11
REPUBLIC OF THE PHILIPPINES DEPARTMENT OF FINANCE BUREAU OF CUSTOMS Port Area, Manila Bids and Awards Committee SUPPLEMENTAL/BID BUlL.ETIN ADDENDUM NO. 1 LEASEOF PHOTOCOPYING MACHINES WITH MULTI-FUN IONAL DEVICE FOR CY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued to clarify, modify or amend items in the Invitation for Negotiated Procurement for the above project. his shall form an integral part of the Bid Documents. ISSUE CLARIfICATION I AlV1ENDMENTS A. The following eligibility and technical documents, as well as the Financial Proposal Form (Annex A), shall be submitted on August 26, 2014, 1:30 p.m. at the GSD Conference Room, OCOM Buiiding t South Harbor, Port Area, tJ1ani!a: (a) or 2014 Mayor's Permit; Cb) Statement of all Ongoing Government and Private Contracts within two (2) years prior to July 3D, 2014 (Annex B); (d) Audited financial statements for the preceding calendar year stam ped received by the Bureau of Internal Revenue; (e) Compliance with the Schedule of Requirements (Annex C) and Technical Specifications (Annex D); (f) Omnibus Sworn Statement (Annex E); and (g) Authority of the Signatory. The supplier whose submission will be determined as the best and final offer will be required to submit the following documents: );> A. The folio ing eligibility and technicai documents, as well as the Financial Proposal Form (Annex A), shall be submitted on IAU9Ust 26, 2014, 1:30 p.m. at the GSD Con~erence Room, OCOf\.1Buildinq, South Harbor, Port Area, Manila: (a) c J 2014 Mayor's Permit; (b) St~tement of all On-going Gdvernment and Private Contracts within two (2) years prior to July 3q 2014 (Annex B); (c) Statement of all Completed G6vernment and Private contrects within two (2) years L pr~or to July 30, 2.014 (Annex C)I' Submit photocopy of the single iargest completed contract. (d) A~dited financial statements for the preceding calendar year stamped received by the Bureau of Internal R~venue; (e) C~mpliance with the Schedule of Requirements(Annex D) and Tefhnical Specifications (Annex E); (f) O~nibus Sworn Statement (A nex F); and (9) Ta ClearanceCertificate; and (h) Au hority of the Signatory. The supplier hose submission will be determined a the best and final offer will be required t submit the following documents:

I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

REPUBLIC OF THE PHILIPPINESDEPARTMENT OF FINANCE

BUREAU OF CUSTOMSPort Area, Manila

Bids and Awards CommitteeSUPPLEMENTAL/BID BUlL.ETIN

ADDENDUM NO. 1

LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICEFOR CY 2014 to 2015

This Addendum No. 1 dated August 19, 2014 is issued to clarify, modify or amend items inthe Invitation for Negotiated Procurement for the above project. his shall form an integralpart of the Bid Documents.

ISSUE CLARIfICATION IAlV1ENDMENTSA. The following eligibility and technical

documents, as well as the FinancialProposal Form (Annex A), shall besubmitted on August 26, 2014, 1:30 p.m.at the GSD Conference Room, OCOMBuiidingt South Harbor, Port Area, tJ1ani!a:

(a) or 2014 Mayor's Permit;Cb) Statement of all Ongoing

Government and PrivateContracts within two (2) yearsprior to July 3D, 2014 (AnnexB);

(d) Audited financial statements forthe preceding calendar yearstam ped received by theBureau of Internal Revenue;

(e) Compliance with the Scheduleof Requirements (Annex C) andTechnical Specifications (AnnexD);

(f) Omnibus Sworn Statement(Annex E); and

(g) Authority of the Signatory.

The supplier whose submission will bedetermined as the best and final offer willbe required to submit the followingdocuments:

);> A. The folio ing eligibility and technicaidocuments, as well as the FinancialProposal Form (Annex A), shall besubmitted on IAU9Ust26, 2014, 1:30 p.m. atthe GSD Con~erence Room, OCOf\.1Buildinq,South Harbor, Port Area, Manila:

(a) cJ 2014 Mayor's Permit;(b) St~tementof all On-going

Gdvernment and Private Contractswithin two (2) years prior to July3q 2014 (Annex B);

(c) Statement of all CompletedG6vernment and Privatecontrects within two (2) years

Lpr~or to July 30, 2.014 (AnnexC)I' Submit photocopy of thesingle iargest completedcontract.

(d) A~dited financial statements for thepreceding calendar year stampedreceived by the Bureau of InternalR~venue;

(e) C~mpliance with the Schedule ofRequirements(Annex D) andTefhnical Specifications (Annex E);

(f) O~nibus Sworn Statement(A nex F); and

(9) Ta ClearanceCertificate; and(h) Au hority of the Signatory.

The supplier hose submission will bedetermined a the best and final offer willbe required t submit the followingdocuments:

Page 2: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

r

(a) CY 2013 Income Tax Returnsand January to June 2014Business Tax Returns filed andpaid thru the Electronic Filingand Payment System;Tax Clearance issued by theCollection Enforcement Divisionof the Bureau of InternalRevenue (BIR) National Office;andPhilGEPSRegistrationCertificate.

(a) CY 20131 Income Tax Returns andJanuary to June 2014 Business TaxReturns filed and paid thru theElectronic Filing and Payment System;

(b) PhilGEPSRegistration Certificate.

I}> Submit the 1ax Clearance Certificate as part

of the Techr ical Documents

~ See attached revised Financial ProposalForm (Anne* A)

~ See attach~d Schedule of Requirements(Annex D), ~o be submitted as part of theTechnical Requlrements

~ See attached Technical Spec'fications(Annex ~)

(b)

(c)

B. Tax Clearance Certificate

C. Financial Proposal Form

D. Section VI. Schedule of Requirements

E. Section VII. Technical Specifications

Reminders:

2

• Submission of bids will be on or before August 26, 014 at 1:30 P.M.• Late bids shall not be accepted.

For guidance and information of all concerned.

~f..~~~A}~tUROM. LACHICA, CESO ndeputy Commissioner, JAGII::hairperson SOC-SAC fo

Page 3: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

Financial Proposal Form

Annex A

Date:

The ChairpersonBureau of CustomsBids and Awards CommitteePort Area, Manila

Gentlemen and/or Ladies:

We, the undersigned, offer to [supply/deliver/perform] [description of the Goods] in conformitywith the technical specifications and schedule of requirements for the sum of [total Bid amount inwords and figures].

~ u_n_it ~ ._p_a_I_.t_ic_U~la_'I_'s ~ __ ~~_.-1 C_~tl' 71 Average of 500,000 copies per monthCost per Copy (inclusive of 12% VAT) I

Grand Total Cost for 16 months ITotal Amount in Words:

We undertake, if our Offer is accepted, to deliver the goods in accordance with the deliveryschedule specified in the Schedule of Requirements.

If our Offer IS accepted, we undertake to provide a performance slcunty ill the form, amounts,and within the times specified in the Implementing Rules and RegulatiO( of Republic Act No. 9184.

We agree to abide by this Offer for one hundred twenty (120) calendar days and it shall remainbinding upon us and may be accepted at any time before the expiration 1fthat period.

Until a formal Contract is prepared and executed, this Offer, together with your writtenacceptance thereof and your Notice of Award, shall be binding upon us.

\Ve understand that you are not bound to accept the lowest or any Offer you may receive.

We certify/confirm that we comply with the eligibility reQUireme1ts as stated in the Invitationfor Negotiated Procurement.

Dated this day of 20-------------- -------------- -----

[signature] [in the capacity of!

Duly authorized to sign Bid for and on behalf of ---c _

Page 4: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

Anne

List of all Ongoing Government and Private C mtracts includingContracts awarded but 110t yet started

Business Name:Business Address:

Name of Contract Date of the I Kinds of Goods Value of Date of DeliveryContract Outstanding

I ContractsGovernment I

I

I I

I-r- !Private

II

I ._--1-

Submitted by(Printed Name & Signature)

Designation

Date

Instructions:l. State all ongoing contracts including those awarded bi t not yet started within two

xB

(2)

..11.

years (government and private contracts) prior to July 301' 2014.

If there is no ongoing contract including awarded but not yet started as of theaforementioned period, state none or equivalent term.

A

Page 5: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

Anne

List of all Completed Government and Private ~:ontracts includingContracts awarded but not yet st rrted

Business Name:Business Address:

-

Name of Contract Date of the Kinds of Goods Value of D."ofDeuve;-~IContract Outstandn g

Contract~Government I

---_. -.II

Private

xC

Submitted by(Printed Name & Signature)

Designation

Date

Instructions:111. State all ongoing contracts including those awarded but not yet started within two (2)

years (government and private contracts) prior to July 31,2014.

IV. If there is no ongoing contract including awarded but not yet started as of theaforementioned period, state none or equivalent term.

Page 6: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

Thedeh

Annex

Section VI. Schedule of Reqi irementsdelivery schedule expressed as weeks/months stipulates hereafter a delivery date which is the date

very to the project site.

Item Description Qtyo Total Delivery DateNumber

1 Photocopying Machines to be installedat the following BOC Buildings Fifteen (15)located at Gate 3, Port Area, Manila, calendar daysNorth Harbor, Manila and Termina12, from receipt ofNAIA, Paraiiaque City. I Notice to

ProceedI (i) OCOM Building

@ Tax Exempt Div 34 units 34 units@ CRMDEl Off. of the Commissioner<lO HRMD</j Depcom. RCf',fIG9 Depcom.IO

I* Appellate Division (LS)11) Director Office, Legal Services External Affairs•• Budget DivisionlFMO\Ill PIADe Dir. Ofc., ens•••• IPO0 ESS•• Accounting Div .Q Depcom. EG

'" Depcom. IAG<8 ITDD9 Depcom. AOCG•• Collection Servicese Administration Office@ Dir., POS

" COAe Depcom. MISTG I• TMS (MISTG)

'" cns Admin.•••• RAD

'" PMC/PSDSfill GSD8 IAS-VCDCl X-ray• AMOIII Legal Service

(ii) POM Building I I'" District con. Ofc.•••• Depcoll for Operations

14 unitsl" DepcolI for Admin. 14 units0 Cash Div.e WDRD!iJ Admin Div. I••• Law Div . I

D

of

Page 7: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

Ih

et COA-POMIt Garments• Depcoll. for Assessment

I" IEDLBD I<j

e WCD

(iii) MICP Building

I0 District Collector's Office

'" FED9 units I 9 nits•• lED

e Admin. Div

'" LBD I• Bonds Div.Ol) North HarbourCl COA

""Law Div.

(iv) NAIA Building

! e District Collector's Officei la AOD

II • Admin. Div. 14 units 14 unitsIIIiI Bonded

I Ie Exporte Disbursement I I

i e Arrival !., IED /FED I0 Law Div. Ia Dutyfree

I61 DepColl. for Operations9 LBD0 Collection Div.e> COA

2 Ono-calltechnician to repair defective Imachines. Response time shall bewithin four (4) hours from verbal orwritten notification. Machines that I

I cannot he repaired within 24 hoursshall be replaced with a new unit,otherwise penalty will be imposed at11/10% of one percent of the applicable

Ii billing month for every day of delay." IOn-site training ofBOC's personnel I.)

Ii on how to use the machine. ---.J

ereby certify to comply and deliver all the above requirements.

Signature over PI-inted Name ofRepresentative

DateName of Company/Bidder

7

Page 8: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

Annex E

Section VII. Technical Specifications

Item Specification Statement of

I Compliance (either"comply" or "not

comply")General:

1 I Rental of remanufactured or brand new (year 200~I onwards) paper copier with Multi-funetional devic

[configuration] (Copier, Printer and Scanner)Digital Type, automatic electronic sorter and feede •. Iand back to bad" feature

2 Model (with LCD display, user friendly and withcapability to deliver clear high quality copies)

3 Warm up time is 2 minutes I!

4 Fixing: heated roller fixing I5 Density Control: Automatic and Manual I

6 Paper Supply and Tray: 500 sheets/tray, minimum of/2trays plus 1 by-pass tray

7 Memory Capacity: 1 GB8 Indicate the locking mechanism of the units to be

-~~supplied i.e. manual key lock, coding pin lock, etc.

9 The units to be supplied should be in existence fori Ionly five (5) years or less from the manufacturing \

date as of the date of submission/opening of bids.The maximum number of meter reading is 600,000per unit. (repair/replacement must be done withiJ24 hours - subject to penalty)Copier Specifications:

1 Copy speed 30 and up copies/minute2 Continuous copying - 1-999 copies" Copy paper size: A3-A5R and 11" x 17" I.J

r4 Maximum original size: A35 Reduction/Enlargement: 25% to 400% I6 Copy paper: regular or special paper (transparencies)--

Scanner Specifications: I1 Interface: 10 base-T/IOO Base- TXllOOO Base-T -----,..,

Driver: TWAIN Driver, HDD TWAIN DriverL

" Protocol: TCP/IP (FTP,SMB,SMT P).)

4 Speed: Black - 50/50 opm (300dpi) I5 Size: Max. A36 Output Format: - Black and White -TIFF, PDF

Output Format: - Colored - TIFF, PDF, compacPDF, JPEG (5 ocom, 3 for the ports)

7 Resolution: Push-ZOO to 600dpi; pun-200 to 600 dpiPrinter Specifications:

1 HDD: 60 GB (shared with the Copier) I2 Print Resolution: 1,200 dpi x 600 dpi or equivalent3 PDL: PCL5e/c, PCL XL, PostScript 34 Protocol: TCPIIP, IPXlSPX (NDS support), 5MB (lNet

BED), LPD, IPPl.l, SNMP, HTTP5 OS Support: Windows 7, XP, 32, 64 bit (upgradab e to

windows 8)

Q

Page 9: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

6 Fonts: Manufacturer's Standard I I7 Interface: 10 BASE - I/lOO BASE-IX/IOOO BASE-I I

I II

IOthers:

1 IOn-call technician to repair defective machines. Response

Itime shall be within four (4) hours from verbal or written

Inotification. Machines that cannot be repaired within 24I hours shall be replaced with a new unit, otherwise penalty I

I will be imposed at 1110% of one percent of the applicableIbilling month for every day of delay.

2 I Iotal billing charges is computed by multiplying theI actual total number of copies reproduced less 2%

spoilage and test copies by the rental rate.

I hereby certify to comply and deliver all the above requirements.

Name of Company/Bidder Signature OVCI' Printed Name ofR . Iepresentative

Date

o

Page 10: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

AFFIDAVIT

Annex F

" ...

Omnibus Sworn Statement

REPUBLIC OF THE PHILIPPINES)CITYIMUNICIPALITY OF ) S.S.

I, [Name of Affiant], of legal age, [Civil Status], [Nationality} and residing at [Addressof Affiani], after having been duly sworn in accordance with law, d hereby depose and statethat:

1. Select one, delete the other:

If a sole proprietorship: I am the sole proprietor of [Na ne of Bidder} with officeaddress at [address of Bidder];

If a partnership, corporation, cooperative, or joint venturf I am the duly authorizedand designated representative of [Name of Bidder] with office address at [address ofBidder};

2. Select one, delete the other:

If a sole proprietorship: As the owner and sole proprietor of [Name of Bidder}, I havefull power and authority to do, execute and perform any and all acts necessary torepresent it in the bidding for [Name of the Project] of the [Name of the ProcuringEntity};

If a partnership, corporation, cooperative, or joint venture: I am granted full powerand authority to do, execute and perform any and all! acts necessary and/or torepresent the [Name cif Bidder} in the bidding as shown in the attached {state title ~fattached document ShtTWing proof of authorization (e.g., duly notarized Secretary 'sCertificate issued by the corporation or the members of the joint venturer]:

3. [Name of Bidder] is not "blacklisted" or barred from bid ing by the Government ofthe Philippines or any of its agencies, offices, corporati ns, or Local GovernmentUnits, foreign government/foreign or international financing institution whoseblacklisting rules have been recognized by the Government Procurement PolicyBoard;

4. Each of the documents submitted in satisfaction of the bidding requirements is anauthentic copy of the original, complete, and all statement I and information providedtherein are true and correct;

5. [Name of Bidder] is authorizing the Head of the Prauthorized representative(s) to verify all the documents su

or its duly

6. Select one, delete the rest:

Page 11: I as (a) or Cb) · 2015. 10. 8. · ADDENDUM NO. 1 LEASEOF PHOTOCOPYINGMACHINES WITH MULTI-FUN IONAL DEVICE FORCY 2014 to 2015 This Addendum No. 1 dated August 19, 2014 is issued

If a sole proprietorship: I am not related to the Head o~ the Procuring Entity,members of the Bids and Awards Committee (BAC), the Tefhnical Working Group,and the BAC Secretariat, the head of the Project Manageme1t Office or the end-userunit, and the project consultants by consanguinity or affinity up to the third civil

degree; 1If a partnership or cooperative: None of the officers and members of [Name ofBidder} is related to the Head of the Procuring Entity, m mbers of the Bids andAwards Committee (BAC), the Technical Working Group, !'nd the BAC Secretariat,the head of the Project Management Office or the end-u er unit, and the projectconsultants by consanguinity or affinity up to the third civil d gree;

If Cl corporation or joint venture: None of the officers, d,ijrectors, and controllingstockholders of [Name of Bidder] is related to the Head 16f the Procuring Entity,members of the Bids and Awards Committee (BAC), the Technical Working Group,and the BAC Secretariat, the head of the Project Management Office or the end-userunit, and the project consultants by consanguinity or affi1'ity up to the third civildegree;

7. [Name of Bidder} complies with existing labor laws and standards; and

8. [Name of Bidder} is aware of and has undertaken the fonoling responsibilities as aBidder:

a) Carefully examine all of the Bidding Documents; Ib) Acknowledge all conditions, local or otherwise, affectipg the implementation of

the Contract;c) Made an estimate of the facilities available and needed for the contract to be bid,

ifany; and Id) Inquire or secure Supplemental/Bid Bulletin(s) issued for the [Name of the

Project}.

Supplier's Representa 'vel Authorized Signatory

Il.J WITNESS WHEREOF, T have hereunto set my hand thi _ day of ~ 20_ at_____ -', Philippines.

SUBSCRIBED AND SWORN TO BEFORE ME, this __ day of ,2014 in the City of. . Affiant exhibiting to me his/her Valid Identification fumber .

Notary Public

Doe. No.:Page No.:Book No:Series of2014.