Special thanks to Paul Nagy @NSN!
*
*
*Scrum / Agile
*Large Scale Transformation
*Team
*Management / Leadership
*Agile Testing / Test Automation
*…
*
*
Product Owner ask the Team :
Can you commit?
Nobody Answers.
Scrum Master looks around, turn
back to the Product Owner
Yes, we can!
*Scrum Master is NOT the manager of
the team.
Team make commitment to the Product
Owner, not the Scrum Master.
Product Owner ask the Team :
Can you commit those?
Team :
No, we can not finish
all those, but we can
take it, and put to
“uncommitted”.
*
Product Owner decides what to do in the
sprint, Team confirms whether they can
finish it or not.
If there’s a little bit capacity left still, just
leave it, since during the Sprint, if Team
- finished all committed features
- Still have certain amount of time
They can call the Product Owner, and select
a couple more features to do in the rest
of the Sprint.
User Story :
“As a Product Owner, I really
want the team to finish on
time.”
Or
“As a Release Manager, I want
the team to do integration
testing for feature x and y.”
Etc.
*INVEST User
Independent
Negotiable
Valuable
Estimable
Small
Testable
As a
<type of user>
I want
<some goal>
so that
<some reason>
User Story :
“Put security path on
product version 2.0”
Q : what are those patches?
A : Team decide.
*
Ensure your Product Owner join the Sprint
Planning with Product Backlog in a good
shape, which has :
Fine-grained, detailed requirements
ready for consumption in the next
sprint, e.g. small user stories
Backlog Grooming Session
Hold it near the ¾ of your sprint.
All team members and PO join.
While the team is splitting features
into tasks, they have routines :
• Design
• Coding (including Unit Test)
• Testing
• Test automation
• Communication with team A
*
All the team members together try to
understand the selected features by sketch
out its design collaboratively, involving both
the developing point of view and also testing
perspectives.
Task Splitting
It’s so hard to estimate the
Test Automation task. But
coach said having tasks
bigger than 16 hours is not
good, so we have to split.
*
What are those Acceptance Tests?
Is testing environment hard to configure?
Any external testing equipment needed?
Any testability support needed? Do we have those?
Any keywords might be needed? Do we have them?
Etc.
*
Scrum Master
(Look around) Let’s start from
you, Zhang San, you can start.
……
(Look at Wang Er) I think you
can keep working on this task,
and contact Zhou Si for lab
issues.
……
Scrum Master
*
TEAM
Progress Monitoring
Task Assignment
Risk Management
Scrum Master @Daily Scrum
Keep an eye on the amount
of ongoing tasks
Surface blocks and
impediments team can’t
solve Notice personal
problems or conflicts and resolve them
Team Member :
I fixed one bug yesterday.
I’ll fix another bug today.
Or :
In the morning, I started
testing, but the SUT is not
able to be connected, after
called Lab engineer for help,
In the afternoon I finally
started to do real testing,
not finished yet.
I’ll continue tomorrow.
*
Focus on team progress
• How long it’ll take still
• Any surprise met
• Any new understandings of the domain or software system to share
• Any problems others should know
• Any help needed
Update status based on task
Team Member
(task x : 8 hours)
Day 1 : No impediments, I’m
working on that. I think 2
hours still left.
Day 2 : It’s hard to debug, but
I’m working on that. It’s fine,
let’s keep 2 hours for it.
Day 3 : ……
*
Use Burndown Chart
React when progress deviates
Clarify
•What happened
•What is the impact
•Are we still on track
•What should we do
Team Member asks can they switch
the Daily Scrum to be twice a week
They thought
• Nobody cares my status
• Nor I care others, since I can
not understand theirs…
*
Managing TASK than people
Line Manager (recently nominated)
“One team member was stuck
on task x (6 hours), still
unfinished after 3 days. Others
were busy with bug fixing. Task
y depended on task x.”
“I think Maybe we need a Gantt
Chart., to control the task
dependency.”
Q : Where’s burndown chart?
A : We don’t use that.
*
• Visual Management
• Visible / handy / accessible
information around team
• Escalate impediments to the team
and searching for help as soon as
possible
• Reveal progress violation via
burndown chart
*
DONE
Q : So, this feature is DONE? How about the Condition of Satisfaction?
A : It’s on the Product Backlog management tool.
(browsing…)
Q : This is your Condition of Satisfaction?!!
A : Yes… As written there :SCV testing done, QC updated, Unit testing
coverage above 90%
Condition of Satisfaction
Definition of Done
*Condition of Satisfaction
• = Confirmation (User Story’s 3C)
• ≈Acceptance Test
It is
• Feature’s behavior details
• User’s expected results in
certain scenarios
DONE & Demo
Q : How many items done?
A : Eh, none of them.
Q : So there is no demo.
A : But they are almost done…
*
A feature is DONE or not, based on the
Definition of Done.
If it’s not DONE, then there is no demo
for that, and they didn’t gain the size
(most probably you use story point).
*
Team
“we have an estimation
problem! We always under-
estimate.”
*
Competence & Low Experience
• Pair with skilled workmates
• Backlog Grooming helps
Risk not Acknowledged
• Uncover risks in Daily Scrum
Task Allocation
• Rough design in Sprint Planning
New Team Members
• Pair with skilled members
*
Laptop Meetings
• People working on their laptops
most of the time
• Don’t listen to others
• Not all members understand the
final decisions
• You have to check with them
one by one
• Explicitly ask the person when
you need their comment
*
• Everybody expresses their opinion
• Focus on the purpose of meeting
• Promote open communication
• Encourage healthy conflicts
*
*Thanks!
Xu Yi
Twitter : kaverjody mailto:[email protected]
mailto:[email protected] http://damianji.spaces.live.com/
http://www.linkedin.com/in/kaveri
“Senior Agile Consultant” @ HP Enterprise Services Scrum / Agile Coaching, Agile Testing & Test Automation HP敏捷开发服务 新浪微群:http://q.weibo.com/820095