' I I AI 1 AGENDA ITEM NO, ..o*amo..mm NORTH LANARKSHlRE COUNCIL REPORT TO : HOUSING COMMITTEE From: DIRECTOR OF HOUSING AND DIRECTOR OF CONSTRUCTION SERVICES Subject: 1996/97 HOUSING CAPITAL MONITORING & PROGRESS STATUS REPORT. ~~ Date: 22 January 1997 I Ref GGKFPAIUJC I (1.00). INTRODUCTION (1.01) A copy of the above report is attached for Committee's consideration. The report reviews progress against the 1996/97 Capital Programme, which was approved by the Housing Committee on 1lth September, 1996. (2.W RECOMMENDATION (2.01) Committee is asked to note this report. (3.00) BACKGROUND (3.01) Available from the Housing Department. 9 U-&' , . I ..... ........................ .............. G. Whitefield Director of Housing Encs. G.G.K. Forsyth Director of Construction Services C:\GGKF\ho.~sing. rpt

I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

' I I

AI 1 AGENDA ITEM NO, . .o*amo. .mm

NORTH LANARKSHlRE COUNCIL REPORT

TO : HOUSING COMMITTEE

From: DIRECTOR OF HOUSING AND DIRECTOR OF CONSTRUCTION SERVICES

Subject: 1996/97 HOUSING CAPITAL MONITORING & PROGRESS STATUS REPORT.

~~

Date: 22 January 1997 I Ref GGKFPAIUJC I

(1.00). INTRODUCTION

(1.01) A copy of the above report is attached for Committee's consideration. The report reviews progress against the 1996/97 Capital Programme, which was approved by the Housing Committee on 1 lth September, 1996.

(2.W RECOMMENDATION

(2.01) Committee is asked to note this report.

(3.00) BACKGROUND

(3.01) Available from the Housing Department.

9 U-&' , . I . . . . . ........................ . . . . . . . . . . . . . .

G. Whitefield Director of Housing

Encs.

G.G.K. Forsyth Director of Construction Services

C : \ G G K F \ h o . ~ s i n g . rpt

Page 2: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

N

1996/97 HRA HOUSING CAPITAL PROGRAMME MONITORING REPORT

Estate Regeneration

Energy Efficiency Heating Insulation Tower Blocks Windows/Doors

Major Repairs & Environmentals Lifts Major Repairs Modernisation etc. Non-Traditional Housing Rosemary Roof Tiles Re-Roofing (Flat Roofs etc) Water Mains

Home Safety & Security Door Entry/CCTV Rewiring Concierge to High Flats

Community Care Special Needs Conversion, Sheltered Housing

Housing Management Decentralisation

Page

1-3

4-5 6

7-8 8-1 0

11 11-13

13 14

14-16 16-17

17

18 19 19

20 20

21

.

Page 3: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01 197 1

PROJECT DESCRIPTION REMARKS Sooo's CONTRACTOR

ESTATE REGENERATION

TANNOCHSIDE, EXTERNAL UPGRADING, PHASE 4.

GOWKTHRAPPLE. IWorks around Allershaw Tower, Birkshaw Tower and Caplaw

Extension 86-1 12 Merrick Terrace Tannochside

Tower and surrounding environs. Upgrading of shops deferred for this financial year

ENVIRONMENTAL IMPROVEMENTS AND

452

488

246

UPGRADING OF SHOPS.

GOWKTHRAPPLE, UPGRADING OF LOCK- UPS.

G F Sharp & CO Ltd

NLCDLO

Stewart Landscapes

TANNOCHSIDE, WINDSOR WALK.

Refurbishment of terraced houses at 1 to 30 Windsor Walk. (Nos. 21 &22 are owned), (28 dwellings).

MUIRHOUSE, ENVIRONMENTAL WORKS, PHASE 1.

Tenders lodged on 13th January 1997.

The formation of grassed, shrubbed and planted areas; alterations to existing and formation of new car parking areas, new footpaths and new retaining walls; formation or traffic speed controls and erection of ornamental walls and railings.

'fender documents complete for lock-ups and 3 pump houses. Prices to be negotiated with DLO

Original contract now complete. Lock-ups complete with the exception of guttering and paintetwork.

Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork, external rendering, and heating installation to Block 1 almost complete. Block 2:- Fire division walls, roof trusses and heating in progress.

Tenders accepted 28/11/96. Prestart meeting 4/12/96, Site commenced 6/1/97

W

Page 4: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

P

HOUSING CAPITAL MONITORING REPORT 23i01197 2

I I I PROJECT DESCRIPTION REMARKS sooo's CONTRACTOR

ESTATE REGENERATION

VIUIRHOUSE, IEMOLITIONS.

VIUIRHOUSE, SHOP JNITS.

JIUIRHOUSE, SHOPS 2AR PARK.

JIUIRHOUSE, ENOVATIONS, PHASE 7,

JORTH MOTHERWELL

lemolition of no-fines concrete blocks and site clearance at 1-24 and 271-297 Muirhouse Road.

bplacement shop units at corner of Shields Road and hirhouse Road. (6 units).

'he construction of 18 car parking spaces at Muirhouse hops with associated hard and soft landscaping.

'he conversion of 22 dwellings to 11 dwellings at 343-385 ihields Drive. Partial demoition, re-roofing, window eplacement, external insulated render system, and external torks.

3nal block demolished and site cleared - contract complete. :ontract extended to include a further two blocks (that is blocks 6 and 8). Tender accepted, contractor commenced lemolition of block 8.

:our units now trading, fitting out in progress in other two inits. External works in progress. Paving at front being :ompleted.

:ontract accepted, work to commence on site on the :ompletion of the demolition of block 6

iite establishment complete; scaffolding around block Irected; removal of asbestos to interior of flats and external ialkways almost complete

oint Venture proposals being pursued.

77

-

350

-

43

630

-

100

rngus Group Ltd

JLC DLO

~~

ILC DLO

'armac Construction

.

Page 5: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97 3

PROJECT DESCRIPTION REMARKS EOOO'E CONTRACTOR

ESTATE REGENERATION

OLD MONKLAND, COATBRIDGE.

Proposals being reviewed following consultations. Consideration being given to early implementation of camera security provision.

JOINT VENTURE, IONA,

AIRDRIE. repairs to footpaths, garage renewal fencing etc. completed.

Refurbishment and re-roofing of houses at 1 to 37, and 46 to Work in progress on last five houses for completion next 50 Iona, Airdrie (42 houses). External works, including week. Roadworks in progress. Additional external works to bc

-

101

152:

-

rarrnac Construction

Page 6: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 2310 1/97 4

HEATING, AD-HOC, NORTH, CUM BERNAULDIKILSY TH

HEATING, AD-HOC, NORTH, MOODIESBURN.

HEATING, CENTRAL, WHINHALL.

I I I PROJECT DESCRIPTION REMARKS thoo's CONTRACTOR

ENERGY EFFICIENCY

Addresses (18 No.) identified for replacement of irreparable heating systems

Addresses 50% committed so far for replacement of irreparable heating systems

The replacement of gas boilers and associated remedial works to 279 houses at: Beechbank Avenue, Burnebrae, Comrnonhead Lane, Whinhall Avenue, Westermavisbank Avenue, Whinhall Road and Wilson Street.

Tender report prepared.

Vennacher St, Garry Way, Balloch Rd, Kames Rd, Katrine Rd, Earn Terr, Tay PI, Monteith Walk, Affric Loan, Cluanie Ave. Laggan Path, Fyne Lane, Broom Wynd, Shotts; Carfin Rd, Lochlea Way, Caledonia Dr, Robert Burns Ave, Alloway Wynd, Carfin (329 houses)

HEATING, 96/97, SOUTH, CONTRACT 3.

Site works commenced 2nd December 1996. Heating installed in 120 houses to date. Completion due April 1997.

HEATING, 96/97, SOUTH, CONTRACT 4.

The installation of gas wet central heating systems with minor builders work and electrical alterations as required and commenced December 1996. Heating installed in 150 houses associated making good. (292 houses)

Tender accepted 20th November 1996. Site works

to date. Completion due February 1997.

I I

I_

3

-

51

I_

43:

18

-

21!

-

L

ruthorised by Local rea Housing ofiice

uthorised by Local rea Housing Office

ILC DLO

) Campbell & CO Ltd

:FM Building Services

Page 7: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 2310 I 197 5

c I 1 PROJECT DESCRIPTION REMARKS Looo's CONTRACTOR

ENERGY EFFICIENCY

HEATING, 96/97, SOUTH, CAPITAL CONTRACT 1.

HEATING, 96/97, SOUTH, CONTRACT 6.

HEATING, 96/97, SOUTH, CONTRACT 7.

WARM AIR HEATING, SOUTH.

Langholm Cres, Kelso Cres, Till St, Lauder Cres, Buchan St, Loudon St, North Dryburgh Rd Coltness; Laburnum Rd, Redwood Cres, Spruce Rd, Walnut PI, Citrus Cres, Magnolia PI, Cedar Ave, Limetree Ave, Hornbeam Rd, Glenburn Cres Viewpark. (386 houses)

Albert Dr, Victoria Rd, Sidehead Rd, Balbakie Rd, Caledonian Ave,Blackness Dr; Mansfield Rd, Langholm Cres, Buchan St, Earlston St, North Dryburgh Rd, Shields Rd, Muirhouse Ave, Loganside Ave, Stanecraigs PI, Brancalmuir Cres, Murdostoun View (31 5 houses)

Viewpark, Knowetop, Bellshill East, Thornlie and Pather (317 houses)

Greenfield Dr, Greenfield St, Thrashbush Cres, Cambusnethan. Rosebank Rd, Gillburn St, Bruce Loan, Rhu Quad, Overtown.( 68 houses)

render accepted 17th January 1997

render report in preparation

render report in preparation.

renders in preparation

ILC DLO

Page 8: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97 6

31

36

51

ENERGY EFFICIENCY

FlbreGlo insulation Ltd

FibreGlo insulation Ltd

FibreGlo Insulation Ltd

INSULATION PROGRAMME, SOUTH, 95/96 HARTHILL & BELLSHILL.

INSULATION PROGRAMME, SOUTH, 96/97, PHASE 1.

INSULATION PROGRAMME, SOUTH, 96/97, PHASE 2.

2avity Wall Insulation to 221 houses at Bel1shill:- Blairholm 3, Motherwell Rd, Glenmore Ave, Bankhead Ave, Coniston I r , Cairnlea Gdns.

2avity wall insulation to 239 houses in the Shotts area: 3elmont Drive, Brown Street, Huntly Terrace, Lansdowne :rescent, Melford Avenue, Springhill Road.

2avity Wall (273 houses):- Castlehill Rd, Orchard St, 3rooklyn Place, Trows Rd, Vulcan St, Milton St, Braidhurst 3, Millfield Ave, Craigview Rd, Merry St, Northfield St, Jack 3, Grange St, Shields Rd, North Rd, Rowanden Ave, Stanlej 3 , Mavisbank Gdns.

:ontract complete.

:ontract substantially complete.

'ender report in preparation.

Page 9: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 2310 1197 7

PROJECT DESCRIPTION REMARKS Sooo's CONTRACTOR

ENERGY EFFICIENCY

1

TOWER BLOCK REFURBISHMENT, CENTRAL.

TOWER BLOCK REFURBISHMENT, CENTRAL.

TOWER BLOCK REFURBISHMENT, CENTRAL.

External proprietary wall overcladding system, and steel framed roof structure with cladding panels to JACKSON COURT, a seventeen storey block. Includes for provision of a front entrance canopy and treatment to the ground floor areas

External proprietary wall overcladding system, and steel framed roof structure with cladding panels to DUNBETH COURT, a seventeen storey block. lncludes for provision of a front entrance canopy and treatment to the ground floor areas.

External proprietary wall overcladding system, and steel framed roof structure with cladding panels to HIGH COATS, a seventeen storey block. Includes for provision of a front entrance canopy and treatment to the ground floor areas.

TOWER BLOCK REFURBISHMENT, SOUTH.

TOWER BLOCK REFURBISHMENT, CENTRAL,

Rainscreen cladding GRANGE TOWER. Includes cladding, window pods to previously installed windows, curtain walling to common areas, new roof and ground floor facade improvements. Addresses = 1 - 105 Grange Tower

External proprietary wall overcladding system, and steel framed roof structure with cladding panels to CHEVIOT COURT, an eight storey block. Includes for provision of a front entrance canopy and ground floor facade improvements.

lorth elevation - complete; Central elevation - complete; kouth elevation - nearing completion; Roof complete.

Iadding nearing completion; roof in progress for completion ty May 1997.

'ender accepted 22nd November 1996. Erection of climbers 1 progress on north and west elevations..

'ender accepted 22nd November 1996. Site works ommenced 6th January 1997. climbers erected, fixings in Irogress.

;round floor brickwork, steelwork to roof, brackets and rails 3 tower complete; window pods, infill balconies and curtain rralling in progress.

Page 10: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23101197

PROJECT DESCRIPTION REMARKS Sooo'a CONTRACTOR

TOWER BLOCK REFURBISHMENT, SOUTH.

WINDOWIDOOR REPLACEMENT, NORTH, PHASES 15 AND 16.

I WINDOW~OOR ITimber window replacement (148 houses), CONDORRAT: lStart onsite 21st January 1997.

Rainscreen cladding MERRYTON TOWER. Includes Extension to Grange Tower Contract. Ground floor cladding, window pods to previously installed windows, foundations complete; ground floor brickwork in progress. curtain walling to common areas, new roof and ground floor Electrical first flx for external lighting in progress. facade improvements. Addresses 1 - 105 Merryton Tower

KILSYTH: Balmalloch Rd, Corrle Rd, High Craigends, Low Craigends, Manse Rd, Montrose Gdns, Parkburn Rd, Register Rd, Park Lane, Shuttle St, Townhead St. CUMBERNAULD: Burngreen Ter, Larch Gr, Main St, Rannoch Ct, Roadside and Smithyends. (262 houses)

Tender accepted 21st November 1996. Site works in progress, windows installed in 130 dwellings.

REPLACEMENT, NORT~, PHASE 17.

Dalshannon Rd, Baird Cres, Primrose PI, Dalshannon Way, Main Rd.; CUMBERNAULD: Mainhead Terr, Springfield Rd; KILSYTH: Backbrae St, William St.

-

1505

-

307

WINDOWIDOOR REPLACEMENT, NORTH, PHASE 18.

WINDOWIDOOR REPLACEMENT, NORTH, PHASE 19.

230

-

250

-

240

-

Replacement of existing timberlmetal windows with associated finishings and repairs to 173 houses at Arnbroe Road.

Tender documents issued 20th January 1997. Tenders to be lodged on 31st January 1997.

Replacement of existing timberlmetal windows with Tender documents issued 21st January 1997. Tenders to be associated finishings and repairs to 158 houses at Northfield lodged on 5th February 1997. Road, Ki,syth,

4mec Lid

NLC DLO

NLC DLO

Page 11: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01 197 9

WIN DO WlDOOR REPLACEMENT, NORTH. MOODIESBURN

WINDOW/DOOR REPLACEMENT, CENTRAL, PHASE 1.

I I I PROJECT DESCRIPTION REMARKS Shoo's CONTRACTOR

Bridgeburn Drive, Pentland Road, and Auchinloch areas.

Replacement of existing timberhetal windows with associated finishings and repairs to 217 houses at BARGEDD1E:- Abercrombie Cres., Dykehead Rd., Edward Str., Gartliston Terr., Grace Ave., Monklandview Cres., Queens Cres., Park Road, and Sunnyside Drive.

ENERGY EFFICIENCY

WINDOW/DOOR REPLACEMENT, SOUTH

HARTHILL & OVERTOWN

Newarthill & Carfin: High St, Mosshall St, Church St, Kirkoswald Rd, Caledonian Dr, Lochlea Way, Robert Burns Ave, Alloway Wynd, Clockenhill PI; Garrion: Gillburn St, Bruce Loan, Rhu Quad, Rosebank Rd; Benhar: Covenanter Rd, Cunningham Drive (233 houses)

WlNDOWlDOOR REPLACEMENT, CENTRAL, PHASE 2.

REPmCEMENT, SOUTH, NETHERTON

Replacement of existing timber/metal windows with associated finishings and repairs to 229 houses at: Gartlea Gdns, Rawyards, Whinhall, Brownshill Ave, James Dernpsey Gdns, Woodside Gdns, Calderbank and Salsburgh.

associated finishings and repairs to 11 0 houses at Netherton Kirkhill Place, Kirknethan

I I WINDQWIDOOR I Replacement of existing timberlmetal windows with

Servicing works to windows in progress.

411 windows installed. remedial works to external render progressing. ventilators being altered to comply with latest regulations.

411 windows installed. External render repairs in progress. Internal snagging in progress.

Substantially complete, except for some snagging.

Substantially complete, except for some snagging.

Page 12: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97

PROJECT DESC RI PTlON REMARKS Eooo's

N 10

CONTRACTOR

ENERGY EFFICIENCY

NI N DOWlDOO R 2EPLACEMENT, SOUTH, (NOWETOP

NINDOW/DOOR EPLACEMENT, SOUTH JEW STEVENSON

NlNDOWlDOOR qEPLACEMENT, SOUTH

YlNDOWlDOOR 2EPLACEMENT, SOUTH

YINDOW/DOOR tEPLACEMENT, SOUTH

Replacement of timberlmetal windows with associated finishings and repairs to 165 houses at Primrose Cres, Fresia Ct, Aster Gdns; Netherton: Kirkhill PI, Clydesdale Ave, Thomson Ave, Nethan Ave, Kirknethan

Knowetop:

Shirrel: Martin PI, Criffel Ph, Morar Wy, Mailie Wlk, Ellisland Wd, Ledi Ph, Carron Wy, Lomond Wy, Brown PI, Glenburn AV, Kilbrick Ln, Armour PI, Lawers Ln, Burns Wy, Laxford Wy, Vorlich Wd, Slioch Sq., Armine Ph, Law Dr, Lintie Rd, Kyle Qd, Mossgiel Wy

Replacement of existing timber/metal windows with associated finishings and repairs to 134 dwellings at Anderson, Doonside and Oakfield Courts, Motherwell.

Replacement of existing timberlmetal windows with associated finishings and repairs to 190 houses at Cleland and Ladywell

Replacement of existing timber/metal windows with associated finishlngs and repairs at Brandon Court, Motherwell. (106 dwellings)

;ubstantially complete, except for some snagging and flats It Primrose CresJFresia Court

itart on site scheduled for late January 1997. Completion Iue end of March 1997.

(rrangements being made for an early start on site.

'ender report in preparation.

'ender accepted 6112196

7

27

511

i a.

-

-

8

ILC DLO

dcFadyen

ILC DLO

ILC DLO

Page 13: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23101197 11

JFT REPLACEMENT,

- I PROJECT I DESCRIPTION 1 - REMARKS I frooo's I CONTRACTOR I - ~

ICoursington Tower.

MAJOR REPAIRS AND ENVIRONMENTALS

AFT REPLACEMENT, SOUTH.

Anderson, Oakfield and Albion Courts.

SOUTH.

AAJOR REPAIRS, JORTH.

AAJOR REPAIRS, iOUTH.

Concrete floor repairs phase 5, at Northfield Avenue, Shotts. (24 dwellings) Nos. 3, 5, 6, 7, 10, 16, 18, 20, 24, 26, 28, 30, 31, 32, 36, 38, 40, 44, 46, 48, 50, 58, 62, 70

Work in progress

Discussions in hand with owner/occupiers, start date to be confirmed.

Canopy repairs and other works to 23 houses in progress. Roof repairs to 5 blocks being implemented.

iNork complete to Nrs. 3 3 and 6. Work in progress to Nr 18. Zontract on programme.

9c

-

5c

-

8C

-

74

khindler Ltd

JLC DLO

Page 14: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

--L

P 12

Alterations to existlng dormer roofs to form pitched roofs and replacement dormer windows with uPVC. Carrick Place, Mosshill Rd, Hattonrigg Road, Gerrard Place and Glengarriff Road, Bellshill

Balcony walkway at Shirrell Avenue, Bellshill, and Main Street, Overton.

Re-roofing and chimney flue replacement to Blackburn houses at Shotts and Allanton (71 houses).

Chimney flue replacement to Blackburn houses at Tinto Crescent. School Lane, Redmine Cres, Hartfield Terr, Dura Rd Allanton; Thomson Terr, Baton Rd, Catherines Cres, Shotts: Tinto St, Tinto Cres, Greenhead Rd Wishaw

Stabilisation works at Torbothie Road.

HOUSING CAPITAL MONITORING REPORT 23/01 197

Original contract for 15 houses complete; a further 29 houses added to contract - 15 of these houses complete, with 4 houses 90% complete.

Specialist contractor carrying out remedial works at Bellshill. Discussions in hand with owner/occupiers at Overton.

Tender accepted 24th December 1996. Public meetings being held. Discussions in hand with ownerloccupiers. Works scheduled to commence first week in February.

Tender accepted 24th December 1996. Public meetings being held. Discussions in hand with owner/occupiers. Works scheduled to commence first week in February.

Complete.

PROJECT DESC RI PTlON REMARKS -00's CONTRACTOR I I MAJOR REPAIRS AND

MAJOR REPAIRS, SOUTH.

SOUTH.

MAJOR REPAIRS, SOUTH.

MAJOR REPAIRS, SOUTH.

MAJOR REPAIRS, SOUTH.

I

/IRON M ENTALS

Page 15: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 2 310 1 I97 13

I PROJECT I DESCRIPTION I REMARKS I iooo's I CONTRACTOR

MAJOR REPAIRS, SOUTH.

MOD/ENVJRONMENTAL IMPROVEMENTS, NORTH.

MAJOR REPAIRS AND ENVIRONMENTALS

Upgrading properties at Manse Road, Netherton

Environmental improvement works to 1-1 9 and 21-29 Northfield Road, Kilsyth (15 houses) Works include external insulated render treatment, and external works - perimeter walling, railings and paving

MOD/ENVlRONMENTAL

NORTH.

Refurbishment of back-court areas at Bridgeburn Dr., Kirkford Rd., Kelvin Dr. and Glencairn Dr., Moodiesburn

IMPROVEMENTS, I

MODlENVlRONMENTAL IMPROVEMENTS, SOUTH.

Scheme in preparation.

Scaffold erected; gutters and downpipes removed; defective render being removed.

Tender accepted 14th January 1997. Arangements being made for a site start next week.

Schemes identified on chronological order of modernisation date.

Page 16: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97 14

NON-TRADITIONAL HOUSING, CENTRAL. SUMMERLEE COTTAGES.

I I I REMARKS hoo'm CONTRACTOR PROJECT DESCRIPTION

External fabric improvement and re-roofing of thirteen non- traditional houses. Phase 1: 1, 2, 5 . 6 , 7, 8, 19 and 22. Phase 2: 15, 16,25, 29 and 30.

MAJOR REPAIRS AND ENWRONMENTALS

NON-TRADITIONAL HOUSING, CENTRAL. BISF HOUSES.

External wall thermal insulation treatment to BISF houses (I dwellings). Phase 2: Moss Avenue, Elswick Drive, Caldercruix. Thrashbush Road, Airdrie. (24 houses).

I

NON-TRADITIONAL [Woodside Cres.; Alcath Road.

HOUSING, SOUTH. WHITSON FAIRHURST 5.

complete.

Contractor in default, report prepared for submission to this Committee. Arrangements being made for the completion of the two houses which were in progress. Tenders to be obtained for the three remaining houses.

NON-TRADITIONAL HOUSING, SOUTH. WHITSON FAIRHURST 6.

Woodside Cres. External wall insulation treatment, cavity wall-tie replacement, roof re-tiling, gutter and downpipe replacement. (20 houses).

Original contract complete (1 9 houses). Contract extended (29th November 1996). Additional 12 houses at Caldercruix are now complete. Insulation board being fixed at 20, 26-36 Thrashbush Road. Rendering being applied to 14, 16, 22, 24 Thrashbush Road.

Block 1:- Wall ties complete; roof stripped and felted; GRP cills, framing to fascia and removal of bossed roughcast in progress.

I

ROSEMARY ROOF TILE IReplacement of defective rosemary tiled pitched roofs to 7 ~

blocks, at Kelvin Way, Courthill Cres, Cronulla PI, Hamil Dr, Parkburn Rd Kilsyth

CUMBERNAULDIKILSYTH

Jbstantially complete.

I I

Page 17: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97 15

'RoGRAMME' MOODJESBURN 1

I PROJECT I DESCRIPTION I REMARKS I booo's I CONTRACTOR I

blocks at Knowe Rd, Crowwood Rd Muirhead; Bothlyn Rd, Chryston Rd Chryston; Bothlyn Cres, Lochend Ave Mount Ellen; Station Rd, Cessnock Rd Millerston; Fourth Ave

MAJOR REPAIRS AND ENVIRONMENTALS

~OSEMARY ROOF TILE 'RoGRAMME' MOODIESBURN 2

3OSEMARY ROOF TILE IReplacement of defective rosemary tiled pitched roofs to 11 (Phase 1 substantially complete.

Replacement of defective rosemary tiled pitched roofs to 31 blocks at Coronation PI., Greenhill Ave, Queensbank Ave, Slakiewood Ave, Mount Ellen; First Ave, Fourth Ave, Langmuirhead Rd, Burnbrae Rd Auchinloch

3OSEMARY ROOF TILE 'ROGRAMME, 2ENTRAL 1.

I Auchinloch I

Replacement of defective rosemary tiled pitched roofs at Albion St, Herriot St, Gainside Rd, Rosehall AV, Woodside St, Stirling St, Hospital St, Mack St, Kelvin St, Wheatholm St Park St, Greengairs Rd, Livingston PI, McAllister AV, Sherdale AV.

ToSEMARy ROOF TILE 'ROGRAMME, ZENTRAL 2.

Replacement of defective rosemary tiled pitched roofs. Scheme being defined.

Scheme being defined. Additional addresses identified for implementation as extensions to previous re-roofing contracts.

Tenders due to be returned by week ending 24/1/97.

:ices obtained, tender report in preparation.

I I

3OSEMARY ROOF TILE (Replacement of defective rosemary tiled pitched roofs to 23 11 Block remaining to complete programme; Contract 3 weeks blocks at Wrangholm Dr., New Stevenson; Community Rd, ahead of programme

'RoGRAMME' 'OUT" '* Community PI., Roman Dr Bellshill; The Loaning, Loganlea I Dr, Sannox Dr, Arran Rd, Motherwell; Douglas St, Viewpark;

~~

ILC DLO

ILC DLO

ILC DLO

Page 18: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 2310 I 197

505

2

00 16

NLC DLO

J B Bennett Const Ltd

I I I PROJECT DESC RI PTlON REMARKS &ooo's CONTRACTOR

ROSEMARY ROOF TILE PROGRAMME, SOUTH 2, blocks at Watson St, Mason Lane, Kirk St, Forgewood Rd,

Replacement of defective rosemary tiled pitched roofs to 18

M'well; Laurel Dr, Craigneuk; Glenburn Terr. Carfin; Union St. New Stevenson. Coltness Dr. Thorndean Ave. Belvidere

MAJOR REPAIRS AND ENVIRONMENTALS

Tenders due to be returned by week ending 24/1/97.

Re-roofing and external wall insulation treatment to the 4- storey flatted properties of a Mitchell Camus pre-fabricated construction. Phase 1 (32 flats) : Nevis 8, Sidlaw Courts. Phase 2 (48 flats): Etive, Killin & Striven Courts.

Original contract completed. Contract extended (3rd December 1996) to include three additional blocks. Work is now in progress at Killin Court - insulation substantially complete, render application in progress. Work has now commenced at Striven Court.

RE-ROOFING FLAT ROOFS ETC., C ~ N ~ ~ L CHAPELSIDE.

RE-ROOFING FLAT ROOFS ETC., CENTRAL.

RE-ROOFING FLAT ROOFS ETC., CENTRAL, RESURFACING WALKWAY. I

Re-roofing and external wall insulation treatment to the four Original contract completed. Contract extended (3rd storey flatted properties of a Mitchell Camus pre-fabricated December 1996) to include three additional blocks. Work construction. Phase 1 (40 flats): Milton Street ; Phase 2 (48 now in progress at 2-4 and 10-12 Milton Street. Pram stores flats): Kirkness Street, Milton Street. etc demolished, scaffolding erected.

Re-roofing of two separate developments of maisonette flats Site works now in progress at Woodside Street. above shopping developments. Bank Street; Woodside Street,

Re-surfacing of pedestrian walkway access to maisonette flats at 4 to 42 Woodside Street.

Start on site dependent upon progress of re-roofing works. It is however anticipated that a substantial part of the works wil be undertaken by the end of the financial year.

538

281

60

Mackenzie Const Ltd

D Campbell &CO Ltd

Polymer Ltd

Page 19: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97 17

PROJECT DESCRIPTION REMARKS Eooo's CONTRACTOR

MAJOR REPAIRS AND ENVIRONMENTALS

!E-ROOFING FLAT LOOFS ETC., SOUTH - ;OURSINGTON TOWER.

!E-ROOFING FLAT lOOFS ETC., SOUTH - IERRY ST/LESLIE ST.

LE-ROOFING FLAT !OOFS ETC., SOUTH - IRUCE STICALDER ST.

VATER MAINS, SOUTH.

1-1 17 Coursington Tower Motherwell Discussions in hand with owner/occupiers. Tender iocuments to be prepared.

Discussions in hand with ownerloccupiers. Tender documents to be prepared.

Discussions in hand with owner/occupiers. Tender documents to be prepared.

Tender being negotiated with NLC DLO.

Page 20: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97

:ontrolled door entry system to 13-15a,17-19a Drumtrocher jtreet and 31-57 Northfield Road, Kilsyth

1 I I PROJECT DESC RI PTlON REMARKS 6ooo's CONTRACTOR

Screens fitted to all blocks; door entry being installed in Drumtrocher Street.

HOME SAFETY AND SECURITY

:ontrolled door entry systems and associated screens in rirdrie and Coatbridge.

rddresses: Thomson Ave. Netherton; Spruce Way,

NORTH.

Tenders received. Locations under review, report prepared for submission to this Committee.

Contract substantially complete

DOOR ENTRYKCTV, CENTRAL.

rddresses: Clunie PI, Lyle Rd, Moffat PI, Towers Rd, Towers '1, Cumbrae Cres, Abbey Walk, Berron Path, Castle Way, :ountess Way, Duchess Way, Gartlinden Terr, Dukes Rd, ;ings PI, Lords Way, Minister Walk, Sunnyside Dr, Windsor lath, Park Rd

DOOR ENTRYICCN, SOUTH.

REWIRING PROGRAMME,

Work scheduled to commence next week.

NORTH.

REWIRING PROGRAMME, CENTRAL.

Aoodiesburn (37 Houses), Muirhead (73 Houses), Gartcosh Tender accepted 15th January 1997. Arrangements being 44 Houses), Mollinsburn (9 Houses), Auchinloch (89 (made for a start on site next week. louses).

Page 21: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 2310 1 I97 19

REWIRING PROGRAMME, SOUTH, BARONS TOWER.

REWlMNG PROGRAMME,

1 I I PROJECT DESCRIPTION REMARKS looo's CONTRACTOR

Rewiring of flats, communal stairs, laundry areas and remott pump houses, with provision for new fighting and emergency light fittings. (1 05 dwellings)

Rewiring of flats, communal stairs, laundry areas and remotr

REWIRING PROGRAMME.

pump houses, with provision for new lighting and emergency light fittings. (105 dwellings)

SOUTH, DAUIEL TOWER.

Rewiring of flats, communal stairs, laundry areas and remott

L

REWIRING PROGRAMME, Low rise housing at Bellshlll.Addresses: Hattenrigg Rd,

SOUTH. Raeburn Walk, Telford St, Hilltop Rd, Ramsay Wynd, Burns Walk, Bell St, Wafl Cres, Kelvin Rd, Macadam Gdns, Fleming Rd, McKenzie Terr, Wilkie Loan, Selkirk Way, Baird

pump houses, with provision for new lighting and emergency light fittings. (1 05 dwellings)

SOUTH, SHIELDS TOWER.

CONCIERGE TO HIGH FLATS, CENTRAL.

Milton Court concierge system - camera security to ground floor, entrance area and car parking area.

Work in progress for completion in February.

Work commenced December 1996, for completion in February 1997.

Work commenced 15 January 1997.

Tender accepted 15th January 1997.

Report prepared for submission to Committee. Tender documents in preparation.

lordan Elechics LM.

lordan Electrics Ltd.

-

4 C Electrics Ltd.

iuopa

Page 22: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

HOUSING CAPITAL MONITORING REPORT 23/01/97

Sonversion of 22 properties to sheltered housing at diewpark, phase 1 - Limetree Avenue, Cedar Avenue, 3lenburn Crescent, and Hornbearn Road.

3riginal Block 237 - 281Airbles Road - Partial demolition and :onversion to form 5 Nr sheltered houses

rv N 20

Electrical works done. Arrangements being made for installation of gas central heating. Door widening and other adaptations in progress.

Demolitions complete; roof trusses erected in position, sheeted and felted roof tiling now in progress; external facade almost complete; Joiner first fixing in progress.

I I I PROJECT DESCRIPTION REMARKS Eooo's CONTRACTOR

COMMUNITY CARE

SPECIAL NEEDS, SOUTt

SPECIAL NEEDS, SOUTI

SPECIAL NEEDS, SOUTI

CONVERSION, SHELTERED HOUSING, SOUTH.

CONVERSION, SHELTERED HOUSING, SOUTH. AIRBLES ROAD PHASE 1

Installation of lift and conservatory atsunart Street, Wishaw

Installation of CCTV system at Clay Road, Bellshill.

JVest End Drive, Bellshill.

kheme prepared for conservatory, price negotiated with )LO; lift on order.

-~ :CTV system being installed.

;ubstantially complete.

6!

L_

33!

_I_

,

anrec

armac Construction

Page 23: I AI I ITEM NO, NORTH LANARKSHlRE COUNCIL REPORT · exception of guttering and paintetwork. Drainage, window installation, and cavity wall insulation to al blocks complete. Roofwork,

,

HOUSING CAPITAL MONITORING REPORT 23/01/97 21

I I I DESCRIPTION REMARKS &ooo's CONTRACTOR

PROJECT

HOUSING MANAGEMENT

SOUTH.

DECENTRALISATION, SOUTH.

:elocation of Housing Office 1 Bank to Merry Street, lothewell

;arfin

:lemington and Holytown

I I work complete except control panel for additional heating

193

:ontract complete.

Vork 4 commenced at Holytown office.

lmwood

ILC DLO