    1.O INTR ODUC TI O N

    The Swedish Tech-built System (STS) method was firstdeveloped by 2 Swede architects, L G Sernebald and B

    Skarin. Widely used in the USA under licence.

  • 8/8/2019 IBS - Light Tech Built

    3/38

    3

    TECH-BUILT

    1.O INTR ODUC TI O N (cont ..)

    I t employs small & strictly modular construction unitsfor the construction of:

    a. a high quality temporary building b. a flexible semi permanent building c. a flexible permanent building.

    Allow easy modification on structural requirement.

  • 8/8/2019 IBS - Light Tech Built

    4/38

    4

    TECH-BUILT

    1.O INTR ODUC TI O N (cont ..)

    The building can be erected by unskilled workers without sacrificing the standards of comfort, design &

    layout of the houses.

  • 8/8/2019 IBS - Light Tech Built

    5/38

    5

    TECH-BUILT

    1.O INTR ODUC TI O N (cont ..)

    App lication The system can be applied for the rapid erection of

    houses, factories, offices & schools with maximumheight of 2 floors.

  • 8/8/2019 IBS - Light Tech Built

    6/38

    6

    TECH-BUILT

    a tech-built house with a steel frame

  • 8/8/2019 IBS - Light Tech Built

    7/38

    7

    TECH-BUILT

    2 .0 TE CH NIQ UES

    FoundationLaid in a conventional method upon a concrete pad /raft footing or upon a basement floor, with additionalseries of bolts (holding down bolts) cast into theconcrete slab.

  • 8/8/2019 IBS - Light Tech Built

    8/38

    8

    TECH-BUILT

    2 .0 TE CH NIQ UES

    Ty pes of U nits2 main types of building components are used for basic

    framework:a. Floor beam unit (1.3 m long / weight 3 1 lb).b. Wall frame unit (column) (2.6 m long / weight 79 lb).

  • 8/8/2019 IBS - Light Tech Built

    9/38

    9

    TECH-BUILT

    2 .0 TE CH NIQ UES

    Floor beam & Wall frameBoth units are mass-produced at factory using 2mmthick sheet steel with corrosion resistance surfacetreatment.

    The floor beam units are perforated with 4 large holes

    to reduce weight & to provide position of services(sanitary, water supply, electricity, heating pipes,telephone etc).

  • 8/8/2019 IBS - Light Tech Built

    10/38

    10

    TECH-BUILT

    2 .0 TE CH NIQ UES

    Special high tensile steel bolts are used for construction works

    The only tool required for the erection of the basicframeworks are 2 spanners.

  • 8/8/2019 IBS - Light Tech Built

    11/38

    11

    TECH-BUILT

    Floor beam unit (1. 3 m intervals)

    Wall frame unit(2.6 m high)

    Note :Floor beams are perforated to reduce dead load and to allow building services.

  • 8/8/2019 IBS - Light Tech Built

    12/38

    12

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD

    A grid is constructed from the flooring beams, thenbolted to the foundation slab (onto the holding downbolts).

    1.3 m x 1.3 m gridlines

  • 8/8/2019 IBS - Light Tech Built

    13/38

    13

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    The vertical wall frame units are next erected, by fastening the lower ends with 2 bolts (high tensile bolts)to the flooring beam grid by using only spanner.

  • 8/8/2019 IBS - Light Tech Built

    14/38

    14

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    The 1 st floor flooring grid is next erected the same way as the ground floor.

  • 8/8/2019 IBS - Light Tech Built

    15/38

    15

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)Sequences

    1st : construction of ground floor beam units

    2nd : construction of ground floor wall frameunits (column)

    3 rd : construction of first floor beam units

    4 th : construction of First floor wall frameUnits (column)

    5 th : construction of Roof beam units

  • 8/8/2019 IBS - Light Tech Built

    16/38

    16

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    Stages in the framework erection

  • 8/8/2019 IBS - Light Tech Built

    17/38

    17

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    A special junction plate and bolt is used to make thejunctions of 4 flooring beams. The joints betweenflooring beam are strong enough to permit a free span

    of 4 modules (1.3 m x 4 = 5 .2m).

  • 8/8/2019 IBS - Light Tech Built

    18/38

    18

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    A special junction detail

    Floor beam unit

    2mm thk mild steel

  • 8/8/2019 IBS - Light Tech Built

    19/38

    19

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    Where balconies or overhangs required, extra flooring beams are simply bolted to the existing flooring section,outside the main framework (cantilevered of 1 module)

    Cantilevered of 1 module only

  • 8/8/2019 IBS - Light Tech Built

    20/38

    20

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    Cross bracing by special reinforcement rods is provideddiagonally to the structure to reinforce the units.

    Cross bracers

    Vertical member for pitch roof

  • 8/8/2019 IBS - Light Tech Built

    21/38

    21

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    Shorter vertical units are bolted to the flooring grids(roof beams) in such a way to produce the pitch of theroof.

    Pitched roof

  • 8/8/2019 IBS - Light Tech Built

    22/38

    22

    TECH-BUILT

    3 .0 CO NSTR UC TI O N MET HOD (cont ..)

    Special staircase units in modular dimensions can beincorporated.

  • 8/8/2019 IBS - Light Tech Built

    23/38

    23

    TECH-BUILT

    4 .0 FINIS H ES

    External C laddingConsist of panels of 2 widths - 1200mm & 100mm(together comprise the basic 1 3 00mm module).100mm panel is called the jointing panel.

    The cladding units are of numerous types depending

    upon the duty to be performed. Outer wall asbestoscement, fibre & timber boarding, plastic, glass, metalsheeting etc.

  • 8/8/2019 IBS - Light Tech Built

    24/38

    24

    TECH-BUILT

    4 .0 FINIS H ES

    External C ladding They are attached to the structural framework using locking device & sealed with soft rubber strips as

    weather protection strips.

    Once the outer wall is in place, insulations (mineral wool / rubber foam blankets) are inserted between

    cavity for both floor and wall.

  • 8/8/2019 IBS - Light Tech Built

    25/38

    25

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Internal cladding After the external cladding has been positioned, theinternal partition (also in modular dimensions of 1200mm & 100mm) of hardboard or blockboard (with

    wall paper) or gypsum board are placed into position.

    They are attached in position by means of espagnolettes which are operated through a hole at the bottom of thepanel. The hole is then covered by the skirting board.

  • 8/8/2019 IBS - Light Tech Built

    26/38

    26

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Internal cladding The surface is then finished with hardwood veneer,plastics, painted panels or simple gypsum panels with

    wall paper.

  • 8/8/2019 IBS - Light Tech Built

    27/38

    27

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Flooring The flooring units consist of plastic-coated, linoleum-covered, rubber-tiled or parquet-covered units.

    Simply attached to the top of the flooring beamframework using spring fasteners.

  • 8/8/2019 IBS - Light Tech Built

    28/38

    28

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Ceiling

    The same modular dimensions solid or perforated. Also can be incorporated with light fittings.

    Can be clipped into position without any further ado.

  • 8/8/2019 IBS - Light Tech Built

    29/38

    29

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Roofing The roofing units are of sandwich construction. Thebottom units (structure member) covered with thick

    layer of insulation & waterproof skin (metal, felt orplastic).

    Rooflight can be incorporated by replacing the unit

    with transparent glass-fibre.

  • 8/8/2019 IBS - Light Tech Built

    30/38

    3 0

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Roofing (cont ..)Flashing and gutter also in modular dimensions & canbe bolted onto the roof.

    Pitch roof can be constructed by modifying the lengthsof vertical supports holding the roof.

  • 8/8/2019 IBS - Light Tech Built

    31/38

    3 1

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Window & D oor Windows and doors are made in modular dimensions,and attached easily to the vertical wall units.

    Special rubber strips are used as draught excludersbetween windows, doors & the structural units.

  • 8/8/2019 IBS - Light Tech Built

    32/38

    3 2

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Interior FittingsK itchen units, wardrobes etc are all made in modulardimensions. Can be fixed directly to the structuralmember by fixing devices.

    Electric wiring is laid in between the cladding units.

    Heating is hot air through special ceiling holes.

  • 8/8/2019 IBS - Light Tech Built

    33/38

    33

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    Fitted cupboards are all made in modular dimensions and can be fixed to structuralmembers with special fixing devices. There is a choice of floor finishes including rubber tiles, plastic, linoleum and parquet.

  • 8/8/2019 IBS - Light Tech Built

    34/38

    34

    TECH-BUILT

    4 .0 FINIS H ES (cont ..)

    The machine made product is expressed honestly

  • 8/8/2019 IBS - Light Tech Built

    35/38

    35

    TECH-BUILT

    5 .0 ADVA NT AGES

    a. Flexibility easy modification to extend the house;simply required 100mm width of extension units, by bolting to the existing structure.

    b . Re-use - the entire structure can be dismantled andre-erect as the same building or a completely different

    type of building.

  • 8/8/2019 IBS - Light Tech Built

    36/38

    36

    TECH-BUILT

    Ground Floor First Floor

    The planning grid is 1.3 m x 1.3 m. To a completed house, further units can be easily beadded to cater foe expanding family. Buildings can be easily dismantled andreassembled elsewhere if required. The planning options are limitless.