52
IBERDROLA IBERDROLA Engineering Engineering and and Construction Construction Nuclear Generation Division Nuclear Generation Division

IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

Embed Size (px)

Citation preview

Page 1: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

••IBERDROLA IBERDROLA EngineeringEngineering and and ConstructionConstruction

••Nuclear Generation Division Nuclear Generation Division

Page 2: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

IBERDROLAIBERDROLAIBERDROLAIBERDROLA

GENERATION

DISTRIBUTIONLATIN

AMERICA

NO ENERGY BUSINESS

33.000 workers33.000 workers33.000 workers33.000 workers

IBERDROLA GROUP BUSINESS LINES

2

GAS

RENEWABLEENERGIES

SCOTTISH POWER

AMERICA

ENERGY EAST

IBERDROLAIBERDROLAIBERDROLAIBERDROLAIngeniería y Ingeniería y Ingeniería y Ingeniería y construcciónconstrucciónconstrucciónconstrucción

MARKETING

Page 3: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

Iberdrola today: Worldwide presence

South KoreaUAE

RussiaUkraine

EstoniaFinland

LatviaPoland

SlovakiaGermany

United Kingdom

Switzerland

GreecePortugal

SpainFrance

3

Current presenceEngineering

Generation / Distribution

Renewables

Tunisia

Mexico

Guatemala

Bolivia

USA.

Venezuela

Chile

Brazil

South Korea

China

TaiwanIndia

KenyaKazakhstan

Qatar

UAE

AlgeriaSyria

Greece

Albania

FYR of Macedonia

Italy

Page 4: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

IBERDROLA ENGINEERING & CONSTRUCTION

4

Page 5: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

IBERDROLA ENGINEERING & CONSTRUCTION

COMPLETE OFFERS COMPRISES

Engineering and consultancy services forpower generation or distribution projects

Support systems for operation and maintenancefor all types of facilities

5

Environmental engineering and consultancy

Civil engineering and construction management

Control, communications, authomatization andprotection systems engineering

Page 6: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

… International growth …

2.245

1.512National

Main Figures

Portfolio (MM €) Sales (MM €)

52% 22%

48%

78%

650

x 3,5

2004 2008

80%38%

20%

62%

332

x 4,6

2004 2008

National International

6

Page 7: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

BrazilTunisia

Poland Slovak R. Bulgaria Russia Egypt Algeria

Greece

In 2008, more than 600 professional work in IBERDRO LA ENGINEERING outside of Spain

Work Force

Mexico

Middle East

Venezuela

Latvia

7

Page 8: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

- Middle East- Latin America- Eastern Europe & Russia

Target regions for our growth

Consolidating the already strong international pres ence

Geographical markets

- Eastern Europe & Russia- North Africa- United Kingdom- USA

USA & UK as new developing areas8

Page 9: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

Achieving targets well ahead of schedule …

Total Sales

EBITDA

Services

20082004

€ 332 MM

€ 30 MM

Engineering and

€ 1,512 MM

€ 95,8 MM

Engineering and

x 4.5

x 3.2

Increase

Operation & financial highlights:

International Sales

% of Sales tothird parties

Areas ofactivity

Workforce

Backlog

Services

33%

€ 65 MM(2 countries)

Engineering and Consultancy

Networks, Conventional and Nuclear Generation

1,000

81%

€ 937 MM(+ 25 countries)

Engineering and Construction

+ Renewables

2,200

x 14,4

x 2,4

x 2.2

650 2,238 x 3.4

9

Page 10: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

S.MEREC WIND FARM (FRANCE)

MARQUESADO WIND FARM (SPAIN)

MALBORK WIND FARM (POLAND)

RABENAU WIND FARM (GERMANY)

LOCUS RIDGE WIND FARM (USA)

LA VENTOSA WIND FARM (MEXICO)

Renewable Projects

10

ABERTURA PV PLANT (SPAIN)

RIO DO FOGO WIND FARM (BRASIL)

PUERTOLLANO CSP (SPAIN)TELEFONICA PV PLANT (SPAIN)

Page 11: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

RIGA 420 CCGT (LATVIA)

FUJAIRAH 225 COGEN (UAE)

SUGRES 400 CCGT (RUSSIA)

MESSAIED 2000 CCGT (QATAR)

TAMAZUNCHALE1150 CCGT (MEXICO)

Generation Projects

11

KURAYMAT 150 ISCC (EGYPT)

LA MUELA 4x230 MW REVERSIBLE HPP (SPAIN)

ARCOS 1800 CCGT (SPAIN) KOUDIET 1200 CCGT (ALGIERS)

Page 12: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ST STENAY (FRANCE) ST SZTUM (POLAND)ST PROVIDENCE HEIGTHS &ST CRESCENT RIDGE (USA)

ST JOSEFA CAMEJO(VENEZUELA)

VHV ST´S & LT´S CFE ROJECTS ( MEXICO)

KEK PROJECTSST´S & LT´S (BULGARY)

Networks Projects

12

C.H. AUTOMATION(KENYA)

DISTRIBUTION AUTOMATION(TUNISIA)

3 ST´S COSERN & 35 AUTOMATED(BRASIL)

ST V.H.V. GIS ARAVACA(SPAIN)

Page 13: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

NUCLEAR GENERATION NUCLEAR GENERATION

13

Page 14: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

NUCLEAR GENERATION: CURRENT MARKET POSITIONING

1. NUCLEAR GENERATION ORGANIZATION2. MAIN NUCLEAR PROJECTS3. NUCLEAR PRODUCTS4. NUCLEAR CAPABILITIES - SKILLS

14

Page 15: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

NUCLEAR GENERATION ORGANIZATION

15

Page 16: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

NUCLEAR GENERATION

Francisco J. López

OPERATIONAL SUPPORT DEPARTMENTJoaquín Suárez

NUCLEAR PROJECTS CLASS BLuis A. Gerez

NUCLEAR BUSINESS DEVELOPMENT

Mª Luisa Sánchez-Mayoral

LATAMNUCLEAR PROJECTS CLASS A

Centrales IBERDROLA APE Laguna VerdeAlejandro Merino

SGR Angra 1Esteban Montoro

ENGINEERING

PRODUCTS DEVELOPMENT

Gestión de Proyectos,Planificación y Control

BUSINESS DEVELOPMENT

PROPOSALSLICENCY & SAFETY Construcción y Servicios

NEW NPP DEPARTMENTHumberto Werdine

NUCLEAR GENERATION ORGANIZATION

ROW 1NUCLEAR PROJECTS CLASS A

Esteban Montoro

MSRs BohuniceJoaquín Gonzalez Delgado

PRODUCTS DEVELOPMENT PROPOSALSLICENCY & SAFETY

NUCLEAR FUEL

DECOMMISSIONING,WASTE MANAGEMENT

Materiales y Gestión de Vida

Construcción y Servicios

WorkWork forceforce �� 50500 0 (350 in (350 in SpainSpain) ) 60% Iberdrola 60% Iberdrola EngineeringEngineering & Construction’ & Construction’ s s employersemployers

16

Page 17: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

Laguna Verde NPP(MEXICO)

ITER-Efda Flamanville III NPP(FRANCE)

Ispra(ITALY )

Bohunice NPP(SLOVAKIA )

NeutronIrradiationVVER Reactor

CERN(SWITZERLAND )

Olkiluoto 3 NPP(FINLAND )

Kozloduy NPP(BULGARIA )

MAIN NUCLEAR PROJECTS

(MEXICO)

Khmelnitsky NPP South Ukraine NPP SE-STC Zaporozhye NPP

(UKRAINE )

Angra NPP(BRASIL )

Kola NPP Novovoronezh NPP Balakovo NPP

( RUSSIA)

Trillo Vandellós IIAscó I & IIAlmaraz I & IICofrentesSta. Mª de Garoña

17

SPAIN

Page 18: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

TYPES OF PROJECTS

Engineering & Technical Assistance

(Studies, analysis, assessment)

Design & Manufacture (Design, procurement, manufacturing

supervision, supply, assembly and testing follow-up, etc.)

EPC (Turnkey Projects)

• Russia - Kola NPP, Novovoronezh NPP,Balakovo NPP (On Site Assistance, RiskMonitoring, Internals degradation, Efficiencyimprovement)

• Ukraine - Khmelnitsky NPP (On Site

• Mexico - CFE. Laguna Verde NPP(Power Uprate)

• Bulgaria – Kozloduy NPP (Plasma)• Ukraine – Zaporozhye NPP

(Incineration Facility). South Ukraine

• Slovakia- ENEL. Bohunice NPP (MSRs-Moisture Separator Reheaters and MainCondenser replacement)

• France - EDF. Flamanville 3 EPR

MAIN NUCLEAR PROJECTS

• Ukraine - Khmelnitsky NPP (On SiteAssistance ), SE-STC (Scientific & TechnicalSupport)

• Italy – ISPRA (Waste Management,Radiological Protection)

• Slovakia – Bohunice NPP(Decommissioning)

• France - ITER (Mechanical and electricalEngineering, Vacum vessel) . EDF (Severeaccidents studies)

• Spain – Cofrentes NPP (EngineeringSupport, Power-uprate, life management,fuel management,…) . Almaraz & Trillo NPP(Nuclear safety and fuel management) .ENRESA (Decommissioning studies)

(Incineration Facility). South UkraineNPP (Primary System insulationreplacement)

• Brasil – Angra 1 NPP (SteamGenerators Replacement)

• Spain – Almaraz NPP (draft CoolingTowers for turbine buildings, Primarysystem weld-overlay). Trillo NPP(Natural cooling towerrefurbishipment). Cofrentes NPP(Equipment repair and replacement)

• France - EDF. Flamanville 3 EPR(Safety related Heat Exchangers, Filtrationequipments for the main condenser coolingfiltration system , Desmineralizers, Pré-rejet” system (equipments associated withthe collection and disposal of filtrationsystem waste), ATD system (micro filtrationsystem for main condensate waterpurification)

18�

Page 19: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

Vandellós II

Ascó I & II• Risk Monitor• Refueling services• Slance lancing of SG• Radiological Protection• Severe Accident Guidelines

Sta. Mª de Garoña• Life Extension Program• Risk Monitor support• On-line preventive Maintenance• Containment evaluation

Trillo • Waste dry casks storage• TH and Neutronics• PSA and Risk-Informed

applications• Refueling services• Slance lancing of SG• Cooling towers filling

replacement• Equipment Reliability

(APE-913)

MAIN PROJECTS IN SPAIN

19

Cofrentes• Plant Engineering support• Life Management• Modernization (Main Condenser,

Turbine, Heaters, Cooling towers, …)• Power uprate (110%)• PSA and Risk-Informed applications• ISI Optimization

Vandellós II• PSA and Risk-Informed

applications• Risk Monitor• Containment evaluation• Refueling services• Slance lancing of SG• Radiological Protection• Severe Accident Guidelines

Almaraz I & II• Life Management• TH and Neutronics• PSA and Risk-Informed

applications• Eq. Reliability (APE-913)• Installation of new cooling towers

(TCA/B systems)• Full structural ‘Weld Over-lay’ in

Presurizer nozzles• Sludge lancing of SGs• MOVs diagnosis

• Risk Monitor• Fuel Cycle extension (24 months)• Fuel licensing methodology• Asset Management• Equipment Reliability (APE-913)• Reracking of spent fuel pool• Radiol. Material ‘declassification’

Page 20: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

COFRENTES NPP – ENGINEERING SUPPORT

Main Projects in Spain

� Location : Cofrentes (Spain)

� Scope: Plant Engineering, Operational and Maintenance

Support, Project Management, Radiation Protection Service,

etc.

MAIN PROJECTS IN SPAIN

20

etc.

� Client: Cofrentes NPP

� Execution date: 1995 – on going

Page 21: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

TRILLO NPP COOLING TOWERS - FOIL FILL AND DRIFT ELIMINATOR REPLACEMENT

� Location : Guadalajara (Spain)

� Scope : Foil fill replacement and drift eliminator

replacement on each tower; inspection and

MAIN PROJECTS IN SPAIN

21

replacement on each tower; inspection and

repair of pipes, channels, etc. on both towers; all

wastes removal and management (PVC,

asbestos, concrete and stainless steel).

� Client : CC NN ALMARAZ-TRILLO, A.I.E.

� Execution date : 2006 - 2008

Page 22: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ALMARAZ NPP UNIT 1&2. INSTALLATION OF PRESSURIZER NOZZLES "Full Structural Weld Overlay"

� Location : Cáceres (Spain)

� Scope : Design, analysis, fabrication, installation,

non-destructive examinations and ASME Code

MAIN PROJECTS IN SPAIN

22

non-destructive examinations and ASME Code

approval of Full Structural Weld Overlay to Alloy

82/182 nozzle welds on the pressurizer.

� Client : CC NN ALMARAZ-TRILLO, A.I.E.

� Execution date : July 2008 – 2010

Page 23: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ALMARAZ NPP – NEW TOWERS FOR AUXILIARY COOLING SYSTEM OF TURBINE BUILDING (for “TC” system)

� Location : Cáceres (Spain)

� Scope :Design, procurement, component

fabrication, FAT, transportation, installation and

MAIN PROJECTS IN SPAIN

23

fabrication, FAT, transportation, installation and

start up of: 6 cooling towers for TCA system and

6 cooling towers for TCB system (3 per each

Almaraz unit).

� Client : CC NN ALMARAZ-TRILLO, A.I.E.

� Execution date : July 2008 – 2010

Page 24: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

BOHUNICE INTERNATIONAL DECOMMISSIONING SUPPORT FUND. PROJECT MANAGEMENT UNIT (PMU) CONSULTANT

� Location : Slovak Republic

� Scope : Support for the decommissioning of

Units 1 and 2 of the Bohunice Nuclear Power

Plant. Planning, execution, management,

BOHUNICE NPP

24

Plant. Planning, execution, management,

coordination and monitoring of all the aspects

required to carry out the projects associated with

the decommissioning of the Plant.

� Client : Slovenske Elektrarne

� Partner: Empresarios Agrupados, Internacional,

S.A. and Indra Sistemas

� Execution date : 2003 - on going

Page 25: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

REPLACEMENT OF TUBES IN MAIN CONDENSERS OF TURBOGENERATORS AT JASLOVSKÉ BOHUNICE V2 NPP

� Location : Slovak Republic

� Scope : Design, fabricate, and deliver sixteen

(16) modular tube bundles for Jaslovské

Bohunice V2 condensers :

BOHUNICE NPP

25

Bohunice V2 condensers :

� Activities : Engineering and Design,

procurement, application protection painting and

Tests.

� Client : Slovenske Elektrarne

� Execution date : 2006 - 2008

Page 26: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

REPLACEMENT OF 4 MSRs FOR POWER UPRATE AT 107% AT BOHUNICE NPP V2 UNIT, Jaslovské Bohunice

� Location : Slovak Republic

� Scope : Design, procurement, transportation of 4

MSRs (Moisture Separator and Reheaters) from

BOHUNICE NPP

26

MSRs (Moisture Separator and Reheaters) from

turbo-groups - TG31, TG41. Dismantling,

assembly, after-assembly and cleaning

operations, operation tests and setting into

operation.

� Client : Slovenské Elektrárne, a.s. – ENEL

� Execution date : July 2008 – September 2010

Page 27: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

SUPPLY OF A FACILITY FOR TREATMENT AND CONDITIONING OF SOLID RADIOACTIVE WASTES WITH A HIGH VOLUME

REDUCTION FACTOR (PLASMA TECHNOLOGY)

� Location : Bulgaria

� Scope : Design, engineering, analyses, supply,

installation and testing of systems, materials,

equipment, components, services and other

KOZLODUY NPP

27

equipment, components, services and other

required items, for supplying a Plasma Melting

Facility that provides High Volume Reduction

Factor and immobilisation of Low and

Intermediate Level Radioactive Waste at

Kozloduy NPP

� Client : Kozloduy NPP

� Partner: BELGOPROCESS

� Execution date : 2009 - 2013

Page 28: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

� Location : MEXICO

� Scope : Modernization of the turbogenerator

group and the systems associated with electricity

generation of the unit 1 and 2 of Laguna Verde

LAGUNA VERDE NPP POWER UPRATE

LAGUNA VERDE NPP

28

NPP, to increase its nominal power by 20%. The

project comprises the design, engineering,

equipment and materials supply, installation,

assembly and tests.

� Client : Federal Electricity Commission (CFE)

� Partner: ALSTOM (Mexico)

� Execution date : March 2007 - December 2010

Page 29: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

PROVISION OF MANAGEMENT SERVICES FOR PRE-DECOMMISSIONING PHYSICAL AND RADIOLOGICAL CHARACTERIZATION OF SHUT DOWN

NUCLEAR INSTALLATIONS

� Location : Italy

� Scope : Provision of management services for

pre-decommissioning physical and radiological

JRC – ISPRA SITE

29

pre-decommissioning physical and radiological

characterization of shut down nuclear facilities at the

European Commission’s Joint Research Centre (EC JRC)

Ispra Site.

� Client : European Commission

� Execution date : October 2006 - on going

Page 30: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

PROVISION OF RADIATION PROTECTION ASSISTANCE

� Location : Italy

� Scope : Providing Radiation Protection Assistance (RPA)

to the Nuclear Decommissioning and Facilities

Management Unit at the European Commission’s Joint

JRC – ISPRA SITE

30

Research Centre (EC JRC), Ispra Site.

� Client : European Commission

� Execution date : March 2006 - on going

Page 31: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

PROBABILISTIC SAFETY ASSESSMENTS FOR ANGRA 2 NPP (PWR-KWU)

� Location : Brazil

� Scope : Development of all PSA activities based on the

ANGRA NPP

31

requirements of the Regulatory Body. Licensing

activities for approval of the Regulatory Body.

Development of new capabilities to use PSA

applications: Risk monitoring.

� Client : ELETRONUCLEAR

� Execution date : November 2004 - April 2008

Page 32: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

STEAM GENERATORS REPLACEMENT FOR ANGRA 1

� Location : Brazil

� Scope : Design engineering for preparing all the

modifications

• Licensing of all the modified systems.• Preparing all the documentation for performing the job:

WP&IR.

ANGRA NPP

32

WP&IR.• Qualifying all the materials and processes.• Civil construction and mechanical erection.• Handling and Rigging of the major equipments.• Developing a Time Schedule to minimize time and save

doses.• ALARA and PR.• Health and Safety.

� Client : ELETRONUCLEAR

� Partner: WESTINGHOUSE, ODEBRECHT S.A.

� Execution Date : May 2007 - on going

Page 33: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

SPECIALIZED SERVICES FOR ALMIRANTE ALVARO ALBERTO NPP UNITS I AND II (ANGRA NPP).

� Location : Brazil

� Scope : Performance of main equipment inspection and

special maintenance required during plant outages. ECT

inspection on Steam Generators, Reactor Vessel Head, Heat

ANGRA NPP

33

inspection on Steam Generators, Reactor Vessel Head, Heat

Exchangers, Thimbles, … and other Maintenance Services,

Snubbers, ILRT, Sludge Lancing and TV inspection of the

Steam Generator tube sheet, Refueling floor activities

assembly, disassembly and refueling of the core, Motor

operated valves diagnosis.

� Client : ELETRONUCLEAR

� Execution date : June 1997 - on going

Page 34: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

SUPPLY OF AN INCINERATOR FACILITY FOR RADWASTE TREATMENT

� Location : Ukraine

� Scope : Design of the equipment, manufacturing,

technical specifications for supply, certification,

support to licensing, performance of the

ZAPOROZHYE NPP

34

acceptance testing, delivery, supervision of the

installation, of the site acceptance tests and the

commissioning. Provision of the design

documentation, operation and maintenance

instructions, training, maintenance support and

spare parts.

� Client : Energoatom

� Partner: ENVIKRAFT, BELGOPROCESS

� Execution date : 2009 - 2012

Page 35: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ASSESSMENT OF THE IMPLEMENTATION OF THE SAFETYRELATED MEASURES FOR KHMELNITSKY NPP, UNIT 2

� Location : Ukraine

� Scope : The main objective of the project is to

provide an assessment of the implementation of the

KHMELNITSKY NPP

35

provide an assessment of the implementation of the

safety related measures at the plant that will help

Energoatom to get loans from EC/Euratom and

EBRD for the modernization of Khmelnitsky NPP

Unit 2

� Client : European Commission

� Partner: SOGIN S.p.A.

� Execution date : May 2004 – May 2005

Page 36: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ON-SITE ASSISTANCE (OSA) FOR KHMELNITSKY NPP

� Location : Ukraine

� Scope : Transferring an operational safety culture and

supporting the implementation of nuclear safety projects.

KHMELNITSKY NPP

36

supporting the implementation of nuclear safety projects.

This is achieved by combining the experience of the

Consultant with the experience and needs of the Beneficiary

Country Nuclear Power Plant operator

� Client : European Commission

� Partner: SOGIN S.p.A.

� Execution date : April 2004 - July 2011

Page 37: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

REPLACEMENT OF THERMAL INSULATION OF THE PRIMARY CIRCUIT AT SOUTH UKRAINE NPP

� Location : Ukraine

� Scope : Design, manufacturing, certification, assistance in

licensing, delivery, supervision of installation and testing,

provision of documentation, training, maintenance and

SOUTH UKRAINE NPP

37

repair during warranty, assistance in licensing process,

development of quality assurance program and of quality

control procedures, for the replacement of the thermal

insulation for sections of pipes and equipment of the

primary circuit inside the containment building.

� Client : ENERGOATOM

� Execution date : July 2006 - on going

Page 38: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

SCIENTIFIC AND ECHNICAL SUPPORT TO ENERGOATOM, SE-STC, KIEV

� Location : Ukraine

� Scope : Transfer of best EU know-how on Quality and Safety

Management, and of specific technical skills, in order to

ENERGOATOM, SE-STC

38

Management, and of specific technical skills, in order to

enable SE-STC to provide an effective and sustainable

sientific and engineering support to ENERGOATOM.

� Client : ENERGOATOM

� Execution date : December 2007- December 2009

Page 39: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

INFLUENCE OF NEUTRON IRRADIATION ON MATERIAL OF INTERNALS REACTOR

� Location : Russian Federation

� Scope : Bringing a complete set of validated experimental

data and scientific/technical/safety methodology, which are

required to address the issue of structural integrity of the

RUSSIAN NPPs

39

required to address the issue of structural integrity of the

core internals, and which would include the latest

international experience.

� Client : European Commission

� Partner: CIEMAT / SEA

� Execution date : December 2006 - on going

Page 40: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ON-SITE ASSISTANCE (OSA) FOR KOLA NPP AND NOVOVORONEZH NPP

� Location : Russian Federation

� Scope : Transferring an operational safety culture and supporting

the implementation of nuclear safety projects. This is achieved by

combining the experience of the Consultant with the experience

and needs of the Beneficiary Country Nuclear Power PlantKola NPP

KOLA & NOVOVORONEZH NPPs

40

and needs of the Beneficiary Country Nuclear Power Plant

operator, with a view to: Improving the operational safety of Kola

NPP (Soft OSA) and carrying out specific safety related projects,

which normally also includes equipment supply (Hard OSA).

� Client : European Commission

� Partner : SOGIN S.p.A.

� Execution date : April 2005 - April 2011 KOLA

May 2007- May 2010 NOVOVORONEZH

Kola NPP

Novovoronezh NPP

Page 41: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

IMPLEMENTATION OF RISK MONITORING TECHNOLOGY FOR BALAKOVO NPP

� Location: Russian Federation

� Scope: Providing technical assistance to develop the Risk-

Monitoring tool in VVER-1000 type Russian Nuclear Power Plants,

BALAKOVO NPP

41

Monitoring tool in VVER-1000 type Russian Nuclear Power Plants,

and transferring the needed know-how.

� Client: European Commission

� Execution date: December 2007- June 2010

Page 42: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

SUPPLY OF ENGINEERING SUPPORT IN THE AREA OF MECHANICAL AND ELECTRICAL ENGINEERING

� Location : France

� Scope : Mechanical and electrical engineering services, for

components related to the power systems and the specifications

for the key components of the mechanical area, detail calculations,

ITER PROJECT

42

for the key components of the mechanical area, detail calculations,

studies, manufacturing drawings, guides, technical specification to

purchase, erection works planning up to the manufacturing level.

� Client : EFDA

� Execution date : October 2005 – On going

Page 43: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

SEVERE ACCIDENT STUDIES FOR EDF

� Location : France

� Scope : Execution of Severe Accident studies with the MAAP

code: impact of small injection flowrate during core

degradation; hydrogen risk assessment in shutdown states;

EDF: ELECTRICITÉ DE FRANCE

43

degradation; hydrogen risk assessment in shutdown states;

direct containment heating risk assessment in shutdown

states.

� Client : Electricité de France

� Execution date : December 2006 - 2011

Page 44: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

HEAT EXCHANGERS FOR FLAMANVILLE 3 NPP (EPR DESIGN)

� Location : France

� Scope : Design, fabrication, and installation of 21 shell and

tubes heat-exchangers for the nuclear island. 16 out of these

21 HXs are conventional and will be designed according to

ASME BPV code Section VIII and have to comply with PED

FLAMANVILLE NPP

44

ASME BPV code Section VIII and have to comply with PED

97/23/CE. The remaining 5 HXs are nuclear and will be

designed according to ASME BPV code Section and have

also to comply with PED.

� Client : Electricité de France

� Partner: ENSA

� Execution date : December 2006 - 2011

Page 45: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

WATER SCREEN FILTERS FOR FLAMANVILLE 3 NPP (EPR DESIGN)

� Location : France

� Scope : Design, fabrication and installation of qualified

traveling water screening filters. The equipments furnished

will be two nuclear safety qualified filters and associated

FLAMANVILLE NPP

45

will be two nuclear safety qualified filters and associated

equipment (cleaning water system and control system).

Additionally some auxiliary devices such as grids, automatic

trash rakes and stop gates are included in the contract.

� Client : Electricité de France

� Execution date : December 2006 - 2011

Page 46: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

DEMINERALIZERS FOR FLAMANVILLE 3 NPP (EPR DESIGN)

� Location : France

� Scope : Design, procurement, fabrication and assembly of

9 demineralizers for different plant systems. These

equipment will be manufactured according with codes

FLAMANVILLE NPP

46

equipment will be manufactured according with codes

ASME VIII and EN 13445

� Client : Electricité de France

� Partner : DEISA

� Execution date : December 2006 - 2009

Page 47: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

ENGINEERING SERVICES FOR OLKILUOTO 3 NPP PROJECT

� Location : Finland

� Scope: Civil back office.Civil site engineering.Piping back office.Piping site engineering.

OLKILUOTO 3 NPP

47

Component back office.System process engineering.Training.Time schedule back office.Time schedule site.

� Client : FRAMATOME

� Execution date : December 2004 – on going

Page 48: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

� Location : Switzerland

� Scope : Exchange of professional experience with

European Organization for Nuclear Research.

COLLABORATION AGREEMENT WITH CERN:MANAGEMENT AND QUALITY CONTROL PROCEDURES

COLLABORATION WITH CERN

48

European Organization for Nuclear Research.

Set up large facilities.

� Client : CERN

� Execution date : 2006 - on going

Page 49: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

NUCLEAR PRODUCTSNUCLEAR PRODUCTS

49

Page 50: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

2.1 ENGINEERING AND CONSTRUCTION OF NEW POWER FACILITIES . 2.1 ENGINEERING AND CONSTRUCTION OF NEW POWER FACILITIES .

MODERNISATION AND IMPROVEMENT OF EQUIPMENTS AND MODERNISATION AND IMPROVEMENT OF EQUIPMENTS AND

SYSTEMSSYSTEMS

2.2 OPERATING POWER PLANTS SUPPORT2.2 OPERATING POWER PLANTS SUPPORT

NUCLEAR PRODUCTS

2.2 OPERATING POWER PLANTS SUPPORT2.2 OPERATING POWER PLANTS SUPPORT

2.3 DECOMMISSIONING2.3 DECOMMISSIONING & DISMANTLING. DISMANTLING.

WASTE MANAGEMENTWASTE MANAGEMENT

50

Page 51: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

NUCLEAR CAPABILITIES - SKILLS

51

Page 52: IBERDROLA IBERDROLA Engineering Engineering … · ••IBERDROLA IBERDROLA Engineering Engineering and and ConstructionConstruction ••Nuclear Generation Division . IBERDROLA

44 Safety and licensing engineeringSafety and licensing engineering

44 Nuclear fuel engineeringNuclear fuel engineering

44 Radiological engineering, decommissioningRadiological engineering, decommissioning and radioactive waste management radioactive waste management

44 Mechanical Mechanical and materials engineeringand materials engineering

NUCLEAR CAPABILITIES - SKILLS

44 Civil nuclear engineeringCivil nuclear engineering

44 Safety related electric, instrumentation and Safety related electric, instrumentation and control control engineeringengineering

44 Nuclear servicesNuclear services

44 Plant engineering and design modifications Plant engineering and design modifications

52