Sent by email: [email protected] and [email protected] March 5th, 2019 Mackenzie Valley Land and Water Board 7th Floor, 4922- 48th Street Box 2130 Yellowknife, NT X1A 2P6 Re: Water License MV2015L2-0003 - Surveillance Network Program (SNP) Monthly Reporting January 2019 Dear Mr. Julian Morse, The following is the monthly SNP report for North American Tungstens Cantung Mine as per Water License MV2015L2-0003. Water Quality Monitoring and Discussion Table 1. Water quality samples collected during the month as required by Water License MV2015L2-0003.
SNP ID Site
Coordinates (UTM)
Sample Location Samples Collected Rationale
S4-5 542519 E, 6869094 N Flat River downstream (landfill bridge crossing) Yes S4-6 540699 E, 6870572 N TP5 Inflow to WWTF No Only when WWTF
operating S4-13 541326 E, 6869967 N E Zone discharge from mine, (MMER FDP) Yes S4-20 541342 E, 6870330 N Drain culvert from pond below TP3 (MMER FDP
4-27-2 culvert) Yes
S4-27-4 541253 E, 6870401 N Groundwater monitoring well MW-5 No Sampled Annually S4-27-7 541055 E, 6870529 N Groundwater monitoring well BH-43 No Sampled Annually S4-27-8 541150 E, 6870457 N Groundwater monitoring well BH-44 No Sampled Annually S4-27-9 540482 E, 6871000 N Groundwater monitoring well BH-53 No Sampled Annually S4-27-10 540991 E, 6870580 N Groundwater monitoring well BH-42 No Sampled Annually S4-27-11 541215 E, 6869955 N TP5-07-MW01 No Sampled Annually S4-27-12 541357 E, 6870091 N TP3-07-MW01 No Sampled Annually S4-27-13 541326 E, 6869967 N TP3-07-MW02 No Sampled Annually S4-27-14 541256 E, 6869942 N Groundwater well southeast of TP5 No Sampled Annually S4-27-15 541600 E, 6869880 N Groundwater well southeast of airstrip No Sampled Annually S4-27-16 540502 E, 6871064 N Groundwater well east of TP1 and 2 No Sampled Annually S4-27-17 539968 E, 6871380 N Groundwater well upstream of project No Sampled Annually S4-27-18 540646 E, 6870369 N Groundwater monitoring well up-gradient of TSF7 No
Removed from SNP until 6 months prior to construction of TSF 6
S4-27-19 540523 E, 6870788 N Groundwater monitoring well down-gradient of TSF7
No
S4-27-20 543765 E, 6868047 N Groundwater monitoring well up-gradient of TSF6 No
I I
l
mailto:[email protected]:[email protected]
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
S4-27-21 543414 E, 6868150 N Groundwater monitoring well down-gradient of north end of TSF6
No
S4-27-22 543593 E, 6867899 N Groundwater monitoring well down-gradient of middle of TSF6
No
S4-27-23 544032 E, 6867627 N Groundwater monitoring well down-gradient of south end of TSF6
No
S4-28-1 541224 E, 6870386 N Mill tails filtrate Yes S4-28-2 541118 E, 6870491 N Mill tails filtrate No Sampled Annually S4-29 538180 E, 6873871 N Flat River upstream Yes S4-30 540162 E, 6870912 N Mill tails filtrate No Only when mill is
operating S4-32 540123 E, 6871229 N Sardine Creek No Frozen S4-33 547271 E, 6864181 N Flat River downstream (far field site) No S4-33R 543488 E, 6867874 N Flat River downstream (alternate site for S4-33) Yes S4-34 540070 E, 6871022 N Seepage down-gradient from fuel berm No No visible discharge S4-36 541243 E, 6870350 N Seepage between TP3 and Flat River No No visible discharge S4-37 540997 E, 6870555 N Seepage between TP4 and Flat River No No visible discharge S4-38 540343 E, 6871176 N Seepage between TP2 and Flat River No No visible discharge S4-39 540407 E, 6871100 N Seepage between TP4 and Flat River No No visible discharge S4-40 540858 E, 6870816 N Surface water point on Flat River between TP2 &
TP4 Yes
S4-41 541804 E, 6869690 N Surface water point on Flat River downstream of TP3
Yes
S4-42 540169 E, 6870899 N Mine water pump in mill Yes S4-43 540699 E, 6870572 N Effluent from the Wastewater Treatment Facility
(WWTF) No Only when WWTF
operating
S4-44 541477 E, 6870223 N Surface water point on Flat River approximately 200 m downstream of drainage channel from Stinky Pond
No Removed from SNP until 3 months prior to discharge of effluent from WWTF.
S4-49 543343 E, 6868099 N Flat River; West of the north end of TSF6 No Removed from SNP until 6 months prior to construction of TSF 6 S4-50 544026 E, 6867532 N Flat River; immediately downstream of TSF6 No
S5-2 540519 E, 6870986 N Old Lagoon Outflow Yes All discharges and stations with EQCs monitored under the SNP met criteria described under WL MV2015L2-0003. Field and lab duplicates reported an acceptable level of precision.
I I
Cantung Mine Site: Box 848, Watson Lake, YT Y0A 1C0 Ph. (604) 759-0913 Fax: (604) 759-0918
Figure 1. Water sampling locations (North).
~)----=-.------,---, --~ 8- ----~,t i ----
ere. II 1"UNGMSERICAN ,,,,,, , , TEN I t II LT ti
Road
/ \
{ _
------=======~!_ __ _:o~~so,:100 1so Water Sampli Meters 200 ___ T ,vowns ite an~g Lo~~tions
-_____________ 1 ~ ~~~~--=. = - =i~F~a~c~,1~,t~ie:.:s~_ :Jr"" Sheet 105H16 M NAO 83 Zone 9 T::hnic.al Service~ arch 21, 2015
Water
Elevation Contour
1:5,000
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
Figure 2. Water sampling locations (South).
5410
Road
F'-../ water
Elevation Contour
Surface Sampling Site
Groundwater Sampling Site
Surface Waters
Seepage Survey 0
110,000
110 220 330 44 0
Meters
544000
6867000
Water Sampling Locations Towns ite and Facil ities
Map Sheet 10SH16 UTM NAO 83 Zone 9
Technical Services March 21, 2015
Cantung Mine Site: Box 848, Watson Lake, YT Y0A 1C0 Ph. (604) 759-0913 Fax: (604) 759-0918
Water Usage and Discharge Table 2. Weekly freshwater consumption in 2019.
Fresh Water Consumption (S4-1) 2019 (m3) Week January February March April May June July August September October November December 1 401 2 564 3 572 4 560 5 389
Total 2,487 0 0 0 0 0 0 0 0 0 0 0 2,487 A Seametrics Model WMP104, (2) flow meter was installed for care and maintenance in November, 2015 to measure freshwater usage. The flow meter was installed and is operated as per the manufacturers instructions. Calibration of the flow meter is completed prior to leaving the manufacturer and does not require field calibration. The measuring probe within the meter does require minimal cleaning due to organic build-up.
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
Figure 3. Freshwater consumption trend for preceding 12 months.
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500
5,000
Jan-
18
Feb-
18
Mar
-18
Apr-
18
May
-18
Jun-
18
Jul-1
8
Aug-
18
Sep-
18
Oct
-18
Nov
-18
Dec-
18
Jan-
19
Cubi
c Met
ers
Date
Fresh Water Usage
' ~ / ....... -- ~ ~ ~- / -
Cantung Mine Site: Box 848, Watson Lake, YT Y0A 1C0 Ph. (604) 759-0913 Fax: (604) 759-0918
Table 3. Weekly velocity and discharge from Stinky Pond culvert.
The Global Flow FP101 portable flow meter requires very little maintenance and calibration. The calibration factors are both preset and provided in the manufacturers manual. These are verified regularly to ensure accurate data is being collected. Ore Milled Due to the suspension of all mining and milling activities, there has been no ore milled in 2017 to date. Waste Rock Lithology Due to the suspension of all underground activities, there are no recent waste rock samples to report. Weekly Waste Rock ARD Due to the suspension of all underground activities, there are no recent waste rock samples to report. Mill Tails ARD Due to the suspension of all milling activities, there are no mill tailings assay results to report. Tailings Management Water elevations in TP4 and TP5 are visually monitored daily during TSF inspections. Table 4. 2019 weekly waste discharged to TSF.
1 0.99 4,9912 0.79 4,6483 0.85 5,0014 0.69 2,9265
Total 17,566 0 0 0 0 0 0 0 0 0 0 0 17,566
Average Velocity
0.83 #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
Flow (m3)Velocity
(m/s) Flow (m3)
Velocity (m/s) Flow (m
3)Velocity
(m/s) Flow (m3)
Velocity (m/s) Flow (m
3)Velocity
(m/s)
September October November December
Flow (m3)Velocity
(m/s) Flow (m3)
Velocity (m/s) Flow (m
3)Velocity
(m/s) Flow (m3)
Velocity (m/s)Flow (m
3)
Velocity and Flow from Stinky Pond Culvert 2019
WeekJanuary February March April May June July August
Velocity (m/s) Flow (m
3)Velocity
(m/s) Flow (m3)
Velocity (m/s)
1 344 02 548 03 439 04 428 05 321 0
Total 2,079 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 2,079
Tailings (m3)
Waste to TSF 2019
WeekJanuary February March April May June July August
Sewage (m3)
Tailings (m3)
Sewage (m3)
Tailings (m3)
Sewage (m3)
September October November DecemberTailings
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Tailings
(m3)Sewage
(m3)Tailings
(m3)
Cantung Mine Site: Box 848, Watson Lake, YT Y0A 1C0 Ph. (604) 759-0913 Fax: (604) 759-0918
A Sparling Model 8712 C/U/H (4) flow meter was installed in 2005 to measure total effluent discharged from the sewage treatment plant. The flow meter was installed and is operated as per the manufacturers instructions. Calibration of the flow meter is completed prior to leaving the manufacturer and does not require field calibration. WWTF The WWTF was de-commissioned and winterized on November 12th, 2015, as per the care and maintenance plan. No discharge has occurred to date. Flat River Hydrology Table 5. Flat River Discharge at SNP Station S4-45.
Figure 4. Discharge from Flat River SNP station S4-45. *The accuracy of discharge volume calculations is expected to improve as the rating curve becomes more refined with continued monitoring over the course of the program.
Week January February March April May June July August September October November December1 296,6262 403,3823 398,3874 393,7965 279,470
Total 1,771,661 0 0 0 0 0 0 0 0 0 0 0 1,771,661
Discharge from S4-45 2019 (m3)
0100,000200,000300,000400,000500,000600,000700,000800,000900,000
1,000,0001,100,0001,200,0001,300,0001,400,0001,500,0001,600,000
Disc
harg
e (m
3/da
y)
Date
S4-45 Discharge (m3/day)
Discharge
Trigger-1-,
u1m I ''ll
- ,__ \ - - - ~ --- ~ --, j -- 1i ---,-, ~ ,1--r r- .._ __ f7 I ,, _ _r-r- rL I I I I I I I I I I I I I I I
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
Care and calibration of leveloggers is minimal. The water quality in the Flat River is of good quality and exhibits little impact on the loggers. When water levels are low (spring and fall) leveloggers and casings are inspected for buildup of solids or calcium deposits that may inhibit the leveloggers ability to record reliable data. These are cleaned as per the manufacturers recommendations. The Swoffer velocity meter and sensor are maintained regularly in order to maintain accurate outputs. Equipment is inspected prior to each use to ensure that it is in an acceptable operating state and to limit the potential for erroneous data. Equipment is also cleaned and stored in their carrying cases after each use. Calibration activities are conducted often as per the manufactures recommendations, and readings are verified by methods outlined in the care and calibration manual prior to each use. Unauthorized Discharges There were no unauthorized discharges in January. Table 7. Fuel tank inspections.
Table 8. Propane tank inspections.
General Site Activities
General care and maintenance of surface equipment, core infrastructure, storage areas, site surveillance, etc.
Snow removal and road maintenance. All underground activity ceased since November 1, 2015.
Tank 1a Diesel fuel N JM Jan 23/19Tank 1b Diesel fuel Tank 2 Diesel fuel N JM Jan 23/19Tank 3 Diesel fuel Tank 4 Gasoline N JM Jan 23/19Tank 6 Diesel fuel N JM Jan 23/19Tank 7 Diesel fuel N JM Jan 23/19Tank 8 Waste Oil N JM Jan 23/19Tank 9 Diesel FuelTank 10 Diesel FuelTank 11 Diesel Fuel N JM Jan 23/19Tank 12 Diesel FuelTank 13 Diesel Fuel N JM Jan 23/19Fuel Line Diesel Fuel N JM Jan 23/19
Fuel Tank Inspections - January 2019
ID EC ID Number Location Product Visual InspectionLeaks (Y/N) Initials Date
EC-00016134 Main Fuel Tank YEC-00016134 Main Fuel Tank Temp. (Not in Service)EC-00016148 Enviro Tank (Warehouse) YEC-00020812 Enviro Tank (Portal) (Not in Service)EC-00016153 Single Wall Tank (Warehouse) YEC-00019830 Main Generator Day Tank YEC-00026319 Incinerator Fuel Tank YEC-00026321 Incinerator Waste Oil Tank YEC-00026322 Kitchen Boiler Tank - Temp. (Not in Service)EC-00033237 Landfill Incinerator Tank - Temp. (Not in Service)
N/A Fire Station Heater YN/A Carpenter/Electrical Shop Heater - Temp. (Not in Service)N/A Pumphouse Generator YN/A Main fuel line from Tank1a to Tank 6 Y
Tank 1 N JM Jan 23/19Tank 2 N JM Jan 23/19Tank 3 N JM Jan 23/19Tank 4 Tank 5Tank 6Tank 7 N JM Jan 23/19Tank 8 N JM Jan 23/19Tank 9 N JM Jan 23/19Tank 10 N JM Jan 23/19Tank 11 N JM Jan 23/19
Propane Tank Inspections - Jan 2019
ID EC ID Number Location Volume % Visual InspectionLeaks (Y/N) Initials Date
N/A Kitchen Tank 24 YN/A Dorm A & C Tank 12 YN/A Crusher Mill Tank 8 YN/A Vent Fans - North Tank (Not Accessible)N/A Vent Fans - Centre Tank (Not Accessible)N/A Vent Fans - South Tank (Not Accessible)N/A Mine Dry 77 YN/A WWTP - North Tank 70 Y
N/A Portable Tank - Behind Administration Building 70 Y
N/A WWTP - South Tank 57 YN/A Bottle Fill Dispenser 59 Y
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
Monitoring Programs
Weekly, monthly, and quarterly water samples were collected as per the water license/MDMER.
Hydrology management plan activities continued. TCAMP activities continued to monitor performance of cover system. Daily weather data collection from meteorological station. Dam stability monitoring continued. Piezometric Data attached in Appendix F.
Waste Management
Daily waste tracking to the landfill, incinerator, and burn bin continued. See tracking sheets in Appendix B.
Construction
No construction activities occurred. Reclamation
No reclamation activities occurred. Submissions to the MVLWB
NATCL Cantung Mine Site Progress Report (Jan. 10, 2019) December SNP Report (Jan. 22, 2019) Response to December 10, 2018 MVLWB Letter (Jan. 30, 2019)
Submissions to GNWT
December Wildlife Report (Jan. 6, 2019) Submission to Environment Canada
Q4 RISS (Jan. 29, 2019)
If you require any further information, please contact the Environmental Department ([email protected]). Prepared by, North American Tungsten Corporation Ltd. Shawn Laidlaw/Stacey OSullivan Environmental Coordinator CC: B.Delaney, S. Sherwood, Cantung Enviro, C. Beveridge (Alvarez & Marsal)
Tim Morton (AANDC), Jarret Hardisty (GNWT-Lands), Sonja Martin Elson (GNWT-ENR), NDDB - Chief Mike Matou DFN - Dahti Tsetso, Carrie Breneman LKFN - Chief G. Antoine, Dean Holman Metis 52
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
Appendices A. TSF Inspections for Month B. Monthly Waste Log C. Water Quality Data D. Water Quality Trends E. Meteorological Data F. Piezometric Elevation Plots
Cantung Mine Site: Ph. (604) 759-0913 Fax: (604) 759-0918
Appendix A (Attached) Appendix B. Monthly Waste Log
Appendix C (Attached) Appendix D (Attached) Appendix E (Attached) Appendix F (Attached)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Monthly Total
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 12 148 160
Landfill 0
Burn Bin 0
Steel 0
Incinerator 231 140 80 60 90 60 75 736
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
Incinerator 0
Landfill 0
Burn Bin 0
Steel 0
0 0 0 0 0 0 231 0 0 0 0 0 140 0 0 12 80 0 0 60 148 90 0 0 60 0 0 0 75 0 0 896Daily Total
Measured in lbsKitchen
Mine Dry
HD Shop/Warehouse/Carpenter Shop
Admin
Reagent Bay
Assay Lab
80 Man
Underground
Primary Crusher/Core Shack
January 2019 Waste Disposal Log - Garbage Pickup Truck
Dorms A&C, Smoke Shacks, Yellow/Green House
WWTF, Powerhouse, Electrical
Mackenzie Valley Land and Water Board7th Floor, 4922- 48th StreetWater Quality Monitoring and DiscussionTable 1. Water quality samples collected during the month as required by Water License MV2015L2-0003.All discharges and stations with EQCs monitored under the SNP met criteria described under WL MV2015L2-0003. Field and lab duplicates reported an acceptable level of precision.Figure 1. Water sampling locations (North).Figure 2. Water sampling locations (South).Water Usage and DischargeTable 2. Weekly freshwater consumption in 2019.A Seametrics Model WMP104, (2) flow meter was installed for care and maintenance in November, 2015 to measure freshwater usage. The flow meter was installed and is operated as per the manufacturers instructions. Calibration of the flow meter is comp...Figure 3. Freshwater consumption trend for preceding 12 months.Table 3. Weekly velocity and discharge from Stinky Pond culvert.The Global Flow FP101 portable flow meter requires very little maintenance and calibration. The calibration factors are both preset and provided in the manufacturers manual. These are verified regularly to ensure accurate data is being collected.Ore MilledWaste Rock LithologyTable 4. 2019 weekly waste discharged to TSF.A Sparling Model 8712 C/U/H (4) flow meter was installed in 2005 to measure total effluent discharged from the sewage treatment plant. The flow meter was installed and is operated as per the manufacturers instructions. Calibration of the flow meter ...The WWTF was de-commissioned and winterized on November 12th, 2015, as per the care and maintenance plan. No discharge has occurred to date.Flat River HydrologyCare and calibration of leveloggers is minimal. The water quality in the Flat River is of good quality and exhibits little impact on the loggers. When water levels are low (spring and fall) leveloggers and casings are inspected for buildup of solids o...The Swoffer velocity meter and sensor are maintained regularly in order to maintain accurate outputs. Equipment is inspected prior to each use to ensure that it is in an acceptable operating state and to limit the potential for erroneous data. Equipme...Unauthorized DischargesThere were no unauthorized discharges in January.Table 7. Fuel tank inspections.Table 8. Propane tank inspections.General Site ActivitiesMonitoring Programs Weekly, monthly, and quarterly water samples were collected as per the water license/MDMER. Hydrology management plan activities continued. TCAMP activities continued to monitor performance of cover system. Daily weather data collection from meteorological station. Dam stability monitoring continued. Piezometric Data attached in Appendix F.Waste Management Daily waste tracking to the landfill, incinerator, and burn bin continued. See tracking sheets in Appendix B.Construction No construction activities occurred.Reclamation No reclamation activities occurred.Submissions to the MVLWB NATCL Cantung Mine Site Progress Report (Jan. 10, 2019) December SNP Report (Jan. 22, 2019) Response to December 10, 2018 MVLWB Letter (Jan. 30, 2019)Submissions to GNWT December Wildlife Report (Jan. 6, 2019)Submission to Environment Canada Q4 RISS (Jan. 29, 2019)If you require any further information, please contact the Environmental Department ([email protected]).North American Tungsten Corporation Ltd.Shawn Laidlaw/Stacey OSullivanEnvironmental CoordinatorCC: B.Delaney, S. Sherwood, Cantung Enviro, C. Beveridge (Alvarez & Marsal)Tim Morton (AANDC), Jarret Hardisty (GNWT-Lands), Sonja Martin Elson (GNWT-ENR),NDDB - Chief Mike MatouDFN - Dahti Tsetso, Carrie BrenemanLKFN - Chief G. Antoine, Dean HolmanMetis 52AppendicesA. TSF Inspections for MonthB. Monthly Waste LogC. Water Quality Data
ESdat Export Info
ESdat Data InfoData Source: LChem1_ChemistryProject: Cantung MineFilter: Where(Sampled_Date_Time Between '02 Jan 2019' And '30 Jan 2019' )Summarise: OffExport Date/Time: 2/9/2019 9:40:04 AMExport By: [email protected]
The following exported Lab Reports are not Accepted: AGAT|19V433247, AGAT|19V433295, AGAT|19Y425017, AGAT|19Y426676, AGAT|19Y426683, AGAT|19Y427053, AGAT|19Y429109, AGAT|19Y429115, AGAT|19Y429118, AGAT|19Y429126, AGAT|19Y430864, AGAT|19Y430867
Chem Profile: Default
SampleSummary
Location_CodeSampled_Date_TimeField_IDLab_Report_Number_Loc_Code_Well_Env_Stds_Conditional_Matrix_Type_Sample_Type_Sample_Depth_Avg
1/14/19 0:00BLANK19Y429126-Field_B
DUP1/7/19 0:00DUP19Y426683DUP-Normal
S-2131/2/19 0:00S-21319Y425017S-213-Normal
S-2131/9/19 0:00S-21319Y426676S-213-Normal
S-2131/16/19 0:00S-21319Y429109S-213-Normal
S-2131/23/19 0:00S-21319Y430864S-213-Normal
S-2131/30/19 0:00S-21319V433247S-213-Normal
S4-11/9/19 0:00S4-119Y426676S4-1-Normal
S4-131/7/19 0:00S4-1319Y426683S4-13-Normal
S4-131/10/19 0:00S4-1319Y427053S4-13-Normal
S4-131/14/19 0:00S4-1319Y429118S4-13-Normal
S4-131/21/19 0:00Dup19Y430867S4-13-Field_D
S4-131/21/19 0:00S4-1319Y430867S4-13-Normal
S4-131/28/19 0:00DUP19V433295S4-13-Field_D
S4-131/28/19 0:00S4-1319V433295S4-13-Normal
S4-27-2 (4-20)1/14/19 0:00S4-27-2 (4-20)19Y429118S4-27-2 (4-20)-Normal
S4-27-2 (4-20)1/16/19 0:00S4-27-2 (4-20)19Y429115S4-27-2 (4-20)-Normal
S4-27-2 (4-20)1/28/19 0:00S4-27-2 (4-20)19V433295S4-27-2 (4-20)-Normal
S4-27-2(4-20)1/7/19 0:00S4-27-2(4-20)19Y426683S4-27-2(4-20)-Normal
S4-27-2(4-20)1/10/19 0:00S4-27-2(4-20)19Y427053S4-27-2(4-20)-Normal
S4-27-2(4-20)1/21/19 0:00S4-27-2(4-20)19Y430867S4-27-2(4-20)-Normal
S4-28-11/8/19 0:00S4-28-119Y426683S4-28-1-Normal
S4-28-11/14/19 0:00S4-28-119Y429118S4-28-1-Normal
S4-28-11/21/19 0:00S4-28-119Y430867S4-28-1-Normal
S4-28-11/28/19 0:00S4-28-119V433295S4-28-1-Normal
S4-291/14/19 0:00DUP19Y429126S4-29-Field_D
S4-291/14/19 0:00S4-2919Y429126S4-29-Normal
S4-33R1/14/19 0:00S4-33R19Y429126S4-33R-Normal
S4-401/14/19 0:00S4-4019Y429126S4-40-Normal
S4-411/14/19 0:00S4-4119Y429126S4-41-Normal
S4-421/14/19 0:00S4-4219Y429126S4-42-Normal
S4-51/14/19 0:00S4-519Y429126S4-5-Normal
S5-21/7/19 0:00S5-219Y426683S5-2-Normal
S5-21/14/19 0:00S5-219Y429118S5-2-Normal
S5-21/21/19 0:00S5-219Y430867S5-2-Normal
S5-21/28/19 0:00S5-219V433295S5-2-Normal
Enviro Limits
ActionLevelSourceChemCodeChemNameLocation_CodeWellAction_LevelAction_Level_MinCommentsConditional_Matrix_TypeConditional_Depth_FromConditional_Depth_ToActionLevel_PrefixActionLevel_SuffixConditional_ChemCode1Conditional_ChemName1Conditional_ChemCode1_UnitsConditional_ChemCode1_Value_MinConditional_ChemCode1_Min_Value_PrefixConditional_ChemCode1_Value_MaxConditional_ChemCode1_Max_Value_PrefixConditional_ChemCode2Conditional_ChemName2Conditional_ChemCode2_UnitsConditional_ChemCode2_Value_MinConditional_ChemCode2_Min_Value_PrefixConditional_ChemCode2_Value_MaxConditional_ChemCode2_Max_Value_PrefixApplies_To_Total_ResultApplies_To_Filtered_ResultLimitsID
Chemistry Output Table
Location_CodeDUPS-213S-213S-213S-213S-213S4-1S4-13S4-27-2 (4-20)S4-27-2(4-20)S4-28-1S4-29S4-29S4-33RS4-40S4-41S4-42S4-5S5-2
Sampled_Date_Time1/14/191/7/191/2/191/9/191/16/191/23/191/30/191/9/191/7/191/16/191/7/191/8/191/14/191/14/191/14/191/14/191/14/191/14/191/14/191/7/19
Field_IDBLANKS4-27-2(4-20)S-213S-213S-213S-213S-213S4-1S4-13S4-27-2 (4-20)S4-27-2(4-20)S4-28-1DUPS4-29S4-33RS4-40S4-41S4-42S4-5S5-2
Lab_Report_Number19Y42912619Y42668319Y42501719Y42667619Y42910919Y43086419V43324719Y42667619Y42668319Y42911519Y42668319Y42668319Y42912619Y42912619Y42912619Y42912619Y42912619Y42912619Y42912619Y426683
ChemNameoutput unitEQL
Faecal ColiformsCFU/100mL1--
INSTRUMENT MONITORING | CANTUNG MINE
WARC03539-01 | JANUARY 2019 | ISSUED FOR REVIEW
3600
3625
3650
3675
3700
3725
Ele
vati
on
(ft
)
TAILINGS POND 32012 Piezometer Installations
GH12-Q; VW20929 GH12-R; VW20930 GH12-S; VW20931 GH12-T; VW20932
GH12-U; VW20933 GH12-V; VW20934 GH12-W; VW20935
INSTRUMENT MONITORING | CANTUNG MINE
WARC03539-01 | JANUARY 2019 | ISSUED FOR REVIEW
3630
3632
3634
3636
3638
3640
3642
Ele
va
tio
n (
ft)
TAILINGS POND 42007 Piezometer Installations
TP4-07-01; VW6310 TP4-07-02; VW6309 TP4-07-03; VW6307 TP4-07-04; VW6308 TP4-07-05; VW6306 TP4-07-06; VW6304
SI-02; VW7593 SI-03; VW7594 SI-04; VW7595 SI-05; VW7596 SI-06; VW7597
INSTRUMENT MONITORING | CANTUNG MINE
WARC03539-01 | JANUARY 2019 | ISSUED FOR REVIEW
3630
3650
3670
3690
3710
3730
3750
Ele
vati
on
(ft
)TAILINGS POND 4
2010 & 2011 Piezometer Installations
DH10-01 (55'); VW7591 DH10-02 (50'); VW7590 DH10-02 (100'); VW7599 DH10-03 (21'); VW15579 DH10-04 (35'); VW7598
VW18340; 2011 VW18341; 2011 VW18342; 2011 VW18343; 2011 VW18344; 2011
INSTRUMENT MONITORING | CANTUNG MINE
ENG.WARC03329-01 | JANUARY 2019 | ISSUED FOR REVIEW
1120
1122
1124
1126
1128
1130
1132
1134
1136
1138
Ele
vati
on
(m
)TAILINGS POND 5
2007 Piezometer Installations
TP5-07-01A TP5-07-01B TP5-07-02A TP5-07-02B
INSTRUMENT MONITORING | CANTUNG MINE
WARC03539-01 | JANUARY 2019 | ISSUED FOR REVIEW
3600
3625
3650
3675
3700
3725
Ele
va
tio
n (
ft)
TAILINGS POND 52012 Piezometer Installations
GH12-L; VW20924 GH12-M; VW20925 GH12-NA; VW20926 GH12-X; VW20936