ICS IN THE PRIVATE SECTOR

JASON MERANTE, CBCP, CISSPSENIOR MANAGER, BCM CAPABILITY LEAD

ACCENTURE

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Agenda

• Introduction

• Incident Command System (ICS) Overview

• Practical Example of ICS in the Private Sector

2

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Introduction

• Problem:  Lack of simple, effective crisis management framework in the private sector– Lack of formal protocols– Perceived lack of business need– Business functions operating in silos

• Solution:  The Incident Command System (ICS) – Flexible, scalable framework – Works in the private sector– Easy to deploy

3

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

ICS Definition

• ICS is a flexible framework designed to achieve effective communication and management during response to and recovery from a disaster

4

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

FEMA ICS Structure*

5

Command Staff

Gen

eral Staff

Incident Commander

Operations Planning Logistics Finance/Admin.

*Source:  http://training.fema.gov/EMIWeb/IS/ICSResource/assets/ICSOrganization.pdf

• ICS is a simple framework that can be used in the public and private sector

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

ICS History

• 1970s:  Created in response to California fires

• 1980s:  Localized expansion and adoption 

• 1990s:  Continued national expansion

• 2000s:  Formal adoption

6

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

ICS Applications

• ICS is a component of the National Incident Management System (NIMS), a FEMA standard

• ICS compliance is a requirement for DHS funding

• ICS is a core component of local CERT training

• ICS web based training and certification is applicable to public and private sector

7

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

• Asked by a global retailer to build a crisis management plan for the IT department

• Pitched the idea of building the plan around ICS framework

Case Study Background

8

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Development Drivers

• IT leadership mandate

• Typical drivers were not a factor

9

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Timing & Team

• 10 week project 

• Core project team of 2 full time people

• Extended team of > 36 contributors/reviewers

• Coordinated across multiple providers / locations

10

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Guiding Principles

• Use ICS as the core framework 

• Map employees into ICS sections

• Manage all levels of IT events

• Integrate into corporate business continuity

• Keep the plan simple and action oriented

• Designate at least two (2) contacts for each role

11

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Crisis Management Plan Scope

12

• The crisis management plan was built to bridge the gap between emergency management and the invocation of recovery plans

Corporate BC Plan

• Documents procedures for getting critical IT systems up and running in an alternate mode

• Includes the transition back to normal operations after the incident is over

Emergency Evacuation Plan

Crisis Management Plan

IT Systems DR Plan

• Addresses the initial stages of any event

• Usually includes specific actions associated with specific events: tornado, blizzard, fire, workplace violence

• Transitions into crisis management plan and/or BC plans and DR plans

• Includes the executive management team

• Oversees and coordinates required response to the incident

• Articulates procedures for communication to executive management

• Provides oversight to monitor recovery efforts

• Transitions into BC plans and DR plans

• Addresses business process recovery (including people)

• Documents procedures for getting critical business units and processes up and running in an alternate mode

• Includes the transition back to normal operations after the incident is over

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

IT Crisis Management Mapped to ICS

13

• The client IT organization was mapped into the ICS structure

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Contents Overview

14

Introduction

Declaration Process

Roles / Responsibilities

Plan Administration

Appendix

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Example:  Introduction

• This section of the plan is written to be a “tear‐away”executive summary

• Contains key information, such as:– Plan owner, alternate, and 

contact information– Summary process diagram– Communication flow 

diagram (call tree)– Team member mappings to 

ICS

15

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Classification System Details

• Introduced three (3) levels of event:– Minor:  expected duration < 24 hours; minimal to moderate damage; resolution by IT 

incident management

– Moderate:  expected duration < 72 hours; moderate damage; resolution by invoking select DR plans

– Severe:  expected duration > 72 hours; severe damage; resolution by invoking many DR plans

• Used a four (4) step process, along with timing guidelines, to manage crisis

– Notification (within 30 minutes)

– Assessment (within 45 minutes)

– Classification (within 60 minutes)

– Declaration (within 90 minutes)

16

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Pre‐Declaration Call Tree

17

• The flow of the call tree varies by event classification

Sources Vary

Automated Notification

IT Incident Manager

C: XXX-XXX-XXXXO: XXX-XXX-XXXX

IT Incident Manager

IT Incident Management Process

Support / Service Managers

Varies

IT Incident

Automated Notification

IT Incident Manager

C: XXX-XXX-XXXXO: XXX-XXX-XXXX

Infrastructure

C: XXX-XXX-XXXXO: XXX-XXX-XXXX

IT Executive Team

(See section 7.3 for contact list)

Infrastructure

C: XXX-XXX-XXXXO: XXX-XXX-XXXX

Business Continuity

C: XXX-XXX-XXXXO: XXX-XXX-XXXX

Vendor Incident

Phone Call or Email

Facility or Other Incident

Phone Call or Email

Vendors

(See section 13.3 for contact list)

Crisis Management Team

(See section 2.4 & 2.5 for contact list)

Minor Crisis Moderate/Severe Crisis

Notification

Assessment

Classification

Declaration

Step

IT Incident Manager

IT Incident Management Process

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

ICS Team Structure

• The ICS structure was used as the basis for the team

18

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Example:  Declaration Process

• This section of the plan provides details on the disaster declaration process and associated communications– Details on each step of the process

– Detailed process flow diagrams

19

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

IT Crisis Management Process Summary

20

Incident Command

Planning

Operations

Logistics

Finance

1 - Notification Next Steps 4 - Declaration2 - Assessment 3 - Classification Within 30 minutes Within 45 minutes Within 60 minutes Within 90 minutes As Necessary

Gen

eral

Sta

ff C

omm

and

Staf

f

Event

Other

Classification LevelIncident Command

IT Incident Management

Safety/Security

Incident CommandIncident Command

IT Incident Management

Planning

Operations

Logistics

Finance

Enterprise BC

Internal Communications

External Comms

StepTiming

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Example:  Roles & Responsibilities

• This section of the plan describes detailedroles for each ICS section aligned team member– Primary and alternate leads for each section

– Brief overview of responsibilities

– Detailed description of recovery responsibilities

21

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Crisis Management Team – General Staff

• Incident Commander: IT Incident Management or Infrastructure Operations

• Operations: IT Incident Management and Technology Group 

• Planning: Disaster Recovery Team

• Logistics: IT Procurement

• Finance and Administration: Finance

22

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Crisis Management Team – Command Staff

• Business Continuity

• Communications/Public Relations (PR)

• Legal

• Safety

• Security

23

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Example:  Plan Administration

• Describes plan maintenance, testing, and distribution 

24

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Plan Example:  Appendix

• This section of the plan contains additional information, links, and resources

25

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Challenges / Lessons Learned

• Long review cycles

• Challenging stakeholder introductions

• Good stakeholder cooperation

26

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

After Action Report: State of the Plan

• Used in several test cases

• Accepted internally and externally

27

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Conclusions

• ICS is a flexible framework 

• ICS works in the private sector

• ICS is simple to deploy from scratch

• An ICS aligned crisis management plan will – Enable improved communications and management– Improve confidence in overall BCM capability– Integrate with other BCM plans

28

April 16‐18, 2012 • Talking Stick Resort • Scottsdale, Arizona

Questions

29

• Please contact me with any follow up questions:

Additional ResourcesRobert S. Emmel

Accenture161 North Clark StreetChicago, IL 60601 ‐3200

Tel:   (312) 693 ‐3892Mobile: (630) 913 ‐8319Email: robert.emmel

@accenture.com

Additional ResourcesJason Merante