4800 METALMASTER WAY - McHENRY, IL 60050 PHONE: 815.477-GEMS WEBSITE: WWW.SNOGEM.COM FAX: 815.455.GEMS E-MAIL: [email protected] DRAWN BY: DATE: SCALE: *** iCLAD™ INSTALLATION INSTRUCTIONS *** ROOF PANEL SEAM (SEAM CONFIGURATION MAY VARY) 5+.8'4 $7..'6Š SET SCREW 5+.8'4 $7..'6Š SET SCREW 501 %7$'Š (MAY VARY DEPENDING ON PROFILE OF METAL ROOF PANEL) SINGLE LOCK PROFILE DOUBLE LOCK PROFILE BULB STYLE PROFILE T-SEAM PROFILE SNO CUBE™ INSTALLATION INSTRUCTIONS 1. MEASURE THE DISTANCE FROM THE EAVE TO THE LOCATION OF THE FIRST ROW AND USE A STRING LINE OVER THE ROOF PANEL SEAMS TO ESTABLISH A STRAIGHT GUIDELINE FOR INSTALLATION. 2. #.+)0 6*' 501 %7$'Š %.#/2 10 6*' 5'#/ ':#%6.; #5 5*190 +0 6*' 14+'06#6+10 10 6*' 4+)*6 5+&' 1( 6*+5 2#)' &'2'0&+0) 10 6*' #22.+%#$.' 5'#/ 241(+.' 3. SET THE FIRST (2) SET SCREWS THAT ARE LOCATED ON THE SIDE OF THE CLAMP WITH THE (2) THREADED HOLES LOCATED AT THE BOTTOM OF THE CLAMP. THE TORQUE SHOULD BE VERIFIED WITH A CALIBRATED TORQUE WRENCH WITHIN THE RECOMMENDED GUIDELINES SET FORTH IN STEP 4 BELOW. NOTE: IF THERE ARE (2) DIFFERENT SIZE SET SCREWS, ALWAYS USE THE LONGER SIZE ONES FOR THIS STEP. 4. USING A CALIBRATED TORQUE WRENCH, TIGHTEN THE THIRD AND FINAL SET SCREW WHICH IS LOCATED ON THE SIDE OF THE CLAMP OPPOSITE THE (2) SET SCREWS SET IN THE PREVIOUS STEP. SET SCREWS SHOULD BE TORQUED AND VERIFIED PER THE FOLLOWING RECOMMENDATIONS: NOTE: CONTACT SNO GEM, INC. FOR THE RECOMMENDED TORQUE REQUIREMENTS OF ANY METAL GAUGE AND/OR MATERIAL NOT LISTED BELOW. A. 24 Ga. STEEL = 150 IN/LBS - 160 IN/LBS B. 22 Ga. STEEL = 180 IN/LBS - 200 IN/LBS 5. 8'4+(; 6*#6 6*' 501 %7$'Š %.#/2 +5 5'%74' 564#+)*6 #0& .'8'. 6*'0 4'2'#6 56'25 (14 4'/#+0+0) %.#/25 $' 574' 61 (1..19 6*' #4%*+6'%65 #0&14 ENGINEER'S REQUIRED SPACING AND/OR LAYOUT, INCLUDING THEIR ADJUSTMENTS FOR FIELD CONDITIONS, IF ANY. (A RECOMMENDED LAYOUT IS FURNISHED BY SNO GEM, INC. ONLY UPON WRITTEN REQUEST) T.B.D. DISCLAIMER THE INFORMATION HEREIN IS CONFIDENTIAL AND PROPRIETARY AND IS NOT TO BE DISCLOSED OR DELIVERED TO THIRD PARTIES WITHOUT THE PRIOR WRITTEN CONSENT OF SNO GEM, INC. SNO GEM, INC. DOES NOT WARRANT THE INSTALLATION IF ITS PRODUCTS. PRODUCT PERFORMANCE IS DEPENDENT ON THE INSTALLERS STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS. SNO GEM, INC. IS NOT A LICENSED ARCHITECT OR ENGINEER, THEREFORE WE STRONGLY RECOMMEND THAT AN ARCHITECT AND/OR STRUCTURAL ENGINEER PROPERLY LICENSED IN THE CITY AND STATE WHERE THE PROJECT IS LOCATED, REVIEW THE CONTEMPLATED LAYOUT TO ENSURE THAT THE BUILDING STRUCTURE CAN WITHSTAND THE PROJECTED SNOW LOAD. SNO GEM, INC. ASSUMES NO LIABILITY THEREFORE. 1 K%.#&Š +056#..#6+10 +05647%6+105 RJH 11/12/16 N.T.S. SNAP LOCK PROFILE 501 %7$'Š 5*190 501 %7$'Š 5*190 501 %7$'Š 5*190 501 %7$'Š <+2 5*190 501 %7$'Š 9+&' 5*190 2 SET SCREW SIDE 2 SET SCREW SIDE 2 SET SCREW SIDE 2 SET SCREW SIDE 2 SET SCREW SIDE TYP. WAVELOCK™ DETAIL 5+.8'4 $7..'6Š SET SCREW PANEL SEAM 1" NAIL-STRIP PROFILE 501 %7$'Š -.1% /+0+ 5*190 2 SET SCREW SIDE

iCLAD™ INSTALLATION INSTRUCTIONS...4800 METALMASTER WAY - McHENRY, IL 60050 PHONE:815.477-GEMS WEBSITE: FAX:815.455.GEMS E-MAIL:[email protected] DRAWN BY: DATE: SCALE: *** iCLAD INSTALLATION

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: iCLAD™ INSTALLATION INSTRUCTIONS...4800 METALMASTER WAY - McHENRY, IL 60050 PHONE:815.477-GEMS WEBSITE: FAX:815.455.GEMS E-MAIL:INFO@SNOGEM.COM DRAWN BY: DATE: SCALE: *** iCLAD INSTALLATION

4800 METALMASTER WAY - McHENRY, IL 60050PHONE: 815.477-GEMS WEBSITE: WWW.SNOGEM.COM

FAX: 815.455.GEMS E-MAIL: [email protected]

DRAWN BY:

DATE:

SCALE:

*** iCLAD™ INSTALLATION INSTRUCTIONS ***

ROOF PANEL SEAM

(SEAM CONFIGURATION MAY VARY)

SILVER BULLET™

SET SCREW

SILVER BULLET™

SET SCREW

SNO CUBE™

(MAY VARY DEPENDING

ON PROFILE OF METAL ROOF PANEL)

SIN

GLE

LO

CK

PR

OF

ILE

DO

UB

LE L

OC

K P

RO

FIL

EB

ULB

ST

YLE

PR

OF

ILE

T-S

EA

M P

RO

FIL

E

SNO CUBE™ INSTALLATION INSTRUCTIONS

1. MEASURE THE DISTANCE FROM THE EAVE TO THE LOCATION OF THE FIRST ROW AND USE A STRING LINE OVER THE ROOF PANEL SEAMS TO ESTABLISH A STRAIGHT GUIDELINE FOR

INSTALLATION.

2. ALIGN THE SNO CUBE™ CLAMP ON THE SEAM EXACTLY AS SHOWN IN THE ORIENTATION ON THE RIGHT SIDE OF THIS PAGE, DEPENDING ON THE APPLICABLE SEAM PROFILE.

3. SET THE FIRST (2) SET SCREWS THAT ARE LOCATED ON THE SIDE OF THE CLAMP WITH THE (2) THREADED HOLES LOCATED AT THE BOTTOM OF THE CLAMP. THE TORQUE SHOULD BE

VERIFIED WITH A CALIBRATED TORQUE WRENCH WITHIN THE RECOMMENDED GUIDELINES SET FORTH IN STEP 4 BELOW.

NOTE: IF THERE ARE (2) DIFFERENT SIZE SET SCREWS, ALWAYS USE THE LONGER SIZE ONES FOR THIS STEP.

4. USING A CALIBRATED TORQUE WRENCH, TIGHTEN THE THIRD AND FINAL SET SCREW WHICH IS LOCATED ON THE SIDE OF THE CLAMP OPPOSITE THE (2) SET SCREWS SET IN THE

PREVIOUS STEP. SET SCREWS SHOULD BE TORQUED AND VERIFIED PER THE FOLLOWING RECOMMENDATIONS:

NOTE: CONTACT SNO GEM, INC. FOR THE RECOMMENDED TORQUE REQUIREMENTS OF ANY METAL GAUGE AND/OR MATERIAL NOT LISTED BELOW.

A. 24 Ga. STEEL = 150 IN/LBS - 160 IN/LBS B. 22 Ga. STEEL = 180 IN/LBS - 200 IN/LBS

5. VERIFY THAT THE SNO CUBE™ CLAMP IS SECURE, STRAIGHT AND LEVEL, THEN REPEAT STEPS 2-5 FOR REMAINING CLAMPS. BE SURE TO FOLLOW THE ARCHITECT'S AND/OR

ENGINEER'S REQUIRED SPACING AND/OR LAYOUT, INCLUDING THEIR ADJUSTMENTS FOR FIELD CONDITIONS, IF ANY. (A RECOMMENDED LAYOUT IS FURNISHED BY SNO GEM, INC. ONLY

UPON WRITTEN REQUEST)

T.B.D.

DISCLAIMER

THE INFORMATION HEREIN IS CONFIDENTIAL AND PROPRIETARY AND IS NOT TO BE DISCLOSED OR DELIVERED TO THIRD

PARTIES WITHOUT THE PRIOR WRITTEN CONSENT OF SNO GEM, INC.

SNO GEM, INC. DOES NOT WARRANT THE INSTALLATION IF ITS PRODUCTS. PRODUCT PERFORMANCE IS DEPENDENT ON

THE INSTALLERS STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS.

SNO GEM, INC. IS NOT A LICENSED ARCHITECT OR ENGINEER, THEREFORE WE STRONGLY RECOMMEND THAT AN

ARCHITECT AND/OR STRUCTURAL ENGINEER PROPERLY LICENSED IN THE CITY AND STATE WHERE THE PROJECT IS

LOCATED, REVIEW THE CONTEMPLATED LAYOUT TO ENSURE THAT THE BUILDING STRUCTURE CAN WITHSTAND THE

PROJECTED SNOW LOAD. SNO GEM, INC. ASSUMES NO LIABILITY THEREFORE.

1

iCLAD™ INSTALLATION INSTRUCTIONSRJH

11/12/16

N.T.S.

SN

AP

LO

CK

PR

OF

ILE

SNO CUBE™ SHOWN SNO CUBE™ SHOWN

SNO CUBE™ SHOWN

SNO CUBE™ ZIP SHOWN

SNO CUBE™ WIDE SHOWN

2 S

ET

SC

RE

W S

IDE

2 S

ET

SC

RE

W S

IDE

2 S

ET

SC

RE

W S

IDE

2 S

ET

SC

RE

W S

IDE

2 S

ET

SC

RE

W S

IDE

TY

P.

WA

VE

LOC

K™

DE

TA

IL

SILVER BULLET™

SET SCREW

PANEL SEAM

1"

NA

IL-S

TR

IP P

RO

FIL

E

SNO CUBE™ KLOC MINI SHOWN

2 S

ET

SC

RE

W S

IDE

Page 2: iCLAD™ INSTALLATION INSTRUCTIONS...4800 METALMASTER WAY - McHENRY, IL 60050 PHONE:815.477-GEMS WEBSITE: FAX:815.455.GEMS E-MAIL:INFO@SNOGEM.COM DRAWN BY: DATE: SCALE: *** iCLAD INSTALLATION

iBEAM™ INSTALLATION INSTRUCTIONS

1. ONCE THE SNO CUBE™ CLAMPS HAVE BEEN INSTALLED AND VERIFIED TO BE PROPERLY TORQUED TO THE MANUFACTURER'S RECOMMENDATIONS, SLIDE A SECTION OF THE

iBEAM™ ONTO THE CLAMPS BY ALIGNING THE KEYS ON THE iBEAM TO THE KEYWAYS ON THE SNO CUBE™.

2. SLIDE THE ENTIRE iBEAM™ SECTION SO THAT THE END IS NO MORE THAN 6" FROM / PAST THE LAST SNO CUBE CLAMP™.

3. ONCE A SECTION OF iBEAM™ HAS BEEN COMPLETELY SLID ONTO THE SNO CUBE™ CLAMPS, ALIGN THE 10-16 x 0.5" TEK FASTENER WITH THE FASTENER ALIGNMENT NOTCH ON THE

iBEAM™ AND THE PANEL SEAM, PULL THE SECTION OF iBEAM™ DOWN SLOPE, THEN FASTEN THROUGH THE iBEAM™ AND INTO THE SNO CUBE™ CLAMP.

4. REPEAT STEP 3 FOR EACH SNO CUBE™ WITHIN THE FIRST SECTION OF THE iBEAM™.

5. REPEAT STEPS 1-4 FOR THE REMAINING SECTIONS OF iBEAM'S™ LEAVING A 0.25" OF GAP IN BETWEEN EACH iBEAM™ ALLOW FOR THERMAL EXPANSION.

10-16 x 0.5" TEK FASTENER

TYPICAL PANEL SEAM

(SEAM CONFIGURATION MAY VARY)

FASTENER ALIGNMENT

NOTCH

iBEAM

TYPICAL SNO CUBE™

KEY

KEYWAY

4800 METALMASTER WAY - McHENRY, IL 60050PHONE: 815.477-GEMS WEBSITE: WWW.SNOGEM.COM

FAX: 815.455.GEMS E-MAIL: [email protected]

DRAWN BY:

DATE:

SCALE:

*** iCLAD™ INSTALLATION INSTRUCTIONS ***

DISCLAIMER

THE INFORMATION HEREIN IS CONFIDENTIAL AND PROPRIETARY AND IS NOT TO BE DISCLOSED OR DELIVERED TO THIRD

PARTIES WITHOUT THE PRIOR WRITTEN CONSENT OF SNO GEM, INC.

SNO GEM, INC. DOES NOT WARRANT THE INSTALLATION IF ITS PRODUCTS. PRODUCT PERFORMANCE IS DEPENDENT ON

THE INSTALLERS STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS.

iCLAD™ INSTALLATION INSTRUCTIONSRJH

11/12/16

N.T.S.

SNO GEM, INC. IS NOT A LICENSED ARCHITECT OR ENGINEER, THEREFORE WE STRONGLY RECOMMEND THAT AN

ARCHITECT AND/OR STRUCTURAL ENGINEER PROPERLY LICENSED IN THE CITY AND STATE WHERE THE PROJECT IS

LOCATED, REVIEW THE CONTEMPLATED LAYOUT TO ENSURE THAT THE BUILDING STRUCTURE CAN WITHSTAND THE

PROJECTED SNOW LOAD. SNO GEM, INC. ASSUMES NO LIABILITY THEREFORE.

2

iBEAM

FASTENER RELIEF CORE

KEY

KEYWAY

Page 3: iCLAD™ INSTALLATION INSTRUCTIONS...4800 METALMASTER WAY - McHENRY, IL 60050 PHONE:815.477-GEMS WEBSITE: FAX:815.455.GEMS E-MAIL:INFO@SNOGEM.COM DRAWN BY: DATE: SCALE: *** iCLAD INSTALLATION

iSPLICE™

10-16 x 0.5" TEK FASTENER

(1 PER iSPLICE™)

0.25" GAP TO ALLOW FOR

THERMAL EXPANSION

1. ONCE ALL OF THE iBEAM'S™ HAVE BEEN FULLY INSTALLED, PLACE AN iSPLICE™ AT EACH JOINT. MAKE SURE THERE IS AT AT LEAST A 0.25" GAP BETWEEN EACH ADJOINING

iBEAM™ TO ALLOW FOR THERMAL EXPANSION.

2. INSTALL THE iSPLICE™ BY SIMPLY PLACING THE END WITHOUT THE PRE-PUNCHED HOLES UP INTO THE iBEAM™ AND ROTATE INTO PLACE (SEE ABOVE DETAIL).

3. USING A 10-16 x 0.5" TEK FASTENER, FASTEN THE iSPLICE™ TO THE iBEAM™. USE ONLY (1) TEK FASTENER PER iSPLICE™ AND FASTEN THROUGH THE PRE-PUNCHED HOLE FURTHEST

FROM THE CLOSET SNO CUBE™ CLAMP.

4. REPEAT STEPS 1-3 FOR EACH JOINT WHERE (2) iBEAMS™ MEET.

iBEAM

iSPLICE™

0.25"

6" MAX

iSPLICE™ INSTALLATION INSTRUCTIONS

10-16 x 0.5" TEK FASTENER

4800 METALMASTER WAY - McHENRY, IL 60050PHONE: 815.477-GEMS WEBSITE: WWW.SNOGEM.COM

FAX: 815.455.GEMS E-MAIL: [email protected]

DRAWN BY:

DATE:

SCALE:

*** iCLAD™ INSTALLATION INSTRUCTIONS ***

DISCLAIMER

THE INFORMATION HEREIN IS CONFIDENTIAL AND PROPRIETARY AND IS NOT TO BE DISCLOSED OR DELIVERED TO THIRD

PARTIES WITHOUT THE PRIOR WRITTEN CONSENT OF SNO GEM, INC.

SNO GEM, INC. DOES NOT WARRANT THE INSTALLATION IF ITS PRODUCTS. PRODUCT PERFORMANCE IS DEPENDENT ON

THE INSTALLERS STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS.

iCLAD™ INSTALLATION INSTRUCTIONSRJH

11/12/16

N.T.S.

SNO GEM, INC. IS NOT A LICENSED ARCHITECT OR ENGINEER, THEREFORE WE STRONGLY RECOMMEND THAT AN

ARCHITECT AND/OR STRUCTURAL ENGINEER PROPERLY LICENSED IN THE CITY AND STATE WHERE THE PROJECT IS

LOCATED, REVIEW THE CONTEMPLATED LAYOUT TO ENSURE THAT THE BUILDING STRUCTURE CAN WITHSTAND THE

PROJECTED SNOW LOAD. SNO GEM, INC. ASSUMES NO LIABILITY THEREFORE.

3

Page 4: iCLAD™ INSTALLATION INSTRUCTIONS...4800 METALMASTER WAY - McHENRY, IL 60050 PHONE:815.477-GEMS WEBSITE: FAX:815.455.GEMS E-MAIL:INFO@SNOGEM.COM DRAWN BY: DATE: SCALE: *** iCLAD INSTALLATION

3" METAL COLOR STRIP

(SAME MATERIAL AS ROOF PANEL)

10-16 x 0.5" TEK FASTENER

(MIN. OF 3 PER COLOR STRIP)

1. USING THE SAME MATERIAL AS THE ROOF PANEL, CUT 3" STRIPS TO MATCH THE LENGTH OF THE iBEAM AND ENOUGH TO CLAD EACH ROW FULLY.

2. MEASURE AND MARK 1" OFF THE LONG EDGE OF THE 3" STRIP, THEN FULLY BEND +/-135° OVER (SEE ABOVE DETAIL).

3. TAKE EACH STRIP AND LAY EACH STRIP OVER THE iBEAM™ SO THAT THE EDGE OPPOSITE OF THE BEND SITS INSIDE THE CHANNEL OF THE iBEAM™, AND SO THAT ANY ADJOINING

STRIPS OVERLAP EACH OTHER NO MORE THAN 2".

FOR THICKER GAUGE MATERIAL, CUTTING OUT A SMALL NOTCH AT THE BOTTOM CORNER MAY BE NECESSARY TO ACHIEVE THE SPECIFIED OVERLAP (SEE DETAIL ABOVE).

4. USE A 10-16 x 0.5" TEK FASTENER TO FASTEN EACH METAL COLOR STRIP TO THE iBEAM™ USING THE FASTENER ALIGNMENT NOTCH AND PANEL SEAM AS A GUIDE.

NOTE: THERE SHOULD BE A TEK FASTENER INSTALLED AT EVERY OTHER CLAMP OR 32" O.C. MAX.

METAL COLOR STRIP INSTALLATION INSTRUCTIONS

2" MIN. OVERLAP

2"+/-

1"+/-

45°

3" METAL COLOR STRIP

RELIEF NOTCH AS NEEDED FOR

THICKER GAUGED MATERIAL.

(APPROX. 2" x 3/16")

4800 METALMASTER WAY - McHENRY, IL 60050PHONE: 815.477-GEMS WEBSITE: WWW.SNOGEM.COM

FAX: 815.455.GEMS E-MAIL: [email protected]

DRAWN BY:

DATE:

SCALE:

*** iCLAD™ INSTALLATION INSTRUCTIONS ***

DISCLAIMER

THE INFORMATION HEREIN IS CONFIDENTIAL AND PROPRIETARY AND IS NOT TO BE DISCLOSED OR DELIVERED TO THIRD

PARTIES WITHOUT THE PRIOR WRITTEN CONSENT OF SNO GEM, INC.

SNO GEM, INC. DOES NOT WARRANT THE INSTALLATION IF ITS PRODUCTS. PRODUCT PERFORMANCE IS DEPENDENT ON

THE INSTALLERS STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS.

iCLAD™ INSTALLATION INSTRUCTIONSRJH

11/12/16

N.T.S.

SNO GEM, INC. IS NOT A LICENSED ARCHITECT OR ENGINEER, THEREFORE WE STRONGLY RECOMMEND THAT AN

ARCHITECT AND/OR STRUCTURAL ENGINEER PROPERLY LICENSED IN THE CITY AND STATE WHERE THE PROJECT IS

LOCATED, REVIEW THE CONTEMPLATED LAYOUT TO ENSURE THAT THE BUILDING STRUCTURE CAN WITHSTAND THE

PROJECTED SNOW LOAD. SNO GEM, INC. ASSUMES NO LIABILITY THEREFORE.

4

Page 5: iCLAD™ INSTALLATION INSTRUCTIONS...4800 METALMASTER WAY - McHENRY, IL 60050 PHONE:815.477-GEMS WEBSITE: FAX:815.455.GEMS E-MAIL:INFO@SNOGEM.COM DRAWN BY: DATE: SCALE: *** iCLAD INSTALLATION

iPLATE™

10-16 x 0.5" TEK FASTENER

iPLATE™

1. ALIGN THE iPLATE™ ALONG THE BACK EDGE OF THE iBEAM AS SHOWN IN THE ABOVE DETAIL PER THE ARCHITECT'S AND/OR ENGINEER'S REQUIRED SPACING AND/OR

LAYOUT, INCLUDING THEIR ADJUSTMENTS FOR FIELD CONDITIONS, IF ANY. (A RECOMMENDED LAYOUT IS FURNISHED BY SNO-GEM®, INC. ONLY UPON WRITTEN REQUEST)

2. USING (2) 10-16 x 0.5" TEK FASTENERS, ATTACH THE iPLATE™ TO THE iBEAM™.

3. MAKE SURE THAT THE iPLATE™ IS SECURELY FASTENED.

4. REPEAT STEPS 1-3 FOR THE REMAINING iPLATES™.

iPLATE™ INSTALLATION INSTRUCTIONS

4800 METALMASTER WAY - McHENRY, IL 60050PHONE: 815.477-GEMS WEBSITE: WWW.SNOGEM.COM

FAX: 815.455.GEMS E-MAIL: [email protected]

DRAWN BY:

DATE:

SCALE:

*** iCLAD™ INSTALLATION INSTRUCTIONS ***

DISCLAIMER

THE INFORMATION HEREIN IS CONFIDENTIAL AND PROPRIETARY AND IS NOT TO BE DISCLOSED OR DELIVERED TO THIRD

PARTIES WITHOUT THE PRIOR WRITTEN CONSENT OF SNO GEM, INC.

SNO GEM, INC. DOES NOT WARRANT THE INSTALLATION IF ITS PRODUCTS. PRODUCT PERFORMANCE IS DEPENDENT ON

THE INSTALLERS STRICT ADHERENCE TO THESE INSTALLATION INSTRUCTIONS.

iCLAD™ INSTALLATION INSTRUCTIONSRJH

11/12/16

N.T.S.

SNO GEM, INC. IS NOT A LICENSED ARCHITECT OR ENGINEER, THEREFORE WE STRONGLY RECOMMEND THAT AN

ARCHITECT AND/OR STRUCTURAL ENGINEER PROPERLY LICENSED IN THE CITY AND STATE WHERE THE PROJECT IS

LOCATED, REVIEW THE CONTEMPLATED LAYOUT TO ENSURE THAT THE BUILDING STRUCTURE CAN WITHSTAND THE

PROJECTED SNOW LOAD. SNO GEM, INC. ASSUMES NO LIABILITY THEREFORE.