bank will decide
whether to map the same with the existing hardware and third
party software licenses or if necessary procure the same, if need
arises.
The Bank requires the bidder to quote for Oracle RDBMS
Licenses to be used for CTS as well ?
No, Bank will arrange for the same.
Page 3 of 25
14 53 & 57 Section 4 : 3.3 h) & 4 c) xi. h) Source code for customized application and documentation of
the CTS shall be the property of the IDBI Bank and the same to be
handed over as part of Go Live.
xi. A copy of the source code of the application customised for IDBI
Bank shall be handed over to the Bank. A copy of all subsequent
updates to the source code shall also be handed over to IDBI Bank
after the release/Go Live.
Request Bank to remove this clause as this conflicts with Pg.
88, Functional Requirement, Point 2 - Escrow - marked as Vital
Only customised source code has to be handed over as it is
Bank's Property and can be used for further
development/enhancements. However, ESCROW
arrangement is for keeping the entire source code of
proposed solution under the safe custody of ESCROW
vendor. Hence, no change in the RFP.
15 58 Section 4 : 5 The Bidder/Vendor will provide 1 year warranty from the date of
issuance of Acceptance Certificate. Any defects/ bugs noticed in the
implemented software / Cheque Truncation System / Document
Management System shall be reworked and/or replaced by the
Bidder/Vendor with defect-free components free-of-cost.
Acceptance Certificate will be issued only after resolution of all
issues raised within 3 months post Go Live for all three grids and all
types of sub member banks including all deliverables as demanded
in the RFP
Request the Bank to modify this clause of warranty of 1 year
from date of issuance of Acceptance Certificate to Warranty of
1 year from date of Go Live - as Acceptance Certificate issuance
is open ended and at the discretion of the Bank.
No change in RFP terms
16 69 Section 5 : 5 - Format for
Unconditional Acceptance
of Terms and Conditions
This is to confirm that we unconditionally accept all the terms and
conditions as mentioned in the RFP floated by IDBI Bank Ltd. for the
"Supply and Implementation of Centralised Image Based Cheque
Truncation System (CTS) solution".
Request the Bank to modify this to -
This is to confirm that we accept all the terms and conditions
as mentioned in the RFP floated by IDBI Bank Ltd. for the
"Supply and Implementation of Centralised Image Based
Cheque Truncation System (CTS) solution" or
This is to confirm that we unconditionally accept the RFP
floated by IDBI Bank Ltd. for the "Supply and Implementation
of Centralised Image Based Cheque Truncation System (CTS)
solution"
The word unconditionally stipulates without conditions hence
"unconditionally accept all the terms and conditions" - is self
negating as it is not possible to unconditionally accept
conditions. As a reference, the bank has used the same
sentence in Page 70 - 6 Self Declaration as -
"We have read and understood the aforesaid RFP and we
hereby convey our absolute and unconditional acceptance to
the aforesaid RFP ".
No change in RFP Terms
17 10 Section 1 : 7. Eligibility
Criteria for Bidders - 8.10
The Bidder shall be either ISO 9001-2008 compliant or CMM Level 3
certified company. (Latest audit surveillance report of ISO
certification or CMM certification to be submitted)
ISO 9001-2008 Certification has been upgraded to ISO 9001-
2015. Is ISO 9001-2015 Acceptable?
Bank will accept either of the certificates.
18 19 Section 2 : 8 - Documents
Constituting the bid - 8.1 -
a) - i
Refer Annexure 1 for the Technical Bid contents and formats. Annexure 1 - does not exist in the RFP document. Do we mean
Annexure III for contents of technical Bid. Please confirm.
Yes, Please refere Annexure I for Bidder's Profile and refer
Annexure III for Contents of Technical Bid.
19 20 Section 2 : 8 - Documents
Constituting the bid - 8.1 -
b) - i
Refer Annexure 2 for the Commercial Bid contents and formats. Annexure 2 - does not exist in the rFP document. Do we mean
to refer Page 64, Secition 5, Clause 2 - Commercial Bid Form.
Please confirm
Yes, Please refer Annexure II for Eligibility Criteria and refer
Page No. 64, Section 5, Clause 2 for COMMERCIAL BID FORM.
Page 4 of 25
20 61 Section 4 : 10 - Schedule of
Implementation / Rollout
Clause - 10.1 - Sub Clause 2
System Configuration / Customization / Handover for User
Acceptance Testing (UAT)
30 days from the Completion of Stage-1 or 60 days from the date of
Purchase order, whichever is earlier
Request the Bank to extend time for Customization as the
schedule of Customization without knowing the detailed SRS
of just 30 days is very aggressive and extremely difficult to
committ and in practice achieve.
No Change in RFP terms
21 64 Section 4 : 2 - Commercial
Bid Form
Serial No B - AMC
AMC @_____ % of above Sr. No. 1 (AMC Per year) for four years,
post warranty Support.
Please clarify that the AMC shall be defined as %age of License
and Cummulative Customisation Cost basis the Manday cost
charged for such customization as per CR process as at each
period when AMC is charged i.e. at each Quarter
Refer to the Corrigendum
22 10 Section 1 : 7 - Eligibilty
Criteria for Bidders - clause
8.12
Bidder should have all necessary licenses, permissions, consents,
NOCs, approvals as required under law for carrying out its business
Please provide a list of documents to be furnished against this
eligibility condition.
Self certification to confirm necessary licenses, permissions,
consents, NOCs, approvals as required under law for carrying
out its business and relavent supporting documents may also
provided.
23 88 Section 6 : 1 - Functional
Requirement
General Is it required that the bidder provide comment against
requirements - explaining how the proposed system meets
with the requirement - on the basis of which the Bidder is
providing the response A/C/NC ?
Refer to the Corrigendum
24 90 Section 6 : 1 - Functional
Requirement
Clause 9
The system proposed shall support multiple sessions for the four
legs of clearing process - inward clearing, inward return, outward
clearing and outward return along with extension as well as
Blockage handling. Must be compatible with the RBI / NPCI Clearing
House (CH), Clearing House Interface (CHI) system and the core
banking software of IDBI Bank as well as its Clients (Corporate and
Sub-Member Banks).
Will provision of flexible data import / export / pull APIs be
sufficient to consider compatibility requirement with banking
systems of IDBI Bank and its Clients (Corporate and Sub-
Member Banks) ?
Selected Bidder has to integrate proposed CTS Solution with
Bank's CBS and also proviode multiple formats for generating
clearing files to CBS of all clients (Corporate and Sub-
Member Banks) as per Bank's requirement,
25 90 Section 6 : 1 - Functional
Requirement
Clause 10
The product should be capable of functioning as a stand-alone
solution.
Please explain the requirement of stand-alone solution Proposed CTS Solution should be independent and there
should not be any dependancy on Bank's other systems like
CBS, Signature System etc. End to end clearing and
processing should be handled through proposed CTS
Solution only.
26 90 Section 6 : 1 - Functional
Requirement
Clause 11
System should be compatible to handle all Cheque Scanning devices
available with the major manufacturer, at present and capable to
integrate with all types of Operating Systems. The Bidder has to
integrate all the scanners on all desktop versions available within
the Bank/Branches/Clients. In case, Bank intends to purchase new
Cheque Scanners then, Bidder has to do the integration without any
additional cost during the contract period (Warranty & AMC). Bank
will ensure to provide proper technical clarifications / APIs to the
Bidder for integration.
Please provide details of the Make / Models of scanners
available as on date with the Bank. Additionally, this clause is
asking the vendor to commit to undertake a task in the future
of which the quantum is unknown - at no additional cost. Such
changes can be committed to be undertaken only under
"Change Request" process as per Section 4 : 4.4 Support - Point
d). Request the Bank to modify this clause
Please find details of CTS Cheque Scanners models available
within the Bank, as on date:
1. Neopost LA 400 Series
2. Neopost LSA 200 Series
3. Neopost LSI 100 Series
4. Seac Banche Orion (130 DPM)
5. Panini Vision X (100 DPM)
6. Canon CR 190i UV
7. Any other scanner model, which is not listed or procured
by the Bank during contract period will also be integrated by
the Bidder without any additional charges.
Page 5 of 25
27 91 Section 6 : 1 - Functional
Requirement
Clause 16
Provision for capturing batch wise/ type wise clearing (CTS / Non-
CTS / Special Clearing / MMS) for the following cases:
a. Cheques Only
b. Cheques with Slip (Product Wise)
c. Marking Paper to Follow (P2F) batches at time of scanning itself.
d. Capturing MMS (Mandate Management Scanning) instruments as
per Bank’s requirement.
Is the Bank looking for end-to-end Mandate Processing
capabilities including interfacing to NACH ?
Selected Bidder has to provide mechanism in proposed CTS
Solution to capture images of mandates as per NPCI
requirements regarding Mandate Management Scanning.
28 91 Section 6 : 1 - Functional
Requirement
Clause 17
Facilities of defining touch points to integrate with the solution for
processing Cheque Truncation. The touch points could be Kiosks,
Instrument Drop machines, ATMs having Cheque Truncation
capabilities, Lock Boxes, Remote Deposit Capture (RDC),Handhold
devices (Mobiles/Tablets) etc.
If the CTS application provides push APIs callable by any
external system as long as the API data structures are adhered
to or Pull API based on a common data format - constitute
conformance to this requirement ?
Specific touch points are having their own feature of
generation of data/images and the proposed CTS Solution is
required to be customised in such a way so that it can accept
all data/image files from all available formats/source systems
including push/pull facility.
29 93 Section 6 : 1 - Functional
Requirement
Clause 30
All Clearing reports, Return memo, posting files for Sub-Member
Banks is to be generated from the system along with manual
generation feature and facility for automatically transmission
through Secured channel.
Please clarify what is meant by "manual generation feature" Auto by system and Manual generation by users for specified
facilities should be available in proposed CTS Solution
30 93 Section 6 : 1 - Functional
Requirement
Clause 34
The user interface for branch operations/ Service Branch Operations
/ Corporate Client / Sub-Member Banks should be browser based
only.
Contradicts with requirement of Offline (Page 51, Section 4 : 3 -
Scope of Work, Point 3.1 c). Please explain what is exactly
needed
Online solution needed for all Bank's Branches and Client
locations, who have strong network connectivity to access
online system whereas Offline Solution is needed for those
Bank's/Client's locations, where Network connectivity is not
too stong to transmit the data/images over Network.
31 94 Section 6 : 1 - Functional
Requirement
Clause 37
Should be able to process Instrument(s) of different size and
colours.
This requirement condraticts with the requirement of
conformance to RBI / NPCI Regulations - as different sizes are
not permitted under CTS 2010 Standards (101mm x 39mm).
Please explain requirement
NON-CTS & Mandates instruments, which doesn't follow
NPCI standards as also to capture all other bank's
instruments, which are different in colours.
32 94 Section 6 : 1 - Functional
Requirement
Clause 41
Should be possible to copy the data on CD/Tape/FTP/emails or any
storage media
Please elaborate what data is expected to be made available,
where - for copying to storage media ?
During Network failure cases, Data/images files should be
writable on Media or can be sent through e-mails.
33 94 Section 6 : 1 - Functional
Requirement
Clause 42
System should provide a Document Management facility to store
the Instrument(s) with unique reference numbers for easy retrieval
at later stages.
Please elaborate on what DMS functionality is expected ? Requirement is for Document Management facility through
Archival System, in which capture facility for identification of
the physical instruments required for easy history retrieval.
34 96 Section 6 : 1 - Functional
Requirement
Clause 64
Performance of hardware / software solution proposed should be
optimum with proper performance benchmarks.
Request the Bank to remove performance of hardware as a
requirement.
No change in RFP terms as Selected Bidder has to provide
hardware sizing as per scalability specified by the Bank and
proposed CTS Solution should be optimum with proper
performance benchmarks.
35 96 Section 6 : 1 - Functional
Requirement
Clause 67
The solution should support data mining exercise of the Bank. Please elaborate on what support for data mining is required Bidder has to interface/format in the proposed CTS Solution
with other systems of the Bank, where CTS Data need to be
provided as per Bank's MIS requirements.
36 97 Section 6 : 1 - Functional
Requirement
Clause 68
The system should support flow of data both ways i.e. from
hub/central location to branch and vice-versa. The system should
also prompt data collection/sending at central/sending location.
Please elaborate requirement - "The system should also
prompt data collection / sending at central / sending location" -
is not clear
Two way communication is must which means proposed CTS
Solution should have feature to pick up and transmit clearing
files/reports as per Bank's requirements.
Page 6 of 25
37 97 Section 6 : 1 - Functional
Requirement
Clause 70
System should allow administrators to manage users, groups, roles
and other document management operations.
Please elaborate requirement - "other document management
operations"
Parameter configuration screens should be available in the
proposed CTS Solution. Parameters could be the amount of
cheque, the no. of cheques, batch size, scan timing etc.
38 97 Section 6 : 1 - Functional
Requirement
Clause 74
The proposed CTS Solution should provide interface with other
software as required by the Bank.
Please explain in detail as to what other softwares, what
interface(s) are expected - as this is too open-ended to provide
a response
Bidder has to interface/format in the proposed CTS Solution
with other systems of the Bank, where CTS Data need to be
provided as per Bank's MIS requirements.
39 97 Section 6 : 1 - Functional
Requirement
Clause 75
The software should have single database structure across different
modules of the system.
Request the Bank to remove this requirement - as this is a
restriction on design of the application and does not lend any
functional use to the Bank
No change in RFP terms.
40 98 Section 6 : 1 - Functional
Requirement
Clause 85
Should provide online interface to extract data from the Clearing
and truncation system to feed IDBI Bank's other application on need
basis.
Please elaborate requirement - "online interface to extract
data" - what data, where made available, in what form ?
Online Interface to generate CTS Data to feed into other
applications. However, Data format requirements will only
be shared with the successful bidder.
41 99 Section 6 : 1 - Functional
Requirement
Clause 102
The solution should also be compatible and integrate/ handshake/
interface with all third party software / middleware of the Bank
(Like CMS / Debt Payout System etc.)
Please elaborate requirement - "compatible and integrate/
handshake/ interface with all third party software /
middleware of the Bank" - as the requirment is too open-
ended to provide a response
Interface requirements will only be file based / images
sharing with other systems as per Bank's current and future
requirements.
42 100 Section 6 : 1 - Functional
Requirement
Clause 109
System to provide open format with encryption feature for all the
data to be archived / to be made compatible with other sources of
data & images.
Please elaborate requirement as this is too open-ended to
provide a response
Bidder has to provide open format with encryption feature in
proposed CTS Solution, which can be used by the Bank for
future requirements.
43 101 Section 6 : 1 - Functional
Requirement
Clause 115
Should provide Batch interface/Grid wise/location wise to extract
data from the Clearing and truncation system to feed IDBI Bank's
other application on need basis.
Please elaborate requirement as this is too open-ended to
provide a response
Bidder has to interface/format in the proposed CTS Solution
with other systems of the Bank, where CTS Data need to be
provided as per Bank's MIS requirements.
44 101 Section 6 : 1 - Functional
Requirement
Clause 116
System should be able to interface and be compatible with IDBI
bank’s existing Archive system.
Please elaborate requirement as to what is the existing Archive
System, what interface is expected ?
Existing Archival system is provided by existing and earlier
CTS Application vendors and Bank like to integrate all history
data into proposed Archvial Solution being provided by the
bidder.
45 102 Section 6 : 2 - Technical
Requirement
Clause 5
The System should have web-based scanning module for Bank’s
Branches / Service Centers / Corporate Clients / Sub-Member Banks
with proper authentication mechanism through intranet & internet
communications and segregation of Clearing Types (CTS / Non-CTS /
Special Clearing / MMS etc.). Apart from CTS Scanner’s driver
installation, there should not be any additional client based setup
required to activate the scanners.
Is it acceptable if additionally a runtime environment (like JRE)
is also required to be installed locally on the client ?
Yes. Mandatorily pre-requisites for Scanner installation can
be accepted depending upon mutual acceptance between
Bank and the bidder.
Page 7 of 25
46 102 Section 6 : 2 - Technical
Requirement
Clause 6
Capability for segregating Deposit Slips and MICR-Failure
instruments in separate output pockets of Cheque Scanners or
depending on Bank’s requirements. All available scanners within the
Bank are having dual/multi output pockets.
Please provide details of the Make / Models of scanners
available as on date with the Bank.
Details of CTS Cheque Scanners models available within the
Bank, as on date:
1. Neopost LA 400 Series
2. Neopost LSA 200 Series
3. Neopost LSI 100 Series
4. Seac Banche Orion (130 DPM)
5. Panini Vision X (100 DPM)
6. Canon CR 190i UV
7. Any other scanner model, which is not listed or procured
by the Bank during contract period will also be integrated by
the Bidder without any additional charges.
47 107 Section 6 : 2 - Technical
Requirement
Clause 47
Dynamic parameter based screen inquiry to allow the user to input
specific parameter and get the results they need.
Please elaborate on the requirement as to what input, for
what type of data, what results, how results to be shown ?
Dynamic inquiry screen feature is to be provided so that User
can select the data requirement and generate result as per
requirement.
48 108 Section 6 : 2 - Technical
Requirement
Clause 53
The system should have provision for migration of account master /
mandate / Signature from Finacle to proposed solution if required
by IDBI Bank and there should be front end/menu driven facility for
importing incremental data and signatures on daily basis.
Request the Bank to remove the requirement of enabling
uploads of signatures through Front-end (front end image
uploads) - as these bulky uploads will have huge negative
impact on performance. Recommend the Bank to modify this
to a back-end service requirement - that can be invoked from
the front-end - server to server image uploads rather than
front-end image uploads.
Process invoking should be front ending. However, backend
services can be executed to complete the desired task.
Bidder has to ensure that process should be straight and
simple.
49 108 Section 6 : 2 - Technical
Requirement
Clause 54
The solution should have the feature of setting up SSO and other
security measures including access control and authentication.
Please elaborate on SSO requirement - is it requiring AD / LDAP
integration or Single Sign On (inheritence of Authenticated
users from Bank Domain) ?
Proposed solution should have both provision and
depending upon Bank's requirement, the finalised approach
will be shared with successful bidder.
50 108 Section 6 : 2 - Technical
Requirement
Clause 56
The system should be portable with latest version and Processor of
the relevant Operating System.
Please provide details of the processor and OS to which
compatibility is to be offered
Hardware and OS recommendations with latest version are
to be provided by the Bidder only.
51 108 Section 6 : 2 - Technical
Requirement
Clause 61
The software should be accessible from Client PCs with Internet
Explorer version8 and above.
Please provide details of all the browsers and the versions to
which compatibility is required
Internet Explorer version8 and above.
52 109 Section 6 : 2 - Technical
Requirement
Clause 64
Selection of branch for scanning to be done from list of branches
attached to that hub or BCP branch under respective grid location.
Please elaborate on the requirement as to what selection is
required ? Linking of a defined user to "home branch" / SOLID
?
Proposed CTS Solution should allow user to scan instruments
under any of Branch by selecting from drop down list from
tagged region.
53 109 Section 6 : 2 - Technical
Requirement
Clause 70
All the relevant details viz., date of processing, branch chosen, batch
no., scanner id, etc. should appear on screen at the time of
scanning.
Request the Bank to remove the requirement of displaying /
selection of Scanner ID and limiting it to selecting scanner
make / model (due to various scanner makes available with the
Bank)
No change in RFP terms
54 109 Section 6 : 2 - Technical
Requirement
Clause 72
DR site & NDR (if any) setups to be configured in auto-replication
mode for data and images replication with Production site through
the proposed solution. Solution should have capabilities for
immediate switchover from Primary to DR or NDR (if any) or vice-
versa during presentation session itself and without any kind of data
loss.
Should this be interpreted as a requirement of RPO for
DR/NDR to be Zero and RTO for DR/NDR to be sub-second ?
RPO and RTO will be based on Bank's policy and the same
will be conveyed to the selected bidder.
Page 8 of 25
55 110 Section 6 : 2 - Technical
Requirement
Clause 76
Option to segregate cheques for collection in NRE account for
verification.
Please elaborate on requirement. Will the Bank provide
interface / Master to identify accounts of NRE ?
Yes.
Account Master data contains NRE identification.
56 111 Section 6 : 2 - Technical
Requirement
Clause 86
Provision for magnifying the cheque image portion to read micro-
lettering characters and also to Barcodes from the face of the
cheques.
Is the requirement for Barcode reading from Image ? If yes,
please specify the types of barcodes that are required to be
read.
Details will be shared with successful bidder.
57 111 Section 6 : 2 - Technical
Requirement
Clause 90
Provision for revert reject of the instruments as per user’s
requirement.
Please elaborate what is meant by "revert reject of the
instruments"
This feature is for inward clearing.
The proposed solution should have the feature of enabling
the user to again accept any inward instrument which has
been rejected earlier.
58 111 Section 6 : 2 - Technical
Requirement
Clause 94
Solution should be capable of integrating with the Cheque Deposit
Kiosk (CDK) and Remote Deposit Capture (RDC) for automatic pickup
of scanned instruments/batches at regular interval. It should also
maintain unique identification for these remote scanning machines
for proper identification and smooth processing.
Pick up of data and images from such devices from a pre-
defined server location conforming to a pre-defined data
structure and format is acceptable ?
Current Data/image format of such devices will be shared
with successful bidder and Bidder has to interface with
proposed CTS Solution along with automatic pickup facility
from various such devices.
59 112 Section 6 : 2 - Technical
Requirement
Clause 96
Software should support template based scanning to capture
various parts of images to accommodate the various types of
Instrument and deposit slips during capture.
Please elaborate on the requirement of scanning various parts
? Does this refer to display only of snippets ?
Proposed CTS Solution should have feature for template
based scanning i.e. scanning of only relavent portion of
cheques as per Bank's requirement. Template details and
specification will be shared with the successful bidder.
60 112 Section 6 : 2 - Technical
Requirement
Clause 100
The software should have Menu driven facility for Backup and
Restoration by Admin Team/It Team
Backup and restoration shell scripts (with Menus) for Admin /
IT teams to run on servers only is acceptable ?
Proposed CTS Solution should have proper mechanism for
Application Backup and Restoration processes.
61 112 Section 6 : 2 - Technical
Requirement
Clause 105
Image quality should be user definable and Controllable. Please elaborate on the requirement as it is very open-ended
to provide a response
User should able to select the default image to be dislayed
on screen and various feature for Zoom In, Zoom Out, Front,
Back, Grey Scale, UV images should be displayed with proper
control.
62 112 Section 6 : 2 - Technical
Requirement
Clause 108
Provision to integrate all available CTS Cheque Scanners within the
Bank by listing in single dashboard and displaying their
Active/Offline status by connecting through Intranet or Internet
Connectivity provided by the Bank.
Request the Bank to remove this requirement as this is
dependent on the cheque scanners APIs and will have huge
negative impact on performance to query all scanners across
all connected workstations to identify their status.
This is essential requirement for consolidating screen for
Cheque scanners monitoring and Active/Offline feature can
be provided with user demand, which will not impact
performance too.
63 115 Section 6 : 7 - Software
Clause b)
The operating system should have features like multi-tasking,
multi–user support, timesharing, dynamic memory management,
I/O spooling, multi-level security, system logging, error analysis and
recovery. Other features like hardware diagnostic tools, system
performance management and tuning, accounting routines and
system monitoring software must be available.
Please clarify if the Bidder is required to provide OS as part of
System Softwares ?
No.
The bidder will provide recommendation regarding
Hardware, OS and Database.
64 115 Section 6 : 7 - Software
Clause k)
The CTS shall provide and support for extracting various parts of the
image like CAR, LAR, Date, Payee Name, bank Name, Signature to
facilitate Application Programming Interface to third party Software
to do ICR, OCR and signature verification.
Please elaborate what is meant by "Application Programming
Interface to third party software to do ICR, OCR and signature
verification" ?
Proposed CTS system can be integrated with any third party
ICR, OCR and Automatic Signature Verification System to get
the benfit of those third party softwares.
Page 9 of 25
65 115 Section 6 : 7 - Software
Clause l)
The Signature Verification application shall provide facilities to
authorized user/authorizer to visually verify the signatures from the
images of the Instrument to the signature database stored in the
data server. It shall also provide facilities for other authentication
steps to be performed along with signature rule matrix, Legal
amount and courtesy amount matches, post-dated Instrument
before the item is accepted for payment or returned.
Please elaborate what is meant by "signature rule matrix" ? Signature Rule Matrix means there should be provision in
proposed Signature System to import Operational
mandates/rules for specific accounts and during verification,
System should display details with inward instruments.
66 120 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 1
Application System should be modular should support modular
implementation.
Please elaborate if the Bank is looking for modular
implementation ? The Project time frame of implementation
within 90 days does not talk of any such modular
implementation
Bidder has to ensure that proposed CTS Solution should be
modular and support modular implementation.
67 120 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 2
The Application should support different messaging protocols, APIs
to support various Delivery Channels such as Internet Banking, etc.
Similarly APIs should be commonly published for facilitating porting
of external applications of IDBI Bank Ltd onto CTS/ system.
Please elaborate on requirement of APIs / messaging protocols
- as this is vague / very open-ended to provide a response
All information exchanged between two systems are carried
out through Standard messaging system and proposed
solution should able to support standard messaging
protocols like ISO etc.
68 120 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 3
Give details regarding the flexibility of the architecture in terms of
ease in addition, modification and deletion of modules (including
third party products) / functionality in the future
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
69 120 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 4
Please provide a list of known bugs in the System Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
70 120 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 5
Vendor/Bidder should provide extensive documentation related to
the Application S/W such as
- Application Architecture
- Database layouts and architecture.
- User Manuals
- System Reference Manuals
- Error Messages and their Meanings
- Training Manuals
- Additions / changes to the documents after upgrades
- Operations Manuals
- Data Dictionary to be provided.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
71 120 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 6
Test Plans covering the entire functionality of the Solution will be
provided by the Bank. The Bidder should be able to arrange (The
applications S/W, H/W, personnel and other resources) for testing.
The exercise will not exceed the duration of 4 calendar weeks
(including the Reference Site visits if any).
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
Page 10 of 25
72 121 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 8
The proposed server hardware specification for the software system
to be hosted should justify the sizing and capacitive & processing
power proportional to the volumes.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
73 121 Section 6 : 9 - Architectural
Details
Clause iii.) - Vital
Application Architecture
Details
Sub Clause - 10
The vendor should specify/ recommend/ benchmark and justify the
sizing and performance parameters needed by the system. Ex. Disk
Raid Structure, Disk Sizing, CPU/ Memory usage etc.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
74 121 Section 6 : 9 - Architectural
Details
Clause iv.) - Desirable
Application Architecture
Details
Sub Clause - 4
Should provide details regarding the level of integration of the
various sub-systems, particularly in case of mix and match of
proprietary and third party products.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
75 121 Section 6 : 9 - Architectural
Details
Clause iv.) - Desirable
Application Architecture
Details
Sub Clause - 6
Please specify whether the proposed architecture uses any
application middle-ware solutions (for. E.g. When the branches are
working in the off-line mode)
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
76 121 Section 6 : 9 - Architectural
Details
Clause iv.) - Desirable
Application Architecture
Details
Sub Clause - 7
Give details of any additional Application S/W and third-party tools
that are required for using the system, in addition to the base
Application System provided by the Vendor/Bidder
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
77 122 Section 6 : 9 - Architectural
Details
Clause v.) - Vital Technical
Architecture Details
Sub Clause - 2
Please give details of Standard benchmark done earlier for volume
handled through the proposed solution.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
78 122 Section 6 : 9 - Architectural
Details
Clause v.) - Vital Technical
Architecture Details
Sub Clause - 3
System should be capable to make copies of the package for
business continuity use, which can be implemented pan India at any
location.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
Page 11 of 25
79 122 Section 6 : 9 - Architectural
Details
Clause v.) - Vital Technical
Architecture Details
Sub Clause - 4
In case of occurrence of a system failure, specify whether.
- A log and recovery facility is provided to return to the pre-failure
situation
- After a system failure the system is able to restart and rebuild the
database to the pre-failure situation
- The system provides for automatic roll forward and rollback.
- Deadlock situations are resolved automatically.
- Processing can be continued without loss of data after a disaster.
- The system should be made available for further processing within
4 hours of its failure. Explain which measures can be taken to
rebuild the database after a failure.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
80 122 Section 6 : 9 - Architectural
Details
Clause v.) - Vital Technical
Architecture Details
Sub Clause - 5
Please give details of the System Performance benchmarks on the
various Network configurations such as
- Leased Lines
- ISDN
- VSAT
- Dial-up Modems
Please mention the bandwidth requirement for the client
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable". Additionally,
the Bank to provide Location-wise volume, processing window,
number of users (named and concurrent), make/model
throughput of scanners planned to be deployed at each
location and the expected throughput - from capture to insert
from each such location to enable us to mention the
bandwidth requirement.
Refer to the Corrigendum
81 122 Section 6 : 9 - Architectural
Details
Clause v.) - Vital Technical
Architecture Details
Sub Clause - 6
Give details of the Scalability provisions in the System. Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
82 123 Section 6 : 9 - Architectural
Details
Clause vi.) - Desirable
Technical Architecture
Details
Sub Clause - 1
Please give details of the proven System Response times
benchmarks.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
83 123 Section 6 : 10 -
Implementation & Support
Details
Clause i.) - Vital
Implementation Details
Sub Clause - 1
Please give the following details of any proven Implementation Case-
study of the proposed solution
- Strategy adopted
- Milestone definitions
- Time Schedules
- Resources used
- Drawbacks, if any
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
84 123 Section 6 : 10 -
Implementation & Support
Details
Clause ii.) - Vital UAT
Details
Sub Clause - 1
Provide three User Acceptance Test (UAT) with specific periodical
interval, Next UAT should address & close all the observations of
previous UAT.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
Page 12 of 25
85 123 Section 6 : 10 -
Implementation & Support
Details
Clause ii.) - Vital UAT
Details
Sub Clause - 2
Provide solution to all the All Bugs / issues / observation of UAT and
remove them before going live.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
86 123 Section 6 : 10 -
Implementation & Support
Details
Clause iii.) - Vital Training
Details
Sub Clause - 1
Provide details of the training programmes to be conducted. Also,
state whether the Bidder will be training the users.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
87 124 Section 6 : 10 -
Implementation & Support
Details
Clause iii.) - Vital Training
Details
Sub Clause - 2
Provide the timetable for the training session with details such as
topics, duration, number of users , etc.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
88 124 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 2
Give a detailed document which covers
- The Bidder presence in India
- The Bidder Support Mechanism
- Support Centres (No. Of Support Centres, locations, Staffing, etc.)
- Methodology to classify calls according to severity
- Maximum Response times to Calls
- Support levels / functions
- Whether dedicated support staff will be maintained at IDBI Bank,
on an on-going basis.
- Support tools
- Call Centres / Help Desk
- 24 hours Availability
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
89 124 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 3
The Bidder should support the entire Solution components
(including third party components used, if any). If not, please specify
the modules supported / not supported
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
90 124 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 4
Give details of any Business Associates / Affiliates / Franchisees of
the Bidder who perform the Support function.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
91 124 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 5
Give details of the clients (if any) who avail of the Support function
of the Bidder
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
Page 13 of 25
92 124 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 6
In case of third-party components being used in the Solution, please
specify the details of the arrangements that will be worked out
between the vendor and the third-party Bidder.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
93 125 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 7
In case of Solution upgrades, please give details of the Deployment
Strategy for the new version, with minimum disruption to the
Banking operations
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
94 125 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 8
Please specify whether there are any restrictions / conditions
applicable, on the Support Arrangement, in case of IDBI Bank not
opting for any higher version of the Solution, whenever it is
available
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
95 125 Section 6 : 10 -
Implementation & Support
Details
Clause v.) - Vital Support
Details
Sub Clause - 9
Please specify whether there are any in-built checks and
mechanisms to track the activities of the Support Staff
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable"
Refer to the Corrigendum
96 125 Section 6 : 10 -
Implementation & Support
Details
Clause vi.) - Desirable
Support Details
Sub Clause - 1
Give details whether the Bidder conforms to any International
Quality Management procedures as part of their Support function.
Request the Bank to remove this clause from this set requiring
the response type - A/C/NC - as this is not answerable as
"Available / Customizable / Not Customizable". Also is not this
already covered under Eligibility - ISO 9001 requirement ?
Refer to the Corrigendum
97 127 Technical Evaluation Applicable to the table in total Sub Total (C) reads "20". Should be corrected to "30" Refer to the Corrigendum
98 8 3.4.1 The Bidder shall furnish, as part of its Bid, a Bid Security (EMD) in
the form of Demand Draft / Bankers’ Cheque/ Pay order, drawn in
favour of “IDBI Bank Limited” for an amount of Rs.5,00,000/-
(Rupees Five Lakh only) payable at Mumbai, and must accompany
the Technical Bid. The Bid security / EMD shall not bear any interest.
We request IDBI Bank to accept EMD in the form of a Bank
Guarantee as well.
No change in RFP terms
99 10 7.8.5 Bidder should have been in existence and in the business of
development, implementation, supply and maintenance of Cheque
Truncation System (CTS) solution for at least five (5) years as on the
date of issue of this RFP. (Self-Declaration and Work Order copies to
be submitted)
Please amend this clause for 3 years experience No change in RFP terms
Page 14 of 25
100 10 7.8.6 The bidder must have successfully implemented CTS Application
Software in minimum two banks in India with at least one of the
Banks handling daily volume of minimum 2 Lakhs (2,00,000) cheque
transactions per day, spread over one or more grids taken together
(Self Declaration giving information regarding (i) Name of Banks,(ii)
Per day processing volumes in each of the banks,(iii) other
applications with which interface has been done; along with
Purchase Order / Agreement Copy to be submitted).
Please amend this clause for a daily volume of 1.2 Lakhs
(1,20,000)
Refer to the Corrigendum
101 10 7.8.7 The bidder must have successfully implemented CTS Signature and
CTS Archival Systems in minimum two Banks in India. (Self
Declaration giving information regarding (i) Name of Banks,(ii) Per
day processing volumes in each of the banks,(iii) other applications
with which interface has been done; along with Purchase Order /
Agreement Copy to be submitted).
CTS Signature system is a part of the CTS Inward module. Does
this match the requirement?
Refer to the Corrigendum
102 42 28.1 The Purchaser may, terminate this Contract by giving the Bidder a
prior and written 30 (thirty) day’s notice indicating its intention to
terminate the Contract under the following circumstances.
The vendor should also have such right, may be with an
enhanced period of notice.
No change in RFP terms
103 43 29.2 In the event that the termination of this Contract is due to the
expiry of the term of this Contract / a decision not to grant any
(further) extension by the Purchaser, the Bidder herein shall be
obliged to provide all such assistance to the successor Bidder or any
other person as may be required and as the Purchaser may specify
including training, where the successor(s) is a
representative/personnel of the Purchaser to enable the successor
to adequately provide the Services hereunder, even where such
assistance is required to be rendered for a reasonable period that
may extend beyond the term/earlier termination hereof.
The purchaser should pay for the services rendered by the
bidder in this period.
No change in RFP terms
104 47 40.2 Professional liability insurance, with a minimum coverage equal to
estimated remuneration and reimbursable.
Applicable for all the employees OR only for the project related
employees?
Project related employees at any point of the contract.
105 47 40.3 Employer's liability and workers' compensation insurance in respect
of the personnel of the Bidder, in accordance with the relevant
provisions of the applicable law, as well as, with respect to such
personnel, any such life, health, accident, travel or other insurance
as may be appropriate; and Insurance against loss of or damage to
(i) System(s)/Solutions purchased in whole or in part with funds
provided under this Contract or otherwise, (ii) the Bidder’s property
used in the performance of the Services, and (iii) any documents
prepared by the Bidder in the performance of the Services.
Applicable for all the employees OR only for the project related
employees?
Project related employees at any point of the contract.
Page 15 of 25
106 53 h Source code for customized application and documentation of the
CTS shall be the property of the IDBI Bank and the same to be
handed over as part of Go Live.
If the customisation is done in the main application, then the
source code for the whole application can not be shared with
the bank. The code can be shared only for the customised
utility.
107 57 xi A copy of the source code of the application customised for IDBI
Bank shall be handed over to the Bank. A copy of all subsequent
updates to the source code shall also be handed over to IDBI Bank
after the release/Go Live.
Same As Above
108 61 9.2 All audit points raised by the Software auditor should be addressed
by the selected bidder without any extra charge.
The audit points should not indicate any change in the the
scope of work OR additional development because of advised
change in the process.
No change in RFP terms
109 90 11 System should be compatible to handle all Cheque Scanning devices
available with the major manufacturer, at present and capable to
integrate with all types of Operating Systems. The Bidder has to
integrate all the scanners on all desktop versions available within
the Bank/Branches/Clients. In case, Bank intends to purchase new
Cheque Scanners then, Bidder has to do the integration without any
additional cost during the contract period (Warranty & AMC). Bank
will ensure to provide proper technical clarifications / APIs to the
Bidder for integration.
Does this point refer to the scanner APIs in a non Windows
environment?
Proposed CTS Solution should have capability to integrate
scanner APIs for Windows and Non-Windows environment
both.
110 102 6 The Cheques scanning is to be done in one single capture with
endorsement, MICR line reading along with UV image scanning.
The cheque scanners should also support capturing all the
images in a single scan.
All existing Cheque Scanners available with the Bank are
supporting scan a cheque image including UV in single pass
only.
111 100 112 The system should provide interfaces and automated checking for
the new CTS 2010 Instrument standards. Ex. UV, watermark
detection etc.
Please clarify if Water Mark can be captured in a Cheque
Image.
Yes.It can be.
112 100 104 The solution should have features / tests/ mechanism to initiate or
perform fraud prevention/detection for tampered/ Xerox / fake
instrument.
This requires certain additional features on the Cheques. No Change in RFP terms.
Recommendations regarding additional features will be
discussed with the selected bidder and may be intimated to
the regulator.
113 103 9 Provides for endorsement, unique item sequence number to be
printed on the reverse side of the instruments and multi-line
endorsement for re-presentment cases. There should not be any
overlapping, in case a new endorsement is required for re-
presented Instrument(s) in outward clearing.
The Cheque Scanner should support multiline endorsement
functionality.
All existing Cheque Scanners available with the Bank support
multiline endorsement.
114 108 58 The software should be based on Oracle Database (preferable) Will the migration to oracle post deployment be acceptable to
the bank?
No change in RFP terms
115 108 59 The software should be platform Independent Please clarify whether the platform referred here is from the
server side OR client side
Client Side, there should not be any dependancy for CTS
processing.
116 109 67 Segregation of government cheques at the time of scanning. The Cheque Scanner should have multiple pockets its APIs
should support on line sorting of the documents.
All existing Cheque Scanners available with the Bank are
multiple pockets scanners.
Only customised source code, which will be Bank's Property
and can be used for further development/enhancements.
However, ESCROW arrangement is for keeping entire source
code of proposed solution under the safe custody of
ESCROW vendor.
Page 16 of 25
117 113 108 Provision to integrate all available CTS Cheque Scanners within the
Bank by listing in single dashboard and displaying their
Active/Offline status by connecting through Intranet or Internet
Connectivity provided by the Bank.
Whether the cheque scanners will be connected on LAN ports
and will have IPs to check the real time status from server side.
Yes.
Network Connectivity & System IPs will be available.
118 118 8 The physical removal of such Instrument(s) should be allowed with
two users jointly approving the same. There should be history of
such retrievals with user id’s for audit and control purposes
Please elaborate the requirement. Any item to be deleted from CTS System during processing
will move to second authoriser for confirmation and audit
trail for each action to be in place for history retrieval.
119 120 6 Test Plans covering the entire functionality of the Solution will be
provided by the Bank. The Bidder should be able to arrange (The
applications S/W, H/W, personnel and other resources) for testing.
The exercise will not exceed the duration of 4 calendar weeks
(including the Reference Site visits if any).
Does the bank expect vendor to provide for test servers and
scanners?
No, Bank will arrange for the same.
120 102 5 The System should have web-based scanning module for Bank’s
Branches / Service Centers / Corporate Clients / Sub-Member Banks
with proper authentication mechanism through intranet & internet
communications and segregation of Clearing Types (CTS / Non-CTS /
Special Clearing / MMS etc.). Apart from CTS Scanner’s driver
installation, there should not be any additional client based setup
required to activate the scanners.
Contradictory/ ambiguous requirement for offline scanning Online solution needed for all Bank's Branches and Client
locations, who have strong network connectivity to access
online system whereas Offline Solution is needed for those
Bank's/Client's locations, where Network connectivity is not
too stong to transmit the data/images over Network.
121 124 1 The Bidder should have local presence i.e. a support centre
operating within India. Also in each of the local centres where the
Cheque truncation facility would be made available in future by RBI
/ NPCI.
Does the bank expect vendors to provide for the support at all
exisitng and future locations in CTS? Support can be provided
remotely through a central location.
Yes. Bank expect vendor's support in all three grids and in
case of any client problem in PAN india, remote support will
be sufficient.
122 Pg. 8 3. Bid Security / EMD #4.1 The Bidder shall furnish, as part of its Bid, a Bid Security (EMD) in
the form of Demand Draft / Bankers’ Cheque/ Pay order, drawn in
favour of “IDBI Bank Limited” for an amount of Rs.5,00,000/-
(Rupees Five Lakh only) payable at Mumbai, and must accompany
the Technical Bid. The Bid security / EMD shall not bear any interest.
Request the Bank to kindly allow EMD submission as a Bank
Guarantee also.
No change in RFP terms
123 Pg. 9 7. Eligibility Criteria for
bidders #8.2
The Bidder should be a Company registered in India under The
Companies Act 1956 / 2013 (Certification of Incorporation along
with certificate of Business commencement to be submitted)
It is not mandatory for Private companies to procure
"Certificate of Business commencement", therefore request
the bank to only consider letter of incorporation for this
criteria. Bidder will provide financial statements / POs as proof
of business commencement if so mandated by bank.
In case of bidder is Private company, the Bank will acccept
"certificate of incorporation"
Page 17 of 25
124 Pg. 10 7. Eligibility Criteria for
bidders #8.6
The bidder must have successfully implemented CTS Application
Software in minimum two banks in India with at least one of the
Banks handling daily volume of minimum 2 Lakhs (2,00,000) cheque
transactions per day, spread over one or more grids taken together
(Self Declaration giving information regarding (i) Name of Banks,(ii)
Per day processing volumes in each of the banks,(iii) other
applications with which interface has been done; along with
Purchase Order / Agreement Copy to be submitted).
Bidder is handling close to 16 Lakh cheques per day through its
hosted /outsouced CTS services. This volume is inclusive of
banks processing daily volumes in the range for 2 - 6 Lakh
instruments.
Therefore request the bank to kindly revise the criteria as "The
bidder must have successfully implemented CTS Application
Software for minimum two banks in India in licence or
hosted/outsourced model with at least one of the Banks
handling daily volume of minimum 2 Lakhs (2,00,000) cheque
transactions per day, spread over one or more grids taken
together."
Refer to the Corrigendum
125 Pg. 10 7. Eligibility Criteria for
bidders #8.7
8.7. The bidder must have successfully implemented CTS Signature
and CTS Archival Systems in minimum two Banks in India. (Self
Declaration giving information regarding (i) Name of Banks,(ii) Per
day processing volumes in each of the banks,(iii) other applications
with which interface has been done; along with Purchase Order /
Agreement Copy to be submitted).
Need clarity - is the scope of CTS Signature system same as
"Signature Verification system with 4-eye concept."?
Refer to the Corrigendum
126 Pg 51 Section 4; #3 Scope of
work
c) Solution involves Online & Offline provision for Bank’s clients
(Corporate or direct/in-direct Sub-Member Banks), who will process
their CTS Clearing at their Service Centers/Branches by accessing to
CTS System, preparing & processing CTS Clearing files from their
end, accessing CTS Reports, generating data/image files for
uploading into their respective Core Banking System and
transfer/receive the CTS Processing files through Secured Data
Transfer Mechanism provided by IDBI Bank.
Request the bank kindly clarify the use case envisaged for both
"offline and online provision for bank's clients"
Online solution needed for all Bank's Branches and Client
locations, who have strong network connectivity to access
online system whereas Offline Solution is needed for those
Bank's/Client's locations, where Network connectivity is not
too stong to transmit the data/images over Network.
127 Pg 51 Section 4; #3 Scope of
work
e) Solution should have capability of handling Virtual Account
Numbers and transactions linked to Virtual Accounts, Credit Card
and Debit Cards as per Bank’s requirements. Solution should also
have provision of Integration, in case existing CBS (Finacle) is
migrated to higher version or new CBS is introduced by the Bank,
without any additional cost during the contract period
(Warranty/AMC).
The requiement for "capability of handling Virtual Account
Numbers and transactions linked to Virtual Accounts, Credit
Card and Debit Cards as per Bank’s requirements" is not clear.
Request the bank to kindly clarify the user case enviaged for
this requirement.
All exisitng integration requirements has to done by the
selected Bidder in the proposed CTS Solution. Further, any
integration requirement on the modules procured during the
contract period (Warranty/AMC) has to be done without any
additional charges.
128 Pg 51 Section 4; #3 Scope of
work
f) Solution should have provision for digital signing in hybrid
environment i.e. distributed as well as in central processing
environment (i.e. at various Cheque collection points or branches
/Central processing /service branches level / off-site locations /
Client Locations), and only with proper validation/authentication,
the processing should be carried out. Bank has already appointed
vendor for providing digital certificates through e-tokens and have
arrangement with IDRBT for system certificates and all these devices
are to be integrated with the proposed solution.
Does the bank need the items approved by a particular user to
be signed using the digital signature of that particular user or
would a single digital signature at the central site used for
signing all the items and files?
Proposed Solution should have provision for digital signing in
hybrid environment i.e. distributed as well as in central
processing environment depending on Bank's requirement.
129 Pg 53 Section 4; #3 Scope of
work #3.3
h) Source code for customized application and documentation of
the CTS shall be the property of the IDBI Bank and the same to be
handed over as part of Go Live.
Need clarity on how this needs to be handled. Only customised source code, which will be Bank's Property
and can be used for further development/enhancements.
However, ESCROW arrangement is for keeping entire source
code of proposed solution under the safe custody of
ESCROW vendor.
Page 18 of 25
130 Pg 89 Section 6
1. Functional
Requirements #5
Provision for Online & Offline Solution for Sub-Member Banks to
handle their clearing independently at their Offices/Locations.
Secured channel for System Access and transferring files will be
provided by the Bank/Sub-member Banks. System should have
capability to handle Segregation and also to provide proper
authentication mechanism so that Direct or In-direct Sub-Member
Banks or Corporate Clients can process all types of clearing
(Outward, Inward, Extension and both types of Returns Clearing) at
their end by using the CTS Solution either in Online or Off-line
mode.
Request the bank kindly clarify the use case envisaged for both
"offline and online provision for Sub-Member Banks"
Online solution needed for all Bank's Branches and Client
locations, who have strong network connectivity to access
online system whereas Offline Solution is needed for those
Bank's/Client's locations, where Network connectivity is not
too stong to transmit the data/images over Network.
131 Pg 89 Section 6
1. Functional
Requirements #8
System should be capable of creating multiple clearing types to suit
Bank’s/Corporate Clients/Sub-Member Banks (All types) clearing
requirements to route the instrument and transaction type level
and maintain separate settlement Ledgers and general ledger
interface at various clearing types.
What are the multiple clearing types that the bank will be
requiring?
Multiple Clearing Type are CTS, Non-CTS, Special Clearing
and multiple Clearing sessions in a day depending upon
current & future RBI directions.
132 Pg 91 Section 6
1. Functional
Requirements #16
Provision for capturing batch wise/ type wise clearing (CTS / Non-
CTS / Special Clearing / MMS) for the following cases:
a. Cheques Only
b. Cheques with Slip (Product Wise)
c. Marking Paper to Follow (P2F) batches at time of scanning itself.
d. Capturing MMS (Mandate Management Scanning) instruments as
per Bank’s requirement.
The scanning requirements (only front image) and the IQA
validations required for mandate scanning are different from
Cheque scanning, therefore request bank to remove the
provision for mandate scanning from the scope.
Mandate scanning is must required and proposed CTS
Solution should have feature to scan mandates and generate
only images (Front B/W and Front Grey Scale) at pre-defined
location.
133 Pg 92 Section 6
1. Functional
Requirements #22
Should provide provision for outward posting files in different levels
and segregation should happen at point of capture itself, depending
on Bank’s / Corporate Clients / Sub-Member Bank’s requirement:
Cheque Wise
Deposit Slip wise
Account Wise etc.
This requirement is not clear. Outward processing usually
happens in batch mode; cheque, deposit slip and account wise
segregation is provided in reports. Request the bank to kindly
clarify the envisaged use case for this requirement.
No Change in RFP terms.
Proposed solution should be able to select the mode of
scanning from the following :-
Cheque only
Cheque with Deposit Slip
Product code wise
any other criteria as per Bank's requirements
134 Pg 94 Section 6
1. Functional
Requirements #42
System should provide a Document Management facility to store
the Instrument(s) with unique reference numbers for easy retrieval
at later stages.
Is this requirement same as the Archival solution or does the
bank need a separate Document Management Solution?
The Bank does not need a separate DM Solution.
Requirement is for an Archival System which would capture
the details of identification/custody/storage of the physical
instruments. The Archival system should enable easy
retrieval of any instument.
135 Pg 96 Section 6
1. Functional
Requirements #67
The solution should support data mining exercise of the Bank. Request the bank to kindly provide details of this requirement -
would giving a data dump in a pre-defined format required by
bank suffice?
Bidder has to provide an interface for intergration with other
systems of the Bank, where CTS Data need to be provided as
per Bank's MIS requirements.
136 Pg 98 Section 6
1. Functional
Requirements #86
Purging details should be captured to store the time and data
contents in host system.
Which purging details is the bank referring to? Purging data from Production system, post successful
transmission into Archival System and with due verification
as per Bank's policy.
Page 19 of 25
137 Pg 100 Section 6
1. Functional
Requirements #107
System should have capability of segregating return items from
Outward Batches with Cheques sorting feature at Cheque Scanning
level.
This requirement is not clear. Returned items will not be
known to the system till the returns session is completed and
therefore segregation cannot be done at scanning level. Does
the bank have some other use case in mind?
Proposed Solution should have feature to upload outward
return file and facility to segregate physical return cheques
through Cheque scanning. This exercise will be executed post
return files received from NPCI.
138 Pg 100 Section 6
1. Functional
Requirements #116
System should be able to interface and be compatible with IDBI
bank’s existing Archive system.
Does the bank require the proposed system to be able to
retrieve images / data from the existing archival system or
migrate the data into bidder's proposed archival system?
Yes, Selected Bidder is required to migrate all existing
Archival data into new proposed Archival System.
139 9 8.2 ( Eligibility Criteria) certificate of Business commencement to be submitted Request bank to please clarify what document required for the
for the same .
The particiapting bidder should submit MOA/AOA
(Memorandum of Article/Article of Agreement) , if
applicable.
140 10 8.6 (Eligibility Criteria) The bidder must have successfully implemented CTS Application
Software in minimum two banks in India with at least one of the
Banks handling daily volume of minimum 2 Lakhs (2,00,000) cheque
transactions per day, spread over one or more grids taken together.
We request Bank to modify this clause to (The bidder must
have successfully implemented CTS Application Software in
minimum two PSUs banks in India with at least one of the PSU
Banks handling daily volume of minimum 50000 to 100000
cheque transactions per day, spread over one or more grids
taken together
Refer to the Corrigendum
141 10 8.7 (Eligibility Criteria) The bidder must have successfully implemented CTS Signature and
CTS Archival Systems in minimum two Banks in India. (Self
Declaration giving information regarding (i) Name of Banks,(ii) Per
day processing volumes in each of the banks,(iii) other applications
with which interface has been done; along with Purchase Order /
Agreement Copy to be submitted).
Please provide more clarify on CTS Signature eligibility point,
as per our understanding it should be part of functional
requirement of Bank .
Refer to the Corrigendum
142 On completion of Requirement Study, Centralised CTS Application
installation for UAT, Interface, trainings and other relevant
installation/Master uploads.- 20% (payment)
We request Bank to consider payment 50 % against the (On
completion of Requirement Study, Centralised CTS Application
installation for UAT, Interface, trainings and other relevant
installation/Master uploads.)
No change in RFP terms
143 On completion of UAT (including resolution of all Issues, Complete
Installation of DC, DR and NDR (if any) setups)- Payment 20%
we request Bank to consider payment Terms 40% for the [On
completion of UAT (including resolution of all Issues, Complete
Installation of DC, DR and NDR (if any) setups),On resolution of
all Issues raised within One Month post Go live (Western Grid
and all its Sub-Member Banks, North Grid and its sub-member
banks, South Grid and sub-member banks
No change in RFP terms
144 On resolution of all Issues raised within One Month post Go live
(Western Grid and all its Sub-Member Banks)- Payment 15%
Rest 10% after completion of (On resolution of all Issues Raised
within 3 months of Go live and upon successful DR-drill run
conducted by the Bank and on issue of Acceptance)
No change in RFP terms
145 On resolution of all Issues raised within One Month post Go live
(Northern Grid and all its Sub-Member Banks)-Payment payment
10%
No change in RFP terms
146 On resolution of all Issues raised within One Month post Go live
(Southern Grid and all its Sub-Member Banks)-Payment 10%
No Change in RFP terms
13 10 (payment terms)
Page 20 of 25
147 On set up of CTS Solution, Signature System and Archival System
and upon successful migration of existing Archival System.-Payment
10%
No change in RFP terms
148 On resolution of all Issues Raised within 3 months of Go live and
upon successful DR-drill run conducted by the Bank and on issue of
Acceptance-payment 15%
No change in RFP terms
149 25 20.5 (Evaluation and
comparison of Bids)
Bidder’s Competiveness and experience in implementing CTS
Solution, Trainings and Manpower Resources.- Point 20 marks
we request Bank to amend this clause as per given below.1(If
Bidder’s Competiveness and experience in implementing CTS
Solution, Trainings and Manpower Resources is greater than 10
PSU Bank then Marks will be 20. 2(Bidder’s Competiveness and
experience in implementing CTS Solution, Trainings and
Manpower Resources more than 6 PSU Bank then marks will
be 10. 3 (Bidder’s Competiveness and experience in
implementing CTS Solution, Trainings and Manpower
Resources more than 2 PSU Bank than mark will be 6
Refer corrigendum for additional clause
150 25 20.7 (Evaluation and
comparison of Bids)
The Bidders scoring a minimum of 70 marks based on the detailed
evaluation in Technical Proposal Evaluation, would be qualified and
short listed for next Phase – Techno-Commercial Bid
We request Bank to Amend this clause . For Technical proposal
60% mark and for commercial proposal 40% mark
No change in RFP terms
151 36 13. LIQUIDATED DAMAGES 13.1. If the Vendor fails to deliver any or all of the
Service(s)/Systems or perform the Services within the time period(s)
specified in the Contract/Agreement/ fails to meet the Service Level
Requirements, IDBI/ Purchaser shall, without prejudice to its other
rights and remedies under and in accordance with the
Contract/Agreement, deduct from the Contract price, as liquidated
damages, a sum equivalent to 1% per week or part thereof of
Contract Price( i.e. item A of Commercial bid) subject to maximum
deduction of 10% of the order value ( item A) of the delayed
Service(s) . In case of undue delay beyond a period of one month
unless otherwise waived by the IDBI / Purchaser, IDBI/Purchaser
may consider termination of the Contract.
We request the Bank to modify the penalty clause as below.
1) Any deduction from contract price as a liquidated damages
will be applicable if any delay in delivery occur due to Vendor
fault.
2) 1% of the cost of Contract price will be deducted per month
as a liquidated damages per Month. Maximum to be 10%
No Change in RFP terms
152 61 10.1(SCHEDULE OF
IMPLEMENTATION
/ROLLOUT
Delivery of licences, DRG and SRS- 30 days from the date of
Purchase Order
We request bank to extend the delivery of licences, DRG and
SRS from 30 days to 60 days from the date of purchase order
No change in RFP terms
13 10 (payment terms)
Page 21 of 25
153 59 7.1 (Timeline and Penalty
for delay in project
implementation
The System should be delivered as per the schedule from date of
placement of Order and vendor should give a certificate that all
modules have been deployed in the Bank’s servers. Penalty will be
applicable for late delivery of the customized software. 1% of the
cost of the software ( item A-1) will be deducted as penalty per
week for failure to achieve the milestones as indicated in the RFP.
We request the Bank to modify the penalty clause as below.
1) Penalty will be applicable for late delivery of the customized
software if any delay occurs from vender side.
2) 1% of the cost of the software (item A-1) will be deducted
as penalty per Month. Maximum penalty would be 10%
No change in RFP terms
154 84 12. SERVICE LEVEL
AGREEMENT
SLA for Software Support& Third Party Tools, if in use:
(Low --2Hours--24 Hours (One Day)
We request the Bank to modify the Timeframe for Resolution
for Low severity to 72 Hours since it is related to operational
issue.
No change in RFP terms
155 51 3 .Scope of Work (3.1.f) Solution should have provision for digital signing in hybrid
environment i.e. distributed as well as in central processing
environment (i.e. at various Cheque collection points or branches
/Central processing /service branches level / off-site locations /
Client Locations), and only with proper validation/authentication,
the processing should be carried out. Bank has already appointed
vendor for providing digital certificates through e-tokens and have
arrangement with IDRBT for system certificates and all these devices
are to be integrated with the proposed solution
Is Bank is looking for item level signing at the central server
through HSM card?
Item level digital signing HSM card will be installed into the CTS
server or CHI server.
Proposed Solution should have provision for digital signing in
hybrid environment i.e. distributed as well as in central
processing environment depending on Bank's requirement.
At Central and distributed levels, Digital Signing can be
executed through HSM Card and e-tokens respectively or any
other mechanism proposed by the Bidder.
156 52 3 .Scope of Work (3.1.l) The Bidder shall commit in writing that the licenses for CTS will be
provided at Enterprise level based only for unrestricted use across
organization and its Clients (Corporate and Sub-Member Banks),
irrespective of locations or number of users for the entire / contract
period. No extra charges as regards to customization/
implementation/ professional charges should be borne by IDBI
Bank.
Please clarify l customization/ implementation/ professional
charges will be applicable for any new installation post go live
Installations related to DC/DR/NDR arrangements during
contract period should be taken care without any additonal
charges.
157 52 3 .Scope of Work (3.1.n) The date of completion of the Project including operationalisation
i.e. performing live operations shall not be later than three months
from the date of award of the Contract. The Bidder shall
categorically undertake to meet this timeline. Time being the
essence of the contract; the Bidder is not likely to be considered if
there is no such undertaking.
We request Bank to consider that completion of this project is
subject to support from Bank and we request the Bank to
provide Grid wise implementation time line with the
truncation model opted by IDBI Bank.
No change in RFP terms
Page 22 of 25
158 53 3.3 c ( Scope of Work) Supply of CTS Application and License: The Bank requires enterprise
license of CTS Software and hence, bidders are required to quote
their price for enterprise license only.
The Bank proposes to procure Enterprise wide licence for the CTS
application Software including Signature and Archival Systems.
There shall not be any restrictions like number of installations, site,
clients, processors etc. There should not be any licensing restriction
for access / usage by all or any of the Bank branches, regional
offices, CPUs, RPUs / Offices of the Bank as well as Clients
(Corporate and direct/In-direct Sub-Member Banks) for CTS Clearing
Processing. Administrative and user level training on software
should be part of the solution.
We request bank to modify the clause that user level training
will be provided along with enterprise license till
implementation.
Post implementation user level training will be consider
separately.
No change in RFP Terms
159 53 3.3 e( Scope of Work) Provide APIs for integrations with various External Systems as
required
We request the Bank to Modify(Bidder will integrate with
Various external system with or without API as or when
required by the Bank )
No change in RFP terms
160 54 3.5. Implementation &
Customizations
Integration with all models of CTS Cheque Scanners available within
the Bank.
Request Bank to provide the existing scanner make and model
along with the API to provide a compliance on the same
Details of CTS Cheque Scanners models available within the
Bank, as on date:
1. Neopost LA 400 Series
2. Neopost LSA 200 Series
3. Neopost LSI 100 Series
4. Seac Banche Orion (130 DPM)
5. Panini Vision X (100 DPM)
6. Canon CR 190i UV
7. Any other scanner model, which is not listed or procured
by the Bank during contract period will also be integrated by
the Bidder without any additional charges.
161 54 3.6. Integration with other
Systems
Any other system as required by the Bank from time to time. Need more clarity in this clause Depending upon Bank's requirement during the currency of
contract, any other integration (Data/Image level)
requirement need to be addressed by the successful bidder.
162 90 Functional Requirements
Point No 11
System should be compatible to handle all Cheque Scanning devices
available with the major manufacturer, at present and capable to
integrate with all types of Operating Systems. The Bidder has to
integrate all the scanners on all desktop versions available within
the Bank/Branches/Clients. In case, Bank intends to purchase new
Cheque Scanners then, Bidder has to do the integration without any
additional cost during the contract period (Warranty & AMC). Bank
will ensure to provide proper technical clarifications / APIs to the
Bidder for integration
Request bank to please quantify the point with respect to list
of scanner & operating System for proper compliance.
Proposed CTS Solution should have capability to integrate
scanner APIs for Windows and Non-Windows environment
both.
163 94 Functional Requirements
Point No 40
System should have configurable day/time limits for the cut off
time, which could be different for different clearing cycles.
Please elaborate the point Proposed Solution should have feature to handle process at
specified cut-off time set for respective grid location with
access rights to be provided for processing beyond cut-off
time.
Page 23 of 25
164 94 Functional Requirements
Point No 53
Auto-Replication between Primary and DR Sites (DR&NDR) should
be available with proper monitoring process. In case of any disaster,
entire solution should be capable to handle immediate switchover
from Primary to DR Sites and Vice-versa without any kind of manual
intervention and user level changes.
The desired functionality and configuration should be made it
available by the replication software. Please clarify the
requirement with respect to CTS solution.
No change in RFP terms
165 95 Functional Requirements
Point No 50
System should have a special interface for auditors and IT users
where access to all data would be allowed without any modification
or change permission.
Please clarify the special interface requirement in detail. Special interface to be provided with read only access in the
proposed solution for monitoring purpose.
166 96 Functional Requirements
Point No 55
System should be able to interface and connect with IDBI Bank’s
existing signature servers and also be able fetch signatures from
CBS. Facility for Migration of existing Bank’s signature system to the
new signature solution, which should be provided by the Bidder.
Bidder has to complete it without any additional cost/charges to the
Bank.
Please provide the existing system details and new system
details
Signature System means Independent Signature solution to
host all Bank's customer's signatures and MOP details and
proposed CTS Solution should integrate to fetch Signature
and MOP details during Technical Verification processes with
4-eye concept.
167 97 Functional Requirements
Point No 74
The proposed CTS Solution should provide interface with other
software as required by the Bank.
Please provide the other software details along with the actual
requirement.
Bidder has to provide interface/format in the required
format to share the details with all other Bank's solution
whereas CTS Data are required to be exported/imported.
168 98 Functional Requirements
Point No 85
Should provide online interface to extract data from the Clearing
and truncation system to feed IDBI Bank's other application on need
basis.
Please provide the other application details along with the
actual requirement.
Online Interface to generate CTS Data to feed into other
applications. However, Data format requirements will only
be shared with the successful bidder.
169 98 Functional Requirements
Point No 87
Possibility of sending emails of images and data records
automatically by the system.
Please specify the criteria for sending the emails Proposed System should have feature to integrate with
Bank's e-mail system to send alerts and sample format/data
by creating special rules in the proposed solution.
170 98 Functional Requirements
Point No 91
Facility to auto-lock/Screen timed out should be available with
configurable feature.
Please elaborate the point of auto-lock Auto-Lock/Screen timed out means facility to configure
screen timed out as per Bank's internal policy and restrict
user during Screen idle scenarios. However, User-
ids/Processing Queues should not be auto-locked during
screen timed out scenarios.
171 99 Functional Requirements
Point No 97
Provision for easy communication between Bank and Sub-Member
Banks and Corporate client in Online Processing system so that
timely alerts can be published to them related to Cut-off timings,
changes in process etc.
Is Bank is looking full fledge messaging system ?
Or
Information (massage) should be displayed in website for the
end used
Feature in proposed system for Banner/ Information
message to be published by Bank to Application users,
whenever requried.
172 99 Functional Requirements
Point No 98
Provision for Fee based transactions reporting for the Bank’s Clients
(Corporate and All types of Sub-Member Banks) as well as
Capture/DEO Vendors.
Please elaborate the point Feature to generate fee based reports depending upon
processing volume and transaction charges set by the Bank
for its Clients and Sub-Member Banks for easy recovery.
173 100 Functional Requirements
Point No 106
The solution should have web-based feature to intimate branches
live status of processing / rejects etc.
Please clarify our understanding : Since branches are assign to
users in CTS system hence the live processing will be available
user wise.
Scanning Branches / Clients should be able to identfy their
scanned batches and monitor live status.
Page 24 of 25
174 100 Functional Requirements
Point No 108
System should have ICR/OCR capabilities to capture any given field
present on the instrument. The fields can be handwritten or printed
and could be present on the instrument.
Amount
Instrument date
Payee name
Account Number
Amount in words
ICR/OCR result are not very good on Indian cheques. we
request bank to please recommend if any specific ICR/OCR
engine need to be considered for integration and as well as
for normalization
No change in RFP terms.
175 104 Technical Requirements:
Point no 18
Shall have options to implement encryptions and digital signatures
at Central level, file level and instrument level.
Is Bank is looking for item level signing at the central server
through HSM card?
Item level digital signing HSM card will be installed into the CTS
server or CHI server.
Proposed Solution should have provision for digital signing in
hybrid environment i.e. distributed as well as in central
processing environment depending on Bank's requirement.
At Central and distributed levels, Digital Scanning can be
executed through HSM Card and e-tokens respectively or any
other mechanism proposed by the Bidder.
176 107 Technical Requirements:
Point no 48
The system should have provision for exception handling like Hold
Back before dispatching the image to RBI / NPCI. Before day end, it
should raise exceptions of such instruments present for the days
clearing.
Please elaborate the Point Provision to hold single or multiple items from respective
Batch(s) before released for Outward Presentation to CHI.
177 108 Technical Requirements:
Point no 52
The proposed solution should be single integrated solution for
Inward Clearing / Signature Verification / Outward Clearing / Reject
processing with a single database system for all the modules instead
of multiple systems. The proposed solution for Corporate Client and
Sub-Member Banks can be the centralised solution (Online) and/or
Off-line model depending on Bank’s requirements.
We propose a modular solution architecture to take care of
last mile failure, instead of single integrated solution for
Inward Clearing / Signature Verification / Outward Clearing /
Reject processing with a single database system for all the
modules instead of multiple systems, request you to please
amend the clause accordingly.
No change in RFP terms
178 109 Technical Requirements:
Point no 68
Option to mark batches specifically as P2F batches, NON CTS
batches, special clearing batches, etc. should be available at the
time scanning only.
Please prove more details on your requirement Capture Application should have feature by default for
Cheque Scanning as CTS Instruments. However, there should
be option available to create Non-CTS or Special Clearing
Batches for Special Session days as per RBI directives.
Similarly, Before or During Batch scanning, capture user can
mark the batch as Paper2Follow "P2F" so that post
presentation, subjective P2F marked batch can be handover
to NPCI physically during P2F Session timings easily.
179 112 Technical Requirements:
Point no 97
IW / DW should read payee names by ICR/OCR and validate with the
agent master uploaded in Core banking software.
ICR/OCR result are not very good on Indian cheques. we
request bank to please recommend if any specific ICR/OCR
engine need to be considered for integration and as well as
for normalization
No change in RFP terms