MATERIAL REQUISITIONNo.:
I-RM-3010.0H-1254-600-TF8-001
CLIENT:E & P SHEET: 1 of 16
JOB:CESSÃO ONEROSA AREA DEVELOPMENT
AREA:PETROBRAS P-76
ENG-E&P/IEUEP-II / IECO
TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
CONSÓRCIO TECHNIP-TECHINT
TKP Nr.: F70107-M02-MR-0170-001CONTRACT Nr.: 0801.0000156.13.2
TECHNICAL RESP.: NAME: ANTONIO E. ZEFERINO INITIALS: AEZ
FILE: I-RM-3010.0H-1254-600-TF8-001_0_P001.DOC CREA REG. Nr.: RJ 2000100216
INDEX OF REVISIONS
REV. DESCRIPTION AND/OR REVISED SHEETS
0 FOR INFORMATION / FOR QUOTATION
REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H
DATE 09/APR/15
DESIGN TF8
EXECUTION DJAQUES
CHECK TBLAIR
APPROVAL RSARAUJO
INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF THEIR PURPOSE
FORM OWNED TO PETROBRAS N-0381 REV. L
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
2 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
SUMMARY
1 INTRODUCTION ................................................................................................................... 3
2 PRESENTATION OF TECHNICAL PROPOSALs................................................................. 3
3 SCOPE OF REQUISITION .................................................................................................... 4
4 DRAWINGS & DOCUMENTS ............................................................................................... 5
5 GENERAL REQUIREMENTS................................................................................................ 5
6 APPLICABLE TECHNICAL DOCUMENTS........................................................................... 6
7 SUPPLIER TECHNICAL DOCUMENTS................................................................................ 7
8 DIGITAL DELIVERY REQUIREMENT................................................................................... 7
9 WEIGHT CONTROL.............................................................................................................. 9
10 OPERATION ENVIRONMENT / MOTION REQUIREMENTS.............................................. 10
11 ANNEXES ........................................................................................................................... 12
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
3 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
1 INTRODUCTION
This Material Requisition and its attachments defines the general requirements for thedesign, manufacture, shop assembly, inspection, testing, certification, preparation forshipment, commissioning supervision and warranties of the Z-TG-1254001A/B – EXHAUSTDUCT EXTENSION OF CO2 COMPRESSION, for operation on the CESSÃO ONEROSAFPSO P-76, offshore Brazil as well as all applicable codes, standards and regulationsreferenced, and the requirements of the Classification Society Rules, where applicable.
Omission of any construction and/or manufacturing detail from this Material Requisition shallnot constitute cause for not carrying out any service, or not supplying any material, asnecessary for perfect operation of the item required in accordance with the applicableSpecification/Data Sheets, with no extra costs.
Any conflict of information found in the documents that comprise this Material Requisitionshall be brought to the attention of PURCHASER, in writing, previously to presentation of theProposal, for due clarification.
SUPPLIER may submit in clarification phase any alternatives based on his experience that istechnically superior and economically more advantageous. These alternatives shall be incompliance with the basic characteristics and performance requirements of the equipment asspecified on this Material Requisition. All alternatives shall be submitted to PURCHASER forapproval, prior the execution.
2 PRESENTATION OF TECHNICAL PROPOSALS
The technical proposal shall present the complete and detailed scope of supply and meet therequirements of all items of the respective Material Requisition (number and revised quoted)and its annexes, without any technical deviation.
Any exclusion and/or alternative to what is specified in the Material Requisition and itsannexes, including the use of the SUPPLIER standard and exclusive technology, shall bepresented in a Deviation List (as per Annex I).
PURCHASER acceptance of each item of the Deviation List will be through TechnicalClarification that will be issued to all SUPPLIERS.
The Deviation List mentioned above shall contain, at least, for each requirement that theSUPPLIER intends to change:
- The documents description, code and selection that contain the requirement;
- The reason for deviation, always indicating the requirements that are different fromSUPPLIER standard and the costs, schedule and technical benefits/impacts of thechange;
- The SUPPLIER proposal.
2.1 TECHNICAL PROPOSAL
The TECHNICAL PROPOSAL shall include the following information, as a minimum,otherwise it will be disqualified:
- Scope of supply, confirmation of compliance and deviation list;
- Compliance with all referenced documentation attached to this RM;
- Compliance with all referenced international standards;
- General description;
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
4 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
- Classification and certification (where applicable);
- Complete data sheets;
- Consumables and tools for assembly, disassembly, maintenance, commissioning andstart-up;
- Spare parts list;
- Outline drawings showing dimensions;
- Preliminary information about necessities for the equipment handling and installation;
- Weight and center of gravity, see form on item 9;
- All documents and drawings required by this requisition;
- Warranty conditions;
- Technical assistance for commissioning start-up and pre-operation onshore and/oroffshore with unit price for working and stand by hours including mobilization /demobilization (separate quotation, if applicable);
- Mechanical assembly supervision at job site (separate quotation);
- Preliminary Inspection and Test Plan;
- Preliminary list of documents;
- Quality Plan;
- Confirmation of motion requirements compliance;
- Confirmation of packing proper for marine transportation;
- Preliminary production schedule;
- Preliminary preservation recommendations prior to installation;
Note: The above items shall also be related to all normally required accessories for safeoperation and maintenance, normally used.
3 SCOPE OF REQUISITION
3.1 EQUIPMENT
See ANNEX II of this Material Requisition, Part I – EQUIPMENT / BULK MATERIALSUPPLY, where there are informed all tagged items, bulk materials and services.
Besides the deliverables above, the scope shall also consider as a minimum the set ofengineering / testing / documentation / inspection / certification and complementary parts, asa minimum, wherever applicable:
Mechanical design; Mechanical calculation; Fabrication design; Thermal design calculation; FEA analysis (if necessary); Drawings, documents and manuals for all items according to item 7; Structural calculation; Fabrication of internal parts (if applicable);
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
5 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
PWHT (where applicable); Inspection, testing and the quality assurance of the equipment; Non-destructive examination (where applicable); All equipment with their supports, lifting lugs and earthing lugs; All raw materials and consumables; Transportation (Separated quotation); Set of spare parts for commissioning and start-up (separate delivery); Painting proper for offshore installations, see I-ET-3010.0F1200-956-PPC-006 -
General Painting; Packing, protection and marking for shipment of all items; Preservation, including equipment handling conditioning and storage at job site; Technical assistance with unit price for working and stand-by hours and
mobilization/demobilization (Separated quotation); Data Book
3.1.1 REMARKS:
- The following items are out of exhaust ducts extension scope:
Installation at job site;
Supply of utilities.
4 DRAWINGS & DOCUMENTS
Drawings & Technical Documents shall comply with item 7 of this Material Requisition plusthose required by the Classification society Rules and Regulatory Body.
SUPPLIER shall submit the list of documentation together with proposal.
SUPPLIER shall be also responsible for calculating, defining and properly informing all loadsto be supported by the FPSO itself.
All applicable data sheets (FD) listed on item 6 of this Material Requisition shall be filled bySUPPLIER and returned for approval in accordance with item 8. Alternatively, SUPPLIERcan submit its own model of data sheet since it present all the information contained in thesereference data sheets, as a minimum.
SUPPLIER is responsible for the consistency among their documents. At any timePURCHASER can request revision to the documents in case an inconsistency is identified.
All revisions in Drawings and Technical Documents must be clearly identified, otherwise theywill be rejected.
5 GENERAL REQUIREMENTS
SUPPLIER shall be responsible for the technical integrity of the equipment includingmechanical design, selection of materials, manufacture, shop assembly and pre-assembling(if applicable), testing, performance guarantee, requirements of Quality Assurance,preservation, commissioning, shipment and specified engineering services.
The design shall maximize the use of interchangeable components and shall utilize theconcept of unit change-out wherever possible.
All equipment and their respective supports must also be designed to withstand theconditions during transport of the equipment from SUPPLIER installation to job site, as well
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
6 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
as for lifting condition.
5.1 EQUIPMENT WEIGHT
SUPPLIER shall inform with its proposal the accurate weight and center of gravity data andfulfill the data sheet presented on section 9. SUPPLIER shall ensure that every effort is madeto reduce weight where practicable.
6 APPLICABLE TECHNICAL DOCUMENTS
SUPPLIER shall take into account the following referenced PURCHASER Documents, onthe latest revision, where applicable. SUPPLIER documents shall provide a detaileddescription of the equipment and scope of supply, as well as all associated technicalrequirements. All equipment parts and details not complying with the specifications belowshall be informed during the clarification phase.
6.1 ATTACHED DOCUMENTS
The information contained in the Data Sheet shall be considered mandatory.
DOCUMENT Nº REV. TITLE
I-FD-3010.0H-1254-600-TF8-496 0 EXHAUST DUCT EXTENSION DATA SHEET
I-DE-3010.0F-1254-600-G01-495 0 EXHAUST DUCT – OUTLINE DRAWING
I-DE-3010.0H-1412-140-TF8-001 BM02 - CO2 COMPRESSION- MAIN STRUCTURE -
PLANS, SECTIONS AND DETAILS
I-ET-3010.0F-1200-956-PPC-006 A GENERAL PAINTING
I-ET-3010.0F-1200-956-PPC-001 A QUALIFICATION TESTS FOR PAINT SYSTEMS
I-ET-3010.01-1200-956-PPR-002 0 PAINTING SYSTEM & QUALITY CONTROL
I-ET-3010.01-1200-956-PPR-001 C PAINTING GUARANTEE
I-ET-3010.0F-1200-956-PPC-002 ASURFACE TOLERANT SOLVENT FREE EPOXIPAINT FOR WET SURFACES (where required)
I-ET-3000.00-1200-956-PCI-001 ACOLOR CODING – OFFSHORE PLATFORM
PAINTING
I-ET-3010.0F-1200-955-PPC-001 A WELDING
I-ET-3010.0F-1200-955-PPC-002 0 REQUIREMENTS FOR WELDING INSPECTION
I-ET-3010.0H-1200-600-TF8-005 C THERMAL INSULATION DESIGN
I-ET-3010.0F-1200-251-PPC-001 A BOLT MATERIALS
I-ET-3010.0H-5140-700-TF8-002 C GROUNDING INSTALLATION TYPICAL DETAILS
I-ET-3010.0H-1200-600-TF8-002 AEQUIPMENT MANUAL DATA BOOKREQUIREMENTS FOR VENDORS
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
7 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
I-ET-3010.0H-1200-600-TF8-003 0INSTRUCTION FOR THE VENDORS
DOCUMENTS REQUIRED BY MATERIALREQUISITION
I-RL-3010.0F-1350-960-PPC-006 D ACCELERATION DATA (as reference)
I-ET-3010.0F-1350-960-PPC-001 B NAVAL REQUIREMENTS (as reference)
I-ET-3A26.00-1000-941-PPC-001 C METOCEAN DATA (as reference)
DR-ENGP-1.1-R.6 EPIPING STANDARD AND MATERIAL FOR OIL
PRODUCTION AND PROCESS FACILITIES
I-ET-3010.00-5400-947-TF8-021 A SAFETY SIGNALLING
I-ET-3010.0F-1200-940-PPC-001 A INTERNAL COATING (where/if required)
N-1710 MCODING OF TECHNICAL ENGINEERING
DOCUMENTS
6.2 NON ATTACHED DOCUMENTS
The following documents must also be considered:
NR-26 LASTSINALIZAÇÃO DE SEGURANÇA
(BRAZILIAN REGULANTION – SAFETYSIGNALING)
NR-30 LASTPLATAFORMAS E INSTALAÇÕES DE
APOIO – ATTACHMENT II, ITEM 9(BRAZILIAN REGULATION)
7 SUPPLIER TECHNICAL DOCUMENTS
See ANNEX II of this Material Requisition, Part II – DOCUMENTS AND DRAWING SUPPLY.
8 DIGITAL DELIVERY REQUIREMENT
All documents/drawings specified for handover to PURCHASER shall be delivered in digitalformats.
Digital deliverables can generally be classified as native editable formats (e.g. MS Word(.doc), MS Excel (.xls), MicroStation (.dgn), AutoCAD (.dwg)), neutral viewing formats (PDF)and image raster formats.
Native format is required for all documentation.
However, neutral viewing formats are acceptable for standard equipment documentation andcertain drawings extract from 3D Model.
As a general rule, files shall not consist of multiple documents (i.e. several documents withdifferent document numbers in the same file). Each uniquely numbered document shall bedelivered as a separate file.
SUPPLIER shall implement quality routines to ensure that the digital information,documentation and data bases delivered reflects the final “as built” version that has been
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
8 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
through the SUPPLIER approval/verification process.
When PDF file are used, the following requirements shall still be followed:
- PDF files shall the greatest extent possible be created by generating them from the originalfile, and digitalizing should be avoided at the maximum.
- Document front sheet shall be included in the source file and the total number of pages,including Annexes, shall appear on the front sheet prior to converting to PDF. Thedocument front page shall always be numbered page 1.
- In all cases indexing through the use of the PDF bookmark function shall be utilized.
- As a minimum and depending on the size of the document, book marking shall be used forthe first three heading levels.
- Different page orientation within a single PDF file shall be avoided as this often leads toprinting problems.
- PDF files will be delivered without any restrictions enabled.
8.1 2D CAD DETAILED REQUIREMENTS
No references, internal or external, are allowed at the handover of 2D documents, i.e. thedrawing frame is to be included in the drawing file. This implies merging of all graphics fromall reference files used in the engineering phase. This also applies to CAD files generatedfrom 3D models.
Fonts to be used on drawings shall make easy distinction of similar characters (e.g. I (capitali), I (lower case L) and 1 (number 1)). Front size should be at least 3 mm high on printout.
SUPPLIER shall certify that it has conducted basic quality control of the documentation intheir systems including information imported from sub-contractors, suppliers and othercontractors for their part of the development.
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
9 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
9 WEIGHT CONTROL
SUPPLIER must fulfill the form below:1 APPLICABLE TO [NOTES 1 & 2]: PROPOSAL PURCHASE AS BUILT
2 FOR: EB-E&P UNIT / MODULE:
3 SITE: CESSÃO ONERSA SERVICE:
4No REQ /TAG:
MANUFACTURER:
5 MODEL: VENDOR:
6 SIZE / TYPE: MAIN EQUIPMENT:
7 SERIAL No. MANUFACTURER No:
8 WEIGHT DATA [NOTE 3]
9 DATA STATUS: ESTIMATED CALCULATED WEIGHTED
10 EQUIPMENT WEIGHT: ACCURACY
11 DRY (kg): 3% 5% 10%
12 OPERATING (kg) 3% 5% 10%
13 TEST (kg): 3% 5% 10%
14
15 REMARKS
16
17
18 DIMENSIONS DATA [NOTES 4, 5, 6 & 7]
19 DATA STATUS: ESTIMATED CALCULATED MEASURED
20 SKETCH:
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36 DRY DIMENSIONS (mm):
37 A a
38 B b
39 C c
40
NOTES
General Notes
1. Vendor shall fill in all blank spaces in the weight control data sheet (fields and check boxes). All missing information will beconsidered as not applicable or not according to vendor’s proposal.
2. Vendor shall fill in data sheets for main and auxiliary equipment, furnished separately or on different skids. If necessary,manufacturer shall produce additional copies of the weight control data sheet.
3. Accuracy of weight figures shall be 10% in the proposal phase. After placing of the purchase order, the accuracy shall berefined to 3%, but never more than that informed on proposal phase.
4. Manufacturer shall indicate with dashed lines on sketch and respective dimensions on the information table all maintenanceareas required for assembly and disassembly of equipment.
5. Manufacturer shall indicate equipment orientation.
6. Any variation in the center of gravity from dry to operating mode shall be noted.
7. Accuracy of dimensions shall be 10% in the proposal phase. After placing of the purchase order, the accuracy shall berefined to 3%, but never more than that informed on proposal phase.
Plan View
CGA
a
Bb
C
Elevation
Top of support
LevelCGc
Y
BC
c
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
10 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
10 OPERATION ENVIRONMENT / MOTION REQUIREMENTS
10.1 OPERATION ENVIROMENT
The equipment supplied shall be suitable for the environment and range of ambientconditions including, wind and motions defined in the attached documentation. Refer to thedocument “Acceleration Data”, I-RL-3010.0F-1350-960-PPC-006_D, “METOCEAN DATA”, I-ET-3A26.00-1000-941-PPC-001_C and “Naval Requirements”, I-ET-3010.0F-1350-960-PPC-001_B.
10.2 MOTION AND STRUCTURAL REQUIREMENTS
All structural elements shall be designed and verified using the yielding, buckling and fatiguecriteria according to the Classification Society Rules last revision.
The relevant data contained in the above Technical Specification and PURCHASERrequirements that shall be considered in the design of the Equipment are summarized below:
10.2.1 OPERATION LIMITS
Process Plant Equipment and Utility Systems
The process plant shall be able to operate under 1-year return period. The accelerationshave been calculated for the operational (1 year) and extreme (100 year) conditions. Resultsare presented in I-RL-3010.0F-1350-960-PPC-006 – ACCELERATION DATA. The maximumaccelerations (with gravitational effects) are presented below, considering the worst Sea andDraft condition case.
Design condition
With gravitational effects
ax (m/s2) ay (m/s2) az (m/s2)
Longitudinal Transversal Vertical
DOC - Design
Operational Condition (1-
Year return period)
0.77 1.99 11.50
DEC - Design Extreme
Condition (100-Year
return period)
1.22 3.78 12.75
Note: CONTRACTOR shall provide the loads on equipment foundations relative to thefollowing conditions:
- Design Condition: See table above;
- Damage Condition: Heel Angle: 22.5º;Trim Angle: 10.0º.
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
11 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
10.2.2 METEOROLOGICAL DATA
Atmospheric pressure Process Plant Equipment and Utility Systems
- Absolute maximum: 1035.0 hPa;
- Mean: 1015.0 hPa;
- Absolute minimum: 999.0 hPa.
SOURCE: Measured data in Merluza field, Santo Basin in the period from 2005 to 2011 andRT/MC 041/2006.
Relative Humidity
- Absolute maximum: 80.4%;
- Mean: 76.5%;
- Absolute minimum: 70.6%.
SOURCE: SIMO – Measured data in Merluza field, Santo Basin in the period from 2005 to2011.
Rainfall
Extreme Rainfall Values by Return Period and Duration (millimeters).
SOURCES: Otto Pfafstetter, Chuvas Intensas no Brasil”, 1982 (Station: Campos).
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
12 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
Air Temperature (DRY BULB)
- Absolute maximum: 33.1 °C;
- Mean: 23.9 °C;
- Absolute minimum: 11.3 °C;
SOURCE: Measured data in Merluza field, Santo Basin in the period from 2005 to 2011.
Wind
Basic wind velocity to be considered by SUPPLIER: 45 m/s.
11 ANNEXES
- ANNEX I: DEVIATION LIST;- ANNEX II: PART I – EQUIPMENT / BULK MATERIAL SUPPLY;
PART II – DOCUMENTS AND DRAWINGS SUPPLY.
MATERIAL REQUISITIONNo.
I-RM-3010.0H-1254-600-TF8-001REV.
0
PETROBRAS P-76SHEET
13 of 16TITLE:
M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION
NP-1
IECO
ANNEX I
DEVIATION LIST
All deviations must be listed. Any deviation not included in this list will notbe accepted.
DOCUMENT Nº DOCUMENT NAME
DOCUMENT Nº DOCUMENT NAME
DOCUMENT Nº DOCUMENT NAME
DOCUMENT Nº DOCUMENT NAME
DOCUMENT Nº DOCUMENT NAME
DOCUMENT Nº DOCUMENT NAME
DOCUMENT Nº DOCUMENT NAME
Material Requisition SR
Client reference
Rev.
A
EQUIPMENT / BULK MATERIAL M02 - EXHAUST DUCT EXTENSION FOR CO2 COMPRESSION
I-RM-3010.0H-1254-600-TF8-001
F70107 M02 SR 0170 001
Project Unit Doc Type
Mat Code
SerialNumber
Page 1/3
SCOPE OF SUPPLY
This supply is composed of two parts
Part I : Equipment / Bulk Material Supply
Part II : Documents and Drawings Supply
Rev. Date Status Written by(name & visa)
Checked by(name & visa)
Approved by(name & visa)
A
0
9-Apr-2015
13-Nov-2014
IFI
IFI
DJAQUES
DJAQUES
TBLAIR
TBLAIR
RSARAUJO
RAMAZO
R31
TR11
(r34
8)
I
A = Added - M = Modified - X = Canceled - D = Canceled in a previous revision
Material Requisition SR
I-RM-3010.0H-1254-600-TF8-001
Client reference
A
Project Unit Doc Type
Mat Code
SerialNumber
Rev.
EQUIPMENT / BULK MATERIAL M02 - EXHAUST DUCT EXTENSION FOR CO2 COMPRESSION
F70107 M02 SR 0170 001
Page 2/3
Current Qty
Tag Number
Z-TG-1254001A
Z-TG-1254001B
1 - 1
2 - 1
PART I : EQUIPMENT / BULK MATERIAL SUPPLY
Description
1
1
EXHAUST DUCT EXTENSION
EXHAUST DUCT EXTENSION
Pos - Sub Pos
Material Requisition SR
I-RM-3010.0H-1254-600-TF8-001
Client reference
A
Project Unit Doc Type
Mat Code
SerialNumber
Rev.
A = Added - M = Modified - X = Canceled - D = Canceled in a previous revision
F70107 M02 SR 0170 001
Page 3/3
Doc Code(1)
Description
First Issue Final Issue(5)
Issue Date(2)
Purpose(3)
Quantity Type(4)
Quantity Type(4)
A0001
A0106
A0107
A0108
A0401
A0401A
A1003
A1109
A1303
A2001
A2202
A5001
A5002
A5007
B1002
B1202
B1304
C1001
C1002
C1008
List of Vendor's Documents and Drawings
Painting Specification
Insulation Procedure
Weight Data Sheet
Vendor Data Book (VDB) Part 1
Vendor Data Book (VDB) Part 1 Index
Calculation Notes
Detailed Drawings
Casing Temperature Calculation Notes
General Arrangement Drawings
Thermal Stress Calculation Notes
Special Precautions for Handling prior and during Erection
Recommendations for Storage prior and after Erection
List of Spare Parts for Erection/Installation, Commissioning and Start-upFabrication and Quality Control Plan
NDT Procedure
Welding Book (Welding Map Welding Procedure Specification Procedure Qualification Report)Engineering Procurement Manufacturing and Test ScheduleProgress Report
Procedure for Preservation, protection and Packing and Recommendations for Handling prior and during Trasnportation
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFR
IFI
IFI
IFR
IFR
IFR
IFR
IFR
IFR
IFR
+4 W
+6 W
+6 W
+4 W
4 WWITH
DELIVERY+12 W
+4 W
+6 W
+8 W
+4 W
+4 W
4 WBEFORE
DELIVERY4 W
BEFORE DELIVERY
+4 W
+4 W
+6 W
+6 W
+4 W
+4 W
6 WBEFORE
DELIVERY
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
1E
E
E
E
E
2C+5DVD
2C+5DVD
E
E
E
E
E
E
E
E
E
E
E
E
E
E
EQUIPMENT / BULK MATERIAL M02 - EXHAUST DUCT EXTENSION FOR CO2 COMPRESSION
*
*
*
*
*
PART II : DOCUMENTS AND DRAWINGS SUPPLY
(1) * Priority document subject to penalization or term of payment(2) ISSUE DATE: number of D = Days / W = Weeks / M = Months after purchase order effective date (unless otherwise specified)(3) PURPOSE: IFR = Issue for review and comments / IFI = Issue for information(4) QUANTITY: per type / TYPE : C = Copy, E = Electronic file, CD = CDROM, OR = Original(5) FINAL ISSUE: Document without comments (with document status = 3)
NOTES :