Upload
jacob-gray
View
217
Download
0
Embed Size (px)
Citation preview
ICT
LAG(15)31
LAG ICT Update
10th November 2015Liver Advisory Group
Organ Donation & Transplantation
London
ICT
LAG(15)31
Contents
•Service Management Resourcing Update
•Key ODT Project Updates
•ODT Hub Overview
•Donor Registration Transformation (DRT) Context
•ICT Change Freeze
ICT
LAG(15)31
Head of Service ManagementAnthony Snape
ServiceDevelopment ManagerIan Millar
Service ManagerBloodMartinBrown
Service Manager ODTMichaela Ackland
Resourcing Update
Service Manager DTS & Group ServicesWendy Dewey
Service Implementation Team Steve LodgeKaren ChinnDavid Wong
Service Implementation TeamArthur BruceDeborah LomasVacancy
Service Implementation TeamKevin RichardsQura HussainMichelle Tones
Service Deployment ManagerGail Blair
Service Deployment LeadsLes MudgeChris MeijburgLouise ReynoldsDavid ClarkVacancy
Service Deployment CoordinatorVacancy
Service Deployment CoordinatorBen Philips
Service D
esign
Service T
ransitio
nS
ervice Strateg
y
Hospital IT Collaboration ManagerMandi Kaur
Recruitment underway – 6 month secondment, Jan 16 to Jun 16
ICT
LAG(15)31
Key ODT Project Updates
Type Summary Description Owner Expected Live Date
Project Status
IT Status Commentary
Project Donor Registration Transformation
To drive efficiencies and removes risk by providing the SNOD community with an iPad application which captures core donor data & more for upload to NTxD and EOS systems automatically.
John Richardson
Apr-16 G G Penetration testing has identified a number of issues with EOS which are being addressed however are not expected to impact the DRT project. Next EOS which supports DRT is due on 30th Nov.
Project ODT Hub To deliver a fundamnetal change in the Organ pathway, by changing the relationship between SNOD's and Duty Office. Programme will also involve the replacement of the National Tranplant database.
Ben Hume Apr-16 A A High level strategy in place and funding now approved for 2015/16 financial year covering Heart allocation scheme. Programme Mgr now in place (Alison Mayes). Delay to ICT systems selection process may impact 2015 project timescales and deliverables.
ICT
LAG(15)31
ICT
LAG(15)31
Funding and priority to be agreed and approved
ICT
LAG(15)31
DRT Coverage
ICT
LAG(15)31
ICT Change FreezeWhat is the IT Change Freeze?The change freeze is a period of time in which change to ‘Production’ or ‘Live’ IT services will be subject to an additional level of restriction and in most instances cannot be made. It is also possible that during the change freeze certain Development and Test environments for services hosted by NHSBT will not be available on an ad-hoc or consistent basis. Why is it needed?NHSBT ICT will be moving data centre equipment and network links to outsourced data centres provided by Specialist Computer Centres PLC (SCC) in Birmingham. To minimise risk and maximise service and resource availability it is important that all non-critical change is suspended while this work takes place. What change will be limited?The change freeze will apply to any change which is not classed as restoring normal service for ‘Production’ or ‘Live’ environments or services. Any software development, testing and deployment work can continue subject to the availability of such platforms as per above, and so long as no new infrastructure or changes to infrastructure are required, for example firewall changes. If there are resource conflicts for the IT Operations or QA teams between change requirements and the data centre move work then the data centre move will be prioritised to ensure adherence to schedule. Any projects that are planning to go live between now and the start of the change freeze must either prove failover between existing data centres as part of their operational acceptance testing or confirm that the change will not impact failover and agree this exemption with the Infrastructure Hosting Technical Design Lead. When will it be in force?The change freeze will be in place between 1st November 2015 to 1st April 2016. Exemptions to the change freeze will be managed through the IT Change Advisory Board (CAB) and any exceptions would require an impact assessment on the data centre move project and approval by the Technical Design Lead for Infrastructure Hosting project.
ICT
LAG(15)31
Thank You