Upload
amarnath-acharya
View
42
Download
0
Embed Size (px)
Citation preview
T
2
3
9
1
0
0
m
T115
T115
50
T208-L
T
1
1
5
5
0
NEW
RO
AD
LAYO
UT AH
EAD
80
T1
1
3
T
1
1
3
T
1
1
3
T
3
0
1
T
3
0
1
T
3
0
1
T
3
0
0
T
3
0
2
R
1
0
8
-
L
R
1
0
8
-
L
T
1
1
5
5
0
100 m
R214
T200
P900
12
0
80
T115
T117
50
T115
50
NEW
RO
AD
LAYO
UT AH
EAD
80
200 m
400 m
T117
80
T115
80
T200
MAIN CONTRACTOR:
PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS)
MINISTRY OF INTERIOR
HEAD OF PLANNING, SAFETY AND RADARS DIVISION (SIGNATURE)
TRAFFIC & PATROL DEPARTMENT
LOCATION PLAN
WAKRAH BYPASS ROAD EXW- P015PROJECT CODE : P 015
CHECKED
DATE
DWG. NO.
DESIGNED
TITLE
DD APPROVAL
SCALE
STATUS
PROJECT
LOGO OR OFFICIAL STAMPASHGHAL TDP APPROVER LOGO OR OFFICIAL STAMP
APPROVER (SIGNATURE)
ASHGHAL TDP REVIEWER LOGO OR OFFICIAL STAMP
REVIEWER (SIGNATURE)
PROJECT MANAGEMENT CONSULTANT: LOGO OR OFFICIAL STAMP
REVIEWER (SIGNATURE AND STAMP)
GENERAL ENGINEERING CONSULTANT: LOGO OR OFFICIAL STAMP
PROJECT MANAGER (SIGNATURE AND CONTACT ADDRESS)
LOGO OR OFFICIAL STAMP
TRAFFIC DIVERSION PLAN APPROVALS GROUP COMMENTS
TRAFFIC POLICE DEPARTMENT COMMENTS
NOTES:
-CONCRETE BARRIER WITH FLASHING
LEGEND:
-SIGN POST / A FRAME
-TRAFFIC SIGN AND REFERENCE
BEACON AND REFLECTIVE TAPE
-PLASTIC WATER FILLED BARRICADE
@A1
REV. NO.
INFRASTRUCTURE AFFAIRS
PUBLIC WORKS AUTHORITY
P.O. BOX 22188
TEL: 44950055
FAX: 44950441
Client:
AM
TM
REV DATE DESCRIPTION
NUMBER
N
-WORK ZONE
TDP Designer:
LARSEN & TOUBRO LTD.
LOCATION
13/12/2015 AS SHOWN
N
See TDP Documents
CA
CA ISSUED FOR APPROVAL13/12/2015
SCALE 1:1000
-EXISTING ROAD
-PROPOSED DIVERSION
CO
NT
IN
UE
D O
N E
XW
-P
015-0000-T
M-LN
T-S
K-00002-010
MA
TC
H LIN
E "B
"
MA
TC
H LIN
E "C
"
MA
TC
H LIN
E "C
"M
AT
CH
LIN
E "D
"
MA
TC
H LIN
E "D
"
SCALE 1:1000
N
N
SCALE 1:1000
SCALE 1:1000
N
Existing Mesaieed Road
Proposed Diversion
Existing Mesaieed Road
Existing Mesaieed Road
Existing Mesaieed Road
MA
TC
H LIN
E "B
"
EXW-P015-0000-TM-LNT-SK-00002-011
TRAFFIC DIVERSION PLAN
PHASE 1 - STATIC WORKS
DURATION OF TRAFFIC DIVERSION WORKS
Static Works
START DATE: 10.01.2016
COMPLETION DATE: 21.04.2016
DESCRIPTION OF WORKS:
Static traffic diversion along Mesaieed road at
junction IC12 to create workzone to facilitate the
construction of the Wakra Bypass.
WZTMG LAYOUT NO: - TL-DC 12 (Modified)