IACS RESOLUTION CHANGES(GMO - 10-12- 2015)

BEKİR SITKI TÜRKMEN

Page 2: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

Resolution Changes January & July 2016 (UR, UI, PR, REC)

10 +3

0 + 7-10

4+14

Procedural Requirements (PR) 0 +1

Recommendations (2015) +4

TOTAL NUMBER OF RESOLUTION CHANGE :

(Jan 2016) = 24 ; (July 2016) : 37 -13

Total UR Changes = 9 (Jan 2016) + (28 – 10) (July 2016)

Total UI Change = 11 Jan 2016 + (9 – 3) (July 2016)

1 + 5

3+ 1 1 + 0

0+1

1 + 0

0 +2

0 +4 - 3

Page 3: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

List of IACS Resolution Changes (January 2016)

IACS-UR

01UR E10 - Test Specification for

Type Approval01.01.2016 UR E10

UR E10

(Rev.6,

Oct. 2014)

02

UR E15 - Electrical Services

Required to be Operable Under

Fire Conditions and Fire

Resistant Cables

01.01.2016 UR E15

UR E15

(Rev.3,

Dec. 2014)

03

UR E18 - Recording of the Type,

Location and Maintenance Cycle

of Batteries

01.01.2016 UR E18

UR E18

(Rev.1,

Dec. 2014)

04 UR F20 - Inert Gas Systems 01.01.2016 UR F20

UR F20

(Rev.7,

May 2015)

05UR S14 - Testing Procedures of

Watertight Compartments01.01.2016 UR S14

UR S14

(Rev.5, Jan.

2015)

(Rev. 1)

Page 4: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

List of IACS Resolution Changes (January 2016)

06

UR Z1 - Annual and intermediate

classification survey coverage of IMO

Resolution A.1053(27) as amended by

IMO Resolution A.1076(28)

------------ UR Z1

UR Z1

(Rev.5,

Mar. 2015)

07

UR Z15 - Hull, Structure, Equipment

and Machinery Surveys of Mobile

Offshore Drilling Units

01.01.2016 UR Z15

UR Z15

(Rev.1, Jan.

2015)

08UR Z17 - Procedural Requirements for

Service Suppliers01.01.2016 UR Z17

UR Z17

(Rev.10,

Jan. 2015)

09UR Z21 - Surveys of Propeller Shafts

and Tube Shafts01.01.2016 UR Z21

UR Z21

(Rev.3,

Feb. 2015)

Page 5: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR E10 (Rev. 6) - Test Specification for Type Approval

IACS UR E10 is applicable, but not confined, to electrical, electronic andprogrammable equipment intended for control, monitoring, alarm andprotection systems for use in ships.

Performance test ; - Test No : 2 - (when Equipment under test is needed to comply an international standard, e.g. IEC 60255 for protection relays, that is a part of performance testing)

Dry Heat test;- Test No : 5 – (Depending on the size of the EUT and climatic conditions 2 hours are often not sufficient to achieve stable conditions, that is why it is increased to next severity level of IEC 60068-2-2, changed to 16 hours)

Damp Heat test; - Test No : 6 – (The test shall start with 25°C ± 3°C and at least 95% humidity)

Vibration test; - Test No : 7 – (For equipment specified especially forincreased vibration levels the vibration test is to be conducted at the agreedvibration level, frequency range and duration, e.g. fuel oil injection systemsof diesel engines)

Page 6: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR E10 (Rev. 6) - Test Specification for Type Approval

Salt Mist test - Test No : 12 – (Added for clarification to ensure that anydeterioration or corrosion is superficial in nature.)

For Electrostatic Discharge test – Test No : 13 -

Air discharge: 2kV, 4kV, 8kV

For Conducted Low Frequency test - Test No : 15 –

It is not required to exceed the power limit of 2W and hence it is acceptableto decrease the voltage applied during the test to keep within the powerlimit.

For keeping max. 2W, the voltage of the test signal may be lower.

For Surge/voltage test – Test No : 18 -

The test description was inaccurate and contained incorrect symbols. This hasbeen corrected according to the source standard. For practical purpose nochange in the testing scope.

TL Additional Rule - Regulations for the Performance of the Type Tests Part 1-Test Specification for Type Approval is updated

Page 7: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR E15 (Rev. 3) - Electrical Services Required to be Operable Under Fire Conditions and Fire

Resistant Cables

The definition of “high fire risk areas” specified by UR E15 (Rev.2) is clarified by givingreference to MSC/Circ.1120.

UR E15 (Rev.2) defines “high fire risk areas” to include machinery spaces such as thosedefined in Chap. II-2 / Reg. 3.30 of SOLAS. However, “machinery spaces as defined byChap. II-2 / Reg. 3.30 of SOLAS” include some spaces which have little or no fire risk (asdefined by MSC/Circ.1120) such as ventilation and air-conditioning rooms as well asstabilizer equipment rooms, etc.

Action : TL Rules, Part B, Chapter 5 Electrical Installations, Part BChapter 5 Electrical Installations Section 12,D is revised.

Page 8: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR E18 (Rev. 1) - Recording of the Type, Location and Maintenance Cycle of Batteries

Where batteries are fitted for use for essential (UI SC134) and emergencyservices a schedule of such batteries is to be compiled and maintained. Theschedule, which is to be reviewed by the Society, during plan approval or thenewbuilding survey, is to include at least the following information regardingthe battery(ies):

Action : Part B, Chapter 5 Electrical Installations, Section 2, C, 8.1 is revised

Page 9: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR F20 (Rev. 7) - Inert Gas Systems

• Main reason to change :

To harmonize the UR with the amended FSS Code as per MSC.367(93).

• History of Decisions Made:

The amended FSS Code Chapter 15 as per MSC.367(93) is applied to tankers,including chemical tankers, constructed on or after 1 January 2016, therefore it wasnecessary to harmonize the UR with the amended FSS Code.

Change :

Only additional items which are not incorporated in MSC.367(93) are kept, other partsof UR F20 are harmonised with references to MSC367 (93).

Action : TL Rules, Part B, Chapter 4, Machinery, Section 20 is revised

Page 10: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

• Main reason to change :

To align UR S14 with the Guidelines submitted to the CorrespondenceGroup on Testing of Watertight Compartments which was established atSDC 1. These are based on the guidelines submitted to SDC 1 (SDC1/INF.13). Also to remove the relaxations and reintroduce the structuraltests for Tankers and Combination Carriers, based on Industry feedback andthe discussion at GPG74.

• Change :

A summary of changes made between UR S14 Rev. 4 and Rev. 5 is as follows:

Updating the definitions for the test types. (many changes, just arepresentative example given)

Page 11: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

Clarifying the “Testing Schedule for New Construction or Major StructuralConversion”.

Page 12: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

Clarifying the “Testing Schedule for New Construction or Major StructuralConversion”.

Page 13: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

Clarifying the “Testing Schedule for New Construction or Major StructuralConversion”.

Page 14: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

Clarifying the “Test Methods”, many changes

Specifying additional requirements for “Hydrostatic or hydropneumatic tightnesstest”.

Page 15: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

Updating Table 1 “Test Requirements for Tanks and Boundaries” and specifyingrequirements for additional “Tanks or boundaries to be tested”.

Page 16: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR S14 (Rev. 5) - Testing Procedures of Watertight Compartments

Updating Table 1 “Test Requirements for Tanks and Boundaries” andspecifying requirements for additional “Tanks or boundaries to be tested”.

Action : Part A, Chapter 1, Hull, Section 3,E is revised

Page 17: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR Z1 (Rev. 5) - Annual and intermediate classification survey coverage of IMO Resolution

A.1053(27) as amended by IMO Resolution A.1076(28)

• Main reason to change :

IMO Res.A.997(25), amended by IMO Res. A.1020(26), which is incorporatedin UR Z1(Rev.4 Corr. 1) had been revoked by IMO Res.A.1053(27), asamended by IMO Res.A.1076(28).

Main changes : - Annual Surveys -

Examining Ship Construction File (SCF) for Bulk carriers and tankers

L >=150 m

Confirming, for bulk carriers constructed before 1 July 1999 withrestrictions imposed with respect to the carriage of cargoes with adensity of 1,780 kg/m3 and above that a triangle is permanentlymarked at midship

confirming, for bulk carriers, that the loading instrument is on boardand functioning

For oil tankers; confirming that the coating system in cargo oil tanks ofcrude oil tankers, when appropriate, is maintained and that in-servicemaintenance and repair activities are recorded in the coating technicalfile

Page 18: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR Z1 (Rev. 5) - Annual and intermediate classification survey coverage of IMO Resolution

A.1053(27) as amended by IMO Resolution A.1076(28)

Main changes : - Intermediate Surveys –

For chemical tankers and gas carriers additional items;

Z1.3.3/4. of the Unified Requirement has have been modified byremoving the item relevant to the spare parts of the ventilators:excluded paragraph 1.3.2.5 of annex 4, of the IMO Res. A 1053(27) asamended.

Action : TL Instructions, CL 111A, CL111I are revised.

Page 19: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR Z15 (Rev. 1) - Hull, Structure, Equipment and Machinery Surveys of Mobile Offshore Drilling

Units

• Main reason to change :

Review UR Z15 and propose changes to update the requirements, in particular, thosefor close-up inspections and scope and procedures for thickness measurements thatneed to be aligned with the development of similar requirements for ships (UR Z7).

Action : Currently out of scope, no rules.

Page 20: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR Z17 (Rev. 10) - Procedural Requirements for Service Suppliers

• To approve firms providing services, such as measurements, tests ormaintenance of safety systems and equipment,

• Main Changes

– Requirements for manufacturer’s approval regarding the service supplier wereincluded.

– Requirements regarding the utilization of service suppliers for classificationand/or statutory services were clarified.

– Procedures for firms engaged in servicing and maintenance of lifeboats,launching appliances and firms engaged in measurements of noise levels werenewly introduced.

– Approval procedures for firms listed in Annex 1 were amended/updated inorder to comply with the mandatory conventions.

– The requirements for the new category of service suppliers, carrying globalvacuum testing of primary/secondary barriers, acoustic and thermographicemissions tests, has been introduced. This new category is related to Statutoryand Class services, and concerns the tightness test of the membranes of thecargo vessels (of the gas carriers).

Action : Classification and Surveys, Section 3,A,11 is revised

Page 21: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UR Z21 (Rev. 3) - Surveys of Propeller Shafts and Tube Shafts

• Main reason to change :

The expected benefits of the work are focused to achieve the harmonization of thesurvey criteria between members on a fundamental matter related to theclassification (e.g. in view of the TOC), taking also in account new buildingtechnologies (e.g. The new kind of water lubrication technologies used in order toprotect the environment against possible pollution) .

Action : TL Classification and Surveys, Section 3, A, 4.9 and Section 3, F

Page 22: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

List of IACS Resolution Changes (January 2016)

IACS-UI

01

UI FTP6 - Testing and approval of

pipe penetrations and cable transits

for use in “A” class divisions

(IMO FTP Code 2010 Annex 1

Part 3)

01.01.2016

IMO FTP Code

2010 Annex 1

Part 3

UI FTP6

(Rev.1

July 2015)

02UI SC118 - Exhaust duct from

galley ranges01.01.2016

SOLAS Reg. II-

2/9.7.5.1.1 and

9.7.5.2.1

UI SC118

(Rev.2

July 2015)

03UI SC188 - Segregation of Cargo

Oil TanksOil Tankers 01.01.2016

SOLAS Reg. II-

2/4.5.1.1

UI SC188

(Rev.2

Feb 2015)

04UI SC188 - Segregation of Cargo

Oil Tanks

Oil Tankers01.01.2016

SOLAS Reg. II-

2/4.5.1.1

UI SC188

(Rev.3

July 2015)

05

UI SC260 - Sample Extraction

Smoke Detection System (FSS

Code / Chapter 10 / 2.4.1.2 as

amended by MSC.292 (87))

01.01.2016

FSS Code / Chapter

10 / 2.4.1.2

(MSC.292 (87))

UI SC260

(Rev.1

June 2015)

06

UI SC262 - Fixed Foam Fire

Extinguishing Systems,

Foamgenerating Capacity

01.01.2016

FSS Code Chapter 6,

3.2.1.2 and 3.3.1.2

(MSC.327(90))

UI SC262

(Rev.1

May 2015)

Page 23: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

List of IACS Resolution Changes (January 2016)

07

UI SC267 - Implementation of the

requirements relating to lifeboat

release and retrieval systems

01.01.2016

LSA Code Paragraph

4.4.7.6

(MSC.320(89))

UI SC267

(New,

Jan 2015)

08

UI SC270 - Fire pumps in ships

designed to carry five or more

tiers of containers on or above the

weather deck

Cargo ships 01.01.2016 UI SC270

UI SC270

(New,

Jan. 2015)

09

UI SC270 - Fire pumps in ships

designed to carry five or more

tiers of containers on or above the

weather deck

Cargo ships 01.01.2016 UI SC270

UI SC270

(Corr.1

Mar. 2015)

10

UI SC270 - Fire pumps in ships

designed to carry five or more

tiers of containers on or above the

weather deck

Cargo ships 01.01.2016 UI SC270

UI SC270

(Corr.2

Sep. 2015)

11

UI SC271 - Additional indicating

unit in the cargo control room in

accordance with amended FSS

Code Chapter 9.2.5.1.3

Cargo ships 01.01.2016 UI SC271

UI SC271

(New,

Jan. 2015)

(Rev. 1)

Page 24: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI FTP6 (Rev. 1) - Testing and approval of pipe penetrations and cable transits for use in “A” class

divisions (IMO FTP Code 2010 Annex 1 Part 3)

• Action :

TL Additional Rule "Implementation of FTP Code” is revised to comply with UIFTP6 Rev.1.

Page 25: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC118 (Rev. 2) - Exhaust duct from galley ranges

• Change :

• Action : S-P 03/15 - Retrospective Application of IACS Unified InterpretationUI SC118 “Exhaust Duct From Galley Ranges” for Ships Constructed before 1January 2016

Page 26: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC188 (Rev. 2) - Segregation of Cargo Oil Tanks (Reg.II-2/4.5.1.1)

• Main reason to change :

Clarity on the term 'similar pumps', a term which is used in the IACS UI andin both IMO Circulars 1037 and 1120.

The requirements such as continuous monitoring of hydrocarbon gases, interlockedlighting with ventilation, Temperature sensors for pumps

Page 27: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC188 (Rev. 2) - Segregation of Cargo Oil Tanks (Reg.II-2/4.5.1.1)

• Change :

Action :

Chapter 1 – Hull, Section 21 E.2.1.1 has been revised according to UI SC188Rev.2.

Page 28: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC188 (Rev. 3)- Segregation of Cargo Oil Tanks (Reg.II-2/4.5.1.1)

• Main reason to change :

In response to the query from shipyards, Safety Panel agreed to clarify that SOLAS regulation II-

2/4.5.10 should apply to the pump rooms containing pumps for transfer of fuel oil having aflashpoint not exceeding 60°C ”regardless of their location”. Further, to eliminate aninconsistency of threshold of “flashpoint” between UI SC188 (rev.2) and SOLAS regulation II-2/4.2.1, it was agreed that the threshold of “flashpoint” of the UI should be harmonised withthe regulation II-2/4.2.1.

Page 29: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC188 (Rev. 3)- Segregation of Cargo Oil Tanks (Reg.II-2/4.5.1.1)

• Change :

Action :

Chapter 1 – Hull, Section 21 E.2.1.1 has been revised according to UI SC188Rev.3.

Page 30: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC260 (Rev. 1) - Sample Extraction Smoke Detection System (FSS Code / Chapter 10 / 2.4.1.2 as

amended by MSC.292 (87))

FSS Code 10.2.4.1.2: The control panel shall be located on the navigationbridge or in the fire control station. An indicating unit shall be located onthe navigation bridge if the control panel is located in the fire controlstation.

Interpretation

..... If the CO2 system discharge pipes are used for the sample extractionsmoke detection system, the control panel can be located in the CO2 roomprovided that an indicating unit* is located on the navigation bridge. Sucharrangements are considered to satisfy the requirements of the regulationof FSS Code 10.2.4.1.2 as amended by MSC.292(87).

*Indicating unit has the same meaning as repeater panel and observation ofsmoke should be made either by electrical means or by visual on repeaterpanel.

• Action :

Chapter 4 Section 18 Item G.3.1 and Chapter 5 Section 9 D.3.7.2.4 have beenrevised according to UI SC260 Rev.1.

Page 31: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC262 (Rev. 1) - Fixed Foam Fire Extinguishing Systems, Foam generating Capacity (FSS Code

/ CHAPTER 6 / 3.2.1.2 and 3.3.1.2 as amended by Res. MSC.327(90))

• Main reason to change :

To clarify a definition of the term “largest protected space” together withexplanatory figures and other fire risk items.

Page 32: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC262 (Rev. 1) - Fixed Foam Fire Extinguishing Systems, Foamgenerating Capacity (FSS Code /

CHAPTER 6 / 3.2.1.2 and 3.3.1.2 as amended by Res. MSC.327(90))

Figure 1- Machinery space including a casing

Page 33: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC262 (Rev. 1) - Fixed Foam Fire Extinguishing Systems, Foamgenerating Capacity (FSS Code /

CHAPTER 6 / 3.2.1.2 and 3.3.1.2 as amended by Res. MSC.327(90))

Figure 2 - Machinery space not including a casing

• Action:

Chapter 4 Section 18 Item K.3.2 has been revised according to UI SC262 Rev.1and by doing so previous implementation date of UI SC262 Rev.0 has beenerased.

Page 34: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC267 (New) - Implementation of the requirements relating to lifeboat release and retrieval

systems (LSA Code Paragraph 4.4.7.6 as amended by resolution MSC.320(89))

Paragraph 4.4.7.6.9

Provision of a Unified Interpretation relating to the components in a lifeboat whichare to be of material that is corrosion resistant in the marine environment andagreement that “safety interlocks” (mechanical protection of on-load release)should be clarified.

Paragraphs 4.4.7.6.7.2 and 4.4.7.6.6

Provision of a Unified Interpretation relating to release mechanism/ interlockdevices (hydrostatic or other means).

Paragraph 4.4.7.6.14

Provision of a UI relating to the mass and design factor of safety that is to be appliedto hanging off and fall preventer arrangements of the release gear mechanism.

Page 35: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC270 (New, Corr. 2) - Fire pumps in ships designed to carry five or more tiers of containers on

or above the weather deck (SOLAS II-2/10.2.2.4.1.2, II-2/10.7.3.2.3 and IMO FSS Code Ch.

12.2.2.1.1)

Page 36: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating

UI SC271 (New) - Additional indicating unit in the cargo control room in accordance with amended

FSS Code Chapter 9.2.5.1.3

• Main reason to change :

To provide unified interpretation of “Additional indicating unit of fire detection and

fire alarm systems in the cargo control room in accordance with amended FSS CodeChapter 9.2.5.1.3” related to FSS Code, Ch.9.2.5.1.3.

Page 37: IACS RESOLUTION CHANGES - gmo.org.tr · PDF fileDry Heat test;- Test No : 5 ... List of IACS Resolution Changes (January 2016) 07 UI SC267 - Implementation of the requirements relating