What is a process model?
3
A structured set of activities required to develop a software system Specification; Design; Validation; Evolution.
A software process model is an abstract representation of a process. It presents a description of a process from some particular perspective.
The software design process4
Architecturaldesign
Abstractspecification
Interfacedesign
Componentdesign
Datastructuredesign
Algorithmdesign
Systemarchitecture
Softwarespecification
Interfacespecification
Componentspecification
Datastructure
specification
Algorithmspecification
Requirementsspecification
Design activities
Design products
Waterfall model (classic lifecycle)7
Requirements analysis and definitionSystem and software designImplementation and Coding Integration and system testingOperation and maintenanceThe main drawback of the waterfall model is
the difficulty of accommodating change after the process is underway. One phase has to be complete before moving onto the next phase.
The waterfall model
8
Requirements
definition
System andsoftware design
Implementationand unit testing
Integration andsystem testing
Operation and
maintenance
Advantages of water fall model
9
The water fall model is easy to implementation.
For implementation of small systems water fall model is use full.
The project requires the fulfillment of one phase, before proceeding to the next.
It is easier to develop various software through this method in short span of time.
Disadvantages of water fall model10
The requirement analysis is done initially and sometimes it is not possible to state all the requirement explicitly in the beginning.
The customer can see working model of the project only at the end.
If we want to go backtrack then it is not possible in this model.
It is difficult to follow the sequential flow in software development process.
What is prototyping11
The Prototyping Model is a systems development method (SDM) in which a prototype (an early approximation of a final system or product) is built, tested, and then reworked as necessary until an acceptableprototype is finally achieved from which the complete system or product can now be developed
Why prototype?
•Evaluation and feedback are central to interaction design•Stakeholders can see, hold, interact with a prototype more easily than a document or a drawing•Team members can communicate effectively•You can test out ideas for yourself •Is quick, cheap and easily changed
Types of prototyping
Throw-away PrototypingEvolutionary PrototypingLow Fidelity PrototypingHigh Fidelity Prototyping
Prototyping model15
Advantages Users can try the system and provide feedback during
development An operational prototype can be produced in weeks. Prototyping enables earlydetection of errors
Problems Lack of process visibility. Management is required. It’s a expensive method in creating. System performance and security issues can be
overlooked
Introduction of RAD
RAD-based methodologies adjust the SDLC phases to get some part of system developed quickly and into the hands of the users.
Rapid Application development focuses on gathering customer requirements through workshops or focus groups, early testing of the prototypes by the customer
using iterative concept, reuse of the existing prototypes (components), continuous integration and rapid delivery.
What is RAD?
Rapid application development (RAD) is a software development methodology that uses minimal planning in favor of rapid prototyping. A prototype is a working model that is functionally equivalent to a component of the product.
In RAD model the functional modules are developed in parallel as prototypes and are integrated to make the complete product for faster product delivery.
The most important aspect for this model to be successful is to make sure that the prototypes developed are reusable.
RAD Vs. Waterfall
RAD-based methodologies are well suited for projects with short time schedules as they increase speed.
Waterfall-based methodologies are the worst choice when time is essential as they do not allow for easy schedule changes.
RAD Model Design PhasesFollowing are the phases of RAD Model:
Business Modeling: The business model for the product under development is designed
in terms of flow of information and the distribution of information between various business channels.
A complete business analysis is performed to find the vital information for business,
how it can be obtained, how and when is the information processed and what are the
factors driving successful flow of information.
Data Modeling: The information gathered in the Business Modeling phase is
reviewed and analyzed to form sets of data objects vital for the business.
The attributes of all data sets is identified and defined. The relation between these data objects are established and
defined in detail in relevance to the business model.
Process Modeling: The data object sets defined in the Data Modeling phase are
converted to establish the business information flow needed to achieve specific business objectives as per the business model.
The process model for any changes or enhancements to the data object sets is defined in this phase.
Process descriptions for adding , deleting, retrieving or modifying a data object are given.
Application Generation: The actual system is built and coding is done by using automation
tools to convert process and data models into actual prototypes.
Testing and Turnover: The overall testing time is reduced in RAD model as the prototypes
are independently tested during every iteration. However the data flow and the interfaces between all the
components need to be fully tested with complete test coverage. Since most of the programming components have already been
tested, it reduces the risk of any major issues.
When to Use RAD
RAD is used when The team includes programmers and analysts who
are experienced with it There are pressing reasons for speeding up
application development The project involves a new ecommerce application
and needs quick results Users are modern and highly engaged with the
goals of the company
Advantage & Disadvantage of RAD
Advantage Disadvantage
Changing requirements can be accommodated.
Progress can be measured.
Iteration time can be short with use of powerful RAD tools.
Productivity with fewer people in short time.
Reduced development time.
Increases reusability of components
Encourages customer feedback
Dependency on technically strong team members for identifying business requirements.
Only system that can be modularized can be built using RAD.
Requires highly skilled developers/designers.
High dependency on modeling skills.
Inapplicable to cheaper projects as cost of modeling and automated code generation is very high.
Management complexity is more.
Incremental development]
24Rather than deliver the system as a single
delivery, the development and delivery is broken down into increments with each increment delivering part of the required functionality.
User requirements are prioritised and the highest priority requirements are included in early increments.
Once the development of an increment is started, the requirements are frozen though requirements for later increments can continue to evolve
Incremental development25
Validateincrement
Develop systemincrement
Design systemarchitecture
Integrateincrement
Validatesystem
Define outline requirements
Assign requirements to increments
System incomplete
Finalsystem
Incremental development advantages26
Customer value can be delivered with each increment so system functionality is available earlier.
Early increments act as a prototype to help elicit requirements for later increments.
Lower risk of overall project failure.The highest priority system services tend to
receive the most testing.
Spiral development27
Process is represented as a spiral rather than as a sequence of activities with backtracking.
Each loop in the spiral represents a phase in the process.
No fixed phases such as specification or design - loops in the spiral are chosen depending on what is required.
Risks are explicitly assessed and resolved throughout the process.
Spiral model sectors28Objective setting
Specific objectives for the phase are identified.Risk assessment and reduction
Risks are assessed and activities put in place to reduce the key risks.
Development and validation A development model for the system is chosen which
can be any of the generic models.Planning
The project is reviewed and the next phase of the spiral is planned.
Rapid software development30Because of rapidly changing business
environments, businesses have to respond to new opportunities and competition.
Rapid software development and delivery is now often the most critical requirement for software systems.
Businesses may be willing to accept lower quality software if rapid delivery of essential functionality is possible.
Requirements31
Because of the changing environment, it is often impossible to arrive at a stable, consistent set of system requirements.
Therefore a waterfall model of development is impractical and an approach to development based on iterative specification and delivery is the only way to deliver software quickly.
Characteristics of rapid software development process
32The processes of specification, design and
implementation are concurrent. There is no detailed specification, and design documentation is minimized.
The system is developed in a series of increments. End users evaluate each increment and make proposals for later increments.
System user interfaces are usually developed using an interactive development system.
An iterative development process33
Validateincrement
Build systemincrement
Specify systemincrement
Design systemarchitecture
Define systemdeliverables
Systemcomplete?
Integrateincrement
Validatesystem
Deliver finalsystem
YES
NO
Advantages of incremental development34
Accelerated delivery of customer services. Each increment delivers the highest priority functionality to the customer.
User engagement with the system. Users have to be involved in the development which means the system is more likely to meet their requirements and the users are more committed to the system.
Problems with incremental development35Management problems
Progress can be hard to judge and problems hard to find because there is no documentation to demonstrate what has been done.
Contractual problems The normal contract may include a specification;
without a specification, different forms of contract have to be used.
Validation problems Without a specification, what is the system being
tested against?Maintenance problems
Continual change tends to corrupt software structure making it more expensive to change and evolve to meet new requirements.
Prototyping36
For some large systems, incremental iterative development and delivery may be impractical; this is especially true when multiple teams are working on different sites.
Prototyping, where an experimental system is developed as a basis for formulating the requirements may be used. This system is thrown away when the system specification has been agreed.
Incremental development and prototyping37
Incrementaldevelopment
Throw-awayprototyping
Delivered system
Executable prototype +System specification
Outlinerequirements
Conflicting objectives38
The objective of incremental development is to deliver a working system to end-users. The development starts with those requirements which are best understood.
The objective of throw-away prototyping is to validate or derive the system requirements. The prototyping process starts with those requirements which are poorly understood.
Agile methods 39Dissatisfaction with the overheads involved
in design methods led to the creation of agile methods. These methods: Focus on the code rather than the design; Are based on an iterative approach to software
development; Are intended to deliver working software quickly
and evolve this quickly to meet changing requirements.
Agile methods are probably best suited to small/medium-sized business systems or PC products.
Principles of agile methods40
Principle Description
Customer involvement The customer should be closely involved throughout thedevelopment process. Their role is provide and prioritise newsystem requirements and to evaluate the iterations of the system.
Incremental delivery The software is developed in increments with the customerspecifying the requirements to be included in each increment.
People not process The skills of the development team should be recognised andexploited. The team should be left to develop their own ways ofworking without prescriptive processes.
Embrace change Expect the system requirements to change and design the systemso that it can accommodate these changes.
Maintain simplicity Focus on simplicity in both the software being developed and inthe development process used. Wherever possible, actively workto eliminate complexity from the system.
Problems with agile methods41
It can be difficult to keep the interest of customers who are involved in the process.
Team members may be unsuited to the intense involvement that characterizes agile methods.
Prioritizing changes can be difficult where there are multiple stakeholders.
Maintaining simplicity requires extra work.Contracts may be a problem as with other
approaches to iterative development
Extreme programming42Perhaps the best-known and most widely used
agile method.Extreme Programming (XP) takes an ‘extreme’
approach to iterative development. New versions may be built several times per day; Increments are delivered to customers every 2 weeks; All tests must be run for every build and the build is
only accepted if tests run successfully.
The XP release cycle43
Break downstories to tasks
Select userstories for this
releasePlan release
Releasesoftware
Evaluatesystem
Develop/integrate/test software
Extreme programming practices 144
Incremental planning Requirements are recorded on Story Cards and the Stories to be included in a release are determined by the time available and their relative priority. The developers break these Stories into development ‘Tasks’.
Small Releases The minimal useful set of functionality that provides business value is developed first. Releases of the system are frequent and incrementally add functionality to the first release.
Simple Design Enough design is carried out to meet the current requirements and no more.
Test first development An automated unit test framework is used to write tests for a new piece of functionality before that functionality itself is implemented.
Refactoring All developers are expected to refactor the code continuously as soon as possible code improvements are found. This keeps the code simple and maintainable.
Extreme programming practices 245
Pair Programming Developers work in pairs, checking each otherÕs work andproviding the support to always do a good job.
Collective Ownership The pairs of developers work on all areas of the system, so thatno islands of expertise develop and all the developers own all thecode. Anyone can change anything.
Continuous Integration As soon as work on a task is complete it is integrated into thewhole system. After any such integration, all the unit tests in thesystem must pass.
Sustainable pace Large amounts of over-time are not considered acceptable as thenet effect is often to reduce code quality and medium termproductivity
On-site Customer A representative of the end-user of the system (the Customer)should be available full time for the use of the XP team. In anextreme programming process, the customer is a member of thedevelopment team and is responsible for bringing systemrequirements to the team for implementation.
2.11. Rapid Application Development (RAD)
46Agile methods have received a lot of attention
but other approaches to rapid application development have been used for many years.
These are designed to develop data-intensive business applications and rely on programming and presenting information from a database.
RAD environment tools47Database programming language
Interface generatorLinks to office applicationsReport generators
A RAD environment48
DBprogramming
language
Interfacegenerator
Officesystems
Reportgenerator
Database management system
Rapid applicationdevelopment environment
Evolutionary development
Exploratory development Objective is to work with customers and to evolve a
final system from an initial outline specification. Should start with well-understood requirements and add new features as proposed by the customer.
Throw-away prototyping Objective is to understand the system requirements.
Should start with poorly understood requirements to clarify what is really needed.
Evolutionary development
Concurrentactivities
ValidationFinal
version
DevelopmentIntermediate
versions
SpecificationInitial
version
Outlinedescription
Evolutionary developmentProblems
Lack of process visibility; Systems are often poorly structured; Special skills (e.g. in languages for rapid prototyping)
may be required.Applicability
For small or medium-size interactive systems; For parts of large systems (e.g. the user interface); For short-lifetime systems.
FORMAL METHODS MODEL52
Comprises set of activities that leads to formal mathematical specification of computer software. Enables a software engineer to specify, develop
and verify a computer based system by applying mathematical notation. Problems of ambiguity, incompleteness
and inconsistency can be managed by this method. Provides a base for verification therefore enable a
UNIFIED PROCESS MODEL53
Comprises best features and characteristics of conventional software process models. Emphasize importance of customer communication and streamlined methods for describing the customers view of system. Phases of Unified Process Inception = Involves customer communication and planning activities. Elaboration = Encompasses the customer communication and modeling activities of the generic process model. Architectural representation using Use Case Model, Analysis Model, Design Model, Implementation Model and Deployment Model.
55
Construction = Develops or acquires the software components that will make each use case operational for end users. Transition = Software is given to end user for beta testing and user feedback reports both defects and necessary changes. Production = Coincides with the deployment activity of process. The on going use of software is monitored, support for the operating environment is provided, and defect reports and requests for changes are submitted and evaluated.