13
ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Embed Size (px)

Citation preview

Page 1: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

ID 02 CB Performance Indicators

Noureddine Filali B.GEO Work Plan Symposium

CB side eventGeneva, May 01, 2014

Page 2: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Genesis and historyGEOSS’ 10-Year Implementation Plan (2005): Within 6 years GEO will: … Produce monitoring and evaluation mechanisms for GEO capacity building efforts;

CB strategy (2006): stipulate the necessity to set in metrics for measuring the progress of CB objectives Task CBC 09-04-b (N. Filali, M.Andiswa, J.Berque)

WP : ID02 Expected achievement by 2015:“Develop qualitative and quantitative Performance Indicators for measuring the efficacy of institutional and individual capacity building programs”

Page 3: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Genesis and history•Report on CB PI for 2009-2011 GEO WP submitted to CB committee,•Poster presented during GEO plenary 2010 exhibition (CB boot).

Page 4: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

ObjectivesCB Strategic Target

Enhance the coordination of efforts to strengthen individual, institutional and infrastructure capacities, particularly in developing countries, to produce and use Earth observations and derived information products.

Specific objectives:Networking activities that specifically build individual, institutional and infrastructure capacity.Leveraging resources for Earth observation capacity building efforts.Increased use of Earth observation in policy and decision making.Enhanced participation of developing countries in GEO and GEOSS.

Page 5: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

PI problematicOutcome Rating Possible indicatorsNetworking activities that specifically build individual, institutional and infrastructure capacity.

Possibly measurable

Number of projects, infrastructures, institutions, people working on capacity building.

Leveraging resources for Earth observation capacity building efforts.

Possibly measurable

Monetary (and non-monetary?) commitments by other parties to earth observation capacity-building projects

Increased use of Earth observation in policy and decision making.

Not measurable

but examples may be

identified

Examples of users (Countries, International Institutions, Treaties and conventions,..) using earth obs data which did not use it previously.

Rate of use by current users.Enhanced participation of developing countries in GEO and GEOSS.

Likely measurable

Number of developing countries (how defined?) that are Members of GEO.

Number of developing countries participating in GEO tasks.

Page 6: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Methodological approach:Itterative process

Page 7: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Networking activities that specifically build individual,

institutional and infrastructure capacity.

Networking activities that specifically build individual,

institutional and infrastructure capacity.

AG-01-C1AG-01-C1

ID-02-C1ID-02-C1 ID-05-C1ID-05-C1

IN-04-C1IN-04-C1

IN-04-C2IN-04-C2

Leveraging resources for Earth observation capacity building

efforts.

Leveraging resources for Earth observation capacity building

efforts.

Increased use of Earth observation in policy and

decision making.

Increased use of Earth observation in policy and

decision making.

Enhanced participation of developing countries in GEO

and GEOSS

Enhanced participation of developing countries in GEO

and GEOSS

ID-02-C1ID-02-C1

ID-05-C1ID-05-C1

IN-04-C2IN-04-C2

ID-02-C1ID-02-C1

ID-05-C1ID-05-C1

IN-04-C2IN-04-C2

AG-01-C1AG-01-C1

ID-02-C1ID-02-C1

ID-05-C1ID-05-C1

IN-04-C2IN-04-C2

Methodological approach:Data collection online WP

Page 8: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Methodological approach:Data collection online WP

Using report generator tools of the online WP

Page 9: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Methodological approach:Data collection framework

Page 10: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Methodological approach:online survey questionnaire

Page 11: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

Intermediate results

Did CB components within your task are?

                                                                                                                   

What's the skills of the target people interested by CB activities?

                                                                                                                   

Which Continent will be targeted by this CB activity?

                                                                                                                   

Involvement of DCInvolvement of DCWhere CB Where CB

Achieved and planned CBAchieved and planned CB Achieved and planned CBAchieved and planned CB

Page 12: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

steps before Next GEO plenaryContinue data collection :

Questionnaire on CB beside GEO task leaders (questionnaire to be sent by Geosec),Process GEO tasks sheet,Collecting any other information about CB

Data processing and analysis, CB PI report redaction and submission to ID02,Recommendations for the next phase.

Page 13: ID 02 CB Performance Indicators Noureddine Filali B. GEO Work Plan Symposium CB side event Geneva, May 01, 2014

2014 requirements

More informations from tasks leads about CB activities, especially quatitative informations, (aswers data collection questionnaire),

Help in data collection, task sheet processing, analysisAny contributors is welcome

Please fill the CB questionnaire