Upload
alexina-jennings
View
216
Download
2
Embed Size (px)
Citation preview
1I n t e g r i t y - S e r v i c e - E x c e l l e n c e
Building 185
Orientation Briefing
101 Nelson Drive
Offutt AFB, 68113-1023
2I n t e g r i t y - S e r v i c e - E x c e l l e n c e 2
Bldg 185 Orientation
Fast Building Facts:
188,000 Square Feet (SF) – all raised floors
12,000 SF computer space with 3’ raised flooring
MILCON Cost: $29.6M (Builder: Kiewit Bldg Group)
Ground Breaking Mar 06, AFWA Occupancy Jan 08
On track for certification from US Green Bldg Council
3I n t e g r i t y - S e r v i c e - E x c e l l e n c e 3
Bldg 185 Orientation
“Green Features” of Building 185: Use of Locally Manufactured Construction Materials Use of Recyclable Building Materials (bamboo paneling, steel walls, steel
furniture) Reuse of Taxiway as Parking Lot High-efficiency Mechanical Systems Raised Flooring Optimized Use of Natural Light Automatic Light Turn On/Off White Roof West-facing Atrium Alternative Fuel Vehicle Parking Areas Bike Racks Indigenous Landscaping (drought resistant) Localized Water Heaters Centralized Printing and Break Rooms
4I n t e g r i t y - S e r v i c e - E x c e l l e n c e 4
Bldg 185 Parking Plan
Reserved Lots (see next slide for details)
16 Handicap Spaces
Alternative Fuel Vehicles have priority along this row
Open Lot
Open Lot
Delivery Vehicle or GOV parking only
2 Handicap Spaces
Bike Racks (future)
5I n t e g r i t y - S e r v i c e - E x c e l l e n c e 5
Bldg 185 - West Side
Auditorium
AFWA CC Office
Lobby – West (a.k.a. Main Entrance) Door to Observation Deck
A8 Office
1 WXG/CC Office
2 WXG/CC Office
6I n t e g r i t y - S e r v i c e - E x c e l l e n c e 6
Bldg 185 - East Side
View of East Side from large parking lot
• Smoking Area
• Future site of bike racks (unfunded)
East Entrance –
This is the entrance most personnel will use
(24/7 ADT access)
Handicap Ramp
7I n t e g r i t y - S e r v i c e - E x c e l l e n c e 7
Bldg 185 – Lobby
Lobby - North Entrance
Future Location of Food Vendor
Requirement submitted to AAFES for vendor to provide
breakfast and lunch items, M-F 0700-1500
Future location of Video Wall
Lobby – South Entrance
South end of lobby will house historical items in display cases
8I n t e g r i t y - S e r v i c e - E x c e l l e n c e 8
Bldg 185 – Auditorium
• Seats ~200
• State-of-the-Art A/V System will be installed this Spring/Summer
Storage Closets
9I n t e g r i t y - S e r v i c e - E x c e l l e n c e 9
Bldg 185 – Centralized Work Room
Shredder Room, Recycle Room and area for additional refrigerators
Refrigerator Area
Shared print/copy/fax Area
Microwave Area
Light Switch
10I n t e g r i t y - S e r v i c e - E x c e l l e n c e 10
Bldg 185 – Break Room
Recycle Room and area for additional refrigerators
Refrigerator
Shared print/copy/shred/fax
Area
Microwave
3rd Floor Break Room
Refrigerator(s)
Microwave(s)
Room for vending machines along wall (past glass area)
Café Furniture (Unfunded)
11I n t e g r i t y - S e r v i c e - E x c e l l e n c e 11
Bldg 185 – Observation Deck
Outdoor Café Furniture (Unfunded)
12I n t e g r i t y - S e r v i c e - E x c e l l e n c e 12
Bldg 185 – Power Boxes
Floor Box
White Jack: Analog LineBlue Jack: Digital Line (Phone and Computer)
13I n t e g r i t y - S e r v i c e - E x c e l l e n c e 13
Bldg 185 Orientation
Diffuser: Individuals can modify air flow in the local area by
twisting the inner ring of the floor diffuser. There is approximately 1/4″ – 1/2″ of travel between the
opened and closed position.
Return Ducts for Forced-air Thermal Units
14I n t e g r i t y - S e r v i c e - E x c e l l e n c e 14
Bldg 185 Orientation
Interior offices configured using demountable walls for more flexibility in accommodating office changes due to reorganizations
15I n t e g r i t y - S e r v i c e - E x c e l l e n c e 15
Bldg 185 Orientation
Example Computer Room (Dev/Test Area)
Computer Room A/C Unit
Floor Tile Puller
16I n t e g r i t y - S e r v i c e - E x c e l l e n c e 16
Bldg 185 Orientation
SIPRNET reading rooms are located on all four levels:
Access: ADT plus Pin or XO-9 Combo
17I n t e g r i t y - S e r v i c e - E x c e l l e n c e 17
Bldg 185 Main Entrance
18I n t e g r i t y - S e r v i c e - E x c e l l e n c e 18
Bldg 185 West View
19I n t e g r i t y - S e r v i c e - E x c e l l e n c e 19
Bldg 185 West View
20I n t e g r i t y - S e r v i c e - E x c e l l e n c e 20
Bldg 185 South View
21I n t e g r i t y - S e r v i c e - E x c e l l e n c e 21
Bldg 185 Unclass Data Center