5
I I I I Central Maine Power Site: Break: __.... __ ctRl'llliD K\IL Other:---- J\ula 10, 1989 Mr. MichMl Jasinski Wuta lllnagllla1t Divisicm Entara..nt ' a:.t Racallaly secticm u. s. Protacticm 1qercy J. F. a.dlc:lin;J ac.tcn, 02203 .... cynthia IO.Dw 8.lreMI of Oil ' llaza1'cbJ8 Material Qaat:rol Protecticm state a... stat.icl'l 17 .. 04333 O'Clana Mcnthl.y Report Diu' In C:XIIplianc. with It. 53 of the O'OJnnor Site ltgreemant far the s-rtau.m of the RI/FS, Doc:k8t No. 1-86-1031, I am enclosin} the activity 11p4t far May 1989. S.tnc.rel.y ycul'8, D'Nircnlintal. S.ViOIB Daputlla1t AXI';.b &1cla.Jre

I Central Maine Power ctRl'llliD1989, l.tt.er, aclpt the IBIP a bm)at cleanJp OCIIplUI1d wculd not be ~, no furthar air JDSelin) wtW.d be parfo.mar:l, EPA aaDpliR} split test results

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I Central Maine Power ctRl'llliD1989, l.tt.er, aclpt the IBIP a bm)at cleanJp OCIIplUI1d wculd not be ~, no furthar air JDSelin) wtW.d be parfo.mar:l, EPA aaDpliR} split test results

I I I I

Central Maine Power

Site Break ____

ctRlllliD KIL Other---shy

Jula 10 1989

Mr MichMl Jasinski Wuta lllnagllla1t Divisicm Entarant at Racallaly secticm u s DN~ Protacticm 1qercy J F ~ adlclinJ actcn bull 02203

cynthia IODw 8lreMI of Oil llaza1cbJ8 Material

Qaatrol ~ofDN~ Protecticm state a staticll 17 ~ 04333

~ect OClana Mcnthly Report

Diu Site~

In CXIIplianc with It 53 of the OOJnnor Site Qa~ ltgreemant far the s-rtaum of the RIFS Dock8t No 1-86-1031 I am enclosin the activity ~ 11p4t far May 1989

Stncrely ycul8

~~-DNircnlintal SViOIB Daputlla1t

AXIb amp1claJre

I I I I

I~

r

_

F OaHlaquoR SITE JoDnHLY SlMUS REKRl

MAY 1989

TASK 1 - DITA CDIUXTl(JIEVAWATICfi

1bis task lllaS ltXIIpleteci with the oollectim of all available site dlaractarizatim data prior to the initiatim of field studies his data was inooqxlrated with data collected frail ather tasks am used in the evaluatioo Pitxl888 to fOXIII1late the RabullUal Investigatim Report am Feasibility study

TASK2-~~

lbe HUraquos project liBilaCJBII8I1t structure is illustrated in the Project cpratim Plan

ImATABIL1IY SltJDlES

Solidificatim study work ia Piooee1iRJ Rallults of the 8tudy will be PIbullbullbullnted to the aqancibull as an~ to the FS Report lihlctl will be dalivmad al JUne 15 1989

RIM W

May 2 lbe PRPa l8t with EPA and KEP to IWViaw the 331 OCIIIIB1ts of the Mudl 1 1989 EPA latter Tachnical discussim Oll1tared arcud varialB ~cna lbe tin) cxnluded with the PRPs statR that they wculd nlpCId to all the CXIIIIII1ta by JUne 30 1989

May 11 In a oanfcwnoa call~ the PRPs EPA and tiEP it was agraectthat (1) tha PRPs wculd nspo~d to all asterislcm lettera of the Mudl 1 1989 ltter aclpt the IBIP u a bm)at cleanJp OCIIplUI1d wculd not be ~ no furthar air JDSelin) wtWd be parfomarl EPA aaDpliR split test results wculd not be inooqxnllted m maps or analyzed in the teKt (2) ~ withalt asteriakll that noted errors or inocx1sistalcies wculd be ~~ (3) the additialal field work refcaaoad in MIEPs OCIIIDBI1ts delivered Uld8r oavar letter dated April 10 1989 wculd not be done (4) the HUraquos wculd ally addrasa the errors and irrxnaisterxies noted in MIEPs CXIIIIIIIlta (5) the PRPs wculd sutait a redraft of the RIFS m June 15 1989

May 17 1ha PRPs addressed the EPA FS review OCillldttee lbe fOOlS of the PI aaantatim was a respcnl8 to the ranecJia] tecilnology PiqxJSed by EPA in their Mudl 1 1989 letter

TASK 3 -~~~ IEVELOHmfl

lbe final develqaent of cigtjectives and alternatives was presented in the Iltaft FS report A report entitled Prelillinary Inclicatim of ARARs was PI aaanted to EPA am tiEP in June 1986 Ql August 13 1987 a revised report lihlctl incorporates chanJ8S ~ by the ~ Amerdment and Raauthorizatim Act was subnitted

I I

~ I I

OQxmor Site status Report May 1989

r TASK 4 - CXHIJNllY RElATICHraquo PIAN

1bare was no CXJDJIlity relatiaw activity in May lbere is no OCIIIIIUlity relatiaw activity achaduled for JUne

TASK 5 - SUBXtfiRACJXR PRX1lREMDfl

No subcontractor procuraiB1t activi ty occurred in May and none is anticipated for Jme

TASK 6 - PDIIITSAl1DDUZATICHraquo

No pandtautharizatiat activity occmred in May and none is anticipated for JUne

TASK 7 - SlIE ~

Site ~ activiU haw ~ CXIIp]atecl Data gathered frclll this etfart wa sin the nm I and nlur n data PIbullbullrtatim 1his data wu al8o -1 in the davtiqiBit of the Draft Feuibility study

TASK 8 - IOFOGRAAIIC JIUIPIJG

It aw incb- 40 foot ard aw incb- 100 foot acale Base Map of the bullita has tt aDiittecl to a ard JIEP 1bia Tallk is now CXIIplete l1lM8 ape ware retenuoecl in the nlur I ard blr II data package the RbullbullUa) Invastigatim Rlport and tMy wre uaed in the Draft Feasibility study

TASK 9 - HDJEXT ~ltIf PIAN

lhe Project Operatiat Plan has bean awmvad by both the EPA and the MIEP On April 22 1987 E C Jordan IUIIIittat an dialldum to the lOP which covered the tt pittin) prooacl1re lfll)loyed in nlur n subaurfaoe soil analysis No fUrther additiaw or charljas to the RgtP are anticipated

TASK 10 - FlEW lllBILIZATIltJf

No Jld)ilizatiCIl of equipnent oocurred in May and none is anticipated for June

TASK 11 - IXJIESTIC WElL SURVEY

1his task has bean CXIIpleted Rasults frclll this fiUrVftj have been inooiporated with the reallts pt ested in the nlur I data package lhese results were iroolpmlted into the RI Reprt

-2shy

I I I I

OQnlor Site status Report May 1989

TASK 12 -~ ASSESSMENl

lhis task has been ex~~pleted with the suhni ssicn of the envira1mental sectioo of the RI Report

TASK 13 - RDI7IE SJHnlaquo INVmlIGMICN

lha PRPs have~ to two imepa1dant seta of ~ic CXIIIIIellts PUrsuant to the agraaoent batwaa the aqancbull and the PRPs third lCUId OCIIII8Its wre addressed in the discussicn of this task in the RI report

TASK 14 - KJnlaUtlaquo WEUS

With the analysis of Dalitoring wall ampallplbull taken in JUly 1987 a OCIIplete grcudwater hydrologic cycle was IIDlitarad his data was nported with the ~ta trca b1r n and wu incmporated in the RI npnt No turthar grcudwater saapling is I8CJiind far the RIPS prooau

TASK 15 - IMRgtIDGIC SIUDDS

Hdrologic stuiibull wre ccnldad with the reporting of site hydrologic cbaractariaticw in the RI I~

TASl( 16 -~ SAIIFL1R ANALYSIS

JMIC 11 - srm SURVEY

lhis task has bean CXIIpleted

JMIC 18 - lliD REDJClICN

1his task was ex~~pleted with the bullJbni ssi cn of data in the RI nport

TASK 19 - RI REKRl

lbe RI nport was subnitted en Daoaltler 18 1987

A partial pecbqe of EPA OCIIIIalts to the draft RI Report was received en March 16 1988 A final packacJe of EPA cxaampits was received en March 31 1988 be IIEP subnitted alllllts en JUly 29 1988 be PRPs respaded to the OCIIIIelrts in the Draft FS Report

-3shy

I I I I

Oltlnlor Site status Report May 1989

TASK 20- ACIICif L1MlTSIRESRNSE ~

An Actia1 Limit Raspaampe Clljectives Report was sutmitted a1 March 1 1988

Rlgulatory cxmbullnts to this report ware preaentad a1 March 16 1988 PRP raspa88 to thaae CXIIIII8I1ts was suJaitted a1 March 30 1988

TASK 21 - RfMmiAL ~~

An OYarView of potential ranedial alternatives was sutmitted Cll March 30 1988 EPA OCIIIIIampJts to this bullniuia1 ware receival in late April 1988 lhe PRPs napcndactto thaae CXIIIIIEI1Its in the draft FS Report subnitted Jme 1 1988 1ha IIEP has not subnitted CXIIIIIIIats

Q May 11 1988 a nport Yrlch lists dataila of rbullbullUa) altemativaa and valuate ~ was IIUtaitted to EPA and IIEP Q1 JUne 28 1988 the PRPs rmMl o Ita traD the EPA ocncaminJ this cloo--lt 1ha PRPa have nat rmMl o E nts traD IIEP

- lMK 23 - arr FS REEltItt

1ha lkatt PS Rlplrt ia a CXIIpldiliD of Task 20 21 and 22 activitiea and finllinl)a 1ha lkatt FS npart was mitted Cl1 JUna 1 1988 BFA cxmaata to tbia bulltwtbullian war receiMl a1 Slptalim 22 1988 IIEP ~were noeiMl a1 OctdJer 11 1988 Aa araed to trf the PRPa in the~ with 1M and IIEP Cll ~ 28 1988 a CXJII)lete Draft RIFS cloo~ was atwitts to the regulators a1 NcMIIi)er 23 1988 lhia wu dena as part of Tak 23 1hia npart l8Spaded to all IIEP and EPA OCIIIIIBIJts ~ RI and PS activity

TASK 24 - FINM RIM RERRl

EPA cxawrta to the II8CClnd draft of the RIFS ItlpOLt ware xaoaivad a1 March 31 EPA alao ~ detalled analysis of another IDll8 ocntrol technology Ihe PRPs wlll reply in~ to the fonat agreed to in the May 11 1989 OCIlfexerx call betwen the PRPs EPA and KEP lhia reply will be -n tri June 15 1989

-4shy

  1. barcode 567535
  2. barcodetext SDMS Doc ID 567535
Page 2: I Central Maine Power ctRl'llliD1989, l.tt.er, aclpt the IBIP a bm)at cleanJp OCIIplUI1d wculd not be ~, no furthar air JDSelin) wtW.d be parfo.mar:l, EPA aaDpliR} split test results

I I I I

I~

r

_

F OaHlaquoR SITE JoDnHLY SlMUS REKRl

MAY 1989

TASK 1 - DITA CDIUXTl(JIEVAWATICfi

1bis task lllaS ltXIIpleteci with the oollectim of all available site dlaractarizatim data prior to the initiatim of field studies his data was inooqxlrated with data collected frail ather tasks am used in the evaluatioo Pitxl888 to fOXIII1late the RabullUal Investigatim Report am Feasibility study

TASK2-~~

lbe HUraquos project liBilaCJBII8I1t structure is illustrated in the Project cpratim Plan

ImATABIL1IY SltJDlES

Solidificatim study work ia Piooee1iRJ Rallults of the 8tudy will be PIbullbullbullnted to the aqancibull as an~ to the FS Report lihlctl will be dalivmad al JUne 15 1989

RIM W

May 2 lbe PRPa l8t with EPA and KEP to IWViaw the 331 OCIIIIB1ts of the Mudl 1 1989 EPA latter Tachnical discussim Oll1tared arcud varialB ~cna lbe tin) cxnluded with the PRPs statR that they wculd nlpCId to all the CXIIIIII1ta by JUne 30 1989

May 11 In a oanfcwnoa call~ the PRPs EPA and tiEP it was agraectthat (1) tha PRPs wculd nspo~d to all asterislcm lettera of the Mudl 1 1989 ltter aclpt the IBIP u a bm)at cleanJp OCIIplUI1d wculd not be ~ no furthar air JDSelin) wtWd be parfomarl EPA aaDpliR split test results wculd not be inooqxnllted m maps or analyzed in the teKt (2) ~ withalt asteriakll that noted errors or inocx1sistalcies wculd be ~~ (3) the additialal field work refcaaoad in MIEPs OCIIIDBI1ts delivered Uld8r oavar letter dated April 10 1989 wculd not be done (4) the HUraquos wculd ally addrasa the errors and irrxnaisterxies noted in MIEPs CXIIIIIIIlta (5) the PRPs wculd sutait a redraft of the RIFS m June 15 1989

May 17 1ha PRPs addressed the EPA FS review OCillldttee lbe fOOlS of the PI aaantatim was a respcnl8 to the ranecJia] tecilnology PiqxJSed by EPA in their Mudl 1 1989 letter

TASK 3 -~~~ IEVELOHmfl

lbe final develqaent of cigtjectives and alternatives was presented in the Iltaft FS report A report entitled Prelillinary Inclicatim of ARARs was PI aaanted to EPA am tiEP in June 1986 Ql August 13 1987 a revised report lihlctl incorporates chanJ8S ~ by the ~ Amerdment and Raauthorizatim Act was subnitted

I I

~ I I

OQxmor Site status Report May 1989

r TASK 4 - CXHIJNllY RElATICHraquo PIAN

1bare was no CXJDJIlity relatiaw activity in May lbere is no OCIIIIIUlity relatiaw activity achaduled for JUne

TASK 5 - SUBXtfiRACJXR PRX1lREMDfl

No subcontractor procuraiB1t activi ty occurred in May and none is anticipated for Jme

TASK 6 - PDIIITSAl1DDUZATICHraquo

No pandtautharizatiat activity occmred in May and none is anticipated for JUne

TASK 7 - SlIE ~

Site ~ activiU haw ~ CXIIp]atecl Data gathered frclll this etfart wa sin the nm I and nlur n data PIbullbullrtatim 1his data wu al8o -1 in the davtiqiBit of the Draft Feuibility study

TASK 8 - IOFOGRAAIIC JIUIPIJG

It aw incb- 40 foot ard aw incb- 100 foot acale Base Map of the bullita has tt aDiittecl to a ard JIEP 1bia Tallk is now CXIIplete l1lM8 ape ware retenuoecl in the nlur I ard blr II data package the RbullbullUa) Invastigatim Rlport and tMy wre uaed in the Draft Feasibility study

TASK 9 - HDJEXT ~ltIf PIAN

lhe Project Operatiat Plan has bean awmvad by both the EPA and the MIEP On April 22 1987 E C Jordan IUIIIittat an dialldum to the lOP which covered the tt pittin) prooacl1re lfll)loyed in nlur n subaurfaoe soil analysis No fUrther additiaw or charljas to the RgtP are anticipated

TASK 10 - FlEW lllBILIZATIltJf

No Jld)ilizatiCIl of equipnent oocurred in May and none is anticipated for June

TASK 11 - IXJIESTIC WElL SURVEY

1his task has bean CXIIpleted Rasults frclll this fiUrVftj have been inooiporated with the reallts pt ested in the nlur I data package lhese results were iroolpmlted into the RI Reprt

-2shy

I I I I

OQnlor Site status Report May 1989

TASK 12 -~ ASSESSMENl

lhis task has been ex~~pleted with the suhni ssicn of the envira1mental sectioo of the RI Report

TASK 13 - RDI7IE SJHnlaquo INVmlIGMICN

lha PRPs have~ to two imepa1dant seta of ~ic CXIIIIIellts PUrsuant to the agraaoent batwaa the aqancbull and the PRPs third lCUId OCIIII8Its wre addressed in the discussicn of this task in the RI report

TASK 14 - KJnlaUtlaquo WEUS

With the analysis of Dalitoring wall ampallplbull taken in JUly 1987 a OCIIplete grcudwater hydrologic cycle was IIDlitarad his data was nported with the ~ta trca b1r n and wu incmporated in the RI npnt No turthar grcudwater saapling is I8CJiind far the RIPS prooau

TASK 15 - IMRgtIDGIC SIUDDS

Hdrologic stuiibull wre ccnldad with the reporting of site hydrologic cbaractariaticw in the RI I~

TASl( 16 -~ SAIIFL1R ANALYSIS

JMIC 11 - srm SURVEY

lhis task has bean CXIIpleted

JMIC 18 - lliD REDJClICN

1his task was ex~~pleted with the bullJbni ssi cn of data in the RI nport

TASK 19 - RI REKRl

lbe RI nport was subnitted en Daoaltler 18 1987

A partial pecbqe of EPA OCIIIIalts to the draft RI Report was received en March 16 1988 A final packacJe of EPA cxaampits was received en March 31 1988 be IIEP subnitted alllllts en JUly 29 1988 be PRPs respaded to the OCIIIIelrts in the Draft FS Report

-3shy

I I I I

Oltlnlor Site status Report May 1989

TASK 20- ACIICif L1MlTSIRESRNSE ~

An Actia1 Limit Raspaampe Clljectives Report was sutmitted a1 March 1 1988

Rlgulatory cxmbullnts to this report ware preaentad a1 March 16 1988 PRP raspa88 to thaae CXIIIII8I1ts was suJaitted a1 March 30 1988

TASK 21 - RfMmiAL ~~

An OYarView of potential ranedial alternatives was sutmitted Cll March 30 1988 EPA OCIIIIIampJts to this bullniuia1 ware receival in late April 1988 lhe PRPs napcndactto thaae CXIIIIIEI1Its in the draft FS Report subnitted Jme 1 1988 1ha IIEP has not subnitted CXIIIIIIIats

Q May 11 1988 a nport Yrlch lists dataila of rbullbullUa) altemativaa and valuate ~ was IIUtaitted to EPA and IIEP Q1 JUne 28 1988 the PRPs rmMl o Ita traD the EPA ocncaminJ this cloo--lt 1ha PRPa have nat rmMl o E nts traD IIEP

- lMK 23 - arr FS REEltItt

1ha lkatt PS Rlplrt ia a CXIIpldiliD of Task 20 21 and 22 activitiea and finllinl)a 1ha lkatt FS npart was mitted Cl1 JUna 1 1988 BFA cxmaata to tbia bulltwtbullian war receiMl a1 Slptalim 22 1988 IIEP ~were noeiMl a1 OctdJer 11 1988 Aa araed to trf the PRPa in the~ with 1M and IIEP Cll ~ 28 1988 a CXJII)lete Draft RIFS cloo~ was atwitts to the regulators a1 NcMIIi)er 23 1988 lhia wu dena as part of Tak 23 1hia npart l8Spaded to all IIEP and EPA OCIIIIIBIJts ~ RI and PS activity

TASK 24 - FINM RIM RERRl

EPA cxawrta to the II8CClnd draft of the RIFS ItlpOLt ware xaoaivad a1 March 31 EPA alao ~ detalled analysis of another IDll8 ocntrol technology Ihe PRPs wlll reply in~ to the fonat agreed to in the May 11 1989 OCIlfexerx call betwen the PRPs EPA and KEP lhia reply will be -n tri June 15 1989

-4shy

  1. barcode 567535
  2. barcodetext SDMS Doc ID 567535
Page 3: I Central Maine Power ctRl'llliD1989, l.tt.er, aclpt the IBIP a bm)at cleanJp OCIIplUI1d wculd not be ~, no furthar air JDSelin) wtW.d be parfo.mar:l, EPA aaDpliR} split test results

I I

~ I I

OQxmor Site status Report May 1989

r TASK 4 - CXHIJNllY RElATICHraquo PIAN

1bare was no CXJDJIlity relatiaw activity in May lbere is no OCIIIIIUlity relatiaw activity achaduled for JUne

TASK 5 - SUBXtfiRACJXR PRX1lREMDfl

No subcontractor procuraiB1t activi ty occurred in May and none is anticipated for Jme

TASK 6 - PDIIITSAl1DDUZATICHraquo

No pandtautharizatiat activity occmred in May and none is anticipated for JUne

TASK 7 - SlIE ~

Site ~ activiU haw ~ CXIIp]atecl Data gathered frclll this etfart wa sin the nm I and nlur n data PIbullbullrtatim 1his data wu al8o -1 in the davtiqiBit of the Draft Feuibility study

TASK 8 - IOFOGRAAIIC JIUIPIJG

It aw incb- 40 foot ard aw incb- 100 foot acale Base Map of the bullita has tt aDiittecl to a ard JIEP 1bia Tallk is now CXIIplete l1lM8 ape ware retenuoecl in the nlur I ard blr II data package the RbullbullUa) Invastigatim Rlport and tMy wre uaed in the Draft Feasibility study

TASK 9 - HDJEXT ~ltIf PIAN

lhe Project Operatiat Plan has bean awmvad by both the EPA and the MIEP On April 22 1987 E C Jordan IUIIIittat an dialldum to the lOP which covered the tt pittin) prooacl1re lfll)loyed in nlur n subaurfaoe soil analysis No fUrther additiaw or charljas to the RgtP are anticipated

TASK 10 - FlEW lllBILIZATIltJf

No Jld)ilizatiCIl of equipnent oocurred in May and none is anticipated for June

TASK 11 - IXJIESTIC WElL SURVEY

1his task has bean CXIIpleted Rasults frclll this fiUrVftj have been inooiporated with the reallts pt ested in the nlur I data package lhese results were iroolpmlted into the RI Reprt

-2shy

I I I I

OQnlor Site status Report May 1989

TASK 12 -~ ASSESSMENl

lhis task has been ex~~pleted with the suhni ssicn of the envira1mental sectioo of the RI Report

TASK 13 - RDI7IE SJHnlaquo INVmlIGMICN

lha PRPs have~ to two imepa1dant seta of ~ic CXIIIIIellts PUrsuant to the agraaoent batwaa the aqancbull and the PRPs third lCUId OCIIII8Its wre addressed in the discussicn of this task in the RI report

TASK 14 - KJnlaUtlaquo WEUS

With the analysis of Dalitoring wall ampallplbull taken in JUly 1987 a OCIIplete grcudwater hydrologic cycle was IIDlitarad his data was nported with the ~ta trca b1r n and wu incmporated in the RI npnt No turthar grcudwater saapling is I8CJiind far the RIPS prooau

TASK 15 - IMRgtIDGIC SIUDDS

Hdrologic stuiibull wre ccnldad with the reporting of site hydrologic cbaractariaticw in the RI I~

TASl( 16 -~ SAIIFL1R ANALYSIS

JMIC 11 - srm SURVEY

lhis task has bean CXIIpleted

JMIC 18 - lliD REDJClICN

1his task was ex~~pleted with the bullJbni ssi cn of data in the RI nport

TASK 19 - RI REKRl

lbe RI nport was subnitted en Daoaltler 18 1987

A partial pecbqe of EPA OCIIIIalts to the draft RI Report was received en March 16 1988 A final packacJe of EPA cxaampits was received en March 31 1988 be IIEP subnitted alllllts en JUly 29 1988 be PRPs respaded to the OCIIIIelrts in the Draft FS Report

-3shy

I I I I

Oltlnlor Site status Report May 1989

TASK 20- ACIICif L1MlTSIRESRNSE ~

An Actia1 Limit Raspaampe Clljectives Report was sutmitted a1 March 1 1988

Rlgulatory cxmbullnts to this report ware preaentad a1 March 16 1988 PRP raspa88 to thaae CXIIIII8I1ts was suJaitted a1 March 30 1988

TASK 21 - RfMmiAL ~~

An OYarView of potential ranedial alternatives was sutmitted Cll March 30 1988 EPA OCIIIIIampJts to this bullniuia1 ware receival in late April 1988 lhe PRPs napcndactto thaae CXIIIIIEI1Its in the draft FS Report subnitted Jme 1 1988 1ha IIEP has not subnitted CXIIIIIIIats

Q May 11 1988 a nport Yrlch lists dataila of rbullbullUa) altemativaa and valuate ~ was IIUtaitted to EPA and IIEP Q1 JUne 28 1988 the PRPs rmMl o Ita traD the EPA ocncaminJ this cloo--lt 1ha PRPa have nat rmMl o E nts traD IIEP

- lMK 23 - arr FS REEltItt

1ha lkatt PS Rlplrt ia a CXIIpldiliD of Task 20 21 and 22 activitiea and finllinl)a 1ha lkatt FS npart was mitted Cl1 JUna 1 1988 BFA cxmaata to tbia bulltwtbullian war receiMl a1 Slptalim 22 1988 IIEP ~were noeiMl a1 OctdJer 11 1988 Aa araed to trf the PRPa in the~ with 1M and IIEP Cll ~ 28 1988 a CXJII)lete Draft RIFS cloo~ was atwitts to the regulators a1 NcMIIi)er 23 1988 lhia wu dena as part of Tak 23 1hia npart l8Spaded to all IIEP and EPA OCIIIIIBIJts ~ RI and PS activity

TASK 24 - FINM RIM RERRl

EPA cxawrta to the II8CClnd draft of the RIFS ItlpOLt ware xaoaivad a1 March 31 EPA alao ~ detalled analysis of another IDll8 ocntrol technology Ihe PRPs wlll reply in~ to the fonat agreed to in the May 11 1989 OCIlfexerx call betwen the PRPs EPA and KEP lhia reply will be -n tri June 15 1989

-4shy

  1. barcode 567535
  2. barcodetext SDMS Doc ID 567535
Page 4: I Central Maine Power ctRl'llliD1989, l.tt.er, aclpt the IBIP a bm)at cleanJp OCIIplUI1d wculd not be ~, no furthar air JDSelin) wtW.d be parfo.mar:l, EPA aaDpliR} split test results

I I I I

OQnlor Site status Report May 1989

TASK 12 -~ ASSESSMENl

lhis task has been ex~~pleted with the suhni ssicn of the envira1mental sectioo of the RI Report

TASK 13 - RDI7IE SJHnlaquo INVmlIGMICN

lha PRPs have~ to two imepa1dant seta of ~ic CXIIIIIellts PUrsuant to the agraaoent batwaa the aqancbull and the PRPs third lCUId OCIIII8Its wre addressed in the discussicn of this task in the RI report

TASK 14 - KJnlaUtlaquo WEUS

With the analysis of Dalitoring wall ampallplbull taken in JUly 1987 a OCIIplete grcudwater hydrologic cycle was IIDlitarad his data was nported with the ~ta trca b1r n and wu incmporated in the RI npnt No turthar grcudwater saapling is I8CJiind far the RIPS prooau

TASK 15 - IMRgtIDGIC SIUDDS

Hdrologic stuiibull wre ccnldad with the reporting of site hydrologic cbaractariaticw in the RI I~

TASl( 16 -~ SAIIFL1R ANALYSIS

JMIC 11 - srm SURVEY

lhis task has bean CXIIpleted

JMIC 18 - lliD REDJClICN

1his task was ex~~pleted with the bullJbni ssi cn of data in the RI nport

TASK 19 - RI REKRl

lbe RI nport was subnitted en Daoaltler 18 1987

A partial pecbqe of EPA OCIIIIalts to the draft RI Report was received en March 16 1988 A final packacJe of EPA cxaampits was received en March 31 1988 be IIEP subnitted alllllts en JUly 29 1988 be PRPs respaded to the OCIIIIelrts in the Draft FS Report

-3shy

I I I I

Oltlnlor Site status Report May 1989

TASK 20- ACIICif L1MlTSIRESRNSE ~

An Actia1 Limit Raspaampe Clljectives Report was sutmitted a1 March 1 1988

Rlgulatory cxmbullnts to this report ware preaentad a1 March 16 1988 PRP raspa88 to thaae CXIIIII8I1ts was suJaitted a1 March 30 1988

TASK 21 - RfMmiAL ~~

An OYarView of potential ranedial alternatives was sutmitted Cll March 30 1988 EPA OCIIIIIampJts to this bullniuia1 ware receival in late April 1988 lhe PRPs napcndactto thaae CXIIIIIEI1Its in the draft FS Report subnitted Jme 1 1988 1ha IIEP has not subnitted CXIIIIIIIats

Q May 11 1988 a nport Yrlch lists dataila of rbullbullUa) altemativaa and valuate ~ was IIUtaitted to EPA and IIEP Q1 JUne 28 1988 the PRPs rmMl o Ita traD the EPA ocncaminJ this cloo--lt 1ha PRPa have nat rmMl o E nts traD IIEP

- lMK 23 - arr FS REEltItt

1ha lkatt PS Rlplrt ia a CXIIpldiliD of Task 20 21 and 22 activitiea and finllinl)a 1ha lkatt FS npart was mitted Cl1 JUna 1 1988 BFA cxmaata to tbia bulltwtbullian war receiMl a1 Slptalim 22 1988 IIEP ~were noeiMl a1 OctdJer 11 1988 Aa araed to trf the PRPa in the~ with 1M and IIEP Cll ~ 28 1988 a CXJII)lete Draft RIFS cloo~ was atwitts to the regulators a1 NcMIIi)er 23 1988 lhia wu dena as part of Tak 23 1hia npart l8Spaded to all IIEP and EPA OCIIIIIBIJts ~ RI and PS activity

TASK 24 - FINM RIM RERRl

EPA cxawrta to the II8CClnd draft of the RIFS ItlpOLt ware xaoaivad a1 March 31 EPA alao ~ detalled analysis of another IDll8 ocntrol technology Ihe PRPs wlll reply in~ to the fonat agreed to in the May 11 1989 OCIlfexerx call betwen the PRPs EPA and KEP lhia reply will be -n tri June 15 1989

-4shy

  1. barcode 567535
  2. barcodetext SDMS Doc ID 567535
Page 5: I Central Maine Power ctRl'llliD1989, l.tt.er, aclpt the IBIP a bm)at cleanJp OCIIplUI1d wculd not be ~, no furthar air JDSelin) wtW.d be parfo.mar:l, EPA aaDpliR} split test results

I I I I

Oltlnlor Site status Report May 1989

TASK 20- ACIICif L1MlTSIRESRNSE ~

An Actia1 Limit Raspaampe Clljectives Report was sutmitted a1 March 1 1988

Rlgulatory cxmbullnts to this report ware preaentad a1 March 16 1988 PRP raspa88 to thaae CXIIIII8I1ts was suJaitted a1 March 30 1988

TASK 21 - RfMmiAL ~~

An OYarView of potential ranedial alternatives was sutmitted Cll March 30 1988 EPA OCIIIIIampJts to this bullniuia1 ware receival in late April 1988 lhe PRPs napcndactto thaae CXIIIIIEI1Its in the draft FS Report subnitted Jme 1 1988 1ha IIEP has not subnitted CXIIIIIIIats

Q May 11 1988 a nport Yrlch lists dataila of rbullbullUa) altemativaa and valuate ~ was IIUtaitted to EPA and IIEP Q1 JUne 28 1988 the PRPs rmMl o Ita traD the EPA ocncaminJ this cloo--lt 1ha PRPa have nat rmMl o E nts traD IIEP

- lMK 23 - arr FS REEltItt

1ha lkatt PS Rlplrt ia a CXIIpldiliD of Task 20 21 and 22 activitiea and finllinl)a 1ha lkatt FS npart was mitted Cl1 JUna 1 1988 BFA cxmaata to tbia bulltwtbullian war receiMl a1 Slptalim 22 1988 IIEP ~were noeiMl a1 OctdJer 11 1988 Aa araed to trf the PRPa in the~ with 1M and IIEP Cll ~ 28 1988 a CXJII)lete Draft RIFS cloo~ was atwitts to the regulators a1 NcMIIi)er 23 1988 lhia wu dena as part of Tak 23 1hia npart l8Spaded to all IIEP and EPA OCIIIIIBIJts ~ RI and PS activity

TASK 24 - FINM RIM RERRl

EPA cxawrta to the II8CClnd draft of the RIFS ItlpOLt ware xaoaivad a1 March 31 EPA alao ~ detalled analysis of another IDll8 ocntrol technology Ihe PRPs wlll reply in~ to the fonat agreed to in the May 11 1989 OCIlfexerx call betwen the PRPs EPA and KEP lhia reply will be -n tri June 15 1989

-4shy

  1. barcode 567535
  2. barcodetext SDMS Doc ID 567535