MATERIAL REQUISITION No.: I-RM-3010.0H-1254-600-TF8-001 CLIENT: E&P SHEET: 1 of 16 JOB: CESSÃO ONEROSA AREA DEVELOPMENT AREA: PETROBRAS P-76 ENG-E&P/ IEUEP-II / IECO TITLE: M02 – Z-TG-1254001A/B – EXHAUST DUCT EXTENSION OF CO2 COMPRESSION NP-1 IECO CONSÓRCIO TECHNIP-TECHINT TKP Nr.: F70107-M02-MR-0170-001 CONTRACT Nr.: 0801.0000156.13.2 TECHNICAL RESP.: NAME: ANTONIO E. ZEFERINO INITIALS: AEZ FILE: I-RM-3010.0H-1254-600-TF8-001_0_P001.DOC CREA REG. Nr.: RJ 2000100216 INDEX OF REVISIONS REV. DESCRIPTION AND/OR REVISED SHEETS 0 FOR INFORMATION / FOR QUOTATION REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H DATE 09/APR/15 DESIGN TF8 EXECUTION DJAQUES CHECK TBLAIR APPROVAL RSARAUJO INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF THEIR PURPOSE FORM OWNED TO PETROBRAS N-0381 REV. L

I-RM-3010.0H-1254-600-TF8-001_0

Embed Size (px)

DESCRIPTION

Requisição

Citation preview

Page 1: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.:

I-RM-3010.0H-1254-600-TF8-001

CLIENT:E & P SHEET: 1 of 16

JOB:CESSÃO ONEROSA AREA DEVELOPMENT

AREA:PETROBRAS P-76

ENG-E&P/IEUEP-II / IECO

TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

CONSÓRCIO TECHNIP-TECHINT

TKP Nr.: F70107-M02-MR-0170-001CONTRACT Nr.: 0801.0000156.13.2

TECHNICAL RESP.: NAME: ANTONIO E. ZEFERINO INITIALS: AEZ

FILE: I-RM-3010.0H-1254-600-TF8-001_0_P001.DOC CREA REG. Nr.: RJ 2000100216

INDEX OF REVISIONS

REV. DESCRIPTION AND/OR REVISED SHEETS

0 FOR INFORMATION / FOR QUOTATION

REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G REV. H

DATE 09/APR/15

DESIGN TF8

EXECUTION DJAQUES

CHECK TBLAIR

APPROVAL RSARAUJO

INFORMATION IN THIS DOCUMENT IS PROPERTY OF PETROBRAS, BEING PROHIBITED OUTSIDE OF THEIR PURPOSE

FORM OWNED TO PETROBRAS N-0381 REV. L

Page 2: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

2 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

SUMMARY

1 INTRODUCTION ................................................................................................................... 3

2 PRESENTATION OF TECHNICAL PROPOSALs................................................................. 3

3 SCOPE OF REQUISITION .................................................................................................... 4

4 DRAWINGS & DOCUMENTS ............................................................................................... 5

5 GENERAL REQUIREMENTS................................................................................................ 5

6 APPLICABLE TECHNICAL DOCUMENTS........................................................................... 6

7 SUPPLIER TECHNICAL DOCUMENTS................................................................................ 7

8 DIGITAL DELIVERY REQUIREMENT................................................................................... 7

9 WEIGHT CONTROL.............................................................................................................. 9

10 OPERATION ENVIRONMENT / MOTION REQUIREMENTS.............................................. 10

11 ANNEXES ........................................................................................................................... 12

Page 3: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

3 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

1 INTRODUCTION

This Material Requisition and its attachments defines the general requirements for thedesign, manufacture, shop assembly, inspection, testing, certification, preparation forshipment, commissioning supervision and warranties of the Z-TG-1254001A/B – EXHAUSTDUCT EXTENSION OF CO2 COMPRESSION, for operation on the CESSÃO ONEROSAFPSO P-76, offshore Brazil as well as all applicable codes, standards and regulationsreferenced, and the requirements of the Classification Society Rules, where applicable.

Omission of any construction and/or manufacturing detail from this Material Requisition shallnot constitute cause for not carrying out any service, or not supplying any material, asnecessary for perfect operation of the item required in accordance with the applicableSpecification/Data Sheets, with no extra costs.

Any conflict of information found in the documents that comprise this Material Requisitionshall be brought to the attention of PURCHASER, in writing, previously to presentation of theProposal, for due clarification.

SUPPLIER may submit in clarification phase any alternatives based on his experience that istechnically superior and economically more advantageous. These alternatives shall be incompliance with the basic characteristics and performance requirements of the equipment asspecified on this Material Requisition. All alternatives shall be submitted to PURCHASER forapproval, prior the execution.

2 PRESENTATION OF TECHNICAL PROPOSALS

The technical proposal shall present the complete and detailed scope of supply and meet therequirements of all items of the respective Material Requisition (number and revised quoted)and its annexes, without any technical deviation.

Any exclusion and/or alternative to what is specified in the Material Requisition and itsannexes, including the use of the SUPPLIER standard and exclusive technology, shall bepresented in a Deviation List (as per Annex I).

PURCHASER acceptance of each item of the Deviation List will be through TechnicalClarification that will be issued to all SUPPLIERS.

The Deviation List mentioned above shall contain, at least, for each requirement that theSUPPLIER intends to change:

- The documents description, code and selection that contain the requirement;

- The reason for deviation, always indicating the requirements that are different fromSUPPLIER standard and the costs, schedule and technical benefits/impacts of thechange;

- The SUPPLIER proposal.

2.1 TECHNICAL PROPOSAL

The TECHNICAL PROPOSAL shall include the following information, as a minimum,otherwise it will be disqualified:

- Scope of supply, confirmation of compliance and deviation list;

- Compliance with all referenced documentation attached to this RM;

- Compliance with all referenced international standards;

- General description;

Page 4: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

4 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

- Classification and certification (where applicable);

- Complete data sheets;

- Consumables and tools for assembly, disassembly, maintenance, commissioning andstart-up;

- Spare parts list;

- Outline drawings showing dimensions;

- Preliminary information about necessities for the equipment handling and installation;

- Weight and center of gravity, see form on item 9;

- All documents and drawings required by this requisition;

- Warranty conditions;

- Technical assistance for commissioning start-up and pre-operation onshore and/oroffshore with unit price for working and stand by hours including mobilization /demobilization (separate quotation, if applicable);

- Mechanical assembly supervision at job site (separate quotation);

- Preliminary Inspection and Test Plan;

- Preliminary list of documents;

- Quality Plan;

- Confirmation of motion requirements compliance;

- Confirmation of packing proper for marine transportation;

- Preliminary production schedule;

- Preliminary preservation recommendations prior to installation;

Note: The above items shall also be related to all normally required accessories for safeoperation and maintenance, normally used.

3 SCOPE OF REQUISITION

3.1 EQUIPMENT

See ANNEX II of this Material Requisition, Part I – EQUIPMENT / BULK MATERIALSUPPLY, where there are informed all tagged items, bulk materials and services.

Besides the deliverables above, the scope shall also consider as a minimum the set ofengineering / testing / documentation / inspection / certification and complementary parts, asa minimum, wherever applicable:

Mechanical design; Mechanical calculation; Fabrication design; Thermal design calculation; FEA analysis (if necessary); Drawings, documents and manuals for all items according to item 7; Structural calculation; Fabrication of internal parts (if applicable);

Page 5: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

5 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

PWHT (where applicable); Inspection, testing and the quality assurance of the equipment; Non-destructive examination (where applicable); All equipment with their supports, lifting lugs and earthing lugs; All raw materials and consumables; Transportation (Separated quotation); Set of spare parts for commissioning and start-up (separate delivery); Painting proper for offshore installations, see I-ET-3010.0F1200-956-PPC-006 -

General Painting; Packing, protection and marking for shipment of all items; Preservation, including equipment handling conditioning and storage at job site; Technical assistance with unit price for working and stand-by hours and

mobilization/demobilization (Separated quotation); Data Book

3.1.1 REMARKS:

- The following items are out of exhaust ducts extension scope:

Installation at job site;

Supply of utilities.

4 DRAWINGS & DOCUMENTS

Drawings & Technical Documents shall comply with item 7 of this Material Requisition plusthose required by the Classification society Rules and Regulatory Body.

SUPPLIER shall submit the list of documentation together with proposal.

SUPPLIER shall be also responsible for calculating, defining and properly informing all loadsto be supported by the FPSO itself.

All applicable data sheets (FD) listed on item 6 of this Material Requisition shall be filled bySUPPLIER and returned for approval in accordance with item 8. Alternatively, SUPPLIERcan submit its own model of data sheet since it present all the information contained in thesereference data sheets, as a minimum.

SUPPLIER is responsible for the consistency among their documents. At any timePURCHASER can request revision to the documents in case an inconsistency is identified.

All revisions in Drawings and Technical Documents must be clearly identified, otherwise theywill be rejected.

5 GENERAL REQUIREMENTS

SUPPLIER shall be responsible for the technical integrity of the equipment includingmechanical design, selection of materials, manufacture, shop assembly and pre-assembling(if applicable), testing, performance guarantee, requirements of Quality Assurance,preservation, commissioning, shipment and specified engineering services.

The design shall maximize the use of interchangeable components and shall utilize theconcept of unit change-out wherever possible.

All equipment and their respective supports must also be designed to withstand theconditions during transport of the equipment from SUPPLIER installation to job site, as well

Page 6: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

6 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

as for lifting condition.

5.1 EQUIPMENT WEIGHT

SUPPLIER shall inform with its proposal the accurate weight and center of gravity data andfulfill the data sheet presented on section 9. SUPPLIER shall ensure that every effort is madeto reduce weight where practicable.

6 APPLICABLE TECHNICAL DOCUMENTS

SUPPLIER shall take into account the following referenced PURCHASER Documents, onthe latest revision, where applicable. SUPPLIER documents shall provide a detaileddescription of the equipment and scope of supply, as well as all associated technicalrequirements. All equipment parts and details not complying with the specifications belowshall be informed during the clarification phase.

6.1 ATTACHED DOCUMENTS

The information contained in the Data Sheet shall be considered mandatory.

DOCUMENT Nº REV. TITLE

I-FD-3010.0H-1254-600-TF8-496 0 EXHAUST DUCT EXTENSION DATA SHEET

I-DE-3010.0F-1254-600-G01-495 0 EXHAUST DUCT – OUTLINE DRAWING

I-DE-3010.0H-1412-140-TF8-001 BM02 - CO2 COMPRESSION- MAIN STRUCTURE -

PLANS, SECTIONS AND DETAILS

I-ET-3010.0F-1200-956-PPC-006 A GENERAL PAINTING

I-ET-3010.0F-1200-956-PPC-001 A QUALIFICATION TESTS FOR PAINT SYSTEMS

I-ET-3010.01-1200-956-PPR-002 0 PAINTING SYSTEM & QUALITY CONTROL

I-ET-3010.01-1200-956-PPR-001 C PAINTING GUARANTEE

I-ET-3010.0F-1200-956-PPC-002 ASURFACE TOLERANT SOLVENT FREE EPOXIPAINT FOR WET SURFACES (where required)

I-ET-3000.00-1200-956-PCI-001 ACOLOR CODING – OFFSHORE PLATFORM

PAINTING

I-ET-3010.0F-1200-955-PPC-001 A WELDING

I-ET-3010.0F-1200-955-PPC-002 0 REQUIREMENTS FOR WELDING INSPECTION

I-ET-3010.0H-1200-600-TF8-005 C THERMAL INSULATION DESIGN

I-ET-3010.0F-1200-251-PPC-001 A BOLT MATERIALS

I-ET-3010.0H-5140-700-TF8-002 C GROUNDING INSTALLATION TYPICAL DETAILS

I-ET-3010.0H-1200-600-TF8-002 AEQUIPMENT MANUAL DATA BOOKREQUIREMENTS FOR VENDORS

Page 7: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

7 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

I-ET-3010.0H-1200-600-TF8-003 0INSTRUCTION FOR THE VENDORS

DOCUMENTS REQUIRED BY MATERIALREQUISITION

I-RL-3010.0F-1350-960-PPC-006 D ACCELERATION DATA (as reference)

I-ET-3010.0F-1350-960-PPC-001 B NAVAL REQUIREMENTS (as reference)

I-ET-3A26.00-1000-941-PPC-001 C METOCEAN DATA (as reference)

DR-ENGP-1.1-R.6 EPIPING STANDARD AND MATERIAL FOR OIL

PRODUCTION AND PROCESS FACILITIES

I-ET-3010.00-5400-947-TF8-021 A SAFETY SIGNALLING

I-ET-3010.0F-1200-940-PPC-001 A INTERNAL COATING (where/if required)

N-1710 MCODING OF TECHNICAL ENGINEERING

DOCUMENTS

6.2 NON ATTACHED DOCUMENTS

The following documents must also be considered:

NR-26 LASTSINALIZAÇÃO DE SEGURANÇA

(BRAZILIAN REGULANTION – SAFETYSIGNALING)

NR-30 LASTPLATAFORMAS E INSTALAÇÕES DE

APOIO – ATTACHMENT II, ITEM 9(BRAZILIAN REGULATION)

7 SUPPLIER TECHNICAL DOCUMENTS

See ANNEX II of this Material Requisition, Part II – DOCUMENTS AND DRAWING SUPPLY.

8 DIGITAL DELIVERY REQUIREMENT

All documents/drawings specified for handover to PURCHASER shall be delivered in digitalformats.

Digital deliverables can generally be classified as native editable formats (e.g. MS Word(.doc), MS Excel (.xls), MicroStation (.dgn), AutoCAD (.dwg)), neutral viewing formats (PDF)and image raster formats.

Native format is required for all documentation.

However, neutral viewing formats are acceptable for standard equipment documentation andcertain drawings extract from 3D Model.

As a general rule, files shall not consist of multiple documents (i.e. several documents withdifferent document numbers in the same file). Each uniquely numbered document shall bedelivered as a separate file.

SUPPLIER shall implement quality routines to ensure that the digital information,documentation and data bases delivered reflects the final “as built” version that has been

Page 8: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

8 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

through the SUPPLIER approval/verification process.

When PDF file are used, the following requirements shall still be followed:

- PDF files shall the greatest extent possible be created by generating them from the originalfile, and digitalizing should be avoided at the maximum.

- Document front sheet shall be included in the source file and the total number of pages,including Annexes, shall appear on the front sheet prior to converting to PDF. Thedocument front page shall always be numbered page 1.

- In all cases indexing through the use of the PDF bookmark function shall be utilized.

- As a minimum and depending on the size of the document, book marking shall be used forthe first three heading levels.

- Different page orientation within a single PDF file shall be avoided as this often leads toprinting problems.

- PDF files will be delivered without any restrictions enabled.

8.1 2D CAD DETAILED REQUIREMENTS

No references, internal or external, are allowed at the handover of 2D documents, i.e. thedrawing frame is to be included in the drawing file. This implies merging of all graphics fromall reference files used in the engineering phase. This also applies to CAD files generatedfrom 3D models.

Fonts to be used on drawings shall make easy distinction of similar characters (e.g. I (capitali), I (lower case L) and 1 (number 1)). Front size should be at least 3 mm high on printout.

SUPPLIER shall certify that it has conducted basic quality control of the documentation intheir systems including information imported from sub-contractors, suppliers and othercontractors for their part of the development.

Page 9: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

9 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

9 WEIGHT CONTROL

SUPPLIER must fulfill the form below:1 APPLICABLE TO [NOTES 1 & 2]: PROPOSAL PURCHASE AS BUILT

2 FOR: EB-E&P UNIT / MODULE:

3 SITE: CESSÃO ONERSA SERVICE:

4No REQ /TAG:

MANUFACTURER:

5 MODEL: VENDOR:

6 SIZE / TYPE: MAIN EQUIPMENT:

7 SERIAL No. MANUFACTURER No:

8 WEIGHT DATA [NOTE 3]

9 DATA STATUS: ESTIMATED CALCULATED WEIGHTED

10 EQUIPMENT WEIGHT: ACCURACY

11 DRY (kg): 3% 5% 10%

12 OPERATING (kg) 3% 5% 10%

13 TEST (kg): 3% 5% 10%

14

15 REMARKS

16

17

18 DIMENSIONS DATA [NOTES 4, 5, 6 & 7]

19 DATA STATUS: ESTIMATED CALCULATED MEASURED

20 SKETCH:

21

22

23

24

25

26

27

28

29

30

31

32

33

34

35

36 DRY DIMENSIONS (mm):

37 A a

38 B b

39 C c

40

NOTES

General Notes

1. Vendor shall fill in all blank spaces in the weight control data sheet (fields and check boxes). All missing information will beconsidered as not applicable or not according to vendor’s proposal.

2. Vendor shall fill in data sheets for main and auxiliary equipment, furnished separately or on different skids. If necessary,manufacturer shall produce additional copies of the weight control data sheet.

3. Accuracy of weight figures shall be 10% in the proposal phase. After placing of the purchase order, the accuracy shall berefined to 3%, but never more than that informed on proposal phase.

4. Manufacturer shall indicate with dashed lines on sketch and respective dimensions on the information table all maintenanceareas required for assembly and disassembly of equipment.

5. Manufacturer shall indicate equipment orientation.

6. Any variation in the center of gravity from dry to operating mode shall be noted.

7. Accuracy of dimensions shall be 10% in the proposal phase. After placing of the purchase order, the accuracy shall berefined to 3%, but never more than that informed on proposal phase.

Plan View

CGA

a

Bb

C

Elevation

Top of support

LevelCGc

Y

BC

c

Page 10: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

10 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

10 OPERATION ENVIRONMENT / MOTION REQUIREMENTS

10.1 OPERATION ENVIROMENT

The equipment supplied shall be suitable for the environment and range of ambientconditions including, wind and motions defined in the attached documentation. Refer to thedocument “Acceleration Data”, I-RL-3010.0F-1350-960-PPC-006_D, “METOCEAN DATA”, I-ET-3A26.00-1000-941-PPC-001_C and “Naval Requirements”, I-ET-3010.0F-1350-960-PPC-001_B.

10.2 MOTION AND STRUCTURAL REQUIREMENTS

All structural elements shall be designed and verified using the yielding, buckling and fatiguecriteria according to the Classification Society Rules last revision.

The relevant data contained in the above Technical Specification and PURCHASERrequirements that shall be considered in the design of the Equipment are summarized below:

10.2.1 OPERATION LIMITS

Process Plant Equipment and Utility Systems

The process plant shall be able to operate under 1-year return period. The accelerationshave been calculated for the operational (1 year) and extreme (100 year) conditions. Resultsare presented in I-RL-3010.0F-1350-960-PPC-006 – ACCELERATION DATA. The maximumaccelerations (with gravitational effects) are presented below, considering the worst Sea andDraft condition case.

Design condition

With gravitational effects

ax (m/s2) ay (m/s2) az (m/s2)

Longitudinal Transversal Vertical

DOC - Design

Operational Condition (1-

Year return period)

0.77 1.99 11.50

DEC - Design Extreme

Condition (100-Year

return period)

1.22 3.78 12.75

Note: CONTRACTOR shall provide the loads on equipment foundations relative to thefollowing conditions:

- Design Condition: See table above;

- Damage Condition: Heel Angle: 22.5º;Trim Angle: 10.0º.

Page 11: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

11 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

10.2.2 METEOROLOGICAL DATA

Atmospheric pressure Process Plant Equipment and Utility Systems

- Absolute maximum: 1035.0 hPa;

- Mean: 1015.0 hPa;

- Absolute minimum: 999.0 hPa.

SOURCE: Measured data in Merluza field, Santo Basin in the period from 2005 to 2011 andRT/MC 041/2006.

Relative Humidity

- Absolute maximum: 80.4%;

- Mean: 76.5%;

- Absolute minimum: 70.6%.

SOURCE: SIMO – Measured data in Merluza field, Santo Basin in the period from 2005 to2011.

Rainfall

Extreme Rainfall Values by Return Period and Duration (millimeters).

SOURCES: Otto Pfafstetter, Chuvas Intensas no Brasil”, 1982 (Station: Campos).

Page 12: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

12 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

Air Temperature (DRY BULB)

- Absolute maximum: 33.1 °C;

- Mean: 23.9 °C;

- Absolute minimum: 11.3 °C;

SOURCE: Measured data in Merluza field, Santo Basin in the period from 2005 to 2011.

Wind

Basic wind velocity to be considered by SUPPLIER: 45 m/s.

11 ANNEXES

- ANNEX I: DEVIATION LIST;- ANNEX II: PART I – EQUIPMENT / BULK MATERIAL SUPPLY;

PART II – DOCUMENTS AND DRAWINGS SUPPLY.

Page 13: I-RM-3010.0H-1254-600-TF8-001_0

MATERIAL REQUISITIONNo.

I-RM-3010.0H-1254-600-TF8-001REV.

0

PETROBRAS P-76SHEET

13 of 16TITLE:

M02 – Z-TG-1254001A/B – EXHAUST DUCTEXTENSION OF CO2 COMPRESSION

NP-1

IECO

ANNEX I

DEVIATION LIST

All deviations must be listed. Any deviation not included in this list will notbe accepted.

DOCUMENT Nº DOCUMENT NAME

DOCUMENT Nº DOCUMENT NAME

DOCUMENT Nº DOCUMENT NAME

DOCUMENT Nº DOCUMENT NAME

DOCUMENT Nº DOCUMENT NAME

DOCUMENT Nº DOCUMENT NAME

DOCUMENT Nº DOCUMENT NAME

Page 14: I-RM-3010.0H-1254-600-TF8-001_0

Material Requisition SR

Client reference

Rev.

A

EQUIPMENT / BULK MATERIAL M02 - EXHAUST DUCT EXTENSION FOR CO2 COMPRESSION

I-RM-3010.0H-1254-600-TF8-001

F70107 M02 SR 0170 001

Project Unit Doc Type

Mat Code

SerialNumber

Page 1/3

SCOPE OF SUPPLY

This supply is composed of two parts

Part I : Equipment / Bulk Material Supply

Part II : Documents and Drawings Supply

Rev. Date Status Written by(name & visa)

Checked by(name & visa)

Approved by(name & visa)

A

0

9-Apr-2015

13-Nov-2014

IFI

IFI

DJAQUES

DJAQUES

TBLAIR

TBLAIR

RSARAUJO

RAMAZO

R31

TR11

(r34

8)

Page 15: I-RM-3010.0H-1254-600-TF8-001_0

I

A = Added - M = Modified - X = Canceled - D = Canceled in a previous revision

Material Requisition SR

I-RM-3010.0H-1254-600-TF8-001

Client reference

A

Project Unit Doc Type

Mat Code

SerialNumber

Rev.

EQUIPMENT / BULK MATERIAL M02 - EXHAUST DUCT EXTENSION FOR CO2 COMPRESSION

F70107 M02 SR 0170 001

Page 2/3

Current Qty

Tag Number

Z-TG-1254001A

Z-TG-1254001B

1 - 1

2 - 1

PART I : EQUIPMENT / BULK MATERIAL SUPPLY

Description

1

1

EXHAUST DUCT EXTENSION

EXHAUST DUCT EXTENSION

Pos - Sub Pos

Page 16: I-RM-3010.0H-1254-600-TF8-001_0

Material Requisition SR

I-RM-3010.0H-1254-600-TF8-001

Client reference

A

Project Unit Doc Type

Mat Code

SerialNumber

Rev.

A = Added - M = Modified - X = Canceled - D = Canceled in a previous revision

F70107 M02 SR 0170 001

Page 3/3

Doc Code(1)

Description

First Issue Final Issue(5)

Issue Date(2)

Purpose(3)

Quantity Type(4)

Quantity Type(4)

A0001

A0106

A0107

A0108

A0401

A0401A

A1003

A1109

A1303

A2001

A2202

A5001

A5002

A5007

B1002

B1202

B1304

C1001

C1002

C1008

List of Vendor's Documents and Drawings

Painting Specification

Insulation Procedure

Weight Data Sheet

Vendor Data Book (VDB) Part 1

Vendor Data Book (VDB) Part 1 Index

Calculation Notes

Detailed Drawings

Casing Temperature Calculation Notes

General Arrangement Drawings

Thermal Stress Calculation Notes

Special Precautions for Handling prior and during Erection

Recommendations for Storage prior and after Erection

List of Spare Parts for Erection/Installation, Commissioning and Start-upFabrication and Quality Control Plan

NDT Procedure

Welding Book (Welding Map Welding Procedure Specification Procedure Qualification Report)Engineering Procurement Manufacturing and Test ScheduleProgress Report

Procedure for Preservation, protection and Packing and Recommendations for Handling prior and during Trasnportation

IFR

IFR

IFR

IFR

IFR

IFR

IFR

IFR

IFR

IFR

IFR

IFI

IFI

IFR

IFR

IFR

IFR

IFR

IFR

IFR

+4 W

+6 W

+6 W

+4 W

4 WWITH

DELIVERY+12 W

+4 W

+6 W

+8 W

+4 W

+4 W

4 WBEFORE

DELIVERY4 W

BEFORE DELIVERY

+4 W

+4 W

+6 W

+6 W

+4 W

+4 W

6 WBEFORE

DELIVERY

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

1E

E

E

E

E

2C+5DVD

2C+5DVD

E

E

E

E

E

E

E

E

E

E

E

E

E

E

EQUIPMENT / BULK MATERIAL M02 - EXHAUST DUCT EXTENSION FOR CO2 COMPRESSION

*

*

*

*

*

PART II : DOCUMENTS AND DRAWINGS SUPPLY

(1) * Priority document subject to penalization or term of payment(2) ISSUE DATE: number of D = Days / W = Weeks / M = Months after purchase order effective date (unless otherwise specified)(3) PURPOSE: IFR = Issue for review and comments / IFI = Issue for information(4) QUANTITY: per type / TYPE : C = Copy, E = Electronic file, CD = CDROM, OR = Original(5) FINAL ISSUE: Document without comments (with document status = 3)

NOTES :